CN107558613B - A kind of installation method of hexagonal pavilion - Google Patents
A kind of installation method of hexagonal pavilion Download PDFInfo
- Publication number
- CN107558613B CN107558613B CN201710863046.XA CN201710863046A CN107558613B CN 107558613 B CN107558613 B CN 107558613B CN 201710863046 A CN201710863046 A CN 201710863046A CN 107558613 B CN107558613 B CN 107558613B
- Authority
- CN
- China
- Prior art keywords
- terrace
- hydraulic cylinder
- device hydraulic
- jacking device
- jacking
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
The present invention relates to a kind of installation methods of hexagonal pavilion, each accessory of hexagonal pavilion can be produced according to demand first, then after the place for needing to build installs terrace, using terrace as fulcrum, each accessory assembly in hexagonal pavilion is got up by the jacking component on terrace, then assembly removal will be jacked again, the installation at scene can be quickly finished, it is easy to operate, save a large amount of set-up time, and be connected firmly stabilization, meets actual processing installation requirements.
Description
Technical field
The invention belongs to garden architecture field more particularly to a kind of installation methods of hexagonal pavilion.
Background technique
Pavilion building is one of Ancient Times in China building pavilion style, and pavilion includes five jiaos of pavilions and hexagonal pavilion etc., wherein hexagonal pavilion
Building is Ancient Times in China building one of pavilion style, in modern society scenic spot or when gardens construction everywhere, and hexagonal can usually be arranged
Pavilion building is as decoration and sight spot.
The pavilion building in ancient times is made using wood material, and the hexagonal pavilion building created in modern society, part is still
Wood material is so used, partially using the preparation such as metal or plastic material.Mode of the existing pavilion building in construction is most
It is to build from ground previous step step by pavilion, wherein each accessory in pavilion is also all built in real time, in this way
Installation at the scene is caused to need sequentially to be built, whole construction is inconvenient, and time-consuming and laborious, when the construction of whole building
Between it is long, be unable to satisfy the efficient installation requirements of modern society.
Summary of the invention
It is convenient and strength-saving that a kind of convenient transportation is provided the invention aims to overcome the deficiencies in the prior art, and effect is installed
The installation method of the high hexagonal pavilion of rate.
In order to achieve the above objectives, the technical solution adopted by the present invention is that: a kind of installation method of hexagonal pavilion, including walk as follows
It is rapid:
The first step sets terrace in the place for needing to build hexagonal pavilion, six built-in fittings is pre-set on terrace, together
When terrace be fixed by the ground riveting of terrace lower end;
Jacking device hydraulic cylinder is mounted in the intermediate port lid of terrace by second step, is inserted partially into jacking device hydraulic cylinder
In hole, the six roots of sensation wing is rotated, is tightly attached to it on terrace, and ensure that wing support center is directed at the center of six built-in fittings, then used
Fixing bolt fixes jacking device hydraulic cylinder and the wing;
Third step is inserted in steel pipe on the top of jacking device hydraulic cylinder, then umbrella frame is installed on steel pipe, while handle
Transverse beam assembly is placed on terrace, and umbrella frame lower end is connected with transverse beam assembly, is supported umbrella frame by transverse beam assembly,
Recycle safety rope that umbrella frame is connected with the wing;
4th step is inserted in Bao Ding in the upper end of steel pipe, the roofing that six integrally formed roofings, eaves tile and rafter are constituted
Component circular array is mounted on umbrella frame, and then angle is clashed in installation between two connected roofing assemblies, and the upper end at angle will in an opposite direction
The upper end of roofing assembly is pressed into precious top;
5th step, all accessory assembly in place, carry out the jacking work of jacking device hydraulic cylinder, the jacking of jacking device hydraulic cylinder
To 1 meter of height, it is ensured that jacking device hydraulic cylinder be increased to require be greater than stem height, then check each safety rope, ensure every by
The same state of power, and it is tight;
6th step holds up six roots of sensation column, the position of casing on adjustment stud end alignment transverse beam assembly, jacking component decline,
So that the upper end of the column is inserted into casing internal expanding pin and is fixed, finally bounces back and jacking device hydraulic cylinder and unload step by step, remove insurance
Rope removes jacking component;
7th step covers terrace intermediate cover, and optical collimator inspection is vertical, Realize, ensures to calibrate.
Preferably, the transverse beam assembly is made of the bearing plate that six pieces of annular arrays are distributed, and between every two bearing plates
Equipped with casing corresponding with column.
Due to the application of the above technical scheme, compared with the prior art, the invention has the following advantages:
The installation method of the hexagonal pavilion of the present invention program can according to demand produce each accessory in pavilion first
Come, then after the place for needing to build installs terrace, using terrace as fulcrum, by the jacking component on terrace by hexagonal
Each accessory assembly in pavilion is got up, and in-site installation is convenient and efficient, saves a large amount of set-up time, and it is steady to be connected firmly
It is fixed, meet actual processing installation requirements.
Detailed description of the invention
Attached drawing 1 is the structural schematic diagram of hexagonal pavilion after omitting jacking component and ground riveting;
Attached drawing 2 is the partial sectional view of the middle A-A of attached drawing 1;
Attached drawing 3 is the partial profile structure of hexagonal pavilion;
Attached drawing 4 is the structural schematic diagram that component is jacked in hexagonal pavilion;
Attached drawing 5 is the structural schematic diagram of hexagonal pavilion middle cross beam component;
Wherein: 1, terrace;2, component is jacked;3, steel pipe;4, Bao Ding;5, umbrella frame;6, transverse beam assembly;7, rafter;Watt 8,
When;9, angle is clashed;10, column;11, built-in fitting;12, riveting;13, roofing;20, jacking device hydraulic cylinder;21, the wing;22, safety rope;
60, bearing plate;61, casing.
Specific embodiment
Below in conjunction with the accompanying drawings and specific embodiment, the present invention is described in further details.
A kind of installation method of hexagonal pavilion of the present invention, includes the following steps:
The first step sets terrace 1 in the place for needing to build hexagonal pavilion, six built-in fittings is pre-set on terrace 1
11, while terrace 1 is fixed by the ground riveting 12 of 1 lower end of terrace;
Jacking device hydraulic cylinder 20 is mounted in the intermediate port lid of terrace 1 by second step, inserts 20 part of jacking device hydraulic cylinder
Enter into hole, rotate the six roots of sensation wing 21, be tightly attached to it on terrace 1, and ensures that 21 support center of the wing is directed at six built-in fittings 11
Center, it is then with fixing bolt that jacking device hydraulic cylinder 20 and the wing 21 is fixed;
Third step is inserted in steel pipe 3 on the top of jacking device hydraulic cylinder 20, and then umbrella frame 5 is installed on steel pipe 4,
Transverse beam assembly 6 is placed on terrace 1 simultaneously, 5 lower end of umbrella frame is connected with transverse beam assembly 6, umbrella frame 5 is made to pass through crossbeam group
Part 6 is supported, and recycles safety rope 22 that umbrella frame 5 is connected with the wing 21;
4th step is inserted in precious top 4 in the upper end of steel pipe 3, six integrally formed roofings 13, eaves tile 8 and rafter 7 is constituted
Roofing assembly circular array be mounted on umbrella frame 5, then angle 9 is clashed in installation between two connected roofing assemblies, in an opposite direction angle 9
Upper end the upper end of roofing assembly is pressed into precious top 4;
5th step, all accessory assembly in place, carry out the jacking work of jacking device hydraulic cylinder 20, jacking device hydraulic cylinder 20
Jacking is to 1 meter of height, it is ensured that jacking device hydraulic cylinder 20 is increased to require to be greater than 10 height of column, then checks each safety rope, really
The same state of every stress is protected, and tight;
6th step holds up six roots of sensation column 10, the position of casing 61, jacking group on adjustment 10 end of column alignment transverse beam assembly 6
Part 2 declines, so that 10 upper end of column is inserted into 61 internal expanding pin of casing and is fixed, finally bounce back jacking device hydraulic cylinder 20 and step by step
It unloads, removes safety rope 22, remove jacking component 2;
7th step covers terrace intermediate cover, and optical collimator inspection is vertical, Realize, ensures to calibrate.
Above-mentioned hexagonal pavilion structure as shown in attached drawing 1-5, including terrace 1, built-in fitting 11, riveting 12, jacking component 2, steel
Pipe 3, precious top 4, umbrella frame 5, transverse beam assembly 6, roofing assembly, in an opposite direction angle 9 and column 10;1 upper end of terrace is pre-buried, and there are six battle arrays
The built-in fitting 11 of column distribution, lower end are equipped with multiple ground riveting 12;Jacking component 2 is equipped at the center of 1 upper end of terrace;The top
Rising component 2 includes jacking device hydraulic cylinder 20, the wing 21 and safety rope 22;The lower end surrounding of the jacking device hydraulic cylinder 20 is distributed with six
The wing 21 that can be rotated upwardly and downwardly, and the front end of the wing 21 is equipped with safety rope 22;20 upper end of jacking device hydraulic cylinder is equipped with steel pipe 3,
And 3 upper end of steel pipe is equipped with precious top 4;The lower section for being located at precious top 4 on the steel pipe 3 is equipped with umbrella frame 5;The umbrella frame 5 passes through
Safety rope 22 is connected with the wing 21, and 5 lower end of above-mentioned umbrella frame is additionally provided with transverse beam assembly 6;Six groups of array distribution on the umbrella frame 5
Roofing assembly, above-mentioned roofing assembly are made of the roofing 13, eaves tile 8 and rafter 7 being integrally connected;Between the adjacent roofing assembly
Equipped with angle 9 in an opposite direction, for roofing assembly upper end to be pressed in precious top 4;It is equipped with column 10 in the built-in fitting 11, and on column 10
End is connected with transverse beam assembly 6;The material at the angle 9, rafter 7 and eaves tile 8 in an opposite direction is glass reinforced plastic;The transverse beam assembly is by six pieces of annulars
The bearing plate 60 of array distribution is constituted, and casing 61 corresponding with column is equipped between every two bearing plate 60.
The installation method of hexagonal pavilion of the invention can according to demand produce each accessory in pavilion, so first
It, will be in hexagonal pavilion by the jacking component on terrace using terrace as fulcrum afterwards after the place for needing to build installs terrace
Each accessory assembly get up, in-site installation is convenient and efficient, saves a large amount of set-up time, and the stabilization that is connected firmly, full
The actual processing installation requirements of foot.
The above is only specific application examples of the invention, are not limited in any way to protection scope of the present invention.All uses
Equivalent transformation or equivalent replacement and the technical solution formed, all fall within rights protection scope of the present invention.
Claims (2)
1. a kind of installation method of hexagonal pavilion, includes the following steps, terrace, terrace are set in the place for needing to build hexagonal pavilion
On pre-set six built-in fittings, while terrace is fixed by the ground riveting of terrace lower end, which is characterized in that further include as
Lower step:
Jacking device hydraulic cylinder is mounted in the intermediate port lid of terrace by the first step, is inserted partially into jacking device hydraulic cylinder in hole,
The six roots of sensation wing is rotated, is tightly attached to it on terrace, and ensures that wing support center is directed at the center of six built-in fittings, then with fixed spiral shell
Bolt fixes jacking device hydraulic cylinder and the wing;
Second step is inserted in steel pipe on the top of jacking device hydraulic cylinder, then umbrella frame is installed on steel pipe, while crossbeam
Component is placed on terrace, and umbrella frame lower end is connected with transverse beam assembly, is supported umbrella frame by transverse beam assembly, then benefit
Umbrella frame is connected with the wing with safety rope;
Third step is inserted in Bao Ding in the upper end of steel pipe, the roofing assembly that six integrally formed roofings, eaves tile and rafter are constituted
Circular array is mounted on umbrella frame, and then angle is clashed in installation between two connected roofing assemblies, and the upper end at angle is by roofing in an opposite direction
The upper end of component is pressed into precious top;
4th step, all accessory assembly in place, carry out the jacking work of jacking device hydraulic cylinder, jacking device hydraulic cylinder is jacked to 1
Meter Gao Du, it is ensured that jacking device hydraulic cylinder is increased to require to be greater than stem height, then checks each safety rope, ensures every stress one
Sample state, and it is tight;
5th step holds up six roots of sensation column, the position of casing on adjustment stud end alignment transverse beam assembly, jacking component decline, so that
The upper end of the column is inserted into casing internal expanding pin and is fixed, and finally bounces back and jacking device hydraulic cylinder and unloads step by step, removes safety rope, shifting
Except jacking component;
6th step covers terrace intermediate cover, and optical collimator inspection is vertical, Realize, ensures to calibrate.
2. the installation method of hexagonal pavilion according to claim 1, it is characterised in that: the transverse beam assembly is by six pieces of circular arrays
The bearing plate of column distribution is constituted, and casing corresponding with column is equipped between every two bearing plates.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710863046.XA CN107558613B (en) | 2017-09-22 | 2017-09-22 | A kind of installation method of hexagonal pavilion |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710863046.XA CN107558613B (en) | 2017-09-22 | 2017-09-22 | A kind of installation method of hexagonal pavilion |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107558613A CN107558613A (en) | 2018-01-09 |
CN107558613B true CN107558613B (en) | 2019-07-16 |
Family
ID=60982626
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710863046.XA Active CN107558613B (en) | 2017-09-22 | 2017-09-22 | A kind of installation method of hexagonal pavilion |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107558613B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107542286B (en) * | 2017-09-22 | 2023-05-05 | 苏州艺库文化旅游发展有限公司 | Structure of pavilion |
CN111425017B (en) * | 2020-04-27 | 2021-07-16 | 明道合创智能科技有限公司 | Construction method of assembled multifunctional modeling pavilion |
CN111749497B (en) * | 2020-05-19 | 2021-10-22 | 宁波市风景园林设计研究院有限公司 | Construction process of four-corner pavilion of ancient building |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2835444Y (en) * | 2005-10-20 | 2006-11-08 | 黄鸣 | Bower with solar thermal-arrest device |
CN201817913U (en) * | 2010-09-29 | 2011-05-04 | 邓世超 | Combined house capable of adjusting lifting |
JP2012132145A (en) * | 2010-12-19 | 2012-07-12 | Takenaka Komuten Co Ltd | Lifting device for building |
CN202416913U (en) * | 2011-12-31 | 2012-09-05 | 赵立峰 | Combined pavilion |
CN204703548U (en) * | 2015-02-15 | 2015-10-14 | 上海天演建筑物移位工程股份有限公司 | Whole building is rectified a deviation, is raised lifting means |
-
2017
- 2017-09-22 CN CN201710863046.XA patent/CN107558613B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2835444Y (en) * | 2005-10-20 | 2006-11-08 | 黄鸣 | Bower with solar thermal-arrest device |
CN201817913U (en) * | 2010-09-29 | 2011-05-04 | 邓世超 | Combined house capable of adjusting lifting |
JP2012132145A (en) * | 2010-12-19 | 2012-07-12 | Takenaka Komuten Co Ltd | Lifting device for building |
CN202416913U (en) * | 2011-12-31 | 2012-09-05 | 赵立峰 | Combined pavilion |
CN204703548U (en) * | 2015-02-15 | 2015-10-14 | 上海天演建筑物移位工程股份有限公司 | Whole building is rectified a deviation, is raised lifting means |
Also Published As
Publication number | Publication date |
---|---|
CN107558613A (en) | 2018-01-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107558613B (en) | A kind of installation method of hexagonal pavilion | |
US9444396B2 (en) | Solar photovoltaic power generation panel mount | |
KR101067629B1 (en) | Pagora pillar structure | |
KR101208892B1 (en) | Prefabricated pavilion | |
CN211714015U (en) | House building structure built in underground space | |
CN204475921U (en) | The dismountable firm structural construction factory building of a kind of safety | |
CN102828614A (en) | Building template system capable of being quickly detached and installed and installation method thereof | |
CN207348509U (en) | A kind of structure in pavilion | |
KR101029360B1 (en) | Pagora pillar structure | |
CN107542286B (en) | Structure of pavilion | |
CN106894650B (en) | Reinforcement structure for mortise and tenon joints of wood structure beam column and construction method thereof | |
CN106988520B (en) | Construction method and support system for high-rise suspension structure | |
KR102114477B1 (en) | Construction Structure of Pole Plate, Comprising Column Head with Upper/Lower Combining Structure for Enhanced Durability of Column and Buildability of Pole Plate | |
KR102332718B1 (en) | Deck road | |
KR101113991B1 (en) | Connection structure of pavillion roof and construction method of the same | |
JP5386214B2 (en) | Foundation structure | |
CN204475919U (en) | The steel-structure factory building that a kind of antidetonation is windproof | |
CN211173008U (en) | Operating platform for variable cross-section cross box column | |
KR101387702B1 (en) | Structure for connects beam on the coulmn of korena-style house and construction methode for there of | |
CN208845017U (en) | Large span stone wood composite structure decorated archway | |
CN209779863U (en) | Reinforced concrete frame beam column node | |
KR20090006141U (en) | A prefabricated pillar for structure | |
CN204174848U (en) | A kind of precast reinforced skeleton of sets of brackets on top of the columns of building in the style of the ancients | |
CN205777870U (en) | A kind of tent column exempting to weld and can fix with ground | |
CN209413130U (en) | A kind of dendriform support rod structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20191009 Address after: 215000 Room 302, building 6, business and tourism building, 381 East Suzhou Avenue, Suzhou Industrial Park, Suzhou City, Jiangsu Province Patentee after: Suzhou Xiangshan workshop Jing original construction Limited by Share Ltd Address before: 215100 Lingshan Road, Xikou Town, Wuzhong District, Suzhou, Jiangsu, No. 505, No. 1 Patentee before: Suzhou Yi Yuan Cultural Tourism Development Co., Ltd. |
|
TR01 | Transfer of patent right |