CN107565451B - A kind of ultra-high-tension power transmission line maintenance auxiliary tool transmitting coaster - Google Patents

A kind of ultra-high-tension power transmission line maintenance auxiliary tool transmitting coaster Download PDF

Info

Publication number
CN107565451B
CN107565451B CN201710898959.5A CN201710898959A CN107565451B CN 107565451 B CN107565451 B CN 107565451B CN 201710898959 A CN201710898959 A CN 201710898959A CN 107565451 B CN107565451 B CN 107565451B
Authority
CN
China
Prior art keywords
plate
axis
lock
padlock
articulated slab
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710898959.5A
Other languages
Chinese (zh)
Other versions
CN107565451A (en
Inventor
乐晓红
马秀秀
刘亚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Southeast Jitong Network Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710898959.5A priority Critical patent/CN107565451B/en
Publication of CN107565451A publication Critical patent/CN107565451A/en
Application granted granted Critical
Publication of CN107565451B publication Critical patent/CN107565451B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a kind of ultra-high-tension power transmission line maintenance auxiliary tools to transmit coaster, its structure includes hanging ring, articulated slab, outer wheel plate, connecting plate, plate hangs structure, movable pulley forms, articulated slab bottom outside is welded to each other with outer wheel plate upper inner, for outer wheel plate far from being welded on the outside of connecting plate upper end on the inside of one end of articulated slab, articulated slab and connecting plate are in same level position.Rope of the present invention passes through after plate hangs structure and realizes and fix by a plate and axis two plates of lock for axis lock;Rope is then passed through plate and hangs between structure and movable pulley, cooperates opposing compression by panel, top pillar and buffering center pillar, while driving two buffer board rotations, a buffer board carries out whole be auxiliarily fixed;Rope sequentially passes through between top sheave and bottom pulley, in solid padlock for fixing top sheave and bottom pulley;A plurality of rope can be set up simultaneously, can also will not be loosened with average force, and when rope drives wheel to roll after setting up a plurality of rope, it is stable, it ensures safety.

