CN107598227A - A kind of metal pipe material borehole drill construction - Google Patents

A kind of metal pipe material borehole drill construction Download PDF

Info

Publication number
CN107598227A
CN107598227A CN201711110488.3A CN201711110488A CN107598227A CN 107598227 A CN107598227 A CN 107598227A CN 201711110488 A CN201711110488 A CN 201711110488A CN 107598227 A CN107598227 A CN 107598227A
Authority
CN
China
Prior art keywords
plate
positioner
fixedly connected
motor
fixed plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201711110488.3A
Other languages
Chinese (zh)
Inventor
李生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201711110488.3A priority Critical patent/CN107598227A/en
Publication of CN107598227A publication Critical patent/CN107598227A/en
Withdrawn legal-status Critical Current

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The present invention relates to tubular object extruding field, more particularly to a kind of metal pipe material borehole drill construction, including supporting table, move material device, positioner and drilling equipment, it is described to move material device, the outbound course of positioner and drilling equipment along supporting table is arranged at intervals successively, the material device that moves is located at supporting table output end side and is fixedly connected with supporting table, positioner is fixedly connected positioned at the side and positioner for moving material device output end with moving material device, the drilling equipment is located at positioner away from device away from the one end for moving material device, working condition moves down material device to by the top of the Workpiece transfer at the top of supporting table to positioner, drilling equipment to the workpiece at the top of positioner punching.The present invention is simple in construction, install convenient and is once transferred to workpiece at the top of positioner with step-type transfer approach by the first motor, the second motor, driver plate, connecting rod and arc.

