CN107562495A - The startup method and starter of a kind of application program - Google Patents
The startup method and starter of a kind of application program Download PDFInfo
- Publication number
- CN107562495A CN107562495A CN201710597231.9A CN201710597231A CN107562495A CN 107562495 A CN107562495 A CN 107562495A CN 201710597231 A CN201710597231 A CN 201710597231A CN 107562495 A CN107562495 A CN 107562495A
- Authority
- CN
- China
- Prior art keywords
- application program
- startup
- priority
- duration
- loading
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Stored Programmes (AREA)
Abstract
This application discloses the startup method and starter of a kind of application program, startup method comprises the following steps:After startup item corresponding to the first application program loads the first duration, startup item corresponding to the second application program is loaded;Wherein, the startup priority of second application program is less than the startup priority of first application program, and first duration is at least first application program and completes to start the duration needed.Because after the first duration, the first application program starts completely, so not having corresponding resource load conflict during the second application program launching, avoids because caused by resource load conflict the problem of starting up's overlong time.
Description
Technical field
The application is related to field of computer technology, more particularly to the startup method and starter of a kind of application program.
Background technology
In order to realize the automatic opening of function of application, most computers system all sets corresponding with application program
Startup item.After operating system is completed to load, corresponding application program launching can be triggered by loading startup item.In startup item
In the case of multiple, after multiple startup item triggerings, application program corresponding to the multiple startup items of computer parallel processing system, journey is realized
The load operating of sequence.
In the case of application program is small programs, occupying system resources are less, operating system has enough systems
The startup and operation of the multiple application programs of resource bearing, the problem of computer starting will not being caused long;And apply journey when multiple
Sequence is large program, needed in the case of taking a large amount of system resources, and operating system loads multiple startup items startups pair simultaneously
During the application program answered, multiple application programs are run and may cause resource load conflict, cause starting up's overlong time simultaneously;
At some in particular cases, multiple application programs run conflict and may also result in system simultaneously delays machine.
The content of the invention
This application provides the startup method and starter of a kind of application program, to solve multiple startup items quilts while add
Carry and cause multiple application programs concurrently to start, resource load conflict and caused by starting up's time course the problem of.
The embodiment of the present invention provides a kind of startup method of application program, comprises the following steps:
After startup item corresponding to the first application program loads the first duration, start corresponding to the second application program of loading
;
Wherein, the startup priority of second application program is less than the startup priority of first application program, institute
State the first duration and be at least the duration that first application program completes startup needs.
Optionally, startup item corresponding to the second application program is loaded as steps described below:
The enabled instruction of user is received, in the 3rd application according to corresponding to starting the enabled instruction after the first duration
Program;
After the 3rd duration, startup item corresponding to second application program is loaded;
Wherein, the described 3rd when a length of 3rd application program complete to start the duration needed.
Optionally, the startup method also includes:
The startup of each application program is determined according to boot sequence of the 3rd application program in all application programs
Weight;
Determined to adjust the startup priority of each application program according to the startup weight of each application program.
Optionally, the startup method also includes:
Receive the change directive of user;
It is the startup priority in the change directive by the startup priority update for starting highest priority application program.
Optionally, the startup method also includes;
On backstage, loading starts the application program;
After the completion of the application program loading, prompting is completed in generation loading.
The embodiment of the present invention also provides a kind of starter of application program, including:
Memory cell, for storing the startup priority of the first application program and the startup priority of the second application program,
And with the first duration;Wherein, the priority of second application program is less than the priority of first application program, described
First duration is at least first application program and completes to start the duration needed;
Loading unit, for after startup item corresponding to the first application program loads the first duration, journey to be applied in loading second
Startup item corresponding to sequence.
Optionally, the starter also includes receiving unit, and receiving unit is used for the enabled instruction for receiving user;
The loading unit is used to the 3rd apply journey according to corresponding to starting the enabled instruction after the first duration
Sequence, and, after the duration of the 3rd application program launching the 3rd, load startup item corresponding to second application program;
Wherein, the described 3rd when a length of 3rd application program complete to start the duration needed.
Optionally, the starter also includes:
Weight calculation unit, it is each for being determined according to boot sequence of the 3rd application program in all startup application programs
The startup weight of individual application program;
Start priority determining unit, stored for adjusting the memory cell according to the startup weight of each application program
Each application program startup priority.
Optionally, the receiving unit is additionally operable to receive the change directive of user;
The priority determining unit that starts is additionally operable to that the application program of highest priority will be started in the memory cell
Startup priority be changed to startup priority in the change directive.
Optionally, the loading unit is loading the first application program on backstage;
Also include Tip element, for the generation loading completion prompting after the completion of the loading of the first application program.
The application program launching method and starter that the present embodiment provides, are loaded in the startup item of the first application program
After first duration, startup item can be just loaded corresponding to the second application program.And after the first duration, the first application program is
Through starting completely, so there is no corresponding resource load conflict during the second application program launching, avoid because resource loading punching
Caused by prominent the problem of starting up's overlong time.
Brief description of the drawings
In order to illustrate more clearly of the technical scheme of the application, letter will be made to the required accompanying drawing used in embodiment below
Singly introduce, it should be apparent that, for those of ordinary skills, without having to pay creative labor,
Other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is the application program launching method flow chart that first embodiment provides;
Fig. 2 is the application program launching method flow chart that second embodiment provides;
Fig. 3 is the application program launching schematic device that 3rd embodiment provides;
Wherein:11- memory cell, 12- loading units, 13- receiving units, 14- weight calculation units, 15- start preferential
Level determining unit, 16- Tip elements.
Embodiment
In order that those skilled in the art more fully understand the technical scheme in the present invention, below in conjunction with of the invention real
The accompanying drawing in example is applied, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described implementation
Example only part of the embodiment of the present invention, rather than whole embodiments.It is common based on the embodiment in the present invention, this area
The every other embodiment that technical staff is obtained under the premise of creative work is not made, should all belong to protection of the present invention
Scope.
Application program launching method provided in an embodiment of the present invention can be applied in various computer systems, especially suitable
In a variety of large-scale application programs are installed, realize the server and engineering machine of multitask execution.
Fig. 1 is the application program launching method flow chart that first embodiment provides.As shown in figure 1, what the present embodiment provided
The startup method of application program comprises the following steps.
S101:Startup item corresponding to the first application program is loaded, starts the first application program.
S102:After the duration of startup item first for loading the first application program, the startup item of the second application program is loaded.
Start initialized operating system after computer electrifying startup, started after the completion of operating system initialization by loading
Application program corresponding to item unlatching.In concrete application, startup item can be start menu startup item, registry boot item, plan
One or more in task start item and service startup item.
Unlike the prior art, the present embodiment start startup method be not once read all startup items,
So that application program corresponding to multiple startup items starts simultaneously, but each journey is applied according to starting priority orders and starting one by one
Sequence.
Assuming that there is four application programs to need the mode by using loading startup item to start, four application programs are respectively
A, B, C and D, startup item corresponding to four application programs are respectively a, b, c and d, and the starting duration of four application programs is respectively
X, y, z and w.In four application programs, it is from high to low A-B-C-D to start priority, so boot sequence is A-B-C-D.
It should be noted that foregoing the first described application program and the second application program be only used for distinguishing two application programs it
With when specifically used, according to starting step, the application program that the first application program and the second application program represent also just occurs
Change.For example, initialization has just been completed, it is necessary to when startup item a is to start A corresponding to loading application programs A in operating system, then
A is the first application program, and B is the second application program;Corresponding, when starting application program B by loading b, then B should for first
With program, C is the second application program;Similarly, if C is the first application program, D is the second application program.
In the present embodiment, task that the startup priority of each application program can be performed by operating personnel according to computer
It is determined that the loading priority weighting of each application program can also be determined by the operating habit of computer statisticses user, using adding
Carry the startup priority that priority weighting determines each application program.
Exemplified by determining the loading priority of each application program using statistical method, using foregoing startup method it
Before, operating system record operating personnel start the order of each application program in the time at one end, and start in sequence
Weight when each application program sequentially distributes each startup is 4,3,2 and 0.9.(it have recorded assuming that having carried out four samplings
Four operating personnel start the order of each reference program), during four computer startings, user launches application it is suitable
Sequence is respectively A-B-C-D, A-B-C-D, A-B-C-D and A-B-D-C, then in four times start, A loading priority weighting is
The weighting weight that the loading priority weighting that 16, B loading priority weighting is 12, C is 6.9, D is 4.7.It is preferential according to loading
Level weight, the startup priority for determining four application programs is A-B-C-D.
It note that the starting duration x, y, z in the present embodiment and w can be when loading corresponding application program completely to need
Long or one application program of operating personnel's start completion simultaneously starts the interval between another application program, and protects
Card has completed startup every interior previous application program here.
Fig. 2 is the application program launching method flow chart that second embodiment provides.As shown in Fig. 2 implement compared to first
The application program launching method that example provides, the application program launching method that second embodiment provides comprise the following steps.
S103:Startup item corresponding to the first application program is loaded, starts the first application program;
S104:Receive the enabled instruction of user, after the first duration the according to corresponding to starting the enabled instruction
Three application programs;
S105:After the 3rd duration, startup item corresponding to second application program is loaded.
In actual use, operating personnel have horse back using a certain application program of startup, realize the demand of respective service, because
This needs voluntarily to start corresponding application program.
Exemplified by using foregoing A-B-C-D application program launchings order under normal circumstances, in actual applications, start in B
Afterwards, operating personnel need to utilize application program D at once, therefore send enabled instruction to operating system, drive os starting
Application program D.
If triggering application program D in application program B start-up courses to start, B and D may be caused to load resource punching
It is prominent, the serious extension of load time is caused, or even cause follow-up multiple application programs while load and produce machine of delaying.In order to avoid
Foregoing problems, operating system after user instruction is received, not directly according to instruction start corresponding to the 3rd application program
D, but certain time is being waited, ensure that (now application program B is after the durations of startup item b first corresponding to loading application programs B
First application program), restart application program D.Likewise, to ensure that application program C and D are not clashed, start by D
The 3rd duration after, reload startup item c corresponding to application program C (now C is the second application program).
If operating personnel often voluntarily start a certain application program, such as often after B startups start D, then representing has
Change the demand of application program launching order.To realize the adjust automatically of application program launching order, what second embodiment provided
Application program launching method also includes S106 and S107.
S106:The startup of each application program is determined according to boot sequence of the 3rd application program in all application programs
Weight.
S107:Determined to adjust the startup priority of each application program according to the startup weight of each application program
During each computer starting, computer can record the boot sequence of each application program.Such as
During one-shot, operating personnel trigger the enabled instruction for starting D after application program B startup item b is loaded, and D opens prior to C
Dynamic, then after first time starts, A startup priority weighting is 16+4=20, and B startup priority weighting is 12+3=15, C
Startup priority weighting be 6.9+0.9=7.8, D priority weighting is 4.7+2=6.7;Weighed according to foregoing each priority
Weight, then when starting next time (during second of startup), the startup priority orders of each application program are A-B-C-D;According to
This priority orders, C still start before D.
And when starting for second, operating personnel trigger still after application program B startup item b is loaded starts D's
Enabled instruction, D is set to start prior to B.Then after second of startup, A startup priority weighting is 20+4=24, and B startup is preferential
Level weight is 15+3=18, and C startup priority weighting is 7.8+0.9=8.7, and D startup priority weighting is 6.7+2=
8.7.Now, application program C and D startup priority weighting is identical, but because early stage start in C due to D start,
Think A-B-C-D in the startup priority orders for starting each application program for the third time.
When third time starts, operating personnel trigger still after application program B startup item b is loaded starts opening for D
Dynamic instruction, makes D start prior to B.After then third time starts, A startup priority weighting is 24+4=28, B startup priority
Weight is 18+3=21, and C startup priority weighting is 8.7+0.9=9.6, and D startup priority weighting is 8.7+2=
10.7.Now, the application program C startup priority weighting for starting priority weighting and being less than D, so changing each application program
Startup priority think A-B-D-C.
In practical application, due to changes in demand, the application program started at first may be changed into B from A.And operating system loads
After the completion of be loaded directly into startup item a corresponding to A, can not make operating personnel sent after the completion of system loads enabled instruction start B.
To solve this problem, on the basis of first embodiment, start the change directive that method can also include receiving user, will open
The startup priority update of the application program of dynamic highest priority is the startup priority in change directive.For example, once opening
During machine, operating personnel send change directive after application program A startups, and the startup priority for starting highest priority is weighed
Rebuilding is changed to 2 so that A startup priority weighting is changed into minimum;When starting next time, the order of application program automatic start becomes
For B-C-D-A.
To improve ease for use, in both of the aforesaid embodiment, on backstage, loading starts each application program;To make operation
Personnel understand corresponding application program loading and completed, and preceding method can also generate loading after the completion of the loading of each application program
Complete prompting.
In addition to providing the startup method of aforementioned applications program, present invention also offers the startup for realizing foregoing startup method
Device.
Fig. 3 is the application program launching schematic device that 3rd embodiment provides.As shown in figure 3, what the present embodiment provided
Starter includes memory cell 11 and loading unit 12.The startup that memory cell 11 is used to store the first application program is preferential
Level and the second application program startup priority, and with the first duration.It is corresponding with preceding method, the second application program
Priority is less than the priority of the first application program, and the first duration is at least the first application program and completes to start the duration needed.
Loading unit 12 is used for after startup item corresponding to the first application program loads the first duration, and journey is applied in loading second
Startup item corresponding to sequence.
As shown in figure 3, the starter that the present embodiment provides can also include receiving unit 13.Receiving unit 13 is used to connect
Receive the enabled instruction of user;Loading unit 12 be used for after the first duration according to the enabled instruction start corresponding to the 3rd
Application program, and, after the duration of the 3rd application program launching the 3rd, load and start corresponding to second application program
;Wherein, the described 3rd when a length of 3rd application program complete to start the duration needed.
Further, the starter that the present embodiment provides also includes weight calculation unit 14 and startup priority determination is single
Member 15.Weight calculation unit 14 is each for being determined according to boot sequence of the 3rd application program in all startup application programs
The startup weight of application program;;Start priority determining unit 15, for adjusting institute according to the startup weight of each application program
State the startup priority of each application program of memory cell storage.
In addition, receiving unit 13 be additionally operable to receive user change directive, start priority determining unit 15 be additionally operable to by
The startup priority of the application program of startup highest priority is changed to the startup in the change directive in the memory cell
Priority.
Completion is loaded for prompting operating personnel's corresponding application programs, the starter that 3rd embodiment provides also includes
Tip element 16.Tip element 16 is used for after loading unit 12 loads the corresponding application program of completion from the background, and generation has loaded
Into prompting.
The startup method to the application program in the embodiment of the present invention and starter are described in detail above.Our department
Divide and the principle and embodiment of the present invention are set forth using specific embodiment, the explanation of above example is only intended to help
Assistant solves the core concept of the present invention, and without departing from the principles of the present invention, those of ordinary skill in the art are not doing
Go out under the premise of creative work the every other embodiment obtained, belong to the scope of protection of the invention.
Claims (10)
1. a kind of startup method of application program, it is characterised in that:
After startup item corresponding to the first application program loads the first duration, startup item corresponding to the second application program is loaded;
Wherein, the startup priority of second application program is less than the startup priority of first application program, and described the
One duration is at least first application program and completes to start the duration needed.
2. startup method according to claim 1, it is characterised in that it is corresponding to load the second application program as steps described below
Startup item:
The enabled instruction of user is received, the 3rd journey is being applied according to corresponding to starting the enabled instruction after the first duration
Sequence;
After the 3rd duration, startup item corresponding to second application program is loaded;
Wherein, the described 3rd when a length of 3rd application program complete to start the duration needed.
3. startup method according to claim 2, it is characterised in that also include:
The startup weight of each application program is determined according to boot sequence of the 3rd application program in all application programs;
Determined to adjust the startup priority of each application program according to the startup weight of each application program.
4. according to the startup method described in claim any one of 1-3, it is characterised in that also include:
Receive the change directive of user;
It is the startup priority in the change directive by the startup priority update for starting highest priority application program.
5. start method according to claim 4, it is characterised in that also include;
On backstage, loading starts the application program;
After the completion of the application program loading, prompting is completed in generation loading.
A kind of 6. starter of application program, it is characterised in that including:
Memory cell, for storing the startup priority of the first application program and the startup priority of the second application program, and
With the first duration;Wherein, the priority of second application program be less than first application program priority, described first
Duration is at least first application program and completes to start the duration needed;
Loading unit, for after startup item corresponding to the first application program loads the first duration, loading the second application program pair
The startup item answered.
7. starter according to claim 6, it is characterised in that also include:
Receiving unit, for receiving the enabled instruction of user;
The loading unit be used for after the first duration according to the enabled instruction start corresponding to the 3rd application program, with
And after the duration of the 3rd application program launching the 3rd, load startup item corresponding to second application program;
Wherein, the described 3rd when a length of 3rd application program complete to start the duration needed.
8. starter according to claim 7, it is characterised in that also include:
Weight calculation unit, for determining each answer according to boot sequence of the 3rd application program in all startup application programs
With the startup weight of program;
Start priority determining unit, for adjusting each of the memory cell storage according to the startup weight of each application program
The startup priority of individual application program.
9. starter according to claim 8, it is characterised in that:
The receiving unit is additionally operable to receive the change directive of user;
The priority determining unit that starts is additionally operable to that opening for the application program of highest priority will be started in the memory cell
Dynamic priority is changed to the startup priority in the change directive.
10. according to the starter described in claim 6-9, it is characterised in that:
The loading unit is loading the first application program on backstage;
Also include Tip element, for the generation loading completion prompting after the completion of the loading of the first application program.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710597231.9A CN107562495A (en) | 2017-07-20 | 2017-07-20 | The startup method and starter of a kind of application program |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710597231.9A CN107562495A (en) | 2017-07-20 | 2017-07-20 | The startup method and starter of a kind of application program |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107562495A true CN107562495A (en) | 2018-01-09 |
Family
ID=60974422
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710597231.9A Pending CN107562495A (en) | 2017-07-20 | 2017-07-20 | The startup method and starter of a kind of application program |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107562495A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109669735A (en) * | 2018-12-07 | 2019-04-23 | 武汉斗鱼鱼乐网络科技有限公司 | Application starting method, apparatus and storage medium based on delay registration |
WO2019233354A1 (en) * | 2018-06-05 | 2019-12-12 | Guangdong Oppo Mobile Telecommunications Corp., Ltd. | Application preloading method and device, storage medium and terminal |
WO2022121333A1 (en) * | 2020-12-09 | 2022-06-16 | 珠海格力电器股份有限公司 | Method and device for starting application |
US11397590B2 (en) | 2018-05-10 | 2022-07-26 | Guangdong Oppo Mobile Telecommunications Corp., Ltd. | Method for preloading application, storage medium, and terminal |
US11442747B2 (en) | 2018-05-10 | 2022-09-13 | Guangdong Oppo Mobile Telecommunications Corp., Ltd. | Method for establishing applications-to-be preloaded prediction model based on preorder usage sequence of foreground application, storage medium, and terminal |
US11604660B2 (en) | 2018-05-15 | 2023-03-14 | Guangdong Oppo Mobile Telecommunications Corp., Ltd. | Method for launching application, storage medium, and terminal |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105740010A (en) * | 2016-01-26 | 2016-07-06 | 青岛海信电器股份有限公司 | Power-on method and terminal equipment |
CN106484473A (en) * | 2016-09-29 | 2017-03-08 | Tcl集团股份有限公司 | A kind of application starts method and apparatus |
CN106886395A (en) * | 2015-12-16 | 2017-06-23 | 芋头科技(杭州)有限公司 | The quick start method and intelligent electronic device of a kind of intelligent electronic device |
-
2017
- 2017-07-20 CN CN201710597231.9A patent/CN107562495A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106886395A (en) * | 2015-12-16 | 2017-06-23 | 芋头科技(杭州)有限公司 | The quick start method and intelligent electronic device of a kind of intelligent electronic device |
CN105740010A (en) * | 2016-01-26 | 2016-07-06 | 青岛海信电器股份有限公司 | Power-on method and terminal equipment |
CN106484473A (en) * | 2016-09-29 | 2017-03-08 | Tcl集团股份有限公司 | A kind of application starts method and apparatus |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US11397590B2 (en) | 2018-05-10 | 2022-07-26 | Guangdong Oppo Mobile Telecommunications Corp., Ltd. | Method for preloading application, storage medium, and terminal |
US11442747B2 (en) | 2018-05-10 | 2022-09-13 | Guangdong Oppo Mobile Telecommunications Corp., Ltd. | Method for establishing applications-to-be preloaded prediction model based on preorder usage sequence of foreground application, storage medium, and terminal |
US11604660B2 (en) | 2018-05-15 | 2023-03-14 | Guangdong Oppo Mobile Telecommunications Corp., Ltd. | Method for launching application, storage medium, and terminal |
WO2019233354A1 (en) * | 2018-06-05 | 2019-12-12 | Guangdong Oppo Mobile Telecommunications Corp., Ltd. | Application preloading method and device, storage medium and terminal |
US11467855B2 (en) | 2018-06-05 | 2022-10-11 | Guangdong Oppo Mobile Telecommunications Corp., Ltd. | Application preloading method and device, storage medium and terminal |
CN109669735A (en) * | 2018-12-07 | 2019-04-23 | 武汉斗鱼鱼乐网络科技有限公司 | Application starting method, apparatus and storage medium based on delay registration |
CN109669735B (en) * | 2018-12-07 | 2022-02-22 | 武汉斗鱼鱼乐网络科技有限公司 | Application starting method and device based on delayed registration and storage medium |
WO2022121333A1 (en) * | 2020-12-09 | 2022-06-16 | 珠海格力电器股份有限公司 | Method and device for starting application |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107562495A (en) | The startup method and starter of a kind of application program | |
EP2021940B1 (en) | Booting an operating system in discrete stages | |
US7356680B2 (en) | Method of loading information into a slave processor in a multi-processor system using an operating-system-friendly boot loader | |
CN108132833A (en) | A kind of distributed timing method for scheduling task and device based on zookeeper technologies | |
CN109656699A (en) | Distributed computing method, device, system, equipment and readable storage medium storing program for executing | |
US20020169949A1 (en) | System and method for dynamic management of a startup sequence | |
CN109684065A (en) | A kind of resource regulating method, apparatus and system | |
US20130191835A1 (en) | Distributed processing device and distributed processing system | |
CN103699398A (en) | Terminal equipment and starting control method thereof | |
CN104978231A (en) | Multisystem device based on internal storage partitions and loading and switching method thereof | |
CN113760543A (en) | Resource management method and device, electronic equipment and computer readable storage medium | |
CN102308279A (en) | Electronic device with overlapped boot task fetches and boot task execution | |
CN102033767A (en) | Single plate and method for upgrading same on line | |
CN108632085A (en) | Gray scale user management method, device, platform and storage medium | |
US9766946B2 (en) | Selecting processor micro-threading mode | |
CN106649116B (en) | Method, device and system for testing embedded Linux product | |
CN113127089A (en) | Starting control method of module of service architecture and computer equipment | |
US20150355997A1 (en) | Server-Platform Simulation Service | |
CN105094991A (en) | Stack capacity setting method and system | |
US20100199284A1 (en) | Information processing apparatus, self-testing method, and storage medium | |
KR20180089693A (en) | Method for reconfigurating a node which is a tactical control apparatus based on virtual computing and data centric architecture | |
CN112631671A (en) | Method and device for initializing operating system | |
US10417041B2 (en) | Moving a software application in a system cluster | |
CN105138380A (en) | Method and device for starting Linux system | |
CN111858234A (en) | Task execution method, device, equipment and medium |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180109 |
|
RJ01 | Rejection of invention patent application after publication |