Description

A kind of ultra-high-tension power transmission line maintenance auxiliary tool transmitting coaster
Technical field
The present invention is a kind of ultra-high-tension power transmission line maintenance auxiliary tool transmitting coaster, belongs to transmitting coaster field.
Background technique
Coaster is essential tool in transmitting equipment, material work in power transmission lines overhauling.
Prior art discloses application No. is: 201610243009.4, a kind of transmitting coaster, it is characterised in that: described Coaster is transmitted, including transmitting coaster handle, hook, wear-resistant block link up with curved handle, articulated shaft, connecting rod, the coaster with pulley; Wherein: transmitting coaster handle is connected to the upper side of hook, and wear-resistant block is arranged in hook inside, and hook connects with hook curved handle It connects, hook curved handle is connect by articulated shaft with connecting rod, and the bottom connection of connecting rod has the coaster of pulley.Of the invention is excellent Point: transmitting coaster of the present invention, theory structure is simple, and manufacture and use are convenient, effectively increases construction efficiency, drops simultaneously Low operational risk.But the prior art can only set up single cord, setting up after a plurality of rope can not average force, and restrict When subband driving wheel rolls, fluctuation of service can not ensure safety.
Summary of the invention
In view of the deficienciess of the prior art, it is an object of the present invention to provide a kind of ultra-high-tension power transmission line maintenance auxiliary tools to pass Pass coaster, with solve can only set up single cord, setting up after a plurality of rope can not average force, and rope drive wheel When rolling, fluctuation of service can not ensure safe problem.
To achieve the goals above, the present invention is to realize by the following technical solutions: a kind of ultra-high-tension power transmission line inspection Auxiliary tool transmitting coaster is repaired, structure includes hanging ring, articulated slab, outer wheel plate, connecting plate, plate hangs structure, movable pulley forms, institute It states articulated slab bottom outside to be welded to each other with outer wheel plate upper inner, the outer wheel plate is welded with far from one end inside of articulated slab On the outside of connecting plate upper end, the articulated slab and connecting plate are in same level position, the articulated slab for being inverted U shape structure be ellipse The hanging ring of round shape is connected by stud, and the plate hangs the hollow portion that structure is connected to articulated slab by axis lock, the movable pulley It is mounted on outer wheel plate middle by buffering lock shaft, the plate hangs structure and is made of axis lock, hanger, base ring, and the axis lock is equipped with 2 It is a to be symmetric, extend through hanger both ends, the base ring is fixedly connected on hanger bottom, the movable pulley by top sheave, In solid padlock, bottom pulley composition, the top sheave pass through with bottom pulley in consolidate padlock and be flexibly connected, the diameter of the top sheave is small In bottom pulley, the top sheave is parallel to each other with bottom pulley, the top sheave, in solid padlock, bottom pulley blocks integrally change structure, Solid padlock is equipped with a pair in described, is made of padlock fixed board, round buckle, and the padlock fixed board, round buckle cooperate, and the padlock is fixed Plate and round buckle group become triangular structure, and the buffering lock shaft is by panel, top pillar, a buffer board, buffering center pillar, two bufferings Board group is at the panel, top pillar, a buffer board group become rectangular configuration, and the buffering center pillar becomes with two buffer board groups Cross structure, the panel medial surface are welded with top pillar upper end, and a buffer board, institute are run through in top pillar one end of the separate panel It states buffering center pillar upper end and is engaged in a buffer board, two buffer boards are run through in the buffering center pillar bottom end, and the outer wheel plate is equipped with Add a layer wheel plate, for described plus layer wheel plate by adding a layer plectane, ring item to form, the splicing of described plus layer plectane has ring item, described plus layer plectane Concentric circles is in ring item.
Further, the axis lock includes that axis locks a plate, axis Lock shaft bar, two plates of axis lock, axis three plates of lock, the axis Lock a plate, axis locks two plates, axis locks three plates and distinguishes parallel, outer spiral shell of the axis Lock shaft bar through axis two plates of lock and both ends Line locks a plate with axis respectively, the internal screw thread of axis three plates of lock is connect.
Further, the padlock fixed board includes ball, rolls shaft, lockplate ontology, is set in the middle part of the rolling shaft There is ball, the rolling shaft is through lockplate ontology and engages.
Further, the buffering center pillar include a segmented column, two segmented columns, three segmented columns, four segmented columns, five segmented columns, six section gasket rings, Seven segmented columns, a segmented column, two segmented columns, three segmented columns, four segmented columns, five segmented columns, six section gasket rings, seven segmented columns successively arrange from top to bottom And it cooperates.
Further, described plus layer plectane includes plus layer plectane ontology, extending column, center collar extension, the extending column are equipped with 4 It is a, it is respectively welded in adding layer rounded difference of plectane medial surface, and be located in ring inner ring, during described plus layer plectane ontology is equipped with Thimble mouth, the center collar extension, which is located at, to be added at layer plectane body central and is equipped with perforation.
Beneficial effect
A kind of ultra-high-tension power transmission line maintenance auxiliary tool of the present invention transmits coaster, is carrying out in use, hanging ring is hung finger Positioning is set, as needed the quantity of rope needed for selection, and quantity is between 1 to 3, and can also hang 3 simultaneously then will rope Son penetrates articulated slab and outer wheel plate, hangs structure by the plate in articulated slab and outer wheel plate, sliding is realized in movable pulley cooperation.
Rope of the present invention, which passes through plate and hangs after structure, locks a plate by the axis that axis is locked and axis is locked two plates and realized and fixes, axis lock It is dynamic that shaft and axis lock three plate mating band turns;Rope is then passed through plate and hangs between structure and movable pulley, by panel, top pillar and delays Center pillar cooperation opposing compression is rushed, while driving two buffer board rotations, a buffer board carries out whole be auxiliarily fixed;Rope according to It is secondary across top sheave and bottom pulley, in solid padlock for fixing top sheave and bottom pulley;A plurality of rope can be set up simultaneously, It can also will not be loosened with average force, and when rope drives wheel to roll after setting up a plurality of rope, it is stable, it ensures Safety.
Detailed description of the invention
Upon reading the detailed description of non-limiting embodiments with reference to the following drawings, other feature of the invention, Objects and advantages will become more apparent upon:
Fig. 1 is that a kind of ultra-high-tension power transmission line of the present invention overhauls the structural schematic diagram that auxiliary tool transmits coaster.
Fig. 2 is that a kind of ultra-high-tension power transmission line of the present invention overhauls the structural schematic diagram that auxiliary tool transmits coaster side.
Fig. 3 is the structural schematic diagram that plate of the present invention hangs structure.
Fig. 4 is the structural schematic diagram of axis of the present invention lock.
Fig. 5 is the structural schematic diagram of movable pulley of the present invention.
Fig. 6 is the structural schematic diagram of present invention buffering lock shaft.
Fig. 7 is the structural schematic diagram of present invention buffering center pillar.
Fig. 8 is the structural schematic diagram of the present invention plus layer wheel plate
Fig. 9 is the structural schematic diagram of padlock fixed board of the present invention.
In figure: hanging ring -1, articulated slab -2, outer wheel plate -3, connecting plate -4, plate hang structure -5, movable pulley -6, buffering lock shaft - 60, axis lock -50, hanger -51, base ring -52, top sheave -61, in solid padlock -62, bottom pulley -63, buffering center pillar -603 plus layer Wheel plate -30 plus layer plectane -300, ring item -301, axis lock a plate -500, axis Lock shaft bar -501, axis and lock two plates -502, axis lock Three plates -503, roll shaft -6201, lockplate ontology -6202, a segmented column -6030, two segmented columns -6031, three at ball -6200 Segmented column -6032, four segmented columns -6033, five segmented columns -6034, six section gasket rings -6035, seven segmented columns -6036 plus layer plectane ontology - 3000, extending column -3001, center collar extension -3002, padlock fixed board -620, round buckle -621, panel -600, top pillar -601, one it is slow Punching -602, buffering center pillar -603, two buffer boards -604.
Specific embodiment
To be easy to understand the technical means, the creative features, the aims and the efficiencies achieved by the present invention, below with reference to Specific embodiment, the present invention is further explained.
Embodiment 1:
Fig. 1-Fig. 9 is please referred to, the present invention provides a kind of ultra-high-tension power transmission line maintenance auxiliary tool transmitting coaster: its structure packet Include that hanging ring 1, articulated slab 2, outer wheel plate 3, connecting plate 4, plate hang structure 5, movable pulley 6 forms, 2 bottom outside of articulated slab and outer 3 upper inner of wheel plate is welded to each other, and the outer wheel plate 3 is welded on the outside of 4 upper end of connecting plate far from one end inside of articulated slab 2, The articulated slab 2 and connecting plate 4 be in same level position, the articulated slab 2 for being inverted U shape structure be elliptoid hanging ring 1 It is connected by stud, the plate hangs the hollow portion that structure 5 is connected to articulated slab 2 by axis lock 50, and the movable pulley 6 passes through slow It rushes lock shaft 60 and is mounted on outer 3 middle of wheel plate, the plate hangs structure 5 and is made of axis lock 50, hanger 51, base ring 52, the axis lock 50, which are equipped with 2, is symmetric, and extends through 51 both ends of hanger, the base ring 52 is fixedly connected on 51 bottom of hanger, and plate hangs knot Structure 5 is mounted on articulated slab 2, and the space of articulated slab 2 is rationally utilized;The movable pulley 6 by top sheave 61, in solid padlock 62, Bottom pulley 63 form, the top sheave 61 pass through with bottom pulley 63 in consolidate padlock 62 be flexibly connected, the diameter of the top sheave 61 Less than bottom pulley 63, the top sheave 61 is parallel to each other with bottom pulley 63, the top sheave 61, in solid padlock 62, bottom pulley 63 Form integral structure, it is described in solid padlock 62 be equipped with a pair, be made of padlock fixed board 620, round buckle 621, the padlock fixed board 620, round buckle 621 cooperates, and the padlock fixed board 620 becomes triangular structure with 621 groups of round buckle, the buffering lock shaft 60 by Panel 600,601, buffer boards 602 of top pillar, buffering 603, two buffer boards 604 of center pillar form, the panel 600, top pillar 601, becoming rectangular configuration for one 602 groups of buffer board, the buffering center pillar 603 and two 604 groups of buffer board become cross structure, 600 medial surface of panel is welded with 601 upper end of top pillar, and a buffer board is run through in 601 one end of top pillar of the separate panel 600 602,603 upper end of buffering center pillar is engaged in a buffer board 602, and two buffer boards are run through in 603 bottom end of buffering center pillar 604, the top sheave 61 and bottom pulley 63 of movable pulley 6 are designed using integral structure, effectively reduce material cost, and whole utilization Rate is big;The outer wheel plate 3 is equipped with plus layer wheel plate 30, and described plus layer wheel plate 30 is described to add by adding layer plectane 300, ring item 301 to form The layer splicing of plectane 300 has ring item 301, and described plus layer plectane 300 and ring item 301 are in concentric circles, and the axis lock 50 includes that axis is locked One plate 500, axis Lock shaft bar 501, axis lock two plates 502, axis locks three plates 503, and the axis locks a plate 500, axis locks two Plate 502, axis lock three plates 503 respectively in parallel, and the axis Lock shaft bar 501 locks the external screw thread point at two plates 502 and both ends through axis The internal screw thread for locking three plates 503 with one plate 500 of axis lock, axis is connect, and axis lock 50 makes to restrict using rotation and reinforcing integrated design It is laborsaving and stable when Suo Ladong;The padlock fixed board 620 includes ball 6200, rolls shaft 6201, lockplate ontology 6202, institute It states to roll and is equipped with ball 6200 in the middle part of shaft 6201, the rolling shaft 6201 is through lockplate ontology 6202 and engages, padlock The design of fixed board 620 is conducive to the disassembly and fixation of top sheave 61, if top sheave 61 can be dismantled when without setting up a plurality of rope, Save cost;The buffering center pillar 603 includes a segmented column 6030, two segmented columns 6031, three segmented columns 6032, four segmented columns 6033, five sections Column 6034, six section gasket rings 6035, seven segmented columns 6036, a segmented column 6030, two segmented columns 6031, three segmented columns 6032, four segmented columns 6033, five segmented columns 6034, six section gasket rings 6035, seven segmented columns 6036 are successively arranged and are cooperated from top to bottom, same for rotating When play buffer function;Described plus layer plectane 300 includes adding layer plectane ontology 3000, extending column 3001, center collar extension 3002, institute Extending column 3001 is stated equipped with 4, is respectively welded in adding the rounded difference of 300 medial surface of layer plectane, and be located at 301 inner ring of ring item Interior, described plus layer plectane ontology 3000 is equipped with center collar extension 3002, and the center collar extension 3002 is located at plus layer plectane ontology 3000 At center and it is equipped with perforation, the design of ring item 301 is reduced the friction ratio of rope, extended using rope service life, while adding layer circle The thickening design service life of plate ontology 3000 is long, and rope pulls also more stable.
Movable pulley described in this patent is that one kind can substitute tradition using rolling bar as the haulage equipment of handbarrow, Ke Yijie Save a large amount of manpower and time.Such as crawler type movable pulley, slope climbing type movable pulley, universal movable pulley, rubber formula movable pulley.
In progress in use, hanging ring 1 is hung designated position, the quantity of the rope needed for selecting as needed, quantity 1 To between 3,3 can also be hung simultaneously, rope is then penetrated into articulated slab 2 and outer wheel plate 3, passes through articulated slab 2 and outer wheel plate 3 Interior plate hangs structure 5, sliding is realized in the cooperation of movable pulley 6.As ultra-high-tension power transmission line maintenance using auxiliary tool transmitting coaster into Row coordinating operation, it is time saving and energy saving high-efficient.
The problems solved by the invention prior art can only set up single cord, can not be averaged setting up after a plurality of rope Stress, and when rope drive wheel rolling, fluctuation of service can not ensure safety.The present invention pass through above-mentioned component mutual group It closes, can achieve rope and hung after structure across plate and a plate is locked by the axis that axis is locked and axis is locked two plates and realized and fixes, axis lock shaft It is dynamic that bar and axis lock three plate mating band turns;Rope is then passed through plate and hangs between structure and movable pulley, passes through panel, top pillar and buffering Center pillar cooperates opposing compression, while driving two buffer board rotations, and a buffer board carries out whole be auxiliarily fixed;Rope is successively Across top sheave and bottom pulley, in solid padlock for fixing top sheave and bottom pulley;A plurality of rope can be set up simultaneously, i.e., Making to set up after a plurality of rope can also will not loosen with average force, and when rope drives wheel to roll, stable, ensure Safety, described in detail below:
The articulated slab 2 and connecting plate 4 be in same level position, the articulated slab 2 for being inverted U shape structure be ellipticity Hanging ring 1 be connected by stud, the plate hangs the hollow portions that structure 5 is connected to articulated slab 2 by axis lock 50, the movable pulley 6 are mounted on outer 3 middle of wheel plate by buffering lock shaft 60, and the plate hangs structure 5 and is made of axis lock 50, hanger 51, base ring 52, institute It states axis lock 50 to be symmetric equipped with 2, extends through 51 both ends of hanger, the base ring 52 is fixedly connected on 51 bottom of hanger, The movable pulley 6 by top sheave 61, in solid padlock 62, bottom pulley 63 form, the top sheave 61 and bottom pulley 63 pass through in it is solid Padlock 62 is flexibly connected, and the diameter of the top sheave 61 is less than bottom pulley 63, and the top sheave 61 is parallel to each other with bottom pulley 63, The top sheave 61, in solid padlock 62, bottom pulley 63 form integral structure, it is described in solid padlock 62 be equipped with a pair, by padlock Fixed board 620, round buckle 621 form, and the padlock fixed board 620, round buckle 621 cooperate, the padlock fixed board 620 and round buckle 621 Group becomes triangular structure, and the buffering lock shaft 60 is by panel 600,601, buffer boards 602 of top pillar, buffering center pillar 603, two Portion's buffer board 604 form, the panel 600,601, one 602 groups of buffer board of top pillar become rectangular configuration, the buffering center pillar 603 and two 604 groups of buffer board become cross structure, 600 medial surface of panel is welded with 601 upper end of top pillar, described separate A buffer board 602 is run through in 601 one end of top pillar of panel 600, and 603 upper end of buffering center pillar is engaged in a buffer board 602, Two buffer boards 604 are run through in 603 bottom end of buffering center pillar, and the outer wheel plate 3 is equipped with plus layer wheel plate 30, described plus layer wheel plate 30 By adding layer plectane 300, ring item 301 to form, the splicing of described plus layer plectane 300 has ring item 301, described plus layer plectane 300 and ring item 301 are in concentric circles.
The above shows and describes the basic principles and main features of the present invention and the advantages of the present invention, for this field skill For art personnel, it is clear that invention is not limited to the details of the above exemplary embodiments, and without departing substantially from spirit of the invention or In the case where essential characteristic, the present invention can be realized in other specific forms.Therefore, in all respects, should all incite somebody to action Embodiment regards exemplary as, and is non-limiting, the scope of the present invention by appended claims rather than on state Bright restriction, it is intended that including all changes that fall within the meaning and scope of the equivalent elements of the claims in the present invention It is interior.Any reference signs in the claims should not be construed as limiting the involved claims.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should It considers the specification as a whole, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art The other embodiments being understood that.

Claims (5)

1. a kind of ultra-high-tension power transmission line maintenance auxiliary tool transmits coaster, structure includes hanging ring (1), articulated slab (2), outer wheel plate (3), connecting plate (4), plate hang structure (5), movable pulley (6) composition, articulated slab (2) bottom outside and outer wheel plate (3) top Inside is welded to each other, and the outer wheel plate (3) is welded on the outside of connecting plate (4) upper end far from one end inside of articulated slab (2), special Sign is:
The articulated slab (2) and connecting plate (4) are in same level position, and the articulated slab (2) is led to for elliptoid hanging ring (1) It crosses stud to be connected, the plate hangs the hollow portion that structure (5) is connected to articulated slab (2) by axis lock (50), the movable pulley (6) It is mounted on outer wheel plate (3) middle by buffering lock shaft (60), the plate hangs structure (5) and locks (50), hanger (51), base ring by axis (52) it forms, the axis lock (50) is equipped with 2 and is symmetric, and extends through hanger (51) both ends, and the base ring (52) is fixed Be connected to hanger (51) bottom, the movable pulley (6) by top sheave (61), in solid padlock (62), bottom pulley (63) form, it is described Top sheave (61) pass through with bottom pulley (63) in solid padlock (62) is flexibly connected, the diameter of the top sheave (61) is less than bottom pulley (63), the top sheave (61) is parallel to each other with bottom pulley (63), the top sheave (61), in solid padlock (62), bottom pulley (63) form integral structure, it is described in solid padlock (62) be equipped with a pair, be made of padlock fixed board (620), round buckle (621), institute Padlock fixed board (620), round buckle (621) mutual cooperation are stated, the padlock fixed board (620) and round buckle (621) group become triangle knot Structure, the buffering lock shaft (60) are delayed by panel (600), top pillar (601), a buffer board (602), buffering center pillar (603), two Punching (604) composition, the panel (600), top pillar (601), buffer board (602) group become rectangular configuration, the buffering Center pillar (603) becomes cross structure with two buffer board (604) groups, and panel (600) medial surface is welded on top pillar (601) A buffer board (602), buffering center pillar (603) upper end are run through in top pillar (601) one end at end, the separate panel (600) It is engaged in a buffer board (602), two buffer boards (604) are run through in the buffering center pillar (603) bottom end;
The outer wheel plate (3) is equipped with plus layer wheel plate (30), and described plus layer wheel plate (30) are by adding a layer plectane (300), ring item (301) group At described plus layer plectane (300), which are glued, to be had ring item (301), and described plus layer plectane (300) and ring item (301) are in concentric circles.
2. a kind of ultra-high-tension power transmission line maintenance auxiliary tool according to claim 1 transmits coaster, it is characterised in that: described Axis lock (50) includes that axis locks a plate (500), axis Lock shaft bar (501), two plates (502) of axis lock, axis three plates (503) of lock, institute It states axis and locks three plate (500), two plates (502) of axis lock, axis lock plates (503) respectively in parallel, the axis Lock shaft bar (501) is passed through It wears axis two plates (502) of lock and the external screw thread at both ends locks a plate (500) with axis respectively, axis locks the internal screw thread of three plates (503) Connection.
3. a kind of ultra-high-tension power transmission line maintenance auxiliary tool according to claim 1 transmits coaster, it is characterised in that: described Padlock fixed board (620) includes ball (6200), rolls shaft (6201), lockplate ontology (6202), the rolling shaft (6201) middle part is equipped with ball (6200), and the rolling shaft (6201) is through lockplate ontology (6202) and engages.
4. a kind of ultra-high-tension power transmission line maintenance auxiliary tool according to claim 1 transmits coaster, it is characterised in that: described Buffering center pillar (603) includes a segmented column (6030), two segmented columns (6031), three segmented columns (6032), four segmented columns (6033), five segmented columns (6034), six section gasket rings (6035), seven segmented columns (6036), a segmented column (6030), two segmented columns (6031), three segmented columns (6032), four segmented columns (6033), five segmented columns (6034), six section gasket rings (6035), seven segmented columns (6036) successively arrange from top to bottom And it cooperates.
5. a kind of ultra-high-tension power transmission line maintenance auxiliary tool according to claim 1 transmits coaster, it is characterised in that: described Adding a layer plectane (300) includes adding layer plectane ontology (3000), extending column (3001), center collar extension (3002), the extending column (3001) 4 are equipped with, is respectively welded in adding the rounded difference of a layer plectane (300) medial surface, and be located in ring item (301) inner ring, Described plus layer plectane ontology (3000) is equipped with center collar extension (3002), and the center collar extension (3002) is located at plus layer plectane ontology (3000) at center and equipped with perforation.
CN201710898959.5A 2017-09-28 2017-09-28 A kind of ultra-high-tension power transmission line maintenance auxiliary tool transmitting coaster Active CN107565451B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710898959.5A CN107565451B (en) 2017-09-28 2017-09-28 A kind of ultra-high-tension power transmission line maintenance auxiliary tool transmitting coaster

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710898959.5A CN107565451B (en) 2017-09-28 2017-09-28 A kind of ultra-high-tension power transmission line maintenance auxiliary tool transmitting coaster

Publications (2)

Publication Number Publication Date
CN107565451A CN107565451A (en) 2018-01-09
CN107565451B true CN107565451B (en) 2019-09-13

Family

ID=60982070

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710898959.5A Active CN107565451B (en) 2017-09-28 2017-09-28 A kind of ultra-high-tension power transmission line maintenance auxiliary tool transmitting coaster

Country Status (1)

Country Link
CN (1) CN107565451B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204384794U (en) * 2014-12-02 2015-06-10 河北神力索具有限公司 A kind of improvement unload button-type pulley structure
CN105591315A (en) * 2015-12-30 2016-05-18 国家电网公司 Steering pulley for net blocking during high-voltage power transmission construction
CN205367562U (en) * 2016-02-02 2016-07-06 贵州电网有限责任公司贵阳供电局 Coaster slowly falls in electric line heavy object
CN205820776U (en) * 2016-07-22 2016-12-21 甘肃送变电工程公司 Four-wheel-type corner block

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204384794U (en) * 2014-12-02 2015-06-10 河北神力索具有限公司 A kind of improvement unload button-type pulley structure
CN105591315A (en) * 2015-12-30 2016-05-18 国家电网公司 Steering pulley for net blocking during high-voltage power transmission construction
CN205367562U (en) * 2016-02-02 2016-07-06 贵州电网有限责任公司贵阳供电局 Coaster slowly falls in electric line heavy object
CN205820776U (en) * 2016-07-22 2016-12-21 甘肃送变电工程公司 Four-wheel-type corner block

Also Published As

Publication number Publication date
CN107565451A (en) 2018-01-09

Similar Documents

Publication Publication Date Title
CN203889873U (en) Multifunctional combined practical type beam engine compartment lifting sling
CN105110213A (en) Crane provided with counterweight balance mechanism adopting dead weight of hoisted object as well as crane transformation scheme
CN109231019A (en) A kind of hanging device of non-woven fabrics
CN107565451B (en) A kind of ultra-high-tension power transmission line maintenance auxiliary tool transmitting coaster
CN201485171U (en) Crane and hoisting hook device thereof
CN209177894U (en) A kind of tower crane attached mounting-demounting hoisting device
CN202030434U (en) Large-span whole-section hoisting sling for steel box girder
CN200974728Y (en) One-machine-multiple-rope foursquare suspension swaying-free nacelle synchronous hoisting mechanism
CN108862006A (en) A kind of crane suspender of high safety
CN104649127A (en) Flexible self-balance multi-suspension-point hanging beam structure
CN209428023U (en) Suspension apparatus is drawn high for replace linear insulator
CN202323488U (en) Screwed clothes hanger
CN202284116U (en) Lifting appliance special for large equipment
CN210214538U (en) Lifting device
CN202148473U (en) Dragging machine special for railway
CN210393417U (en) Polyurethane steel wire suspender
CN202337635U (en) Safety hook rigging with handle
CN201082851Y (en) Weight-balancing locking mechanism for crawler crane
CN214059604U (en) Rigging with double-ring connection device
CN206088818U (en) Arm equipment is torn open in extra -large -size tower machine high altitude
CN108821100A (en) A kind of crane suspension hook that fastness is strong
CN207260634U (en) A kind of high strength steel structure stand
CN109869100A (en) A kind of novel marine riser elevator spider
CN216377154U (en) Multi-joint steel wire rope rigging with buffering performance
CN216336113U (en) Fan tower cylinder hoisting device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20190820

Address after: 350200 No. 15 Xiqian Road, Dongdu Village, Yutian Town, Changle City, Fuzhou City, Fujian Province

Applicant after: Chen Jianqing

Address before: 730020 No. 3 Jiayuguan West Road, Chengguan District, Lanzhou City, Gansu Province

Applicant before: Yue Xiaohong

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20221128

Address after: No. 208, Jinhu West Road, Shancheng Town, Taining County, Sanming City, Fujian Province

Patentee after: Taining power supply company of State Grid Fujian Electric Power Co.,Ltd.

Patentee after: Sanming Yiyuan Electric Power Engineering Construction Co.,Ltd. Taining Branch

Patentee after: SANMING POWER SUPPLY COMPANY OF STATE GRID FUJIAN ELECTRIC POWER Co.,Ltd.

Address before: No. 15 Xiqian Road, Dongdu Village, Yutian Town, Changle City, Fuzhou City, Fujian Province 350200

Patentee before: Chen Jianqing

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230726

Address after: 311400 No. 20, Yuyang Road, Lushan Street, Fuyang District, Hangzhou City, Zhejiang Province

Patentee after: HANGZHOU SOUTHEAST JITONG NETWORK CO.,LTD.

Address before: No. 208, Jinhu West Road, Shancheng Town, Taining County, Sanming City, Fujian Province

Patentee before: Taining power supply company of State Grid Fujian Electric Power Co.,Ltd.

Patentee before: Sanming Yiyuan Electric Power Engineering Construction Co.,Ltd. Taining Branch

Patentee before: SANMING POWER SUPPLY COMPANY OF STATE GRID FUJIAN ELECTRIC POWER Co.,Ltd.

TR01 Transfer of patent right