CN107559105A - Ship and its double air supply systems - Google Patents

Ship and its double air supply systems Download PDF

Info

Publication number
CN107559105A
CN107559105A CN201710954203.8A CN201710954203A CN107559105A CN 107559105 A CN107559105 A CN 107559105A CN 201710954203 A CN201710954203 A CN 201710954203A CN 107559105 A CN107559105 A CN 107559105A
Authority
CN
China
Prior art keywords
gas
storage tank
pipeline
supply pipe
air supply
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710954203.8A
Other languages
Chinese (zh)
Inventor
罗哲
蒋孙建
尹辉
于海东
魏啸
余军庆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China International Marine Containers Group Co Ltd
CIMC Enric Investment Holdings Shenzhen Co Ltd
Jingmen Hongtu Special Aircraft Manufacturing Co Ltd
Original Assignee
China International Marine Containers Group Co Ltd
CIMC Enric Investment Holdings Shenzhen Co Ltd
Jingmen Hongtu Special Aircraft Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China International Marine Containers Group Co Ltd, CIMC Enric Investment Holdings Shenzhen Co Ltd, Jingmen Hongtu Special Aircraft Manufacturing Co Ltd filed Critical China International Marine Containers Group Co Ltd
Priority to CN201710954203.8A priority Critical patent/CN107559105A/en
Publication of CN107559105A publication Critical patent/CN107559105A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/10Internal combustion engine [ICE] based vehicles
    • Y02T10/30Use of alternative fuels, e.g. biofuels

Landscapes

  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

The invention provides a kind of ship and its double air supply systems, this pair of air supply system includes:Storage tank and two gas supply pipe systems;Storage tank is storing LNG fuel;Two gas supply pipe systems are respectively arranged at the both ends of the storage tank and connected by pipeline with the tank inside space, and the LNG fuel in the storage tank can be supplied by two gas supply pipe system to outside respectively.Double air supply systems of the invention respectively set a set of gas supply pipe system at the both ends of storage tank, solve in the case that a gas supply pipe system breaks down in vessel motion, another gas supply pipe system still is able to work, the lasting supply of marine fuel power is ensure that, the dangerous generation for avoiding ship from running out of steam and bringing.

