CN107588750A - 一种适用于深埋隧道掌子面围岩全过程变形监测的方法 - Google Patents

一种适用于深埋隧道掌子面围岩全过程变形监测的方法 Download PDF

Info

Publication number
CN107588750A
CN107588750A CN201710555127.3A CN201710555127A CN107588750A CN 107588750 A CN107588750 A CN 107588750A CN 201710555127 A CN201710555127 A CN 201710555127A CN 107588750 A CN107588750 A CN 107588750A
Authority
CN
China
Prior art keywords
tunnel
face
main
measuring point
deformation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710555127.3A
Other languages
English (en)
Inventor
赵东平
胡炜
喻渝
谭信荣
甘目飞
李老三
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Eryuan Engineering Group Co Ltd CREEC
Original Assignee
China Railway Eryuan Engineering Group Co Ltd CREEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Eryuan Engineering Group Co Ltd CREEC filed Critical China Railway Eryuan Engineering Group Co Ltd CREEC
Priority to CN201710555127.3A priority Critical patent/CN107588750A/zh
Publication of CN107588750A publication Critical patent/CN107588750A/zh
Pending legal-status Critical Current

Links

Abstract

一种适用于深埋隧道掌子面围岩全过程变形监测的方法,以在隧道开挖过程中实现对隧道掌子面前方围岩变形的全方位监测,保障隧道施工安全。包括隧道正洞和其前端的正洞掌子面,所述正洞掌子面前一定距离处,于隧道正洞延伸方向一侧设置横向试验导洞,由该横向试验导洞开挖面设置向正洞掌子面前方延伸的横向钻孔,横向钻孔的端口处设置开挖面测点,横向钻孔内沿其延伸方向间隔设置掌子面前方变形测点,由开挖面测点和掌子面前方变形测点监测正洞掌子面前方的变形。