Description

A kind of metal pipe material borehole drill construction
Technical field
The present invention relates to tubular object extruding field, more particularly to a kind of metal pipe material borehole drill construction.
Background technology
In industrial production, it is often necessary to which the polishing either drilling that batch is carried out to tubing is handled, but the feeding of tubing Be can not be ignored the problem of, nowadays the feeding of tubing need by tubing it is orderly pass to manipulator or processing equipment Be processed, tube stock loading device quality production efficiency is had a major impact, current tube stock loading device however be exactly to tie Structure is simple, feeding poor performance, though otherwise be exactly that there is preferable feeding performance, it is complicated with high costs, it is unfavorable for enterprise Development.
The content of the invention
In view of the above-mentioned deficiencies in the prior art, it is an object of the present invention to provide a kind of metal pipe material borehole drill construction.
To solve the above problems, the present invention provides following technical scheme:
A kind of metal pipe material borehole drill construction, including supporting table, move and expect device, positioner and drilling equipment, the shifting material device, The outbound course of positioner and drilling equipment along supporting table is arranged at intervals successively, and the material device that moves is located at supporting table output end Side is simultaneously fixedly connected with supporting table, and positioner is consolidated positioned at the side and positioner for moving material device output end with moving material device Fixed connection, the drilling equipment are located at positioner and move down material device away from the one end for moving material device, working condition away from device To by the top of the Workpiece transfer at the top of supporting table to positioner, drilling equipment is to the workpiece progress at the top of positioner Punching.
Further, the supporting table includes base and limiting plate, and the top of the base is provided with what is set diagonally downward Inclined-plane, limiting plate are provided with the first limiting plate and the second limiting plate, and first limiting plate and the second limiting plate are vertically arranged and One limiting plate is fixedly connected with the side of base, and the second limiting plate is fixedly connected with the opposite side of base.
Further, the shifting material device includes the first fixed plate being fixed on the first limiting plate and is fixed on the second limit The second fixed plate on the plate of position, first fixed plate and the second fixed plate are horizontally disposed with and the first fixed plate and the second fixed plate Upper surface copline, be provided with the top of first fixed plate and the second fixed plate equidistant successively along the long sideline of the first fixed plate The limited block of setting, it is provided with and is used for the workpiece between two adjacent limited blocks to calmly between the first fixed plate and the second fixed plate The transfer part of position device transfer.
Further, the transfer part include the first motor, the second motor, driver plate, connecting rod and several holding The arc of workpiece is held in the palm, first motor and the second electric machine structure are identical and are arranged at intervals, and the driver plate is provided with two, one Individual driver plate is fixedly connected with the output shaft of the first motor, and another driver plate is fixedly connected with the output shaft of the second motor, even One end of extension bar is fixedly connected with the driver plate on the first motor output shaft, the output shaft of the other end of connecting rod and the second motor On driver plate be fixedly connected, bottom of all arcs along connecting rod length direction successively spaced set and arc It is fixedly connected with the connecting rod.
Further, the positioner includes the first locating rod, the second locating rod and keeper, and the one of the first locating rod End is fixedly connected with the first fixed plate, and the other end of the first locating rod is provided with the first barrier plate being vertically arranged, the second locating rod One end be fixedly connected with the second fixed plate, the other end of the second locating rod is provided with the second barrier plate being vertically arranged, keeper Between the first locating rod and the second locating rod.
Further, the keeper includes locating piece, the first cylinder and the 3rd stopper, the locating piece top droop Set, the first cylinder and the 3rd stopper are respectively positioned at the top of locating piece, and the first cylinder is fixedly connected with locating piece and the first cylinder Output end be fixedly connected with the 3rd stopper, the 3rd stopper bottom and locating piece top slide coordinate.
Further, the drilling equipment includes keel, electric cylinders, L-type plate, the second cylinder and the 3rd motor, the pad High block is vertically arranged, and electric cylinders at the top of keel with being fixedly connected, and L-type plate is vertically arranged and the cunning on one end and electric cylinders of L-type plate Block is fixedly connected, and the second cylinder is fixedly connected on the other end of L-type plate, and the output end of the second cylinder is provided with U-shaped support, the 3rd electricity Machine is located in U-shaped support, and the output shaft of the 3rd motor through U-shaped support and is provided with drill bit in its end.
Beneficial effect:A kind of metal pipe material borehole drill construction of the present invention, workpiece are sequentially placed into base top, and workpiece answers itself Gravity rolls to the first fixed plate and the second fixed plate direction, limited block of the workpiece at the top of the first fixed plate and the second fixed plate Contradict, the first motor and the second motor are synchronized with the movement and drive driver plate to be moved along a track, and driver plate drives connecting rod and connection The workpiece of base top is transferred in the first locating rod and the second locating rod by some arcs at the top of bar successively, the first resistance Baffle plate and the second barrier plate stop workpiece, and the first cylinder driving the 3rd is blocked in locating piece top slide, the 3rd barrier plate with First barrier plate and the first barrier plate are engaged and fix workpiece, and the second cylinder driving U-shaped board moves down, the 3rd motor Drill bit on driving gas output shaft drills to tubing, and it is different to tubing that electric cylinders driving L-type strip moves the second cylinder and the 3rd motor Position is drilled, and the present invention is simple in construction, install convenient and passes through the first motor, the second motor, driver plate, connecting rod and arc Workpiece is once transferred at the top of positioner by shape plate with step-type transfer approach.
Brief description of the drawings
Fig. 1 is the dimensional structure diagram of the present invention;
Fig. 2 is the partial sectional view one of the present invention;
Fig. 3 is the partial sectional view two of the present invention;
Fig. 4 is the local dimensional structure diagram of the present invention;
Fig. 5 is the dimensional structure diagram that the present invention moves materials and parts;
Fig. 6 is the assembling schematic diagram of the first motor and driver plate of the invention;
Fig. 7 is the dimensional structure diagram of perforating device of the present invention;
Fig. 8 is the left view of perforating device of the present invention;
Fig. 9 is the dimensional structure diagram of keeper of the present invention;
Description of reference numerals:Supporting table 1, base 1a, limiting plate 1b, the first limiting plate 1b1, the second limiting plate 1b2, move material device 2, the first fixed plate 2a, limited block 2b, transfer part 2c, the first motor 2c1, the second motor 2c2, driver plate 2c3, connecting rod 2c4, Arc 2c5, positioner 3, the first locating rod 3a, the first barrier plate 3a1, the second locating rod 3b, the second barrier plate 3b1 are fixed The position cylinder of part 3c, locating piece 3c1, first 3c2, the 3rd stopper 3c3, drilling equipment 4, keel 4a, electric cylinders 4b, L-type plate 4c, Second cylinder 4d, the 3rd motor 4e, U-shaped support 4f, drill bit 4g.
Embodiment
With reference to Figure of description and embodiment, the specific embodiment of the present invention is described in further detail:
Referring to figs. 1 to a kind of metal pipe material borehole drill construction shown in Fig. 9, including supporting table 1, material device 2, the and of positioner 3 are moved Drilling equipment 4, the outbound course for moving material device 2, positioner 3 and drilling equipment 4 along supporting table 1 are arranged at intervals successively, The material device 2 that moves is located at the output end side of supporting table 1 and is fixedly connected with supporting table 1, and positioner 3 is positioned at shifting material device 2 The side of output end and positioner 3 is fixedly connected with moving material device 2, the drilling equipment 4 is located at positioner 3 away from device Away from the one end for moving material device 2, working condition moves down material device 2 to by the Workpiece transfer at the top of supporting table 1 to positioner 3 Top, drilling equipment 4 to the workpiece at the top of positioner 3 punching.
The supporting table 1 includes base 1a and limiting plate 1b, the base 1a top are oblique provided with setting diagonally downward Face, limiting plate 1b are provided with the first limiting plate 1b1 and the second limiting plate 1b2, the first limiting plate 1b1 and the second limiting plate 1b2 It is vertically arranged and the first limiting plate 1b1 is fixedly connected with base 1a side, the second limiting plate 1b2 and base 1a opposite side is consolidated Fixed connection, base 1a are obliquely installed, workpiece because self gravitation scrolls down through, limiting plate 1b to by workpiece base 1a's Top prevents workpiece from being moved to base 1a tops with exterior domain.
Shown in reference picture 2, Fig. 3, Fig. 4, Fig. 5 and Fig. 6, the material device 2 that moves includes being fixed on the first limiting plate 1b1 The first fixed plate 2a and the second fixed plate for being fixed on the second limiting plate 1b2, the first fixed plate 2a and second fix Plate level is set and the upper surface copline of the first fixed plate 2a and the second fixed plate, and the first fixed plate 2a and second is fixed It is provided with along the limited block 2b, the first fixed plate 2a in the first long sidelines of fixed plate 2a successively spaced set and second and fixes at the top of plate The transfer part 2c for being used for transferring the workpiece between two adjacent limited block 2b to positioner 3 is provided between plate, first fixes In a logical horizontal plane, limited block 2b prevents workpiece in the first fixed plate 2a and the workpiece to be fixed for plate 2a and the second fixed plate It is mobile at the top of two fixed plates.
The transfer part 2c includes the first motor 2c1, the second motor 2c2, driver plate 2c3, connecting rod 2c4 and several use With the arc 2c5, the first motor 2c1 of support workpiece and the second motor 2c2 structures it is identical and be arranged at intervals, the transmission Plate 2c3 is provided with two, and a driver plate 2c3 is fixedly connected with the first motor 2c1 output shaft, another driver plate 2c3 and the Two motor 2c2 output shaft is fixedly connected, and connecting rod 2c4 one end is fixed with the driver plate 2c3 on the first motor 2c1 output shafts Connection, the connecting rod 2c4 other end are fixedly connected with the driver plate 2c3 on the second motor 2c2 output shaft, all arcs Plate 2c5 is fixedly connected along connecting rod 2c4 length directions successively spaced set and arc 2c5 bottom with connecting rod 2c4, the One motor 2c1 and the second motor 2c2, which is synchronized with the movement, drives driver plate 2c3 to be moved along a track, and driver plate 2c3 drives connecting rod Workpiece at the top of base 1a is transferred to the top of positioner 3 by some arc 2c5 at the top of 2c4 and connecting rod 2c4 successively.
The positioner 3 includes the first locating rod 3a, the second locating rod 3b and keeper 3c, and the one of the first locating rod 3a End is fixedly connected with the first fixed plate 2a, and the first locating rod 3a other end is provided with the first barrier plate 3a1 being vertically arranged, and second Locating rod 3b one end is fixedly connected with the second fixed plate, and the second locating rod 3b other end, which is provided with second be vertically arranged, to be stopped Between the first locating rod 3a and the second locating rod 3b, the first keeper 3c and the second keeper 3c are used by plate 3b1, keeper 3c The workpiece to get off is transferred from the first fixed plate 2a and the second fixed plate with support.
Shown in reference picture 9, the keeper 3c includes locating piece 3c1, the first cylinder 3c2 and the 3rd stopper 3c3, institute The setting of locating piece 3c1 top droops is stated, the first cylinder 3c2 and the 3rd stopper 3c3 are respectively positioned at the top of locating piece 3c1, the first gas Cylinder 3c2 is fixedly connected with locating piece 3c1 and the first cylinder 3c2 output end is fixedly connected with the 3rd stopper 3c3, and the 3rd stops Block 3c3 bottoms coordinate with locating piece 3c1 top slides, and the first barrier plate 3a1 and the second barrier plate 3b1 stop workpiece, and first Cylinder 3c2 drivings the 3rd are blocked in locating piece 3c1 top slides, the 3rd barrier plate and the first barrier plate 3a1 and the first barrier plate 3a1, which is engaged, fixes workpiece.
Shown in reference picture 7 and Fig. 8, the drilling equipment 4 includes keel 4a, electric cylinders 4b, L-type plate 4c, the second cylinder 4d and the 3rd motor 4e, the keel 4a are vertically arranged, and for electric cylinders 4b with being fixedly connected at the top of keel 4a, L-type plate 4c is vertical Set and L-type plate 4c one end is fixedly connected with the sliding block on electric cylinders 4b, the second cylinder 4d is fixedly connected on the another of L-type plate 4c End, the second cylinder 4d output end are provided with U-shaped support 4f, and the 3rd motor 4e is located in U-shaped support 4f, and the 3rd motor 4e's is defeated Shaft is provided with drill bit 4g, the second cylinder 4d driving U-shaped board through U-shaped support 4f and in its end and moved down, the 3rd motor 4e Drill bit 4g on driving gas output shaft drills to tubing, and electric cylinders 4b driving L-type plates 4c drives the second cylinder 4d and the 3rd motor 4e Tubing diverse location is drilled.
The above described is only a preferred embodiment of the present invention, any limit not is made to the technical scope of the present invention System, therefore any subtle modifications, equivalent variations and modifications that every technical spirit according to the present invention is made to above example, In the range of still falling within technical scheme.