Description

Ship and its double air supply systems
Technical field
The present invention relates to Ship Power Equipment field, more particularly to a kind of ship and its double air supply systems.
Background technology
Liquefied natural gas (LNG) is used as emerging ship energy, has low-carbon, environmental protection, economic dispatch advantage, and gradually form day Right gas ship power industrial chain.
Gas as single fuel marine engine arises at the historic moment under this industry background, and it is by single gas fuel work To drive fuel, the design and manufacture of production domesticization have been completed.Satisfactory fuel is provided for this New Marine engine Demand with reality.Greatly developing and applying especially with natural gas waterborne in recent years, including the Changjiang river, the big fortune in capital Hangzhoupro The equal successful modification in a plurality of river such as river or newly-built more natural gas powered ships, but is all at present single air supply system, if occurring Fault impact whole ship operates.
The content of the invention
In order to solve the above-mentioned technical problem, it is existing to solve the invention reside in a kind of ship of offer and its double air supply systems Technology because single air supply system failure can not influence whole ship running the problems such as.
For above-mentioned technical problem, the present invention proposes a kind of double air supply systems peculiar to vessel, for gas as single fuel Power Vessel, This pair of air supply system includes:Storage tank and two gas supply pipe systems;Storage tank is storing LNG fuel;Two gas supply pipe systems are distinguished It is arranged at the both ends of the storage tank and is connected by pipeline with the tank inside space, the LNG fuel in the storage tank can Outwards supplied by two gas supply pipe system respectively.
In a preferred approach, each gas supply pipe system includes:First pipeline and the heat exchange dress being arranged on the first pipeline To put and ratio adjusting valve, the LNG fuel in the storage tank is delivered to the heat-exchanger rig and heated and gasified as gaseous fuel, The ratio adjusting valve flow, the pressure and temperature of the gaseous fuel of the gasification is adjusted to meet outside gas equipment Required with gas.
In a preferred approach, the outside gas equipment is gas engine;Each gas supply pipe system also includes:Second Pipeline and the buffer unit being arranged on the second pipeline;The buffer unit by the second pipeline respectively with the tank body LNG fuel connects with gas engine;The LNG fuel energies in the second pipeline segmentation between the buffer unit and the tank body Enough gasifications at ambient temperature be gaseous fuel, and to be collected in the buffer unit interior with to gas engine for the gaseous fuel Igniter fuel first is provided.
In a preferred approach, each gas supply pipe system also includes:Root valve, it is arranged at the first pipeline and the tank body The end of connection, by the keying of the root valve to control conveying of the LNG fuel to the heat-exchanger rig out of described tank body.
In a preferred approach, each gas supply pipe system includes:Pressure charging system, the pressure charging system include:First supercharging Pipeline and the second pressure piping, first pressure piping is connected by pressure charging valve with the liquid Space in the storage tank, described Second pressure piping connects with the gas-phase space in the storage tank;When the LNG fuel pressures in the storage tank are less than setting value, The heat exchange can be flowed into through first pressure piping by the liquid phase medium in the control storage tank of the pressure charging valve to fill Put and gasified, afterwards, the gas medium after gasification flows into the gas-phase space of the storage tank through second pressure piping.
In a preferred approach, gas supply pipe system also includes:Gas system preferentially is used, it is described preferentially to be included with gas system:Gas Body pipeline and the valve being arranged on the gas piping;One end of the gas piping and the gas-phase space of the storage tank connect Logical, the other end is outwards to supply, and when the gaseous pressure in the storage tank exceedes setting safety value, the valve can be beaten automatically Open, and the gas phase media in the storage tank is outwards supplied through the gas piping.
In a preferred approach, gas supply pipe system also includes:Charging system;The charging system includes:Liquid phase pipeline, gas Phase pipeline, filter and overflow mechanism;The liquid phase pipeline and gas phase pipeline respectively fill with the tank body and outside Equipment is connected, and the filter is arranged on the liquid phase pipeline;The LNG fuel of outside filling equipment can be through the liquid Phase Pipeline transport to the filter is filtered, and the LNG fuel after filtering is carried out into topping up to the storage tank;To During the storage tank carries out topping up, when the pressure in the storage tank reaches an early warning value, the gas phase media in the storage tank Can be through the gas phase Pipeline transport to outside filling equipment;It is described after the LNG fuel in the storage tank reaches preset value Overflow mechanism can send alarm and automatically cut off the topping up to the storage tank.
