CN106629411B - A kind of multi-functional tube has handling appliance - Google Patents

A kind of multi-functional tube has handling appliance Download PDF

Info

Publication number
CN106629411B
CN106629411B CN201710075719.5A CN201710075719A CN106629411B CN 106629411 B CN106629411 B CN 106629411B CN 201710075719 A CN201710075719 A CN 201710075719A CN 106629411 B CN106629411 B CN 106629411B
Authority
CN
China
Prior art keywords
assembly
hanging hook
gripper clamp
flexible arm
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710075719.5A
Other languages
Chinese (zh)
Other versions
CN106629411A (en
Inventor
于芳
潘田佳
游青青
高杭
李志刚
田雨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Honghua Petroleum Equipment Co Ltd
Original Assignee
Sichuan Honghua Petroleum Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Honghua Petroleum Equipment Co Ltd filed Critical Sichuan Honghua Petroleum Equipment Co Ltd
Priority to CN201710075719.5A priority Critical patent/CN106629411B/en
Publication of CN106629411A publication Critical patent/CN106629411A/en
Application granted granted Critical
Publication of CN106629411B publication Critical patent/CN106629411B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C17/00Overhead travelling cranes comprising one or more substantially horizontal girders the ends of which are directly supported by wheels or rollers running on tracks carried by spaced supports
    • B66C17/06Overhead travelling cranes comprising one or more substantially horizontal girders the ends of which are directly supported by wheels or rollers running on tracks carried by spaced supports specially adapted for particular purposes, e.g. in foundries, forges; combined with auxiliary apparatus serving particular purposes

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Earth Drilling (AREA)

Abstract

The present invention relates to petroleum and natural gas drilling technique fields, more particularly to a kind of multi-functional tube tool handling appliance, it includes multi-functional tube tool loop wheel machine, pipe has a storage device assembly, pipe tool conveyer and anchoring device, and present device can a variety of pipes tools of handling simultaneously, improve the utilization rate of lifting device, reduce drilling tool processing equipment, while reduce the space of the drilling platforms of hold facility, so as to reduce the weight of drilling platforms.