Claims (7)

  1. A kind of 1. metal pipe material borehole drill construction, it is characterised in that:Including supporting table(1), move material device(2), positioner(3)With Drilling equipment(4), it is described to move material device(2), positioner(3)And drilling equipment(4)Along supporting table(1)Outbound course successively It is arranged at intervals, it is described to move material device(2)Positioned at supporting table(1)Output end side and and supporting table(1)It is fixedly connected, positioner (3)Expect device positioned at moving(2)The side of output end and positioner(3)Expect device with moving(2)It is fixedly connected, the drilling equipment (4)Positioned at positioner(3)Away from device away from shifting material device(2)One end, working condition moves down material device(2)That will hold Saddle(1)The Workpiece transfer at top is to positioner(3)Top, drilling equipment(4)To positioner(3)The workpiece at top Punched.
  2. A kind of 2. metal pipe material borehole drill construction according to claim 1, it is characterised in that:The supporting table(1)The bottom of including Seat(1a)And limiting plate(1b), the base(1a)Top be provided with the inclined-plane that sets diagonally downward, limiting plate(1b)Provided with One limiting plate(1b1)With the second limiting plate(1b2), first limiting plate(1b1)With the second limiting plate(1b2)Be vertically arranged and First limiting plate(1b1)With base(1a)Side be fixedly connected, the second limiting plate(1b2)With base(1a)Opposite side fix Connection.
  3. A kind of 3. metal pipe material borehole drill construction according to claim 2, it is characterised in that:It is described to move material device(2)Including It is fixed on the first limiting plate(1b1)On the first fixed plate(2a)Be fixed on the second limiting plate(1b2)On the second fixed plate, First fixed plate(2a)Horizontally disposed and the first fixed plate with the second fixed plate(2a)It is total to the upper surface of the second fixed plate Plane, first fixed plate(2a)It is provided with the top of the second fixed plate along the first fixed plate(2a)Long sideline is equidistantly set successively The limited block put(2b), the first fixed plate(2a)And second be provided between fixed plate and be used for two adjacent limited blocks(2b)Between Workpiece to positioner(3)The transfer part of transfer(2c).
  4. A kind of 4. metal pipe material borehole drill construction according to claim 3, it is characterised in that:The transfer part(2c)Including One motor(2c1), the second motor(2c2), driver plate(2c3), connecting rod(2c4)Arc with several to support workpiece (2c5), first motor(2c1)With the second motor(2c2)Structure is identical and is arranged at intervals, the driver plate(2c3)It is provided with Two, a driver plate(2c3)With the first motor(2c1)Output shaft be fixedly connected, another driver plate(2c3)With the second electricity Machine(2c2)Output shaft be fixedly connected, connecting rod(2c4)One end and the first motor(2c1)Driver plate on output shaft(2c3) It is fixedly connected, connecting rod(2c4)The other end and the second motor(2c2)Output shaft on driver plate(2c3)It is fixedly connected, institute There is the arc(2c5)Along connecting rod(2c4)Length direction spaced set and arc successively(2c5)Bottom and connection Bar(2c4)It is fixedly connected.
  5. A kind of 5. metal pipe material borehole drill construction according to claim 4, it is characterised in that:The positioner(3)Including First locating rod(3a), the second locating rod(3b)And keeper(3c), the first locating rod(3a)One end and the first fixed plate (2a)It is fixedly connected, the first locating rod(3a)The other end be provided with the first barrier plate for being vertically arranged(3a1), the second locating rod (3b)One end be fixedly connected with the second fixed plate, the second locating rod(3b)The other end be provided with the second barrier plate for being vertically arranged (3b1), keeper(3c)Positioned at the first locating rod(3a)With the second locating rod(3b)Between.
  6. A kind of 6. metal pipe material borehole drill construction according to claim 5, it is characterised in that:The keeper(3c)Including fixed Position block(3c1), the first cylinder(3c2)With the 3rd stopper(3c3), the locating piece(3c1)Top droop is set, the first cylinder (3c2)With the 3rd stopper(3c3)It is respectively positioned on locating piece(3c1)Top, the first cylinder(3c2)With locating piece(3c1)It is fixed to connect Connect and the first cylinder(3c2)Output end and the 3rd stopper(3c3)It is fixedly connected, the 3rd stopper(3c3)Bottom and positioning Block(3c1)Top slide coordinates.
  7. A kind of 7. metal pipe material borehole drill construction according to claim 6, it is characterised in that:The drilling equipment(4)Including Keel(4a), electric cylinders(4b), L-type plate(4c), the second cylinder(4d)With the 3rd motor(4e), the keel(4a)Set vertically Put, electric cylinders(4b)With keel(4a)Top is fixedly connected, L-type plate(4c)It is vertically arranged and L-type plate(4c)One end and electric cylinders (4b)On sliding block be fixedly connected, the second cylinder(4d)It is fixedly connected on L-type plate(4c)The other end, the second cylinder(4d)It is defeated Go out end and be provided with U-shaped support(4f), the 3rd motor(4e)Positioned at U-shaped support(4f)It is interior, and the 3rd motor(4e)Output shaft pass through U Type support(4f)And it is provided with drill bit in its end(4g).
CN201711110488.3A 2017-11-12 2017-11-12 A kind of metal pipe material borehole drill construction Withdrawn CN107598227A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711110488.3A CN107598227A (en) 2017-11-12 2017-11-12 A kind of metal pipe material borehole drill construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711110488.3A CN107598227A (en) 2017-11-12 2017-11-12 A kind of metal pipe material borehole drill construction