Description

一种适用于深埋隧道掌子面围岩全过程变形监测的方法
技术领域
本发明专利涉及隧道围岩变形监测方法,特别涉及一种适用于深埋隧道掌子面围岩全过程变形监测的方法。
背景技术
为了确保隧道施工的安全,在隧道施工过程中,需采用仪器或元器件对隧道围岩和支护结构的变形及内力状态进行量测。量测数据可以有效指导施工,修正设计,使隧道的施工和设计纳入动态的科学管理中。目前,隧道的围岩收敛、拱顶下沉、接触压力、钢拱架内力、二衬内力等项目的量测技术已经比较成熟,量测结果较为准确。
掌子面的稳定性是决定隧道施工安全的关键因素之一。在隧道施工过程中,常通过超前钻孔探测、超前地质预报等方式来获取掌子面前方岩层的地质情况,并据此制定合理的施工工法。尽管如此,软弱破碎围岩中的大断面隧道在施工时仍然发生过掌子面坍塌的现象,对施工人员的人身安全带来巨大危害,同时也对工程造价和工程进度造成不利影响。因此,加强掌子面前方围岩变形的监测,探明掌子面开挖过程中前方围岩的变形规律,从而预测掌子面的变形对隧道施工安全具有重要意义。
对于浅埋隧道,可以通过在隧道掌子面前方地表钻孔的方式安装位移计,对隧道掌子面全过程位移进行监测,然而对于大埋深隧道上述方案不具备可行性。此外,现行隧道相关规程、规范也未提及此方面的内容。本申请所涉及的一种适用于深埋隧道掌子面全过程变形监测的方法可以实现掌子面前方围岩变形的全方位监测,对判定大断面隧道掌子面围岩稳定性、加强施工安全保障、探明围岩变形规律具有重要意义。
发明专利内容
本发明专利所要解决的技术问题是提供一种适用于深埋隧道掌子面围岩全过程变形监测的方法,以在隧道开挖过程中实现对隧道掌子面前方围岩变形的全方位监测,保障隧道施工安全。
本发明专利解决其技术问题所采用的技术方案如下:
本发明的一种适用于深埋隧道掌子面围岩全过程变形监测的方法,包括隧道正洞和其前端的正洞掌子面,其特征是:所述正洞掌子面前一定距离处,于隧道正洞延伸方向一侧设置横向试验导洞,由该横向试验导洞开挖面设置向正洞掌子面前方延伸的横向钻孔,横向钻孔的端口处设置开挖面测点,横向钻孔内沿其延伸方向间隔设置掌子面前方变形测点,由开挖面测点和掌子面前方变形测点监测正洞掌子面前方的变形。
本发明的有益效果是,可以监测隧道开挖过程中掌子面围岩变形全过程数据,包括掌子面的挤出变形、围岩的竖向及横向变形,所测数据能有效判定隧道掌子面围岩稳定性,进而指导设计、施工,实现隧道动态化设计、施工。
附图说明
本说明书包括如下四幅附图:
图1是本发明一种适用于深埋隧道掌子面围岩全过程变形监测的方法实施例1的侧视图;
图2是本发明一种适用于深埋隧道掌子面围岩全过程变形监测的方法实施例1的断面图;
图3是本发明一种适用于深埋隧道掌子面围岩全过程变形监测的方法实施例2的侧视图;
图4是本发明一种适用于深埋隧道掌子面围岩全过程变形监测的方法实施例2的断面图;
图中示出构件、部位名称及所对应的标记:隧道正洞10,正洞掌子面11,平行导洞20,试验导洞21,试验平行导洞22,横向钻孔30,掌子面前方变形测点31,开挖面测点32,横向通道40。
具体实施方式
下面结合附图对本发明专利进一步说明。
参照图1和图3,本发明一种适用于深埋隧道掌子面围岩全过程变形监测的方法,包括隧道正洞10和其前端的正洞掌子面11,所述正洞掌子面11前一定距离处,于隧道正洞10延伸方向一侧设置横向试验导洞21,由该横向试验导洞21开挖面设置向正洞掌子面11前方延伸的横向钻孔30,横向钻孔30的端口处设置开挖面测点32,横向钻孔30内沿其延伸方法间隔设置掌子面前方变形测点31,由开挖面测点32和掌子面前方变形测点31监测正洞掌子面11前方的变形。参照图2和图4,所述横向钻孔30沿横向试验导洞21开挖面的竖向间隔设置。所述各掌子面前方变形测点31埋设三向位移计,采用高精度全站仪测试开挖面测点32的变形,以修正掌子面前方围岩的变形值。
参照图1和图2,所述隧道正洞10的延伸方向一侧具有平行导洞20,横向试验导洞21在正洞掌子面11前方与平行导洞20相贯通,即在平行导洞20内开挖横向试验导洞21。
参照图3和图4,所述隧道正洞10的延伸方向一侧设置一段与之平行的试验平行导洞22,横向试验导洞21在正洞掌子面11前方与试验平行导洞22相贯通,隧道正洞10与试验平行导洞22在正洞掌子面11后方通过横向通道40相贯通。即由隧道正洞10先开挖横向通道40,再开挖试验平行导洞22和横向试验导洞21。
以上所述只是用图解说明本发明专利一种适用于深埋隧道掌子面围岩全过程变形监测的方法的一些原理,并非是要将本发明专利局限在所示和所述的具体结构和适用范围内,故凡是所有可能被利用的相应修改以及等同物,均属于本发明专利所申请的专利范围。

Claims (5)

1.一种适用于深埋隧道掌子面围岩全过程变形监测的方法,包括隧道正洞(10)和其前端的正洞掌子面(11),其特征是:所述正洞掌子面(11)前一定距离处,于隧道正洞(10)延伸方向一侧设置横向试验导洞(21),由该横向试验导洞(21)开挖面设置向正洞掌子面(11)前方延伸的横向钻孔(30),横向钻孔(30)的端口处设置开挖面测点(32),横向钻孔(30)内沿其延伸方法间隔设置掌子面前方变形测点(31),由开挖面测点(32)和掌子面前方变形测点(31)监测正洞掌子面(11)前方的变形。
2.如权利要求1所述的一种适用于深埋隧道掌子面围岩全过程变形监测的方法,其特征是:所述横向钻孔(30)沿横向试验导洞(21)开挖面的竖向间隔设置。
3.如权利要求1所述的一种适用于深埋隧道掌子面围岩全过程变形监测的方法,其特征是:所述开挖面测点(32)位移由全站仪测得,各掌子面前方变形测点(31)位移由埋设的三向位移计测得。
4.如权利要求1所述的一种适用于深埋隧道掌子面围岩全过程变形监测的方法,其特征是:所述隧道正洞(10)的延伸方向一侧具有平行导洞(20),横向试验导洞(21)在正洞掌子面(11)前方与平行导洞(20)相贯通。
5.如权利要求1所述的一种适用于深埋隧道掌子面围岩全过程变形监测的方法,其特征是:所述隧道正洞(10)的延伸方向一侧设置一段与之平行的试验平行导洞(22),横向试验导洞(21)在正洞掌子面(11)前方与试验平行导洞(22)相贯通,隧道正洞(10)与试验平行导洞(22)在正洞掌子面(11)后方通过横向通道(40)相贯通。
CN201710555127.3A 2017-07-10 2017-07-10 一种适用于深埋隧道掌子面围岩全过程变形监测的方法 Pending CN107588750A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710555127.3A CN107588750A (zh) 2017-07-10 2017-07-10 一种适用于深埋隧道掌子面围岩全过程变形监测的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710555127.3A CN107588750A (zh) 2017-07-10 2017-07-10 一种适用于深埋隧道掌子面围岩全过程变形监测的方法