In a preferred approach, the storage tank includes:The tank body of tubular and the end socket for being arranged at the tank body both ends, described two Gas supply pipe system is connected from the outside of storage tank with two end sockets respectively;The each end socket position connection one of storage tank has side opening Casing, the casing and end socket surround the space of a closing, and the gas supply pipe system is in the space;The storage tank and two Gas exhaustion line is equipped with individual casing, wherein, the gas-phase space in the gas exhaustion line and storage tank on the storage tank connects Logical, the gas discharge pipe on the casing connects with housing interior volume, the gas discharge pipe on the storage tank and two casings Road stretches out and converges to safe diffusion device.
In a preferred approach, control valve is equipped with the gas exhaustion line on the storage tank and two casings, with respectively The gas in the gas-phase space and two tanks inner space of the storage tank is controlled to discharge.
In a preferred approach, the casing includes bottom wall and is connected to the support member of the bottom wall lower surface.
The present invention also proposes a kind of ship, and it includes:Hull, the gas engine being arranged in the hull, Yi Jishe The above-mentioned double air supply systems peculiar to vessel being placed on the main ship deck, two gas supply pipe systems of double air supply systems can Supplied respectively to the gas engine on hull.
Compared with prior art, the invention has the advantages that:Double air supply systems of the invention are each at the both ends of storage tank A set of gas supply pipe system is set, solved in the case that a gas supply pipe system breaks down in vessel motion, another supply Pipe-line system still is able to work, ensure that the lasting supply of marine fuel power, the danger for avoiding ship from running out of steam and bringing Occur.
Brief description of the drawings
Fig. 1 is the structural representation of the double air supply systems of the present embodiment.
Fig. 2 is the structural representation of A-A directions (left end) in Fig. 1.
Fig. 3 is the structural representation of C-C directions (right-hand member) in Fig. 1.
Fig. 4 is the structural representation of the double air supply system left ends of the present embodiment.
Fig. 5 is Fig. 4 overlooking the structure diagram.
Fig. 6 is the structural representation of the double air supply system right-hand members of the present embodiment.
Fig. 7 is Fig. 6 overlooking the structure diagram.
Description of reference numerals is as follows:2nd, storage tank;21st, tank body;22nd, end socket;31st, the first pipeline;301st, heat-exchanger rig;32、 Second pipeline;304th, buffer unit;4th, casing;41st, side wall;42nd, roof;43rd, bottom wall;401st, square tube support member;402nd, gas Delivery pipe;100th, safe diffusion device;5th, pressure charging system;51st, the first pressure piping (right-hand member gas supply pipe system is omitted and shown); 6th, preferentially gas system is used;71st, liquid phase pipeline;72nd, gas phase pipeline;701st, filter;702nd, overflow mechanism.
Embodiment
Embodying the exemplary embodiment of feature of present invention and advantage will describe in detail in the following description.It should be understood that The present invention can have various changes in different embodiments, and it is neither departed from the scope of the present invention, and theory therein Bright and diagram is treated as purposes of discussion in itself, and is not used to the limitation present invention.
The ship that the present embodiment provides is gas as single fuel Power Vessel, and it includes:Hull, the gas being arranged in hull Engine, and the double air supply systems peculiar to vessel being arranged on main ship deck.
Refering to Fig. 1, this pair of air supply system includes:The gas supply pipe system of storage tank 2 and two.Storage tank 2 is storing LNG fuel; Two gas supply pipe systems are respectively arranged at the both ends of storage tank 2 and connected by pipeline with the inner space of storage tank 2, the LNG in storage tank 2 Fuel can be supplied by two gas supply pipe systems to the gas engine on hull respectively.
It should be noted that double air supply systems of the present embodiment are not limited to be used on ship.
Double air supply systems of the present embodiment respectively set a set of gas supply pipe system at the both ends of storage tank, solve vessel motion In in the case that a gas supply pipe system breaks down, another gas supply pipe system still is able to work, ensure that marine fuel moves The lasting supply of power.