Publications (1)

Publication Number Publication Date
CN107598227A true CN107598227A (en) 2018-01-19

Family

ID=61086301

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711110488.3A Withdrawn CN107598227A (en) 2017-11-12 2017-11-12 A kind of metal pipe material borehole drill construction

Country Status (1)

Country Link
CN (1) CN107598227A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115876051A (en) * 2023-03-08 2023-03-31 临沂金正阳管业有限公司 Outer diameter detection equipment for manufacturing seamless steel pipe

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115876051A (en) * 2023-03-08 2023-03-31 临沂金正阳管业有限公司 Outer diameter detection equipment for manufacturing seamless steel pipe

Similar Documents

Publication Publication Date Title
CN106311869B (en) A kind of metal pipe material processing puncher with shock-absorbing function
CN205599752U (en) Steam heating pipe puncher
CN105414601B (en) Vision positioning automatic drilling equipment
CN102699911A (en) Flexible transfer and carrying manipulator
CN107598227A (en) A kind of metal pipe material borehole drill construction
CN204818979U (en) Immediately, dual -purpose numerical control machine tool crouches
CN105817886A (en) Continuous drilling and tapping device of workpieces
CN105478832A (en) Metal tube drilling device with drilling and chip cleaning functions
CN103978326A (en) Automatic robot welding work station
CN104526711B (en) The concentric gripping manipulator of double-rod
CN203830952U (en) Automatic robot welding workstation
CN207464257U (en) A kind of metal pipe material borehole drill construction
CN107363541A (en) A kind of ring flange automatic assembly line
CN108145026B (en) Large three-dimensional manipulator
CN100389898C (en) Apparatus for enlarging tube used in heat exchanger
CN204620894U (en) A kind of sheet forming pay-off
CN104227255B (en) Condenser row's weldering production line
CN106736188A (en) A kind of transformer case system of processing and transformer production system
CN100333850C (en) Apparatus for enlarging tube used in heat exchanger
CN204772574U (en) Sucking disc formula manipulator of self -adaptive control
CN207952686U (en) A kind of automobile pipe fitting drilling equipment
CN105382588A (en) Steel construction connecting plate boring grab
CN206455731U (en) A kind of punch press sucker adjusts grip device
CN107199460A (en) A kind of installation board assembly line of electrical complete equipment
CN107716750A (en) A kind of automatic flare formation equipment of copper tube part

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20180119