CN107587851A - A kind of mechanization workover treatment power elevator and elevator conveyer method - Google Patents

A kind of mechanization workover treatment power elevator and elevator conveyer method Download PDF

Info

Publication number
CN107587851A
CN107587851A CN201610527501.4A CN201610527501A CN107587851A CN 107587851 A CN107587851 A CN 107587851A CN 201610527501 A CN201610527501 A CN 201610527501A CN 107587851 A CN107587851 A CN 107587851A
Authority
CN
China
Prior art keywords
elevator
transhipment
slips
interior
power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610527501.4A
Other languages
Chinese (zh)
Other versions
CN107587851B (en
Inventor
王增林
贾庆升
张雷
金鑫
智勤功
付增
魏斌
罗文莉
唐倩雯
张方圆
苏秋涵
郝丽伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Chemical Corp
Sinopec Research Institute of Petroleum Engineering Shengli Co
Original Assignee
China Petroleum and Chemical Corp
Sinopec Research Institute of Petroleum Engineering Shengli Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Chemical Corp, Sinopec Research Institute of Petroleum Engineering Shengli Co filed Critical China Petroleum and Chemical Corp
Priority to CN201610527501.4A priority Critical patent/CN107587851B/en
Publication of CN107587851A publication Critical patent/CN107587851A/en
Application granted granted Critical
Publication of CN107587851B publication Critical patent/CN107587851B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a kind of mechanization workover treatment power elevator and elevator conveyer method, wherein power elevator, including power elevator bearing and the suspention slips being arranged on power elevator bearing, transporter, hanger, the suspention slips is arranged on lower end outside before power elevator bearing, the hanger is arranged on power elevator support outer face and sets transporter positioned at the surface of suspention slips, the top of the suspention slips.The transporter includes transhipment slips, transhipment slip hydraulic cylinder, hydraulic motor, transhipment rack.Mounting board oil pipe body, realization do not damage oil pipe and complete lower oil tube construction the present invention in operation process, are adapted to special oil pipe operation;The elevator conveyer method used simultaneously realizes that elevator is transported during may be implemented in lower oil tube, be effectively improved mechanization workover treatment efficiency.

