CN206375969U - A kind of electrode installing device of AC single phase monopole electroslag furnace - Google Patents

A kind of electrode installing device of AC single phase monopole electroslag furnace Download PDF

Info

Publication number
CN206375969U
CN206375969U CN201720051246.0U CN201720051246U CN206375969U CN 206375969 U CN206375969 U CN 206375969U CN 201720051246 U CN201720051246 U CN 201720051246U CN 206375969 U CN206375969 U CN 206375969U
Authority
CN
China
Prior art keywords
semi
circulars
support frame
watt
hung
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720051246.0U
Other languages
Chinese (zh)
Inventor
王海明
刘需
石玉龙
张福利
孙少海
李博斌
李程
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HBIS Co Ltd
Hebei Iron and Steel Co Ltd
Original Assignee
Hebei Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Iron and Steel Co Ltd filed Critical Hebei Iron and Steel Co Ltd
Priority to CN201720051246.0U priority Critical patent/CN206375969U/en
Application granted granted Critical
Publication of CN206375969U publication Critical patent/CN206375969U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Vertical, Hearth, Or Arc Furnaces (AREA)
  • Furnace Details (AREA)

Abstract

A kind of electrode installing device of AC single phase monopole electroslag furnace, belongs to electroslag furnace maintenance of equipment technical field, for installing AC single phase monopole electrode in electroslag furnace.Its technical scheme is:Lifting deck is hung by two semi-circulars and watt constituted, the two ends that two semi-circulars are hung watt are respectively to be detachably connected, two semi-circulars hang watt diameter of bore of annulus of composition and the external diameter of dummy electrode matches, hanger is welded on lifting deck, there is load-bearing pin-and-hole respectively on the side wall that two semi-circulars are hung watt, load-bearing pin-and-hole is corresponding with the mounting hole of dummy electrode, support frame is steel frame, the bottom surface of lifting deck is placed on the annular brace platform at support frame center, there is an opening for being more than dummy electrode external diameter the side of annular brace platform, the outer end of support frame is placed on the top of watercooled hood.The utility model is simple in construction, easy to use, safe, has not only enhanced the security reliability of consutrode lifting process but also has been prevented effectively from consutrode in installation process by the situation of load-supporting part compressive strain.