Publications (1)

Publication Number Publication Date
CN107588750A true CN107588750A (zh) 2018-01-16

Family

ID=61041877

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710555127.3A Pending CN107588750A (zh) 2017-07-10 2017-07-10 一种适用于深埋隧道掌子面围岩全过程变形监测的方法

Country Status (1)

Country Link
CN (1) CN107588750A (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109540014A (zh) * 2018-11-06 2019-03-29 北京市政建设集团有限责任公司 一种用于隧道掌子面挤出变形监测方法
CN111336987A (zh) * 2020-03-30 2020-06-26 浙江省交通运输科学研究院 隧道施工中拱顶沉降监测点埋置深度的确定方法
CN114135315A (zh) * 2021-11-22 2022-03-04 中铁十六局集团第三工程有限公司 一种严重大变形隧道超前应力释放施工方法
CN114382458A (zh) * 2021-12-15 2022-04-22 中建三局集团有限公司 地下施工过程中地下水位及地层变形可视化实时监测方法
CN115370417A (zh) * 2022-07-22 2022-11-22 北京交通大学 隧道掌子面挤出变形测试方法及其装置
CN115560723A (zh) * 2022-12-07 2023-01-03 中国矿业大学(北京) 一种大跨度隧道围岩瞬时变形的超前测量方法

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH073766A (ja) * 1993-06-18 1995-01-06 Toyo Constr Co Ltd トンネルの施工方法
JPH11303592A (ja) * 1998-04-17 1999-11-02 Shimizu Corp 多重支保構築工法
JP2004044106A (ja) * 2002-07-09 2004-02-12 Okumura Corp トンネル周壁面の変位の推定方法
CN101270666A (zh) * 2008-05-16 2008-09-24 中铁十一局集团第四工程有限公司 隧道掌子面前方地质情况扩大断面水平钻孔预测预报法
CN102444407A (zh) * 2011-12-12 2012-05-09 中铁二局股份有限公司 高地应力软弱围岩隧道下台阶施工变形控制方法
CN103134462A (zh) * 2013-02-05 2013-06-05 北京首尔工程技术有限公司 隧道变形实时自动监测系统及监测方法
JP2013238038A (ja) * 2012-05-15 2013-11-28 Shimizu Corp トンネルの施工方法
CN103742158A (zh) * 2014-01-02 2014-04-23 中铁工程设计咨询集团有限公司 倾斜隧道的超前支护和挖掘方法
CN103808807A (zh) * 2012-11-09 2014-05-21 中国水电顾问集团华东勘测设计研究院 现场围岩微破裂区域的测量方法

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH073766A (ja) * 1993-06-18 1995-01-06 Toyo Constr Co Ltd トンネルの施工方法
JPH11303592A (ja) * 1998-04-17 1999-11-02 Shimizu Corp 多重支保構築工法
JP2004044106A (ja) * 2002-07-09 2004-02-12 Okumura Corp トンネル周壁面の変位の推定方法
CN101270666A (zh) * 2008-05-16 2008-09-24 中铁十一局集团第四工程有限公司 隧道掌子面前方地质情况扩大断面水平钻孔预测预报法
CN102444407A (zh) * 2011-12-12 2012-05-09 中铁二局股份有限公司 高地应力软弱围岩隧道下台阶施工变形控制方法
JP2013238038A (ja) * 2012-05-15 2013-11-28 Shimizu Corp トンネルの施工方法
CN103808807A (zh) * 2012-11-09 2014-05-21 中国水电顾问集团华东勘测设计研究院 现场围岩微破裂区域的测量方法
CN103134462A (zh) * 2013-02-05 2013-06-05 北京首尔工程技术有限公司 隧道变形实时自动监测系统及监测方法
CN103742158A (zh) * 2014-01-02 2014-04-23 中铁工程设计咨询集团有限公司 倾斜隧道的超前支护和挖掘方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
周丁恒;曲海锋;蔡永昌;曹力桥;杨宏伟;: "特大断面大跨度隧道围岩变形的现场试验研究" *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109540014A (zh) * 2018-11-06 2019-03-29 北京市政建设集团有限责任公司 一种用于隧道掌子面挤出变形监测方法
CN111336987A (zh) * 2020-03-30 2020-06-26 浙江省交通运输科学研究院 隧道施工中拱顶沉降监测点埋置深度的确定方法
CN114135315A (zh) * 2021-11-22 2022-03-04 中铁十六局集团第三工程有限公司 一种严重大变形隧道超前应力释放施工方法
CN114382458A (zh) * 2021-12-15 2022-04-22 中建三局集团有限公司 地下施工过程中地下水位及地层变形可视化实时监测方法
CN115370417A (zh) * 2022-07-22 2022-11-22 北京交通大学 隧道掌子面挤出变形测试方法及其装置
CN115370417B (zh) * 2022-07-22 2024-02-23 北京交通大学 隧道掌子面挤出变形测试方法及其装置
CN115560723A (zh) * 2022-12-07 2023-01-03 中国矿业大学(北京) 一种大跨度隧道围岩瞬时变形的超前测量方法

Similar Documents

Publication Publication Date Title
CN107588750A (zh) 一种适用于深埋隧道掌子面围岩全过程变形监测的方法
Shen et al. Response and control technology for entry loaded by mining abutment stress of a thick hard roof
CN104880544A (zh) 地下工程中对软弱围岩注浆加固效果的检测与评价方法
CN103293560A (zh) 一种采动三向应力场的测试方法
CN102539652A (zh) 深埋隧洞围岩开挖响应系统性监测方法
CN109238161A (zh) 一种巷道表面绝对收敛量的观测装置及观测方法
CN103399354A (zh) 隧道地质的预报方法和系统
CN110792450B (zh) 一种确定注浆锚索超前支护的方法
JP2009174178A (ja) 地下構造物の構築方法
Sainoki et al. Impact of the intermediate stress component in a plastic potential function on rock mass stability around a sequentially excavated large underground cavity
Grandori et al. Hard rock extreme conditions in the first 10 km of TBM-driven Brenner Exploratory Tunnel
WO2023093529A1 (zh) 采动煤层底板破坏深度监测方法
Chen et al. A method for computing unsupported roof distance in roadway advancement and its in-situ application
JP4771173B2 (ja) 掘削地盤におけるリバウンド量の推定方法および地盤掘削方法
JP5319618B2 (ja) 地山状況予測方法およびトンネル掘削方法
CN110502794B (zh) 一种大型缓倾角软弱结构面下部围岩高地应力集中带破坏模式的预测方法
CN106592654A (zh) 一种钢管桩垂直度监测方法
CN108801530B (zh) 一种工作面超前支承压力影响范围实测方法
CN111156051A (zh) 一种隧道围岩内部位移监控系统及塌方预警方法
CN212003265U (zh) 一种隧道围岩内部位移监控系统
CN115560723B (zh) 一种大跨度隧道围岩瞬时变形的超前测量方法
CN103323279A (zh) 评价尺寸效应对隧洞开挖响应影响的试验方法
CN113532371B (zh) 一种巷道围岩绝对变形量动态监测方法
Xi et al. Comprehensive monitoring and stability assessment of roadway with water gushing in a fault zone
CN111964555A (zh) 一种边坡地下位移监测仪及其位移监测方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180116

WD01 Invention patent application deemed withdrawn after publication