Specifically, it is horizontal tank refering to Fig. 1 to Fig. 7, the present embodiment storage tank 2, it is positioned over hull by bearing On main deck.The storage tank 2 includes:The tank body 21 of tubular and the end socket 22 for being arranged at the both ends of tank body 21, each end socket 22 of storage tank 2 Position connection one has the casing 4 of side opening;Casing 4 is made of stainless steel, and it surrounds the space of closing, two supply with end socket 22 Pipe-line system is connected and is respectively arranged in two tanks 4 from the outside of storage tank 2 with two end sockets 22 respectively, so that the two of storage tank 2 End, which respectively constitutes, goes along with sb. to guard him gas check, to be that gas supply pipe system concentrated setting is gone along with sb. to guard him in gas check in this, and prevents the position The leakage natural gas put is to wider diffusion.
The casing 4 that the both ends of storage tank 2 are set includes:Side wall 41, roof 42 and bottom wall 43, the wherein lower surface of bottom wall 43 are connected with Square tube support member 401, so as to have gap between bottom wall 43 and the main deck of hull, prevent the internal cause LNG of casing 4 leakage to right Main ship deck causes frostbite and damage;In addition, the setting of square tube support member 401 can also reduce drawing of the casing 4 to end socket 22 Power load, it is ensured that integrally-built stability.
In other embodiments, square tube support member 401 can also be replaced by the support member of other shapes.
Further, it is equipped with gas exhaustion line on storage tank 2 and two casings 4.Wherein, the gas discharge on storage tank 2 Pipeline (not shown) connects with the gas-phase space in storage tank 2, inside the gas discharge pipe 402 on two casings 4 and casing 4 Space connects, and the gas exhaustion line being connected with storage tank 2 and the gas exhaustion line 402 being connected with casing 4 stretch out simultaneously Safe diffusion device 100 is converged to, discharge is concentrated so as to realize, reduces gas discharge region, reduce the area of ship danger zone, Security incident occurs for prevention.More preferably, what is be connected with storage tank 2 connects gas exhaustion line 402 in gas exhaustion line and casing 4 On be equipped with control valve (not shown), can either control respectively in the gas-phase space and the inner space of two tanks 4 of storage tank 2 Gas discharges, and and can enough avoids the mutual backflow for the gas that storage tank 2 and two casings 4 outwards diffuse.
In addition, the gas check of going along with sb. to guard him that end socket 22 and casing 4 are formed is additionally provided with exhausting system to discharge in time in it naturally Gas;Pollution discharge structure is designed with the bottom wall 43 of casing 4, outwards to flow to safety zone by the pollution discharge structure, reduces and is going along with sb. to guard him The various perils that may occur brought in gas check by the discharging of natural gas.
Always illustrated with the right and left shown in Fig. 1, the gas supply pipe system of the present embodiment is located at a left side for storage tank 2 respectively Right both ends, the gas supply pipe system as supply function right-hand member is main system.Wherein, the main gas supply pipe system of left and right ends Also there are other functions respectively, specifically, the gas supply pipe system of right-hand member also has provides work(of lighting a fire first for gas engine , function of increasing pressure and function can be filled, left end gas supply pipe system provides ignition function first except having simultaneously for gas engine Outside function of increasing pressure, also have and preferentially use airway dysfunction.
Next, the subsystem configured corresponding to each function possessed by above-mentioned gas supply pipe system is carried out specifically It is bright.Each gas supply pipe system includes:First pipeline 31, the heat-exchanger rig 301 being arranged on the first pipeline 31, proportion adjustment Valve (not shown) and root valve (not shown).The effect of LNG fuel gas-phase space in storage tank 2 in storage tank 2 Under be delivered to heat-exchanger rig 301 and heated and gasified as gaseous fuel, stream of the ratio adjusting valve to the gaseous fuel of the gasification Amount, pressure and temperature are adjusted to meet the use gas requirement of the gas engine on hull.Wherein, root valve is arranged at first The end that pipeline 31 is connected with the end socket 22 of storage tank 2, by the keying of root valve to control LNG fuel to be filled to heat exchange out of storage tank 2 301 conveying is put, in order to cut off the source of trouble of a gas supply pipe system of failure.
Further, each gas supply pipe system also includes:Second pipeline 32 and the buffering being arranged on the second pipeline 32 Device 304.Buffer unit 304 is connected with the LNG fuel in storage tank 2 and gas engine respectively by the second pipeline 32;Buffering The LNG fuel in the second pipeline segmentation between device 304 and storage tank 2 can gasify as gaseous fuel at ambient temperature, and And the gaseous fuel is collected in buffer unit 304 to provide igniter fuel first to gas engine.Buffer unit 304 is set Put and both provided stable gaseous fuel for normal supply, being lighted a fire first for gas engine again provides gaseous fuel;Especially it is The latter, avoid because gas engine is without recirculated water, it is impossible to the source of recycled water of heat exchange is provided for heat-exchanger rig 301, and makes to change Thermal 301 can not normally gasify LNG fuel the problem of.
In the present embodiment, each gas supply pipe system also includes:Pressure charging system 5.The pressure charging system 5 includes:First increases The pressure piping (not shown) of pressure pipe road 51 and second, the first pressure piping 51 pass through regulating valve (not shown) and storage tank Liquid Space connection in 2, the second pressure piping connect with the gas-phase space in storage tank 2.Due to the continuous quilts of the LNG in storage tank 2 Use, the pressure in storage tank 2 can reduce with the reduction of liquid, when pressure is less than setting value, it is impossible to meet that gas starts Requirement of the machine to gas fuel pressure, and the liquid phase medium in the control storage tank 2 for passing through pressure charging valve can be through the first pressure piping 51 inflow heat-exchanger rigs 301 are gasified, and afterwards, the gas medium after gasification flows into the gas phase of storage tank 2 through the second pressure piping Space, so as to realize the supercharging to storage tank 2, when reaching supercharging setting value, pressure charging valve is closed automatically.
A heat-exchanger rig 301 is only set in each gas supply pipe system, it can be not only used for the heat exchange to outside supply Device, it can also be used to the supercharging of the pressure charging system 5 so that heat-exchanger rig 301 is combined into one with dual-use function, saves ship Upper limited space.
Wherein, be only arranged in the gas supply pipe system of left end preferential is included with gas system 6:Gas piping is (in figure not Show) and the valve (not shown) that is arranged on gas piping;One end of gas piping connects with the gas-phase space of storage tank 2 Logical, the other end to gas engine to supply.When gaseous pressure is higher in storage tank 2 and reaches setting safety value, whole system Valve can be preferentially opened, the gas phase media allowed in storage tank 2 supplies through gas piping to gas engine, so that the gas in storage tank 2 Phase medium is preferentially used, and to avoid the emptying of the hypertonia of storage tank 2 and fuel from losing, reduces the service wear of LNG fuel Rate.
The charging system being only arranged in the gas supply pipe system of right-hand member includes:Liquid phase pipeline 71, gas phase pipeline 72, filtering Device 701 and overflow mechanism 702.
Liquid phase pipeline 71 and gas phase pipeline 72 respectively with storage tank 2 and the filling equipment (such as tank car or gas station) of outside The gentle phase pipeline connection of liquid phase pipeline, filter 701 are arranged on liquid phase pipeline 71.Specifically, liquid pump or supercharging are passed through The LNG fuel of outside filling equipment is delivered into filter 701 through liquid phase pipeline 71 to be filtered, and by after filtering LNG fuel carries out topping up to storage tank 2;During topping up is carried out to storage tank 2, when the pressure in storage tank 2 reaches an early warning value, Gas phase media in storage tank 2 can be delivered to the filling equipment of outside through gas phase pipeline 72, release pressure, and can reduce and put Sky loss.After the LNG fuel in storage tank 2 reaches preset value, overflow mechanism 702 can send alarm and automatically cut off to storage tank 2 topping up, prevent from overcharging.
In the present embodiment, positioned at the left and right ends of storage tank 2 gas supply pipe system it is slightly different in structure so that both ends Also difference, the gas supply pipe system main system of the present embodiment right-hand member, left end have been pair to function possessed by gas supply pipe system System, on the premise of double supply functions are ensured, system cost is reduced as far as possible.However, in actual use, positioned at left and right ends Gas supply pipe system structure can with identical, can also by increase and decrease make storage tank both ends gas supply pipe system have it is required Function.
Although describing the present invention with reference to above exemplary embodiment, it is to be understood that, term used be explanation and Exemplary and nonrestrictive term.Due to the present invention can be embodied in a variety of forms without departing from invention spirit or Essence, it should therefore be appreciated that above-mentioned embodiment is not limited to any foregoing details, and should be limited in appended claims Widely explained in spirit and scope, thus the whole changes fallen into claim or its equivalent scope and remodeling all should be with Attached claim is covered.

