A kind of drying device of rubber tube wire braider
Technical field
The present invention relates to sebific duct field, more particularly to a kind of drying device of rubber tube wire braider.
Background technology
Sebific duct manufacture is an important component in Rubber Industry, and sebific duct structure is generally divided into inner glue layer, outer glue-line
And casing play.Typically using with steel wire, cotton thread or fiber braiding layer as skeleton, in wire knitting machine by braided steel wire to sebific duct
During inner glue layer, generally require inner glue layer precooling first, increase the hardness of inner glue layer, avoid glue in steel wire crush injury
Layer, after the completion of braiding, because temperature official post sebific duct surface forms condensed water, outer glue-line is coated to next step has carried out huge shadow
Ring, and time-consuming for naturally dry, influences the overall processing efficiency of sebific duct.
The content of the invention
The invention aims to solve shortcoming present in prior art, and a kind of rubber tube wire braider proposed
Drying device.
To achieve these goals, present invention employs following technical scheme:
A kind of drying device of rubber tube wire braider, including braider body and sebific duct, the side of the braider body
Wall is connected by contiguous block with the side wall of the first sleeve, activity grafting sebific duct in first sleeve, the side of first sleeve
Installation cavity is offered in wall, the inside of the installation cavity is provided with flexible pipe, and flexible pipe is provided with air exhauster, and one end of the flexible pipe is passed through
Wear the side wall of installation cavity and extend to the outside of the first sleeve, and the other end of flexible pipe sequentially passes through second sleeve and installation cavity
The madial wall rotation connection of side wall, the second sleeve and installation cavity, and the inner bottom wall of the lateral wall of second sleeve and installation cavity
Between be connected with second spring, the top of the second sleeve is provided with disk, and the madial wall of disk and installation cavity is rotatablely connected,
The outer ring of the disk is connected with the upper end of irony push rod, and the lower end of irony push rod contacts with the lateral wall of second sleeve, institute
The side wall for stating irony push rod is connected with one end of U-shaped elastic rod, and the other end of the U-shaped elastic rod is connected with dividing plate, and dividing plate
Outer ring and the madial wall of installation cavity connect, the lower surface of the dividing plate is connected with connecting plate, and the connecting plate is close to disk
Side wall is connected with electromagnet;
The madial wall that the installation cavity is located above dividing plate is connected with 3rd sleeve, in the 3rd sleeve activity be plugged with
Mobile bar, the first spring, the upper end of the mobile bar are connected between one end of the mobile bar and the inner bottom wall of 3rd sleeve
Face is connected with the first contact, and first contact is provided with the second wafer, and the upper end of the second wafer close to the side of 3rd sleeve
It is connected with the inner roof wall of installation cavity, the inner roof wall of the installation cavity is connected with internal electric source, and electromagnet, the first contact, second
Contact and internal electric source form first series circuit by wire, and the other end and the ball of the mobile bar offset, and ball
Matched in embedded installation cavity side wall in the through hole opened up.
Preferably, the outer ring of the ball is connected with adsorptive pads.
Preferably, the upper surface of the dividing plate is inclined-plane.
Preferably, apopore is offered on the lateral wall of first sleeve, and apopore is in same level with dividing plate
On face.
Preferably, the lower end of the irony push rod is connected with projection.
Compared with prior art, the beneficial effects of the invention are as follows:The present invention is simple in construction, by adding flexible pipe, irony top
The structures such as bar, U-shaped elastic rod, electromagnet, dividing plate, ball and adsorptive pads, sebific duct drive ball to rotate, and adsorptive pads are by sebific duct
The globule absorbs, adsorptive pads through mobile bar extrude caused by water droplet flowed out from delivery port, ball pushes to the right mobile bar, and first touches
Piece and the second wafer contact, first series circuit are connected, and electromagnet, which is powered, attracts irony push rod to rotate, and irony push rod pushes the
Two sleeves are allowed to rotate, and make the angulation change of flexible pipe, start air exhauster exhausting and blow to sebific duct through flexible pipe, this combining structure, operation
Simply, it is easy to use, the globule is adsorbed through adsorptive pads, through flexible pipe blowing drying, and the blowing of different angle causes air flow,
Sebific duct more quickly is dried, drying time is reduced, improves the processing efficiency that sebific duct integrally produces.
Brief description of the drawings
Fig. 1 is structural representation proposed by the present invention;
Fig. 2 is A structure enlargement diagrams of the present invention.
In figure:Braider body 1, the first sleeve 2, sebific duct 3, installation cavity 4, flexible pipe 5, air exhauster 6, second sleeve 7, disk
8th, irony push rod 9, U-shaped elastic rod 10, electromagnet 11, dividing plate 12,3rd sleeve 13, mobile bar 14, the first spring 15, ball
16th, adsorptive pads 17.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete
Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, rather than whole embodiments.
Reference picture 1-2, a kind of drying device of rubber tube wire braider, including braider body 1 and sebific duct 3, braider
The side wall of body 1 is connected by contiguous block with the side wall of the first sleeve 2, activity grafting sebific duct 3 in the first sleeve 2, the first sleeve 2
Side wall in offer installation cavity 4, the inside of installation cavity 4 is provided with flexible pipe 5, and flexible pipe 5 is provided with air exhauster 6, air exhauster 6, electricity
Source switch and external power source form Article 2 series circuit by wire, and side wall and the extension of installation cavity 4 are run through in one end of flexible pipe 5
To the outside of the first sleeve 2, and the other end of flexible pipe 5 sequentially passes through second sleeve 7 and the side wall of installation cavity 4, second sleeve 7 with
The madial wall rotation connection of installation cavity 4, and the second bullet is connected between the inner bottom wall of the lateral wall of second sleeve 7 and installation cavity 4
Spring, the top of second sleeve 7 is provided with disk 8, and the madial wall of disk 8 and installation cavity 4 is rotatablely connected, the outer ring connection of disk 8
There is the upper end of irony push rod 9, and the lower end of irony push rod 9 contacts with the lateral wall of second sleeve 7, the side wall of irony push rod 9 connects
One end of U-shaped elastic rod 10 is connected to, the other end of U-shaped elastic rod 10 is connected with dividing plate 12, and the outer ring of dividing plate 12 and installation cavity 4
Madial wall connection, the lower surface of dividing plate 12 is connected with connecting plate, and connecting plate is connected with electromagnet 11 close to the side wall of disk 8;
The madial wall that installation cavity 4 is located at the top of dividing plate 12 is connected with 3rd sleeve 13, in 3rd sleeve 13 activity be plugged with
Mobile bar 14, is connected with the first spring 15 between one end of mobile bar 14 and the inner bottom wall of 3rd sleeve 13, mobile bar 14 it is upper
End face is connected with the first contact, and the first contact is provided with the second wafer, and the upper end of the second wafer close to the side of 3rd sleeve 13
It is connected with the inner roof wall of installation cavity 4, the inner roof wall of installation cavity 4 is connected with internal electric source, and electromagnet 11, the first contact, second
Contact and internal electric source form first series circuit by wire, and the other end and the ball 16 of mobile bar 14 offset, and ball
Matched in the 16 insertion side walls of installation cavity 4 in the through hole opened up.
The outer ring of ball 16 is connected with adsorptive pads 17, and the upper surface of dividing plate 12 is inclined-plane, is opened on the lateral wall of the first sleeve 2
Provided with apopore, and apopore is in same level with dividing plate 12, and the lower end of irony push rod 9 is connected with projection.
Operation principle:After the completion of braided steel wire on sebific duct 3, passed through from the first sleeve 2, sebific duct 3 drives 16 turns of ball
Dynamic, adsorptive pads 17 absorb the globule on sebific duct 3, and adsorptive pads 17 extrude caused water droplet through mobile bar 14 and flowed out from delivery port,
Ball 16 pushes to the right mobile bar 14, and the first contact and the second wafer contact, first series circuit are connected, and electromagnet 11 is logical
Electric attraction irony push rod 9 rotates, and irony push rod 9 pushes second sleeve 7 and is allowed to rotate, and makes the angulation change of flexible pipe 5, starts exhausting
The exhausting of machine 6 blows to sebific duct 3 through flexible pipe 5, and in the presence of the first spring 15, mobile bar 14 sets back, the first contact and second
Contact separates, and first series circuit disconnects, and in the presence of U-shaped elastic rod 10, irony push rod 9 sets back, in the second bullet
In the presence of spring, flexible pipe 5 sets back, and this combining structure is simple to operate, easy to use, adsorbs the globule through adsorptive pads 17, warp
The blowing drying of flexible pipe 5, and the blowing of different angle causes air flow, more quickly dries sebific duct 3, when reducing dry
Between, improve the processing efficiency that sebific duct integrally produces.
The foregoing is only a preferred embodiment of the present invention, but protection scope of the present invention be not limited thereto,
Any one skilled in the art the invention discloses technical scope in, technique according to the invention scheme and its
Inventive concept is subject to equivalent substitution or change, should all be included within the scope of the present invention.