Description

A kind of electrode installing device of AC single phase monopole electroslag furnace
Technical field
The utility model is related to a kind of device for installing AC single phase monopole electrode in electroslag furnace, belongs to AC single phase monopole electricity Slag hearth maintenance of equipment technical field.
Background technology
Electroslag furnace is the capital equipment of electroslag metallurgy, and electroslag metallurgy process is that metal consumable electrode is melted, molten drop was formed Cross to drippage and form the process of metal bath and metallic crystal.Consutrode is raw material and by by electric current in whole process Slag bath is heated and gradually melted away.Whether electroslag furnace wide variety, be typically fed mode and spindle by power supply mode, consutrode Movement is classified.Power supply mode is divided into direct current electroslag furnace and exchanges electroslag furnace, and general industry electroslag furnace is all using exchange electroslag Stove, exchange electroslag furnace can be divided into single-phase and multiphase electroslag furnace.Single-phase electric slag furnace is divided into single-phase single-pole electroslag furnace and single-phase twin-stage again Series connection electroslag furnace, the utility model is mainly used in single-phase single-pole electroslag furnace.
Single-phase single-pole electroslag furnace needs consutrode being installed on conductive material bar before smelting makes current loop A part.Consutrode first welds together before being connected with conductive material bar with dummy electrode, the design of conductive material bar lower tip There is pneumatic gripping device, dummy electrode, every time just can be by false electricity when conductive material bar drops to certain position as clamping object Pole is held, and such consutrode directly can just form one by dummy electrode with conductive material bar and reliably be connected.Smelt Into rear, it is necessary to which dummy electrode is removed and cut away with remaining consutrode part in case reusing from conductive material bar.At present, Dummy electrode method is installed and uses the primitive method that crowbar locks button, is existed during electrode is lifted by crane and dismounted Because clamping not strongly the phenomenon of solid electrode delamination, it is also possible to the situation of support frame deformed damaged occur, these problems all have impact on The progress of electrode dismounting work, and with certain potential safety hazard, it is quite necessary to solve.
Utility model content
The electrode that technical problem to be solved in the utility model is to provide a kind of AC single phase monopole electroslag furnace installs dress Put, this device can effectively solve the problem that the dismounting problem of dummy electrode, while ensure that weight bearing area is indeformable during being used for a long time, More convenient and quicker when using, saves the worry of repeated disassembled and assembled suspender belt, while avoiding due to electrode when loosened screw causes to lift by crane The danger come off.
Solving the technical scheme of above-mentioned technical problem is:
A kind of electrode installing device of AC single phase monopole electroslag furnace, it includes lifting deck and support frame two parts, hung The seat that is loaded is hung by two semi-circulars watt to be constituted, and the two ends that two semi-circulars are hung watt are respectively to be detachably connected, and two semi-circulars are hung Composition is annulus after watt connection, and the diameter of bore of annulus and the external diameter of dummy electrode that two semi-circulars hang watt composition match, hung Hanger is respectively welded in the be loaded upper surface hung watt of two semi-circulars of seat, has load-bearing respectively on the side wall that two semi-circulars are hung watt Pin-and-hole, load-bearing pin-and-hole is corresponding with the mounting hole of dummy electrode, and support frame is steel frame, and the center of support frame is annular brace Platform, the bottom surface that two semi-circulars of lifting deck are hung watt is placed on the annular brace platform at support frame center, annular brace platform There is an opening for being more than dummy electrode external diameter side, and the outer end of support frame is placed on the top of watercooled hood.
The electrode installing device of above-mentioned AC single phase monopole electroslag furnace, two semi-circulars of the lifting deck hang watt one There is a pin-and-hole at end respectively, and one end that two semi-circulars are hung watt is connected as the structure that is rotatably connected, two semi-rings by bearing pin through pin-and-hole The other end that shape is hung watt has a screw respectively, and two semi-circulars are hung and watt are connected as annulus by fastening bolt through screw.
The electrode installing device of above-mentioned AC single phase monopole electroslag furnace, support frame as described above is an English truss, support frame There are three triangular support arms, three support arms are circumferentially uniform, one end of three support arms and the annular at support frame center The periphery of supporting table is connected, and the other end of three support arms is respectively erected in the top of watercooled hood.
The electrode installing device of above-mentioned AC single phase monopole electroslag furnace, the upper table of the annular brace platform at support frame as described above center There is a positioning convex for installing lifting deck in face, has corresponding positioning recessed on the bottom surface that two semi-circulars of lifting deck are hung watt Groove, the positioning convex of the annular brace platform at support frame center is embedded in the detent of lifting deck.
On the electrode installing device of above-mentioned AC single phase monopole electroslag furnace, the bottom surface of three support arms of support frame as described above There is installation raised respectively, have corresponding mounting groove in the upper surface of watercooled hood, the installation projection of support arm is embedded in watercooled hood Mounting groove in.
The beneficial effects of the utility model are:
The utility model uses split-type design, and lifting deck is to be detachably connected by bearing pin and dummy electrode, support frame The top of watercooled hood is placed on, lifting deck is pushed away together with dummy electrode from the side opening of annular brace platform one at support frame center Enter in support frame, lifting deck is placed on the annular brace platform at support frame center, completes the installation of dummy electrode.The utility model Realize the safety lifting of electrode well by split-type design and dismount, fundamentally solve that dummy electrode comes off asks Topic, also makes support force enhancing of the dummy electrode in disassembly process, situations such as be not in support frame deformed damaged.The utility model Have the advantages that simple in construction, lightweight, easy installation and removal, using safety, dismount it is quick, completely can replace it is existing fall The operation of artificial dismounting afterwards, it should widely popularize application.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is Fig. 1 top view;
Fig. 3 is Fig. 1 side view;
Fig. 4 is Fig. 1 partial enlarged drawing.
Marked in figure as follows:Dummy electrode 1, consutrode 2, support frame 3, support arm 4, lifting deck 5, semi-circular hang watts 6, Bearing pin 7, hanger 8, fastening bolt 9, bearing pin 10, positioning convex 11, watercooled hood 12.
Embodiment
The utility model includes lifting deck 5 and the two parts of support frame 4, and dummy electrode 1 and consutrode 2 are welded as a whole.
Shown in figure, lifting deck 5 hangs watts 6 by two semi-circulars and constituted, the two ends that two semi-circulars hang watts 6 are respectively can Dismounting connection.There is a pin-and-hole one end that two semi-circulars of lifting deck 5 hang watts 6 respectively, and bearing pin 10 is through pin-and-hole by two semi-rings One end that shape hangs watts 6 is connected as the structure that is rotatably connected, and the other end that two semi-circulars hang watts 6 has screw, fastening bolt 9 respectively Two semi-circulars are hung watts 6 through screw and are connected as annulus.Two semi-circulars hang watt diameter of bore of the annulus of 6 compositions and vacation electricity The external diameter of pole 1 matches, and is opened in use, two semi-circulars hang watt 6 one end for having screw, with fastening spiral shell after clamping dummy electrode 1 Bolt 9 is connected.Due to being fixed using fastening bolt, so security, so avoids vacation during lifting very well The danger that electrode 1 comes off.
Shown in figure, hanger 8 is respectively welded in the upper surface that two semi-circulars of lifting deck 5 hang watts 6, in two semi-circulars There is load-bearing pin-and-hole respectively on the side wall for hanging watts 6, load-bearing pin-and-hole is corresponding with the mounting hole of dummy electrode 1.Lift the two and half of deck 5 Annular is hung watts 6 and clamped after dummy electrode 1, and bearing pin 7 is penetrated into load-bearing pin-and-hole and dummy electrode 1 that two semi-circulars hang watt 6 side walls Mounting hole, lifting deck 5 is connected as one with dummy electrode 1.
Shown in figure, support frame 3 is a steel construction English truss, and the center of support frame 3 is annular brace platform, support frame 3 have three triangular support arms 4, and three support arms 4 are circumferentially uniform, one end and the center of support frame 3 of three support arms 4 The periphery of annular brace platform is connected, and the other end of three support arms 4 is respectively erected in the top of watercooled hood 12.
Shown in figure, there is an opening for being more than the external diameter of dummy electrode 1 side of the annular brace platform at the center of support frame 3, When dismounting lifting deck 5 and dummy electrode 1, in the support frame 3 that can be pushed into dummy electrode 1 at opening, lifting deck 5 is placed On the annular brace platform at the center of support frame 3, dummy electrode 1 is located in the annular brace platform at the center of support frame 3.Due to support frame 3 It is designed with wide-angle opening, it is ensured that dummy electrode 1 is normal through thus can first putting and consutrode 2 and then install again Support frame 3, it is more flexibly convenient in operation to make smelting personnel.
Shown in figure, there is the positioning convex 11 for installing lifting deck 5 upper surface of the annular brace platform at the center of support frame 3, Two semi-circulars of lifting deck 5, which are hung on watts 6 bottom surface, corresponding detent, the annular brace platform at the center of support frame 3 Positioning convex 11 be embedded in lifting deck 5 detent in, it is ensured that the horizontal precise positioning of dummy electrode 1.
Show have installation raised on the bottom surface of three support arms 4 of support frame 3 respectively, in watercooled hood 12 in figure There is corresponding mounting groove upper surface, and the installation projection of support arm 4 is embedded in the mounting groove of watercooled hood 12.It can so play fixed The effect of the anti-skidding positioning in position, makes support frame 3 without departing from precalculated position.
Application method of the present utility model:
In use, two semi-circulars for opening lifting deck 5 hang watts 6, dummy electrode 1 is inserted in, observation bearing pin 7 inserts false electricity Two semi-circulars of closure lifting deck 5 hang watts 6 after the mounting hole of pole 1, and fastening bolt 9 is turned clockwise will lift deck 5 Two semi-circulars hang watt 6 lockings, it is ensured that dummy electrode 1 is together with the lifting close installation of deck 5.Then caught on and hung with crown block hook The precalculated position that ear 8 will be put into watercooled hood 12 with consutrode 3 and dummy electrode 1.The annular brace platform of support frame 3 is opened Support frame 3 is pushed into after mouthful alignment dummy electrode 1, three support arms 4 of support frame 3 and is placed on watercooled hood 12, makes lifting Annular brace platform of the deck 5 just to the center of support frame 3, overhead traveling crane, which slowly puts down dummy electrode 1, makes the groove and branch of the bottom of lifting deck 5 Positioning convex 11 on support 3 is engaged.
Crown block hook disengages hanger 8, carries out the installation operation of conductive material bar and dummy electrode 1.
Crown block hook catches on hanger 8 and slings dummy electrode 1 and remaining consutrode 2 to precalculated position after the completion of smelting, takes Dummy electrode 1 and remaining consutrode 2 are hung specified location by lower support arm 3, overhead traveling crane, tear lifting deck 5 open.

Claims (5)

1. a kind of electrode installing device of AC single phase monopole electroslag furnace, it is characterised in that:It includes lifting deck(5)And support Frame(3)Two parts, lift deck(5)Hung watt by two semi-circulars(6)Composition, two semi-circulars are hung watt(6)Two ends be respectively It is detachably connected, two semi-circulars are hung watt(6)Composition is annulus after connection, and two semi-circulars are hung watt(6)The annulus of composition it is interior Bore dia and dummy electrode(1)External diameter match, lift deck(5)Two semi-circulars hang watt(6)Upper surface be respectively welded Hanger(8), hung watt in two semi-circulars(6)Side wall on have load-bearing pin-and-hole, load-bearing pin-and-hole and dummy electrode respectively(1)Mounting hole It is corresponding, support frame(3)For steel frame, support frame(3)Center be annular brace platform, lift deck(5)Two semi-rings Shape is hung watt(6)Bottom surface be placed on support frame(3)On the annular brace platform at center, the side of annular brace platform has one to be more than vacation Electrode(1)The opening of external diameter, support frame(3)Outer end be placed on watercooled hood(12)Top.
2. the electrode installing device of AC single phase monopole electroslag furnace according to claim 1, it is characterised in that:The lifting Deck(5)Two semi-circulars hang watt(6)One end have pin-and-hole, bearing pin respectively(10)Two semi-circulars are hung watt through pin-and-hole (6)One end be connected as the structure that is rotatably connected, two semi-circulars are hung watt(6)The other end have screw, fastening bolt respectively(9) Two semi-circulars are hung watt through screw(6)It is connected as annulus.
3. the electrode installing device of AC single phase monopole electroslag furnace according to claim 2, it is characterised in that:The support Frame(3)It is an English truss, support frame(3)There are three triangular support arms(4), three support arms(4)It is circumferentially uniform, Three support arms(4)One end and support frame(3)The periphery of the annular brace platform at center is connected, three support arms(4)It is another One end is respectively erected in watercooled hood(12)Top.
4. the electrode installing device of AC single phase monopole electroslag furnace according to claim 3, it is characterised in that:The support Frame(3)There is installation lifting deck the upper surface of the annular brace platform at center(5)Positioning convex(11), lift deck(5)Two Individual semi-circular is hung watt(6)Bottom surface on have corresponding detent, support frame(3)The positioning convex of the annular brace platform at center (11)It is embedded in lifting deck(5)Detent in.
5. the electrode installing device of AC single phase monopole electroslag furnace according to claim 4, it is characterised in that:The support Frame(3)Three support arms(4)Bottom surface on have installation raised respectively, in watercooled hood(12)Upper surface have corresponding peace Tankage, support arm(4)Installation projection be embedded in watercooled hood(12)Mounting groove in.
CN201720051246.0U 2017-01-17 2017-01-17 A kind of electrode installing device of AC single phase monopole electroslag furnace Expired - Fee Related CN206375969U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720051246.0U CN206375969U (en) 2017-01-17 2017-01-17 A kind of electrode installing device of AC single phase monopole electroslag furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720051246.0U CN206375969U (en) 2017-01-17 2017-01-17 A kind of electrode installing device of AC single phase monopole electroslag furnace

Publications (1)

Publication Number Publication Date
CN206375969U true CN206375969U (en) 2017-08-04

Family

ID=59400113

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720051246.0U Expired - Fee Related CN206375969U (en) 2017-01-17 2017-01-17 A kind of electrode installing device of AC single phase monopole electroslag furnace

Country Status (1)

Country Link
CN (1) CN206375969U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113862487A (en) * 2021-08-25 2021-12-31 山东莱锻机械股份有限公司 Vacuum electroslag furnace convenient for feeding

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113862487A (en) * 2021-08-25 2021-12-31 山东莱锻机械股份有限公司 Vacuum electroslag furnace convenient for feeding

Similar Documents

Publication Publication Date Title
CN206375969U (en) A kind of electrode installing device of AC single phase monopole electroslag furnace
CN106011366B (en) Converter taphole complexes combined method installation method
CN201367299Y (en) Sling for lifting large-scale coke oven doors
CN207877121U (en) A kind of equipment for supporting patient with burn of steel box-girder
CN104668933B (en) Disassembling and assembling method for rotating arm and pivot of turbine runner
CN206974161U (en) Combined zinc alloy production metallurgical furnace
CN206927468U (en) A kind of charging device for iron-smelting furnace
CN206088741U (en) Hoist of safe handling converter sublance
CN207061632U (en) A kind of annular holder for stopper handling
CN206127443U (en) Dual -purpose hoist of anode steel claw and guide arm
CN205816797U (en) A kind of ladle is with turning over bag apparatus
CN204975311U (en) Two safety mechanism of ladle auxiliary hook
CN212388088U (en) Novel monopole electroslag furnace
CN104671061B (en) The dismounting of web turnover lifting appliance bolt, installation method
CN215626196U (en) Sling of auxiliary electrode for vacuum consumable electrode furnace
KR100931661B1 (en) Crane hook separator
CN205367470U (en) Raw materials overhead hoist for steel factory
CN221607589U (en) Electrolytic bath cathode carbon block lifting appliance
CN209614234U (en) Packet device is turned over used in a kind of high-temperature fusant smelting process
CN219341399U (en) Special vertical hoisting clamp for electroslag ingot
CN203820814U (en) Replacement and transport device for blast furnace cooling wall
CN208532001U (en) A kind of die casting aluminium foundry returns handling apparatus
CN218754526U (en) Concentric jib of holding balance
CN108715400A (en) Metallurgy, which is hung, to be hung with automatic picking off and hanging hook and metallurgy with hot-metal bottle tipping suspender
CN207046160U (en) Waste storage tank

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170804

Termination date: 20200117