Claims (11)

  1. A kind of 1. double air supply systems peculiar to vessel, for gas as single fuel Power Vessel, it is characterised in that this pair of air supply system includes:
    Storage tank, to store LNG fuel;
    Two gas supply pipe systems, it is respectively arranged at the both ends of the storage tank and is connected by pipeline with the tank inside space, LNG fuel in the storage tank can be supplied outwards by two gas supply pipe system respectively.
  2. 2. double air supply systems peculiar to vessel as claimed in claim 1, it is characterised in that each gas supply pipe system includes:First pipe Road and the heat-exchanger rig and ratio adjusting valve being arranged on the first pipeline, the LNG fuel in the storage tank are delivered to the heat exchange Device is heated and gasified as gaseous fuel, and the ratio adjusting valve is to the flow of the gaseous fuel of the gasification, pressure and temperature Degree is adjusted uses gas requirement with the outside gas equipment of satisfaction.
  3. 3. double air supply systems peculiar to vessel as claimed in claim 2, it is characterised in that the outside gas equipment starts for gas Machine;
    Each gas supply pipe system also includes:Second pipeline and the buffer unit being arranged on the second pipeline;The buffer unit Connected respectively with the LNG fuel in the tank body and gas engine by the second pipeline;The buffer unit and the tank body Between the second pipeline segmentation in LNG fuel can gasify at ambient temperature as gaseous fuel, and the gaseous fuel is received Combine in the buffer unit to provide igniter fuel first to gas engine.
  4. 4. double air supply systems peculiar to vessel as claimed in claim 2, it is characterised in that each gas supply pipe system also includes:Root Valve, it is arranged at the end that the first pipeline is connected with the tank body, by the keying of the root valve to control LNG fuel from institute State the conveying to the heat-exchanger rig in tank body.
  5. 5. double air supply systems peculiar to vessel as claimed in claim 2, it is characterised in that each gas supply pipe system includes:Supercharging system System, the pressure charging system include:First pressure piping and the second pressure piping, first pressure piping pass through pressure charging valve and institute The liquid Space connection in storage tank is stated, second pressure piping connects with the gas-phase space in the storage tank;When the storage tank , can be through institute by the liquid phase medium in the control storage tank of the pressure charging valve when interior LNG fuel pressures are less than setting value State the first pressure piping inflow heat-exchanger rig to be gasified, afterwards, the gas medium after gasification is through second pressure inlet Road flows into the gas-phase space of the storage tank.
  6. 6. double air supply systems peculiar to vessel as claimed in claim 1, it is characterised in that gas supply pipe system also includes:Preferentially use gas System, it is described preferentially to be included with gas system:Gas piping and the valve being arranged on the gas piping;The gas piping One end connects with the gas-phase space of the storage tank, and the other end is outwards to supply, when the gaseous pressure in the storage tank exceedes setting During safety value, the valve can automatically open up, and the gas phase media in the storage tank is outwards supplied through the gas piping.
  7. 7. double air supply systems peculiar to vessel as claimed in claim 1, it is characterised in that gas supply pipe system also includes:Charging system; The charging system includes:Liquid phase pipeline, gas phase pipeline, filter and overflow mechanism;
    The filling equipment of the liquid phase pipeline and gas phase pipeline respectively with the tank body and outside is connected, and the filter is set It is placed on the liquid phase pipeline;
    The LNG fuel of outside filling equipment can be delivered to the filter through the liquid phase pipeline and be filtered, and LNG fuel after filtering is subjected to topping up to the storage tank;During topping up is carried out to the storage tank, in the storage tank When pressure reaches an early warning value, the gas phase media in the storage tank can be set through the gas phase Pipeline transport to filling for outside It is standby;After the LNG fuel in the storage tank reaches preset value, the overflow mechanism can send alarm and automatically cut off to described The topping up of storage tank.
  8. 8. double air supply systems peculiar to vessel as claimed in claim 1, it is characterised in that the storage tank includes:The tank body of tubular and set The end socket at the tank body both ends is placed in, two gas supply pipe system is connected from the outside of storage tank with two end sockets respectively;
    The each end socket position connection one of storage tank has the casing of side opening, and the casing surrounds the sky of a closing with end socket Between, the gas supply pipe system is in the space;Gas exhaustion line is equipped with the storage tank and two casings, wherein, institute The gas exhaustion line stated on storage tank connects with the gas-phase space in storage tank, gas discharge pipe and box house on the casing Space connects, and the gas exhaustion line on the storage tank and two casings stretches out and converges to safe diffusion device.
  9. 9. double air supply systems peculiar to vessel as claimed in claim 8, it is characterised in that the gas row on the storage tank and two casings Put and control valve is equipped with pipeline, to control the gas in the gas-phase space of the storage tank and two tanks inner space to arrange respectively Put.
  10. 10. double air supply systems peculiar to vessel as claimed in claim 8, it is characterised in that the casing includes bottom wall and is connected to institute State the support member of bottom wall lower surface.
  11. A kind of 11. ship, it is characterised in that including:Hull, the gas engine being arranged in the hull, and be arranged at Double air supply systems peculiar to vessel as described in claim 1 to 10 any one on the main ship deck, double air supply systems Two gas supply pipe systems can be supplied respectively to the gas engine on hull.
CN201710954203.8A 2017-10-13 2017-10-13 Ship and its double air supply systems Pending CN107559105A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710954203.8A CN107559105A (en) 2017-10-13 2017-10-13 Ship and its double air supply systems

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710954203.8A CN107559105A (en) 2017-10-13 2017-10-13 Ship and its double air supply systems

Publications (1)

Publication Number Publication Date
CN107559105A true CN107559105A (en) 2018-01-09

Family

ID=60985598

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710954203.8A Pending CN107559105A (en) 2017-10-13 2017-10-13 Ship and its double air supply systems

Country Status (1)

Country Link
CN (1) CN107559105A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108194835A (en) * 2018-02-08 2018-06-22 南通中集能源装备有限公司 LNG fuel air supply system peculiar to vessel
CN108916648A (en) * 2018-07-12 2018-11-30 南通诺德瑞海洋工程研究院有限公司 A kind of LNG air supply system on deck carrier
CN110822291A (en) * 2018-08-10 2020-02-21 中航国际船舶发展(中国)有限公司 High-reliability LNG (liquefied Natural gas) supply system for dual-fuel ship
CN115783127A (en) * 2022-12-22 2023-03-14 江苏科技大学 Fuel storage tank for dual-fuel power ship

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101309631B1 (en) * 2012-03-20 2013-09-17 에스티엑스조선해양 주식회사 Fuel supply system for lng fuelled vessel
CN205036458U (en) * 2015-08-06 2016-02-17 上海佳豪船舶工程设计股份有限公司 Fuel control system suitable for small -size LNG power boats and ships
CN207393345U (en) * 2017-10-13 2018-05-22 荆门宏图特种飞行器制造有限公司 Ship and its double air supply systems

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101309631B1 (en) * 2012-03-20 2013-09-17 에스티엑스조선해양 주식회사 Fuel supply system for lng fuelled vessel
CN205036458U (en) * 2015-08-06 2016-02-17 上海佳豪船舶工程设计股份有限公司 Fuel control system suitable for small -size LNG power boats and ships
CN207393345U (en) * 2017-10-13 2018-05-22 荆门宏图特种飞行器制造有限公司 Ship and its double air supply systems

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108194835A (en) * 2018-02-08 2018-06-22 南通中集能源装备有限公司 LNG fuel air supply system peculiar to vessel
CN108194835B (en) * 2018-02-08 2024-04-16 南通中集能源装备有限公司 Marine LNG fuel gas supply system
CN108916648A (en) * 2018-07-12 2018-11-30 南通诺德瑞海洋工程研究院有限公司 A kind of LNG air supply system on deck carrier
CN108916648B (en) * 2018-07-12 2023-11-21 南通诺德瑞海洋工程研究院有限公司 LNG gas supply system on deck transport ship
CN110822291A (en) * 2018-08-10 2020-02-21 中航国际船舶发展(中国)有限公司 High-reliability LNG (liquefied Natural gas) supply system for dual-fuel ship
CN115783127A (en) * 2022-12-22 2023-03-14 江苏科技大学 Fuel storage tank for dual-fuel power ship
CN115783127B (en) * 2022-12-22 2024-04-16 江苏科技大学 Fuel storage tank for dual-fuel power ship

Similar Documents

Publication Publication Date Title
CN107559105A (en) Ship and its double air supply systems
US20060156744A1 (en) Liquefied natural gas floating storage regasification unit
CN114320686B (en) Marine methanol fuel supply method
WO2021008620A1 (en) Gas supply system employing two fuels for use in ultra-large container ship, and ultra-large container ship
CN113047994A (en) Methanol fuel dual-fuel ship
CN106184684A (en) Peculiar to vessel automatically control removable LNG fuel tank case air supply system
CN206352725U (en) A kind of LNG fuel low pressure air supply system peculiar to vessel of High redundancy
CN102213361B (en) Liquid ethylene storage tank, liquid ethylene storage and gasification system and liquid ethylene gasification method
CN104379440B (en) Vessel for transporting compressed gas
CN202381982U (en) LNG (liquefied natural gas) filling device for barge
CN207393345U (en) Ship and its double air supply systems
CN207212548U (en) The high-pressure gas feed system of ship dual fuel engine
CN102494244B (en) Pontoon LNG aeration device and operation method thereof
KR101525679B1 (en) A Liquefied Gas Treatment System
KR20140066348A (en) Liquefied natural gas regasification apparatus
CN207645810U (en) For ship and the double fuel combustion-type inert gas system of ocean engineering
CN207374605U (en) The unpowered fixed filling ships of LNG
JP2023529204A (en) Fuel supply system and fuel supply method for liquefied gas carrier
CN207809808U (en) A kind of helicopter oiling relief system and its ocean platform, ship
CN204201473U (en) A kind of BOG of LNG landing stage formula gas station reclaims power generation system
CN108913217B (en) Air supply system and air supply method of gasification furnace
KR102498287B1 (en) High expansion foam system using vacuum pressure
KR102682134B1 (en) Gas treatment system and Offshore plant having the same
CN204704607U (en) A kind of cold compensation type liquefied natural gas filling device
CN104751909A (en) Container pressurizing and energy-storage system in nuclear power station

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination