CN107598805A - A kind of pipeline installs auxiliary mould - Google Patents

A kind of pipeline installs auxiliary mould Download PDF

Info

Publication number
CN107598805A
CN107598805A CN201710886685.8A CN201710886685A CN107598805A CN 107598805 A CN107598805 A CN 107598805A CN 201710886685 A CN201710886685 A CN 201710886685A CN 107598805 A CN107598805 A CN 107598805A
Authority
CN
China
Prior art keywords
support column
stud
auxiliary mould
lifting structure
pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710886685.8A
Other languages
Chinese (zh)
Inventor
陈雪
段琪桐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Jianghuai Automobile Group Corp
Original Assignee
Anhui Jianghuai Automobile Group Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Jianghuai Automobile Group Corp filed Critical Anhui Jianghuai Automobile Group Corp
Priority to CN201710886685.8A priority Critical patent/CN107598805A/en
Publication of CN107598805A publication Critical patent/CN107598805A/en
Pending legal-status Critical Current

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention discloses a kind of pipeline to install auxiliary mould, including:Base;Supporting parts, first end is formed with the support face for support pipeline;Lifting structure, first end are fixed on the base, and the second end of the lifting structure is fixedly connected with the second end of the supporting parts, and reciprocal lifting is realized in the support face under the driving of the lifting structure.Compared with prior art, the present invention is installed by setting lifting structure to lift supporting parts with carrying out the tracheae of different level, more effective convenient, safety, solves the operation difficult point of high-altitude pipeline splicing.

Description

A kind of pipeline installs auxiliary mould
Technical field
The present invention relates to technical field of tooling clamps, particularly a kind of pipeline installation auxiliary mould.
Background technology
Many equipment need to be equipped with source of the gas in automobile plant's process of construction, therefore the installation of gas circuit is essential. Under normal circumstances, tracheae is fixed by technique steel construction, it is necessary to splice to tracheae in tracheae installation process, is spelled The linearity of pipeline need to be ensured when connecing.When workmen carries out pipeline splicing at the scene, the splicing operation between adjacent tubes is usual One people welding is aided in using a people.Due to about 2.5 meters of the absolute altitude of tracheae, take tracheae and adjacent tracheae to align work more tired It is difficult.
Existing scheme is only that workmen is finely adjusted by the long wooden unit auxiliary at scene to position of trachea.This scheme behaviour Make inconvenient, and the risk that tracheae comes off, wooden unit falls down to the ground be present, the adjustment to tracheae absolute altitude can only be by manually dragging long wooden unit It is adjusted, it is time-consuming, laborious.
The content of the invention
It is an object of the invention to provide a kind of pipeline to install auxiliary mould, and to solve deficiency of the prior art, it can It is more convenient, safely and effectively realize high-altitude pipeline align installment work.
The invention provides a kind of pipeline to install auxiliary mould, including:
Base;
Supporting parts, first end is formed with the support face for support pipeline;
Lifting structure, first end are fixed on the base, and the of the second end of the lifting structure and the supporting parts Two ends are fixedly connected, and reciprocal lifting is realized in the support face under the driving of the lifting structure.
Pipeline installation auxiliary mould as described above, these, it is preferred to, the lifting structure include the first support column, Second support column and rotating handles, first support column offer vertically extending assembly cavity, and first support column leads to Cross the assembly cavity to be slidably sheathed on second support column, top and the supporting parts of first support column Second end is fixedly connected, and on the base, the side wall of first support column offers for the bottom of second support column The first screwed hole connected with the assembly cavity, the rotating handles is formed with the first stud, and first stud is described in Pushed against after first screwed hole in the outside wall surface of second support column.
Pipeline installation auxiliary mould as described above, these, it is preferred to, the rotating handles also include hand block and Contiguous block, has provided holding slot in the hand block, and the contiguous block is L-shaped part, one end of the contiguous block and described hand-held It is fixedly connected in the middle part of block, the other end of the contiguous block is fixedly connected with first stud.
Pipeline installation auxiliary mould as described above, these, it is preferred to, the lifting structure, which also includes, increases section, The top surface for increasing section and bottom surface offer the second screwed hole, and the second stud is fixed with the base, described to increase section It is spirally connected by the second screwed hole and second stud of bottom surface, the bottom of second support column is fixed with the 3rd stud, institute State to increase to save and be spirally connected by the second screwed hole of top surface with the 3rd stud.
Pipeline installation auxiliary mould as described above, these, it is preferred to, it is described increase section be provided with it is multiple, it is multiple to increase Save vertical stacking.
Pipeline installation auxiliary mould as described above, these, it is preferred to, the support face includes horizontal segment and is connected to The tilting section at the horizontal segment both ends.
Pipeline installation auxiliary mould as described above, these, it is preferred to, the base bottom is provided with multiple road wheels.
Compared with prior art, the present invention lifts supporting parts to carry out the tracheae of different level by setting lifting structure Installation, more effective convenient, safety, solves the operation difficult point of high-altitude pipeline splicing.
Brief description of the drawings
Fig. 1 is the integrally-built axonometric drawing of the present invention;
Fig. 2 is the side view of the present invention;
Fig. 3 is the axonometric drawing of partial structurtes of the present invention;
Fig. 4 is the axonometric drawing of rotating handles;
Fig. 5 is the axonometric drawing of the first support column;
Fig. 6 is the axonometric drawing for increasing section;
Fig. 7 is the side view of base.
Description of reference numerals:1- bases, 2- supporting parts, 3- supports face, 4- lifting structures, the support columns of 5- first, 6- second Support column, 7- rotating handleses, 8- assembly cavities, the screwed holes of 9- first, 10- compress face, the studs of 11- first, 12- hand blocks, 13- companies Block, 14- holding slots are connect, 15- increases section, the screwed holes of 16- second, the studs of 17- second, the studs of 18- the 3rd, 19- horizontal segments, 20- Tilting section, 21- road wheels.
Embodiment
The embodiments described below with reference to the accompanying drawings are exemplary, is only used for explaining the present invention, and can not be construed to Limitation of the present invention.
As depicted in figs. 1 and 2, the embodiment provides a kind of pipeline to install auxiliary mould, including:Base 1, use In the support of whole frock;Supporting parts 2, first end is formed with the support face 3 for support pipeline;Lifting structure 4, first end is solid Due on the base 1, the second end of the lifting structure 4 is fixedly connected with the second end of the supporting parts 2, and the present embodiment is excellent Elect the mode of being welded and fixed as, fixed, Stability Analysis of Structures, while be easy to process, the support face 3 is in the lifting structure 4 Driving is lower to realize reciprocal lifting.
Above-described embodiment is installed by setting lifting structure 4 to lift supporting parts 2 with carrying out the tracheae of different level, more Effectively convenient, safety, solves the operation difficult point of high-altitude pipeline splicing.
Gas circuit, it is necessary to ensure the linearity of pipeline, in order to finely tune the position of pipeline, improves the precision of splicing in splicing And operating efficiency, as shown in Figure 3 and Figure 5, the lifting structure 4 includes the first support column 5, the second support column 6 and rotation handle Hand 7, first support column 5 offer vertically extending assembly cavity 8, and assembly cavity 8 is through first support column 5 and with One support column 5 is coaxially disposed, and in favor of processing and forming, first support column 5 is slidably sheathed on by the assembly cavity 8 On second support column 6, the in-profile of the exterior contour of second support column 6 and the assembly cavity 8 is adapted, and is formed Gap coordinates, and the top of first support column 5 is fixedly connected with the second end of the supporting parts 2, and the present embodiment is preferably to weld The mode of connecing is fixed, the bottom of second support column 6 on the base 1, the side wall of first support column 5 offer with The first screwed hole 9 that the assembly cavity 8 connects, the rotating handles 7 is formed with the first stud 11, first stud 11 and institute State the first screwed hole 9 and form screw thread cooperation, first stud 11 is pushed against in described second after passing through first screwed hole 9 In the outside wall surface of dagger 6.
By loosening rotating handles 7, the outside wall surface of the end face of the first stud 11 not with second support column 6 contacts, and One support column 5 is so as to realize lift adjustment height, after proper height is adjusted to, rotates rotating handles 7, the first stud 11 Second support column 6 is moved closer to, tightens the first stud 11 so that the first stud 11 is pushed against on second support column 6, So as to limit the lifting carriage of the first support column 5.
The rotation of rotating handles 7 can select the modes such as motor driving, rotary cylinder driving or manpower driving, this implementation Example is preferably manpower driving, so conveniently extends the job area of this frock, not by powering or supply is constrained, specifically, such as Shown in Fig. 4, the rotating handles 7 also includes hand block 12 and contiguous block 13, and holding slot 14 has been provided in the hand block 12, To facilitate human hand to grip, while with loss of weight and cost can be reduced, the contiguous block 13 is L-shaped part, one end of the contiguous block 13 It is fixedly connected with the middle part of the hand block 12, the other end of the contiguous block 13 is fixedly connected with first stud 11, even Connect between block 13 and first stud 11 formed with the face that compresses 10, when the first stud 11 turns to end, compress face 10 The wall of the first support column 5 is pressed on, it is spacing to be formed.Employee grips hand block 12 by holding slot 14, swings arm, i.e., The rotation of the first stud 11 can be achieved, it is convenient and swift.
Height is significantly adjusted in order to facilitate lifting structure 4, the lifting structure 4, which also includes, increases section 15, described The top surface and bottom surface for increasing section 15 offer the second screwed hole 16, as shown in Figure 6 and Figure 7, second are fixed with the base 1 Stud 17, the section 15 that increases are spirally connected by the second screwed hole 16 of bottom surface with second stud 17, second support column 6 Bottom be fixed with the 3rd stud 18, the section 15 that increases passes through the second screwed holes 16 of top surface and the spiral shell of the 3rd stud 18 Connect.When coarse adjustment is needed, the both ends for increasing section 15 are spirally connected with the second stud 17 and the 3rd stud 18 respectively, such first The height of the support column 6 of dagger 5 and second can quick regulation, by set increase section 15, can significantly adjust holding for supporting parts 2 Support height, improve the scope of application of operating efficiency and frock.
Further, it is described increase section 15 be provided with it is multiple, it is multiple to increase 15 vertical stackings of section, increase section and 15 be designed as module Change, several sections 15 that increase can be connected through a screw thread and are overlapped according to height requirement, increasing the stack manner of section 15 can join Connected mode of the prior art, such as studs connection or screw rod connection are examined, will not be described here, by increasing Section 15, the tracheae splicing being suitable on the larger production line of difference in height.
For more stable fixation tracheae, it is set to keep stable state in support operation process, reduction is rocked, institute Stating support face 3 includes horizontal segment 19 and is connected to the tilting section 20 at the both ends of horizontal segment 19.Support face 3 forms the V-arrangement for cutting bottom Structure, tracheae are column structure, are held on tilting section 20, so as to avoid rocking.
In order to facilitate this mobile frock, the bottom of base 1 is provided with multiple road wheels 21.
The operating process of the present embodiment is:
1 employee increases the just successive step frock height of section 15 according to the requirement of tracheae absolute altitude by increase and decrease;
Tracheae is handed to the second employee by 2 first employees, and the second employee places tracheae on supporting parts 2;
3 first employees adjust the horizontal absolute altitude of tracheae by adjusting rotating handles 7;
4 second employees are responsible for splicing two neighboring tracheae.
Construction, feature and the action effect of the present invention, above institute is described in detail according to the embodiment shown in schema above Only presently preferred embodiments of the present invention is stated, but the present invention is not to limit practical range shown in drawing, it is every according to structure of the invention Want made change, or be revised as the equivalent embodiment of equivalent variations, when still without departing from specification and illustrating covered spirit, All should be within the scope of the present invention.

Claims (7)

1. a kind of pipeline installs auxiliary mould, it is characterised in that including:
Base (1);
Supporting parts (2), first end is formed with the support face (3) for support pipeline;
Lifting structure (4), first end are fixed on the base (1), the second end and the supporting parts of the lifting structure (4) (2) the second end is fixedly connected, and the support face (3) realizes reciprocal lifting under the driving of the lifting structure (4).
2. pipeline according to claim 1 installs auxiliary mould, it is characterised in that:The lifting structure (4) includes first Support column (5), the second support column (6) and rotating handles (7), first support column (5) offer vertically extending assembling Chamber (8), first support column (5) are slidably sheathed on second support column (6) by the assembly cavity (8), institute The top for stating the first support column (5) is fixedly connected with the second end of the supporting parts (2), the bottom of second support column (6) On the base (1), the side wall of first support column (5) offers the first screw thread connected with the assembly cavity (8) Hole (9), the rotating handles (7) pass through first screwed hole (9) formed with the first stud (11), first stud (11) Push against afterwards in the outside wall surface of second support column (6).
3. pipeline according to claim 2 installs auxiliary mould, it is characterised in that:The rotating handles (7) also includes Hand block (12) and contiguous block (13), holding slot (14) have been provided on the hand block (12), the contiguous block (13) is L-shaped Part, one end of the contiguous block (13) be fixedly connected in the middle part of the hand block (12), the other end of the contiguous block (13) It is fixedly connected with first stud (11).
4. pipeline according to claim 2 installs auxiliary mould, it is characterised in that:The lifting structure (4) also includes Increase section (15), the top surface for increasing section (15) and bottom surface offer the second screwed hole (16), fixed on the base (1) There is the second stud (17), the section (15) that increases is spirally connected by the second screwed hole (16) of bottom surface with second stud (17), The bottom of second support column (6) is fixed with the 3rd stud (18), described to increase second screwed hole of the section (15) by top surface (16) it is spirally connected with the 3rd stud (18).
5. pipeline according to claim 4 installs auxiliary mould, it is characterised in that:It is described increase section (15) be provided with it is multiple, It is multiple to increase section (15) vertical stacking.
6. pipeline according to claim 1 installs auxiliary mould, it is characterised in that:The support face (3) includes horizontal segment (19) and it is connected to the tilting section (20) at the horizontal segment (19) both ends.
7. pipeline according to claim 1 installs auxiliary mould, it is characterised in that:Base (1) bottom is provided with multiple Road wheel (21).
CN201710886685.8A 2017-09-25 2017-09-25 A kind of pipeline installs auxiliary mould Pending CN107598805A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710886685.8A CN107598805A (en) 2017-09-25 2017-09-25 A kind of pipeline installs auxiliary mould

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710886685.8A CN107598805A (en) 2017-09-25 2017-09-25 A kind of pipeline installs auxiliary mould

Publications (1)

Publication Number Publication Date
CN107598805A true CN107598805A (en) 2018-01-19

Family

ID=61057698

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710886685.8A Pending CN107598805A (en) 2017-09-25 2017-09-25 A kind of pipeline installs auxiliary mould

Country Status (1)

Country Link
CN (1) CN107598805A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110394760A (en) * 2019-04-02 2019-11-01 合肥江淮汽车制管有限公司 A kind of new E SP controller module brake pipe installation mold
CN111922944A (en) * 2020-08-11 2020-11-13 散裂中子源科学中心 Auxiliary device convenient for dismounting drift tube and use method thereof
CN113843600A (en) * 2021-11-04 2021-12-28 中国建筑第八工程局有限公司 Pipe penetrating device for reinforcement cage and pipe penetrating method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20130055092A (en) * 2011-11-18 2013-05-28 노벨정밀금속(주) Jig assembly to change motor
CN204430869U (en) * 2015-01-29 2015-07-01 无锡同联机电工程有限公司 A kind of feet of height adjustable anti-rotation
CN204942935U (en) * 2015-08-07 2016-01-06 中国石油天然气股份有限公司 Support device
CN205673802U (en) * 2016-06-20 2016-11-09 中冶建工集团有限公司 Hand-rail type liftable ball bracket
CN206449306U (en) * 2017-02-15 2017-08-29 中国海洋石油总公司 Pipeline support

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20130055092A (en) * 2011-11-18 2013-05-28 노벨정밀금속(주) Jig assembly to change motor
CN204430869U (en) * 2015-01-29 2015-07-01 无锡同联机电工程有限公司 A kind of feet of height adjustable anti-rotation
CN204942935U (en) * 2015-08-07 2016-01-06 中国石油天然气股份有限公司 Support device
CN205673802U (en) * 2016-06-20 2016-11-09 中冶建工集团有限公司 Hand-rail type liftable ball bracket
CN206449306U (en) * 2017-02-15 2017-08-29 中国海洋石油总公司 Pipeline support

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110394760A (en) * 2019-04-02 2019-11-01 合肥江淮汽车制管有限公司 A kind of new E SP controller module brake pipe installation mold
CN111922944A (en) * 2020-08-11 2020-11-13 散裂中子源科学中心 Auxiliary device convenient for dismounting drift tube and use method thereof
CN113843600A (en) * 2021-11-04 2021-12-28 中国建筑第八工程局有限公司 Pipe penetrating device for reinforcement cage and pipe penetrating method thereof

Similar Documents

Publication Publication Date Title
CN107598805A (en) A kind of pipeline installs auxiliary mould
CN206831069U (en) A kind of instrument of surveying and mapping tripod with warning device
CN104060839A (en) Construction control method special for steel-structure vertical keels of metal curtain wall of large gymnasium
CN106166784A (en) A kind of glue-free chopping block forming machine
CN208350077U (en) A kind of king-post 3 D locating device
CN102689127B (en) Tool equipment for escalator truss handrail system and assembly method for tool equipment
CN204238583U (en) A kind of adjustable mobile bracket for the large-scale support installing of narrow space
CN211278123U (en) City rail vehicle is with dismantling frock
CN210440910U (en) Hydraulic engineering is with surveying device convenient to carry
CN208135797U (en) A kind of street lamp installation tool
CN209098139U (en) A kind of steel two-wheel overhanging crane
CN106994472A (en) A kind of correcting working table
CN209773833U (en) Workpiece clamping device convenient to adjust and used for welding
CN209486062U (en) A kind of multifunction motor vehicle Tail gas measuring probe socket
CN103741710B (en) Without the construction method of parallels erection equipment
CN211824158U (en) Detection device for bicycle steel ring production
CN205999793U (en) The auxiliary device that a kind of urban viaduct steel box-girder is installed
CN206794436U (en) A kind of correcting working table
CN206717340U (en) Fork truck inner arm takes the jig of electricity
CN216893580U (en) Be used for swift accurate marking laying-out instrument of job site arc control line
CN209742368U (en) auxiliary tool for cast-in-place box girder support construction
CN205638274U (en) Righting device is used in welding
CN219690349U (en) Noise reduction barrier for road and bridge construction
CN204304286U (en) Bushing maintenance traversing carriage
CN208981739U (en) It is a kind of to jack mobile moulding bed certainly

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180119