Description

A kind of multi-functional tube has handling appliance
Technical field
The present invention relates to petroleum and natural gas drilling technique field, more particularly to one kind can handle drilling tool and can also locate Manage the multi-functional tube tool handling appliance of marine riser.
Background technology
In the prior art, the loop wheel machine that the marine riser processing system of drilling platforms is equipped with can only handle marine riser and stretch Section, if you need to handle drilling tool, then drilling platforms need to be further provided with drilling tool processing equipment.This results in drilling platforms to need to be equipped with two sets Pipe has processing system, these equipment not only occupy the space of a large amount of drilling platforms or ship, while also increase drilling platforms Or the weight of ship, since marine riser and drilling tool do not need to handle simultaneously, this has resulted in the idle of pipe tool processing equipment, reduces The utilization rate of equipment.
To solve the above problems, need to invent a kind of can also handle the multi-functional tube of marine riser to handle drilling tool Have handling appliance, in this way can for also reduced while drilling platforms or drill ship saving more spaces drilling platforms or The weight of drill ship improves the utilization rate of equipment.
Invention content
It is an object of the invention to overcome the above-mentioned deficiency in the presence of the prior art, drilling tool can be handled by providing one kind The multi-functional tube tool handling appliance of marine riser can also be handled.
In order to achieve the above object, the present invention provides following technical solutions.
A kind of multi-functional tube has handling appliance, including:
Multi-functional tube has loop wheel machine, and the multi-functional tube tool loop wheel machine includes the track being fixedly connected with installation foundation, is mounted on Door type frame assembly on the track, the trolley assembly being flexibly connected with the door type frame assembly, with trolley assembly activity The flexible arm assembly of connection, hanging hook assembly rigidly connected with the flexible arm assembly and gripper clamp assembly, with the gate The control room that frame assembly is fixedly connected;
Pipe has storage device, and the pipe tool storage device is fixedly connected with the installation foundation, and the pipe has storage device Including marine riser storage device and drilling tool storage device, the marine riser storage device is used for storing marine riser, the drilling tool storage Cryopreservation device is used for storing drilling rod, drill collar and casing etc., and the marine riser storage device can close two with the drilling tool storage device It is one, can also individually separates;
Anchoring device, the anchoring device includes hanging hook assembly anchoring device and gripper clamp assembly anchoring device, described to hang Hook assembly anchoring device and gripper clamp assembly anchoring device are fixedly connected respectively with the installation foundation, the hanging hook assembly anchoring Device is used to be anchored the hanging hook assembly of off working state, and the gripper clamp assembly is used to be anchored the folder of off working state Pincers assembly is held, the quantity of the hanging hook assembly anchoring device is 2, and the quantity of the gripper clamp assembly anchoring device is 1.
As the preferred embodiment of the present invention, the flexible arm assembly is identical with the quantity of trolley assembly and is all higher than being equal to 2, The gripper clamp assembly and a flexible arm assembly are rigidly connected, and the quantity of the hanging hook assembly is 2, respectively with one The flexible arm assembly rigid connection, the flexible arm assembly are made of three sections of square tubes, described small with being mounted on by steel wire rope Cable drum connection on vehicle assembly, the rotation of the cable drum drive the lifting of the flexible arm assembly.
When the quantity of the flexible arm assembly and trolley assembly be 2 when, then on a flexible arm assembly increase with The hydraulic line of the clamping clipper joint, when the hanging hook assembly works, the gripper clamp assembly is anchored on the gripper clamp It is removed from the flexible arm assembly after on assembly anchoring device, two flexible arm assemblies connect with the hanging hook assembly Connect, when the gripper clamp assembly works, a hanging hook assembly be anchored on the hanging hook assembly anchoring device after from institute It states and is removed on flexible arm assembly, two flexible arm assemblies are connect respectively with a hanging hook assembly and gripper clamp assembly.
When the quantity of the flexible arm assembly and trolley assembly is 3, then positioned at the institute on the door type frame assembly both sides It states flexible arm assembly to connect with two hanging hook assembly, the flexible arm assembly positioned at position among the door type frame assembly It is connect with the gripper clamp assembly.
As the preferred embodiment of the present invention, the door type frame assembly includes flexible leg, rigid leg and girder, the rail Road quantity is 2 and is installed in parallel on the installation foundation, and the flexible leg and rigid leg are located at the girder respectively Both sides, one end of the flexible leg is fixedly connected with a track, the other end of the flexible leg and the master One end bottom of beam is fixedly connected, and one end of the rigid leg is fixedly connected with another track, the rigid leg The other end be fixedly connected with the other end bottom of the girder, be separately installed with gate on the flexible leg and rigid leg Frame drive motor, the door type frame move under the synchronous driving of two door type frame drive motors along the track, institute Trolley assembly is stated to move along the track on the girder under the driving of trolley motor.
The course of work:
In handling marine riser, the anchoring states of the hanging hook assembly and gripper clamp assembly are first released from, positioned at the door The door type frame assembly drive motor on the flexible leg and rigid leg of type frame assembly both sides is driven by gear drive It moves the door type frame assembly and is moved to designated position, the hanging hook assembly and gripper clamp assembly are carried by the flexible arm assembly Certain altitude is risen to, the pipe tool having with the pipe in storage device is avoided to interfere, the gripper clamp assembly is passed through described Flexible arm assembly promotion avoids interfering with marine riser to a high position, then drives to after movement position the door type frame, adjusts The whole position with each trolley assembly of the hanging hook assembly rigidly connected two so that two hanging hook assembly are located at described The both ends of girder, then synchronous to transfer hanging hook assembly, after transferring to marine riser position, the hanging hook assembly clamps water proof simultaneously The both ends of pipe promote marine riser by the flexible arm assembly and marine riser are hoisted to operating position.
In handling drilling tool, the anchoring states of the hanging hook assembly and gripper clamp assembly are first released from, positioned at the gate The door type frame drive motor on the flexible leg and rigid leg of frame both sides drives the gate by gear drive Frame is moved to designated position, and the hanging hook assembly and gripper clamp assembly are promoted to certain altitude by the flexible arm assembly, The pipe tool having with the pipe in storage device is avoided to interfere, two hanging hook assembly are carried by the flexible arm assembly A high position is raised to avoid interfering with pipe tool, in order to avoid drilling tool and the door type frame generate interference during handling drilling tool, pair and institute It states the rigidly connected trolley assembly of gripper clamp assembly progress and is provided with displacement position-limiting device, then drive the door type frame To after movement position, adjustment and the position of the rigidly connected trolley assembly of the gripper clamp assembly make it be located substantially at drilling tool Center, transfer after the gripper clamp assembly clamps drilling tool and promoted, drilling tool is hoisted to operating position.
Compared with prior art, beneficial effects of the present invention:
1st, can a variety of pipes tool of handling simultaneously, improve the utilization rate of lifting device;
2nd, reduce drilling tool processing equipment, while reduce the space of the drilling platforms of hold facility, bored so as to reduce The weight of well platform.
Description of the drawings
Fig. 1 has handling appliance stereogram for multi-functional tube of the present invention;
Fig. 2 is the door type frame assembly front view that multi-functional tube of the present invention has handling appliance;
Front view when Fig. 3 is a kind of structure handling marine riser that multi-functional tube of the present invention has handling appliance;
Front view when Fig. 4 is a kind of structure handling drilling tool that multi-functional tube of the present invention has handling appliance;
Front view when Fig. 5 is another structure handling marine riser that multi-functional tube of the present invention has handling appliance;
Front view when Fig. 6 is another structure handling drilling tool that multi-functional tube of the present invention has handling appliance.
It is marked in figure:1- multi-functional tubes have loop wheel machine, 11- tracks, 12- door type frame assemblies, 121- flexible legs, 122- rigidity Supporting leg, 123- girders, 13- trolley assemblies, 14- stretch arm assembly, 15- hanging hook assembly, 16- gripper clamp assemblies, 17- control rooms, 2- pipes have storage device, 21- marine riser storage devices, 22- drilling tool storage devices, 3- anchoring devices, the anchoring of 31- hanging hook assembly Device, 32- gripper clamp assembly anchoring devices.
Specific embodiment
With reference to embodiment and specific embodiment, the present invention is described in further detail, but should not understand this Range for aforementioned body of the present invention is only limitted to following embodiment, all to belong to this based on the technology that the content of present invention is realized The protection domain of invention.
As depicted in figs. 1 and 2, a kind of multi-functional tube tool handling appliance, including multi-functional tube tool loop wheel machine 1, pipe tool storage dress 2 and anchoring device 3 are put, and multi-functional tube tool loop wheel machine 1, pipe tool storage device 2 and anchoring device 3 are fixedly connected with basis, Middle multi-functional tube tool loop wheel machine 1 is by track 11, door type frame assembly 12, trolley assembly 13, flexible arm assembly 14, hanging hook assembly 15, folder It holds pincers assembly 16 and control room 17 forms, 11 quantity of track is fixedly connected for 2 with basis, 2 11 parallel installations of track, gate Frame assembly 12 is placed to be slidably connected on the rail 11 with track 11, and trolley assembly 13 is mounted on 12 top of door type frame assembly and gate Frame assembly 12 is slidably connected, and flexible arm assembly 14 is flexibly connected by steel wire rope with the roller on trolley assembly 13, hanging hook assembly 15 and gripper clamp assembly 16 be rigidly connected with flexible arm assembly 14, control room 17 is fixedly connected with door type frame assembly, gate Frame assembly 12 is made of flexible leg 121, rigid leg 122 and girder 123, the structure as shown in Figure 2 of flexible leg 121, but Such structure is not limited to, the top of flexible leg 121 is fixedly connected with the bottom of 123 one end of girder, the bottom of flexible leg 121 Portion is flexibly connected with a track 11, and the top of rigid leg 122 is fixedly connected with the bottom of 123 other end of girder, and rigidity is propped up The bottom of leg 122 is flexibly connected with another track 11, and control room 17 is fixedly connected with rigid leg 122, pipe tool storage device 2 It is made of marine riser storage device 21 and drilling tool storage device 22, for storing marine riser, drilling tool stores up marine riser storage device 21 Cryopreservation device 22 is used for storing drilling tool, and anchoring device 3 is made of hanging hook assembly anchoring device 31 and gripper clamp assembly anchoring device 32, The quantity of hanging hook assembly anchoring device 31 is used for being anchored hanging hook assembly 15 for 2, and the quantity of gripper clamp assembly anchoring device 32 is 1 It is a to be used for being anchored gripper clamp assembly 16.
As shown in figure 3, when the quantity that Fig. 3 is trolley assembly 13 and flexible arm assembly 14 is 3 handling marine riser work Schematic diagram, two flexible arm assemblies 14 positioned at 123 both sides of girder are rigidly connected respectively with two hanging hook assembly 15, positioned at girder The flexible arm assembly 14 at 123 intermediate positions is rigidly connected with gripper clamp assembly 16, and the course of work is:It is first released from hanging hook assembly 15 and the anchoring states of gripper clamp assembly 16, on the flexible leg 121 and rigid leg 122 of 12 both sides of door type frame assembly Door type frame drive motor drives door type frame assembly 12 to be moved to designated position by gear drive, by hanging hook assembly 15 and gripper clamp Assembly 16 is promoted to certain altitude by flexible arm assembly 14, and the pipe tool having with pipe in storage device 2 is avoided to interfere, will Gripper clamp assembly 16 is promoted to a high position by flexible arm assembly 14 and avoids interfering with the marine riser that hanging hook assembly 15 clamps, so After door type frame assembly 12 is driven movement position afterwards, adjustment and two hanging hook assembly, 15 rigidly connected two trolley assemblies 13 Position so that two hanging hook assembly 15 are located at the both ends of girder 123, and then synchronous decentralization hanging hook assembly 15, transfers to water proof Behind pipe position, two hanging hook assembly 15 clamp the both ends of marine riser simultaneously, promote marine riser by flexible arm assembly 14 and incite somebody to action Marine riser is hoisted to operating position.
As shown in figure 4, the work of handling drilling tool is shown when the quantity that Fig. 4 is trolley assembly 13 and flexible arm assembly 14 is 3 It is intended to, two flexible arm assemblies 14 positioned at 123 both sides of girder are rigidly connected respectively with two hanging hook assembly 15, positioned at girder The flexible arm assembly 14 at 123 intermediate positions is rigidly connected with gripper clamp assembly 16, and the course of work is:It is first released from hanging hook assembly 15 and the anchoring states of gripper clamp assembly 16, on the flexible leg 121 and rigid leg 122 of 12 both sides of door type frame assembly Door type frame drive motor drives door type frame assembly 12 to be moved to designated position by gear drive, by hanging hook assembly 15 and gripper clamp Assembly 16 is promoted to certain altitude by flexible arm assembly 14, and the pipe tool having with pipe in storage device 2 is avoided to interfere, will Two hanging hook assembly 15 are promoted to a high position by flexible arm assembly 14 and avoid interfering with drilling tool, during in order to avoid handling drilling tool Drilling tool and door type frame assembly 12 generate interference, and pair carrying out rigidly connected trolley assembly 13 with gripper clamp assembly 16, there is provided displacements Then limiting device drives door type frame assembly to after movement position, adjustment is total with 16 rigidly connected trolley of gripper clamp assembly It is made to be located substantially at the center of drilling tool into 13 position, decentralization gripper clamp assembly 16 is promoted after clamping drilling tool, drilling tool is hung It is transported to operating position.
In another embodiment, the quantity of trolley assembly 13 and flexible arm assembly 14 is 2, as shown in Figure 5 and Figure 6, Fig. 5 It is the operating diagram of handling marine riser, the course of work is:The anchoring states of hanging hook assembly 15 are first released from, positioned at door type frame Door type frame drive motor on the flexible leg 121 and rigid leg 122 of 12 both sides of assembly drives door type frame by gear drive Assembly 12 is moved to designated position, and hanging hook assembly 15 and flexible arm assembly 14 are rigidly connected, and passes through the arm assembly that stretches 14 promote hanging hook assembly 15, and the pipe tool having with pipe in storage device is avoided to interfere, then drives door type frame assembly 12 To after movement position, adjustment and the position of two hanging hook assembly, 15 rigidly connected two trolley assemblies 13 so that two suspension hooks Assembly 15 is located at the both ends of girder 123, then synchronous decentralization hanging hook assembly 15, and after transferring to marine riser position, two suspension hooks are total It clamps the both ends of marine riser simultaneously into 15, marine riser is promoted by flexible arm assembly 14 and marine riser is hoisted to working position It puts;Fig. 6 is the operating diagram of handling drilling tool, and the course of work is:The anchoring states of gripper clamp assembly 16 are first released from, are located at Door type frame drive motor on the flexible leg 121 and rigid leg 122 of 12 both sides of door type frame assembly is driven by gear drive Door type frame assembly 12 is moved to designated position, and gripper clamp assembly 16 and flexible arm assembly 14 are rigidly connected, and pass through and stretch Contracting arm assembly 14 promotes gripper clamp assembly 16, the pipe tool having with pipe in storage device is avoided to interfere, in order to avoid handling Drilling tool and door type frame assembly 12 generate interference during drilling tool, pair carry out rigidly connected trolley assembly 13 with gripper clamp assembly 16 and set Then displacement position-limiting device drives door type frame assembly to after movement position, adjustment is with gripper clamp assembly 16 rigidly connected The position of trolley assembly 13 makes it be located substantially at the center of drilling tool, and decentralization gripper clamp assembly 16 is promoted after clamping drilling tool, will Drilling tool is hoisted to operating position, and in handling drilling tool, hanging hook assembly 15 can both be anchored on hanging hook assembly anchoring dress simultaneously Put on 31, can also a hanging hook assembly 15 be anchored on another hanging hook assembly 15 and telescopic arm on hanging hook assembly anchoring device 31 The rigid connection of assembly 14 is promoted to a high position.

Claims (3)

1. a kind of multi-functional tube has handling appliance, including:
Multi-functional tube has loop wheel machine, and the multi-functional tube tool loop wheel machine includes the track being fixedly connected with installation foundation, mounted on described Door type frame assembly on track, the trolley assembly being flexibly connected with the door type frame assembly are flexibly connected with the trolley assembly Flexible arm assembly, hanging hook assembly rigidly connected with the flexible arm assembly and gripper clamp assembly are total with the door type frame Into the control room being fixedly connected;
Pipe has storage device, and the pipe tool storage device includes marine riser storage device and drilling tool storage device, the marine riser Storage device and drilling tool storage device are fixedly connected respectively with the installation foundation;
Anchoring device, the anchoring device includes hanging hook assembly anchoring device and gripper clamp assembly anchoring device, the suspension hook are total Into anchoring device for being anchored the hanging hook assembly, the gripper clamp assembly anchoring device is used to be anchored the gripper clamp assembly, The hanging hook assembly anchoring device and gripper clamp assembly anchoring device are fixedly connected respectively with the installation foundation.
2. a kind of multi-functional tube tool handling appliance according to claim 1, it is characterised in that:The flexible arm assembly and small The quantity of vehicle assembly is identical and is all higher than equal to 2, and the gripper clamp assembly and a flexible arm assembly are rigidly connected, described The quantity of hanging hook assembly is 2, is rigidly connected respectively with a flexible arm assembly.
3. a kind of multi-functional tube tool handling appliance according to claim 2, it is characterised in that:The door type frame assembly includes Flexible leg, rigid leg and girder, the quantity of the track for 2 and is installed in parallel on the installation foundation, described soft One end of property supporting leg is fixedly connected with a track, and the other end of the flexible leg and one end bottom of the girder are consolidated Fixed connection, one end of the rigid leg are fixedly connected with another track, the other end of the rigid leg with it is described The other end bottom of girder is fixedly connected.
CN201710075719.5A 2017-02-13 2017-02-13 A kind of multi-functional tube has handling appliance Active CN106629411B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710075719.5A CN106629411B (en) 2017-02-13 2017-02-13 A kind of multi-functional tube has handling appliance