Description

A kind of mechanization workover treatment power elevator and elevator conveyer method
Technical field
The present invention relates to the workover rig of petroleum industry underground work, specifically a kind of mechanization workover treatment power is hung Card and elevator conveyer method.
Background technology
Traditional workover treatment is to complete oil pipes with two elevator rotations to remove, it is necessary to artificial lift to move elevator, dislodging suspension ring, Labor strength is big, low construction efficiency.Current mechanization workover treatment mainly has following two modes:One kind is logical Cross power elevator and block oil pipe body, expose tubing coupling, realize not lift to move elevator lower oil tube, power slip pair be present The problem of this bulk damage of oil pipe is big, another way are the lower oil tubes by way of hanging upside down card automatically, and this mode is not damaged Hinder oil pipe, but exist and hang upside down the card time and grow, the problem of low construction efficiency.
By retrieval, find to realize the technology for alternately hanging tubing string purpose, or blank in elevator.
The content of the invention
It is an object of the invention to provide a kind of mechanization workover treatment power elevator and elevator conveyer method, in operation process Not mounting board oil pipe body, realization do not damage oil pipe and complete lower oil tube construction, are adapted to special oil pipe operation;Use simultaneously Elevator conveyer method realizes that elevator is transported during may be implemented in lower oil tube, be effectively improved mechanization workover treatment Efficiency.
In order to reach above-mentioned purpose, present invention employs following technical scheme, a kind of power elevator, including power elevator branch Seat and suspention slips, transporter, the hanger being arranged on power elevator bearing, the suspention slips are arranged on power Lower end inside before elevator bearing, the hanger are arranged on power elevator support outer face and are located at the surface of suspention slips, The top of the suspention slips sets transporter.
The transporter includes transhipment slips, transhipment slip hydraulic cylinder, hydraulic motor, transhipment rack, the transhipment card Watt positioned at suspention slips surface, it is described transhipment slip hydraulic cylinder be connected to transhipment slips rear end control transhipment slips beat Open and close, the transhipment rack is meshed with the gear in hydraulic motor, the hydraulic motor and transhipment slip hydraulic cylinder Link into an integrated entity, the transhipment slips and transhipment slip hydraulic cylinder follow hydraulic motor to be moved forward and backward on transhipment rack together.
Run on before and after the transhipment slips in guiding mechanism.
Balance weight is provided with the power elevator bearing, ensures that power elevator bearing is put down by center line or so gravity of hanger Weighing apparatus.
In order to reach above-mentioned another object, present invention employs following technical scheme, a kind of power elevator conveyer method, bag Include following steps:
When above carrying oil pipe, first tubing coupling is sitting on first interior elevator, first interior elevator is in pithead position, Second interior elevator is in the position away from well head, and first interior elevator valve is closed below box cupling, transfers power elevator And the suspention step that suspention slips blocks first interior elevator is closed, simultaneously close off transhipment slips and block transhipment step, dock Carry to during next tubing coupling to carrying power elevator on hanger by hook after blocking, second interior elevator is pushed into well Mouth position, closes second interior elevator valve, tubing coupling is sitting on second interior elevator, oil pipe is dismantled with hydraulic tongs Button, oil pipe is pushed on oil pipe jack up unit, is opened the valve on first interior elevator, is made oil pipe and first interior elevator Depart from, the lower drain line of oil pipe jack up unit recovery, hook decentralization power elevator, following act is completed while decentralization: To open suspention slips and decontrol first interior elevator, open hydraulic motor, hydraulic motor internal gear moves on transhipment rack, Transhipment slips moves with first interior elevator on transhipment guide groove, first interior elevator is pushed into remote inside power elevator The position of pithead position, complete more than act after, the location of power elevator is transferred to second interior elevator of well head, is closed Close suspention slips to dock with second interior elevator, open transhipment slips, first interior elevator departs from power elevator, in well Mouthful remote location, power elevator is carried on hook, following act is completed during upper carry:Slips is transported to move along transhipment guide groove Move to power elevator close to the position of well head, close elevator in transhipment slips docking second, when carrying to next tubing coupling When, promote first interior elevator to close elevator valve, lower drain line makes tubing coupling be sitting in first to pithead position On elevator, hydraulic tongs dismantles tubing thread, above puies forward oil pipe circulation above procedure and has completed oil pipe construction;
Lower drain line step above carries the inverse process of oil pipe.
Compared to prior art, the invention has the advantages that:
1st, by the cooperation of power elevator and interior elevator, not lift to move elevator, the mechanization lower oil tube hung of not seting out are realized Operation, effectively mitigate labor strength;
2nd, it is applied widely, it is adapted to the workover treatment of a variety of special oil pipes;
3rd, realize and do not damage oil pipe lower oil tube, effectively extend construction well is excused from a college course the phase, has saved operating cost;
4th, interior elevator realizes transhipment inside power elevator, transports apart from short, transshipment acitivity is simple to operation;
5th, elevator transhipment can be completed during lower oil tube, is effectively improved mechanization workover treatment efficiency;
6th, the generation of single-ring accident can effectively be avoided by not plucking suspension ring, improve working security.
Brief description of the drawings
Fig. 1 is a kind of structural representation of power elevator of the present invention;
Fig. 2 is Fig. 1 left view;
Fig. 3 is interior elevator front view;
Fig. 4 is interior elevator top view;
Fig. 5 is wellhead lifting-clamping push-pull device at fixed structure and interior elevator change in location schematic diagram.
In figure:1st, slips is suspended in midair;2nd, guide groove is docked;3rd, balance weight;4th, hanger;5th, slips is transported;6th, transport Slip hydraulic cylinder;7th, hydraulic motor;8th, guide groove is transported;9th, rack is transported;10th, interior elevator;11st, step is suspended in midair; 12nd, step is transported;13rd, operating platform;14th, abutted flange;15th, elevator push-pull device at fixed.
Embodiment
Detailed description for the present invention and technology contents, coordinate brief description of the drawings as follows, but accompanying drawing is only provided with reference to saying It is bright to be used, not it is used for being any limitation as the present invention.
According to Fig. 1-5, a kind of power elevator, described suspention slips 1 is arranged on lower end outside before power elevator bearing, By hydraulic cylinder controlling switch, for suspending internal slip 10 in midair;It is hanger 4 to suspend in midair directly over slips 1, for connecting suspension ring, Top is provided with elevator pin;Described docking guide groove 2, for importing interior elevator 10;Described balance weight 3, hangs in power Weight before and after balance, when docking oil pipe, for docking with oil pipe jack up unit, is easy to pour into oil pipe when card removes; Described transhipment slips 5 is controlled open and close by transhipment slip hydraulic cylinder 6, and hydraulic motor 7 exists with moving gear, gear Moved on transhipment rack 9, transhipment slips 5 can be driven to be moved forward and backward in guiding mechanism, guiding mechanism can lead for transhipment Groove 8, the transhipment in power elevator of elevator 10 in realization.Described interior elevator 10 has two groups, is provided with interior elevator and hangs Cape rank 11, interior elevator transhipment step 12, interior elevator 10 are built-in with motor, and the valve in interior elevator 10 is provided with gear Gear is carried out with motor to be connected, Electric control can be achieved and open and close, and is equipped with the keying that remote control realizes elevator 10 in remote control Elevator, the described lower section of operating platform 13 are provided with abutted flange 14 and elevator push-pull device at fixed 15, and abutted flange 14 is used for Docking well head, elevator push-pull device at fixed can promote interior elevator 10 to arrive pithead position a`, can also pull interior elevator before construction 10 arrive the position b` away from well head, and when under power elevator not in pithead position, a and a` is on same vertical line, b It is in b` on same vertical line, when power elevator is transferred to pithead position, a overlaps with a` positions, b and b` positions Overlap.
When above carrying oil pipe, first tubing coupling is sitting on first interior elevator, first interior elevator is in well head a` Position, second interior elevator are in the b` positions away from well head, and its elevator valve is in opening, using in first Elevator valve in the remote control closing that elevator is equipped with, transfers power elevator, makes power elevator interior location a and a` positions weight Close, power elevator is inserted in first interior elevator, closes the suspention step 11 that suspention slips 1 blocks first interior elevator, together When close transhipment slips 5 block transhipment step 12, docking block after by hook on hanger 4 carry power elevator, carry to During next tubing coupling, second interior elevator is pushed into well head a` positions by elevator push-pull device at fixed 15, closed in second Elevator valve, tubing coupling is sitting on second interior elevator, tubing thread is dismantled with hydraulic tongs, oil pipe is pushed into oil pipe rises Rise on device, open the valve on first interior elevator, depart from oil pipe and first interior elevator, oil pipe jack up unit returns Drain line is accepted, hook decentralization power elevator, following act is completed while decentralization:Open suspention slips 1, Ran Houzhuan Fortune slips 5 is moved on transhipment guide groove 8, and first interior elevator is pushed into the b positions away from pithead position inside power elevator Put, complete more than act after, power elevator is transferred to well head, and the location of second interior elevator a` leans on power elevator The position a of nearly well head is overlapped, and power elevator is inserted in second interior elevator, closes suspention slips 1 and second interior elevator pair Connect, unlatching transhipment slips 5, first interior elevator disengaging power elevator, the b` positions in well head distal end, carried on hook Power elevator, following act is completed during upper carry:To be moved to power elevator close along transhipment guide groove 8 for transhipment slips 5 The a positions of well head, elevator in transhipment slips docking second is closed, when carrying to during next tubing coupling, elevator push-and-pull fills 15 promotion, first interior elevator is put to well head a` positions, closes elevator valve, lower drain line makes tubing coupling be sitting in first On interior elevator, hydraulic tongs dismantles tubing thread, above puies forward oil pipe circulation above procedure and has completed oil pipe construction.
During lower drain line, first interior elevator docking oil pipe closes elevator valve, and power elevator closes suspention slips docking the One interior elevator, second interior elevator are put to well head distal end b` positions, transfer hook, power elevator is sitting in well head, power Elevator position a overlaps with the a` positions residing for first interior elevator, opens suspention slips 1 and departs from first interior elevator, closes Transhipment slips 5 is closed, docks second interior elevator, hook suitably above carries, while transports slips 5 and pushed in guide groove 8 is transported For second interior elevator to power elevator close to a positions of pithead position, power elevator closes suspention slips 1, oil pipe raising dress Push oil pipe is put, tubing coupling docks second interior elevator through power elevator, and second interior elevator closes elevator valve, Hook is transferred, and oil pipe pin thread is docked with lower section oil pipe box, detained on hydraulic tongs, and a small distance is put forward on hook connects oil pipe Hoop leaves first interior elevator, opens first interior elevator valve, and elevator push-pull device at fixed 15 pulls open first interior elevator to remote From the position b` positions of well head, hook is transferred, power elevator is sitting in well head, now, interior elevator position a overlaps with a`, Position b overlaps with b`, opens suspention slips and departs from second interior elevator, closing transhipment slips docks first interior elevator and followed Ring above procedure completes lower Tubing During Running.
Above elevator push-pull device at fixed, interior elevator, suspention slips, the structure of transhipment slips in itself are prior art, so Its concrete structure and suspention slips, the suspention step of the transhipment internal elevator of slips, the attachment structure of transhipment step are no longer superfluous State.
The invention belongs to the lower oil tube process in mechanization workover treatment, suitable for removing oil during mechanization workover treatment Pipe, it is possible to increase well head automaticity, reduce labor strength, improve efficiency of construction.
Presently preferred embodiments of the present invention is the foregoing is only, is not used to limit the scope of the claims of the present invention, other use this hair The equivalence changes of bright patent spirit, it all should all belong to the scope of the claims of the present invention.

Claims (5)

  1. A kind of 1. power elevator, it is characterized in that, including power elevator bearing and the suspention slips being arranged on power elevator bearing, transporter, hanger, the suspention slips is arranged on lower end outside before power elevator bearing, the hanger is arranged on power elevator support outer face and sets transporter positioned at the surface of suspention slips, the top of the suspention slips.
  2. A kind of 2. power elevator according to claim 1, it is characterized in that, the transporter includes transhipment slips, transhipment slip hydraulic cylinder, hydraulic motor, transhipment rack, the rear end control transhipment slips that the transhipment slip hydraulic cylinder is connected to transhipment slips opens and closes, the transhipment rack is meshed with the gear in hydraulic motor, the hydraulic motor links into an integrated entity with transhipment slip hydraulic cylinder, and the transhipment slips and transhipment slip hydraulic cylinder follow hydraulic motor to be moved forward and backward on transhipment rack together.
  3. 3. a kind of power elevator according to claim 2, it is characterised in that run on before and after the transhipment slips in guiding mechanism.
  4. 4. a kind of power elevator according to claim 2, it is characterised in that balance weight is provided with the power elevator bearing, ensures power elevator bearing using hanger as center line or so gravitational equilibrium.
  5. 5. a kind of power elevator conveyer method, comprises the following steps:
    When above carrying oil pipe, first tubing coupling is sitting on first interior elevator, first interior elevator is in pithead position, second interior elevator is in the position away from well head, first interior elevator valve is closed below box cupling, decentralization power elevator simultaneously closes the suspention step that suspention slips blocks first interior elevator, simultaneously close off transhipment slips and block transhipment step, dock after blocking by hook to carrying power elevator on hanger, carry to during next tubing coupling, second interior elevator is pushed into pithead position, close second interior elevator valve, tubing coupling is sitting on second interior elevator, tubing thread is dismantled with hydraulic tongs, oil pipe is pushed on oil pipe jack up unit;
    The valve on first interior elevator is opened, departs from oil pipe and first interior elevator, the lower drain line of oil pipe jack up unit recovery, hook decentralization power elevator, following act is completed while decentralization:Open suspention slips and decontrol first interior elevator, open hydraulic motor, hydraulic motor internal gear is moved on transhipment rack, and transhipment slips moves with first interior elevator on transhipment guide groove, and first interior elevator is pushed into the position away from pithead position inside power elevator;
    After being acted more than completing, power elevator the location of is transferred to second interior elevator of well head, suspention slips is closed to dock with second interior elevator, open transhipment slips, first interior elevator departs from power elevator, power elevator is carried on well head remote location, hook, following act is completed during upper carry:Transhipment slips is moved to power elevator close to the position of well head along transhipment guide groove, closes elevator in transhipment slips docking second, when carrying to during next tubing coupling, promoting first interior elevator to pithead position;
    Elevator valve is closed, lower drain line makes tubing coupling be sitting on first interior elevator, and hydraulic tongs dismantles tubing thread, above puies forward oil pipe circulation above procedure and has completed oil pipe construction;
    Lower drain line step above carries the inverse process of oil pipe.
CN201610527501.4A 2016-07-06 2016-07-06 A kind of mechanization workover treatment power elevator and elevator conveyer method Active CN107587851B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610527501.4A CN107587851B (en) 2016-07-06 2016-07-06 A kind of mechanization workover treatment power elevator and elevator conveyer method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610527501.4A CN107587851B (en) 2016-07-06 2016-07-06 A kind of mechanization workover treatment power elevator and elevator conveyer method

Publications (2)

Publication Number Publication Date
CN107587851A true CN107587851A (en) 2018-01-16
CN107587851B CN107587851B (en) 2019-11-29

Family

ID=61045136

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610527501.4A Active CN107587851B (en) 2016-07-06 2016-07-06 A kind of mechanization workover treatment power elevator and elevator conveyer method

Country Status (1)

Country Link
CN (1) CN107587851B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102733764A (en) * 2012-06-29 2012-10-17 中国石油化工股份有限公司 Method and device for suspending pipe column in well workover treatment
CN203145858U (en) * 2013-03-25 2013-08-21 中国石油化工股份有限公司 Mechanical elevator
CN203321368U (en) * 2013-06-05 2013-12-04 中国石油天然气股份有限公司 Deep-well pump pipe elevator device
CN104405304A (en) * 2014-01-13 2015-03-11 中国石油化工股份有限公司 Workover operation system and process capable of realizing unattended operation at wellhead
CN104453741A (en) * 2014-01-13 2015-03-25 中国石油化工股份有限公司 Mechanical workover treatment elevator transportation method
CN206091902U (en) * 2016-07-06 2017-04-12 中国石油化工股份有限公司 Mechanized workover power elevator

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102733764A (en) * 2012-06-29 2012-10-17 中国石油化工股份有限公司 Method and device for suspending pipe column in well workover treatment
CN203145858U (en) * 2013-03-25 2013-08-21 中国石油化工股份有限公司 Mechanical elevator
CN203321368U (en) * 2013-06-05 2013-12-04 中国石油天然气股份有限公司 Deep-well pump pipe elevator device
CN104405304A (en) * 2014-01-13 2015-03-11 中国石油化工股份有限公司 Workover operation system and process capable of realizing unattended operation at wellhead
CN104453741A (en) * 2014-01-13 2015-03-25 中国石油化工股份有限公司 Mechanical workover treatment elevator transportation method
CN206091902U (en) * 2016-07-06 2017-04-12 中国石油化工股份有限公司 Mechanized workover power elevator

Also Published As

Publication number Publication date
CN107587851B (en) 2019-11-29

Similar Documents

Publication Publication Date Title
US3404741A (en) Automated system and drilling rig for continuously and automatically pulling and running a drill-pipe string
CN205638216U (en) Oil -well rig tubular column automated processing system
CN104074476B (en) A kind of mechanization well-repairing well head oil pipe centering devices and methods therefor
CN103352664B (en) Remote-controlled intelligent workover treatment hook and using method
CN107227934A (en) A kind of oil-well rig tubing string automated programming system
CN103437710B (en) Continuous circulation device and method for operation of assembling casing pipe
CN104775763A (en) Mechanization workover treatment device and method
CN206091902U (en) Mechanized workover power elevator
CN203145859U (en) Elevator transferring device for mechanical workover operation
CN105672906A (en) Single-elevator oil pipe-tubing device and process
CN104712270A (en) Oil field well workover operation robot
CN108252664B (en) Remote control is with gallery rig of auto-control handling drilling rod
CN203756072U (en) Mechanical well repair work device
CN107587851A (en) A kind of mechanization workover treatment power elevator and elevator conveyer method
CN106629411B (en) A kind of multi-functional tube has handling appliance
CN102650196B (en) Buckle type elevator
CN103775008B (en) The righting of mechanization workover treatment rod tube guides method and the device of dislodging suspension ring
CN109138868A (en) Light maintenance well head automatic operation device
CN209704511U (en) Tube rod conveyer for well site automated job
CN104727759A (en) Well workover oil tube centering system
CN203756075U (en) Large intelligent hook for use in mechanical well repair work
CN204283250U (en) In well, tubing string removes automation equipment
CN104074480B (en) The device and method of mechanization workover treatment elevator transhipment
CN207046671U (en) A kind of suspender for safely and efficiently loading and unloading high line
CN203756073U (en) Mechanical well repair work system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant