CN107572359A - A kind of method of slag ladle hook - Google Patents
A kind of method of slag ladle hook Download PDFInfo
- Publication number
- CN107572359A CN107572359A CN201710974923.0A CN201710974923A CN107572359A CN 107572359 A CN107572359 A CN 107572359A CN 201710974923 A CN201710974923 A CN 201710974923A CN 107572359 A CN107572359 A CN 107572359A
- Authority
- CN
- China
- Prior art keywords
- slag ladle
- underframe
- support frame
- base
- framework
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Furnace Details (AREA)
Abstract
A kind of method of slag ladle hook, belongs to metallurgical steelmaking technical field, including the description below:(1)In slag ladle swing floor, slag ladle and special stand are fixed, ensure that slag ladle is placed stabilization and will not toppled over;(2)When needing handling slag ladle, hook is directly hung on shackle plate, staff's original after slag ladle from lifting by crane slag ladle, accordingly even when shackle plate is likely to occur fracture, be not in that personnel injure;(3)The special stand is made up of base, support frame, and support frame is connected with base;The base is made up of underframe, upper framework, connecting rod, is connected between underframe and upper framework by connecting rod;Underframe, upper framework are annular framework, and upper ledge, which is set up, breach at one;Support frame as described above is made up of steel plate bending into annular and end in bell-mouthed bracing ring and some reinforcements.Present invention effectively prevents the hidden danger of personnel's injury.
Description
Technical field
The invention belongs to metallurgical steelmaking technical field, and in particular to a kind of method of slag ladle hook.
Background technology
During slag ladle handling, it is necessary to worker hang up properly hook, confirm after, carry out handling.But slag ladle is hung during handling
Otic placode is likely to occur fracture, or slag ladle place it is unstable topple over, during worker is linked up with, can damage, exist
Larger hidden danger is, it is necessary to which a kind of keep apart method by equipment operation and personnel.
The content of the invention
In order to avoid fracture or slag ladle placement wild effect occur for equipment emerged in operation slag ladle shackle plate, ensure hook
The personal safety of worker, improves hook work operations efficiency, and the present invention provides a kind of method of slag ladle hook.
The present invention uses following technical scheme:A kind of method of slag ladle hook, including the description below:
(1)In slag ladle swing floor, slag ladle and special stand are fixed, ensure that slag ladle is placed stabilization and will not toppled over;
(2)When needing handling slag ladle, hook is directly hung on shackle plate, staff's original is from slag ladle is lifted by crane after slag ladle, so
Be not in personnel's injury even if shackle plate is likely to occur fracture;
(3)The special stand is made up of base, support frame, and support frame is connected with base;The base is by underframe, upper ledge
Frame, connecting rod composition, are connected between underframe and upper framework by connecting rod;Underframe, upper framework are annular framework, on
Framework is provided with breach at one;Support frame as described above by steel plate bending into annular and end be in bell-mouthed bracing ring and some reinforcements
Muscle forms.
When needing slag ladle handling, due to by slag ladle fixing-stable, being so not in that slag ladle topples over event, worker's hook
Afterwards away from slag ladle, be not in the event that shackle plate is broken injury, effectively prevent because unit exception causes personnel to hinder
Harmful hidden danger.
Start in mid-May, 2017 to try out in Taiyuan Iron and Steel Co. processing factory stainless steel slag operation area slag ladle hooking process, due to by slag
Tank is fixed on special stand, effectively prevent and slag ladle occurs and topple over the event of hurting sb.'s feelings, and does not go out away from slag ladle after worker's hook
The event of existing shackle plate fracture injury.
Brief description of the drawings
Fig. 1 is the structure chart that slag ladle fixes special stand and slag ladle in the present invention.
Fig. 2 is Fig. 1 top view(Remove slag ladle in figure).
In figure, 1, underframe, 2, upper framework, 3, connecting rod, 4, reinforcement, 5, bracing ring, 6, slag ladle, 7, breach.
Embodiment
Shown in Fig. 1, Fig. 2, special stand is made up of base, support frame, and support frame is connected with base;The base is by lower frame
Frame 1, upper framework 2, connecting rod 3 form, and are connected between underframe 1 and upper framework 2 by connecting rod 3;Underframe 1, upper framework 2 are equal
For annular framework, upper ledge, which is set up, breach 7 at one;Support frame as described above is by steel plate bending into annular and end in bell-mouthed
Bracing ring 5 and some reinforcements 4 form.
(1)In slag ladle swing floor, slag ladle 6 is fixed with special stand, ensures that slag ladle is placed stabilization and will not toppled over;
(2)When needing handling slag ladle, hook is directly hung on the shackle plate of slag ladle 6, staff's original after slag ladle from lifting by crane slag
Tank, accordingly even when shackle plate is likely to occur fracture, be not in personnel's injury.
Claims (1)
1. a kind of method of slag ladle hook, including the description below:
(1)In slag ladle swing floor, slag ladle and special stand are fixed, ensure that slag ladle is placed stabilization and will not toppled over;
(2)When needing handling slag ladle, hook is directly hung on shackle plate, staff's original is from slag ladle is lifted by crane after slag ladle, so
Be not in personnel's injury even if shackle plate is likely to occur fracture;
(3)The special stand is made up of base, support frame, and support frame is connected with base;The base is by underframe, upper ledge
Frame, connecting rod composition, are connected between underframe and upper framework by connecting rod;Underframe, upper framework are annular framework, on
Framework is provided with breach at one;Support frame as described above by steel plate bending into annular and end be in bell-mouthed bracing ring and some reinforcements
Muscle forms.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710974923.0A CN107572359A (en) | 2017-10-19 | 2017-10-19 | A kind of method of slag ladle hook |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710974923.0A CN107572359A (en) | 2017-10-19 | 2017-10-19 | A kind of method of slag ladle hook |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107572359A true CN107572359A (en) | 2018-01-12 |
Family
ID=61037214
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710974923.0A Pending CN107572359A (en) | 2017-10-19 | 2017-10-19 | A kind of method of slag ladle hook |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107572359A (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU899649A1 (en) * | 1980-05-20 | 1982-01-23 | Днепропетровский Завод Металлургического Оборудования | Support ring for slag carrier cup |
CN2199214Y (en) * | 1994-06-17 | 1995-05-31 | 李力行 | Combined steel slag pot |
CN102605115A (en) * | 2011-11-16 | 2012-07-25 | 马钢(集团)控股有限公司 | Process method for producing steel shots by ladle-casting slag pelletization |
CN202945251U (en) * | 2012-11-19 | 2013-05-22 | 铜陵晟王冶金车辆有限责任公司 | Cinder ladle protecting bracket |
CN203096089U (en) * | 2013-02-18 | 2013-07-31 | 新兴铸管股份有限公司 | Steel casting cinder pot |
-
2017
- 2017-10-19 CN CN201710974923.0A patent/CN107572359A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU899649A1 (en) * | 1980-05-20 | 1982-01-23 | Днепропетровский Завод Металлургического Оборудования | Support ring for slag carrier cup |
CN2199214Y (en) * | 1994-06-17 | 1995-05-31 | 李力行 | Combined steel slag pot |
CN102605115A (en) * | 2011-11-16 | 2012-07-25 | 马钢(集团)控股有限公司 | Process method for producing steel shots by ladle-casting slag pelletization |
CN202945251U (en) * | 2012-11-19 | 2013-05-22 | 铜陵晟王冶金车辆有限责任公司 | Cinder ladle protecting bracket |
CN203096089U (en) * | 2013-02-18 | 2013-07-31 | 新兴铸管股份有限公司 | Steel casting cinder pot |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105438960B (en) | A kind of hanging method using U-shaped movable hood type hanger erection tower kind equipment | |
CN102060232B (en) | Transportation method for refractory brick for stove construction | |
CN202764059U (en) | Clamping device for monocrystalline silicon rod squaring process | |
JP2012127103A (en) | Demolition method of cylindrical structure | |
CN107572359A (en) | A kind of method of slag ladle hook | |
CN205603044U (en) | RH vacuum impregnation pipe ring brick hoist | |
CN203382365U (en) | Lifting appliance system for lifting thin, long and thin-wall equipment integrally | |
CN205061416U (en) | OG fan tegillum hoist device | |
CN104401865B (en) | Steel billet handling appliance | |
CN104909260A (en) | Heavy-duty spring lifting method and device | |
CN203127986U (en) | Adjustable lifting tool for T joist steel formwork of high-speed rail | |
CN106312515A (en) | Hydraulic dismounting device for steel ladle trunnion | |
CN205990181U (en) | A kind of light-duty shockproof suspension hook | |
CN202346665U (en) | Lifting mechanism for heat treatment of flange | |
CN208166421U (en) | A kind of hanging apparatus of metal plate | |
CN207296350U (en) | Detachable operating platform for steel pipe column | |
CN208980168U (en) | A kind of suspender claw hook device | |
CN202379580U (en) | Pipeline horizontal lifting appliance with automatic hook | |
CN203156028U (en) | Slag-shielding device of torpedo ladle | |
CN205662225U (en) | Become a bundle semitrailer pterygoid lamina special lifting device | |
CN206375969U (en) | A kind of electrode installing device of AC single phase monopole electroslag furnace | |
CN214733811U (en) | Auxiliary hoisting tool for mounting supporting roller and centering roller of rotary hearth furnace | |
CN204474129U (en) | Upending frame | |
CN109505423A (en) | A kind of concrete chimney method for dismounting and its application | |
CN204657468U (en) | A kind of iron and steel bag dry slag hooks bag device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180112 |