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710075719.5A CN106629411B (en) 2017-02-13 2017-02-13 A kind of multi-functional tube has handling appliance

Publications (2)

Publication Number Publication Date
CN106629411A CN106629411A (en) 2017-05-10
CN106629411B true CN106629411B (en) 2018-06-19

Family

ID=58845946

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710075719.5A Active CN106629411B (en) 2017-02-13 2017-02-13 A kind of multi-functional tube has handling appliance

Country Status (1)

Country Link
CN (1) CN106629411B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR3068343B1 (en) * 2017-06-30 2020-11-13 Lohr Ind HANDLING GATE AND HANDLING SYSTEM INCLUDING SUCH GANTRY
CN107416702A (en) * 2017-08-22 2017-12-01 四川宏华石油设备有限公司 A kind of connecting beam apparatus between novel telescopic arm
CN109236210A (en) * 2018-11-30 2019-01-18 中煤科工(内蒙古)采矿工程技术有限公司 A kind of open air drill rig dismountable moving drilling tool library

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN206569931U (en) * 2017-02-13 2017-10-20 四川宏华石油设备有限公司 A kind of multi-functional pipe handling appliance

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101487298B1 (en) * 2013-05-15 2015-01-28 삼성중공업 주식회사 Multi Riser Crane
CN203296722U (en) * 2013-06-14 2013-11-20 四川宏华石油设备有限公司 Floating type gate marine riser crane for offshore drilling
CN103359626B (en) * 2013-07-29 2015-09-02 四川宏华石油设备有限公司 A kind of Marine riser crane
CN105540431A (en) * 2016-01-27 2016-05-04 中船第九设计研究院工程有限公司 Offshore crane hoisting system with rigid telescopic sleeve
CN106241590B (en) * 2016-08-02 2018-02-27 四川京石工程技术有限公司 A kind of oil drilling tools automatic clamping and placing equipment

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN206569931U (en) * 2017-02-13 2017-10-20 四川宏华石油设备有限公司 A kind of multi-functional pipe handling appliance

Also Published As

Publication number Publication date
CN106629411A (en) 2017-05-10

Similar Documents

Publication Publication Date Title
CN106629411B (en) A kind of multi-functional tube has handling appliance
CN106761487B (en) The method that marine drilling platform has processing system with pipe and connects movement thribble
CN110043203A (en) A kind of automated drilling rig and the method using automated drilling rig progress tubing string movement
CN203716882U (en) Pipe racking system of semiautomatic racking drill pipe
CN103437724B (en) A kind of offshore boring island tubing string supporting device
EP1799955A1 (en) Tubular handling apparatus and a drilling rig
CN207361607U (en) A kind of natural gas line installation pipe clamping device
CN201419983Y (en) Folding arm type crane of drilling platform
CN203333167U (en) Drilling racking platform manipulator
CN103615204B (en) The pipe system of gang drill bar is sent in semi-automation
CN105201425A (en) Offshore drilling pipe conveying device
CN105484683A (en) Automatic discharge device for drill strings
CN202148920U (en) Conveying mechanism for tunnel construction
CN206928916U (en) Stacking tubing string manipulator
CN209024048U (en) A kind of high stability tubing derrick crane
CN206569931U (en) A kind of multi-functional pipe handling appliance
CN205349253U (en) Automatic discharging equipment of drilling string
CN104712270A (en) Oil field well workover operation robot
CN203066587U (en) Wire pole drill lifting machine with adjustable drill distance
CN104389535A (en) Drill rod automatic treatment device
CN204024527U (en) Drilling rod automatic processing device
CN207333951U (en) A kind of sebific duct mounting bracket and drill jumbo
CN208220674U (en) A kind of pulling type pipe tool grasping board migration device
CN105927172B (en) A kind of workover automatization operation system
CN216197842U (en) Propelling mechanism for rock drilling jumbo

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant