A kind of hanging basket for bridge construction
Technical field
The present invention is a kind of hanging basket for bridge construction, belongs to construction hanging basket field.
Background technique
Hanging Basket is the capital equipment in cantilever construction, can be divided into truss-like, cable-stayed type, fashioned iron formula and mixing by structure type
4 kinds of formula.It is special that various forms Hanging Basket is comprehensively compared in requirement according to concrete cantilever construction process requirement and design drawing to Hanging Basket
Point, weight, using steel type, construction technology etc.;Hanging Basket design principle: from heavy and light, structure is simple, more stable and stronger, Forward and
It is convenient to mount and dismount, there is stronger reusable property, the features such as small is deformed after stress, and Hanging Basket down space is sufficient, it is possible to provide
Larger operation side is conducive to steel bar template constructing operation.
Existing technology can not it is convenient, quickly move left and right Hanging Basket, cause boundary of works area not mentioned further
It rises, affects working efficiency.
Summary of the invention
In view of the deficienciess of the prior art, it is an object of the present invention to provide a kind of hanging basket for bridge construction, it is existing to solve
Technology can not it is convenient, quickly move left and right Hanging Basket, cause boundary of works area not get a promotion further, affect work
The problem of efficiency.
To achieve the goals above, the present invention is to realize by the following technical solutions: a kind of hanging basket for bridge construction,
Its structure includes mounting bracket, fixed derrick, construction basket, main transmission bar, accessory drive bar, guard rail, protective net, driving
Device, fastening bolt, fastening foot is young, protects bottom plate, and the protective net is rectangular configuration and is installed on construction by embedded mode
Basket front and rear surfaces, the guard rail are set there are six altogether and are installed at left and right sides of construction basket in the form of double, and described is auxiliary
Drive rod is helped to be installed on lower end on rear side of construction basket by manner, upper end is equipped with main transmission bar on rear side of the construction basket,
The fixed derrick sets there are two altogether and is parallelly mounted to both ends on rear side of main transmission bar and accessory drive bar, the mounting bracket
The top of two fixed derricks is installed on there are two frame is set altogether and by welding manner, the driver passes through welding manner and pacifies
Medium position loaded on top on rear side of construction basket, the fastening foot son is installed on main transmission bar by fastening bolt, auxiliary passes
Lever both ends, the main transmission bar, accessory drive bar are mutually fixed by fastening foot son with fixed derrick, and the construction basket is set
There are lower tumbler, lower roller, upper roller, upper block, driving gear, driven roller, positioning plate, driving handwheel, the lower tumbler is set
It is installed on construction basket left side lower end there are two and for circular configuration and by lower roller, there are two the upper block is set
And it is installed on upper end on the left of construction basket for circular configuration and by upper roller, the positioning plate is installed on by welding manner to be applied
Top on the left of work basket, the driven roller is that columnar structured and right side is connected through positioning plate with driving handwheel, described
By being connected in the middle part of embedded mode and driving gear on the left of driven roller, the main transmission bar includes limited block, sliding slot, leads
Bar, Tooth Surface, the limited block are rectangular configuration and are installed on the guide rod left and right sides and bottom phase by welding manner
Mutually parallel, the Tooth Surface is set at the top of guide rod and is an integral molding structure, and the sliding slot is set in the middle part of guide rod and is
Integrated formed structure.
Further, the protection bottom plate is equipped with positioning pin, bottom plate plate body, set in the middle part of the described bottom plate plate body there are two
The through-hole of activity installing positioning pin.
Further, the bottom plate plate body is that rectangular configuration and upper end by welding manner are installed on fixed derrick bottom
And it is mutually perpendicular to accessory drive bar.
Further, the construction basket bottom is additionally provided with more than two location holes.
Further, multiple location holes are parallel and are mutually perpendicular to be installed on construction basket top and the knot that is integrally formed
Structure.
Beneficial effect
A kind of hanging basket for bridge construction of the present invention, the invention has the benefit that as shown in figs. 1-7, passing through mounting bracket
It can be used for fixed derrick and be fixed on bridge edge railing, then construction basket is fixed by fixed derrick, the main biography being equipped with
Lever integral middle be equipped with sliding slot, the construction basket rear end being equipped with by upper block, lower tumbler respectively with main transmission bar, accessory drive
The sliding slot of bar is fastened, to make construction basket convenient for carrying out moving left and right guiding by main transmission bar, accessory drive bar, then
Main transmission bar surface is equipped with Tooth Surface, and the driver being equipped with is fixed on construction basket upper end by positioning plate, by driving handwheel
Driven roller is driven to be driven, and the Tooth Surface that rotational driving gear is equipped with main transmission bar is intermeshed, constructor
Member can control moving left and right for construction basket according to driving handwheel, and two be equipped with protect bottom plate to install by fixed derrick
In construction basket bottom, can effectively prevent from applying to play positioning action through construction basket and bottom plate plate body by positioning pin
Work basket voluntarily slides, and improves the safety of construction.
The driver that the present invention is equipped with, which realizes driven roller by rotate driving handwheel, drives control, to make to drive gear
It is intermeshed with Tooth Surface, realizes the locomotive function of construction basket, whole operation is convenient, quick, more effectively improves and applies
The regional scope of work, accelerates working efficiency.
Detailed description of the invention
Upon reading the detailed description of non-limiting embodiments with reference to the following drawings, other feature of the invention,
Objects and advantages will become more apparent upon:
Fig. 1 is a kind of structural schematic diagram of hanging basket for bridge construction of the present invention.
Fig. 2 is the structural schematic diagram of A in Fig. 1.
Fig. 3 is a kind of backsight structural representation of hanging basket for bridge construction of the present invention.
Fig. 4 is construction basket side structure schematic view of the invention.
Fig. 5 is main transmission rod structure schematic diagram of the invention.
Fig. 6 is construction basket bottom substance schematic diagram of the invention.
Fig. 7 is a kind of side structure schematic view of hanging basket for bridge construction of the present invention.
In figure: mounting bracket -1, fixed derrick -2, construction basket -3, main transmission bar -4, accessory drive bar -5, guard rail -
6, protective net -7, driver -8, fastening bolt -9, fastening foot son -10, protection bottom plate -11, lower tumbler -301, lower roller -302,
Upper roller -303, upper block -304, driving gear -305, driven roller -306, positioning plate -307, driving handwheel -308, location hole -
309, limited block -401, sliding slot -402, guide rod -403, Tooth Surface -404, positioning pin -1101, bottom plate plate body -1102.
Specific embodiment
To be easy to understand the technical means, the creative features, the aims and the efficiencies achieved by the present invention, below with reference to
Specific embodiment, the present invention is further explained.
Please refer to Fig. 1-Fig. 7, the present invention provides a kind of hanging basket for bridge construction: its structure includes mounting bracket 1, fixes and hang
Bar 2, construction basket 3, main transmission bar 4, accessory drive bar 5, guard rail 6, protective net 7, driver 8, fastening bolt 9, fastening foot
Son 10, protection bottom plate 11, the protective net 7 are rectangular configuration and are installed on construction 3 front and rear surfaces of basket, institute by embedded mode
The guard rail 6 stated is set there are six altogether and is installed at left and right sides of construction basket 3 in the form of double, and the accessory drive bar 5 is logical
It crosses manner and is installed on construction 3 rear side lower end of basket, the 3 rear side upper end of construction basket is equipped with main transmission bar 4, and described consolidates
Determine sunpender 2 and set there are two and be parallelly mounted to main transmission bar 4 and 5 rear side both ends of accessory drive bar altogether, the mounting bracket 1 is total
If the top of two fixed derricks 2 is installed on there are two and by welding manner, the driver 8 passes through welding manner and installs
Medium position in construction 3 rear side top of basket, the fastening foot son 10 are installed on main transmission bar 4, auxiliary by fastening bolt 9
5 both ends of drive rod, the main transmission bar 4, accessory drive bar 5 are fixed by fastening foot son 10 with 2 phase of fixed derrick, described
Basket 3 of constructing is equipped with lower tumbler 301, lower roller 302, upper roller 303, upper block 304, driving gear 305, driven roller 306, positioning
Plate 307, driving handwheel 308, the lower tumbler 301 set there are two and for circular configuration and pass through lower roller 302 and be installed on and apply
3 left side lower end of work basket, the upper block 304 set there are two and as circular configuration and are installed on by upper roller 303
Construction 3 left side upper end of basket, the positioning plate 307 are installed on construction 3 left side top of basket, the driven roller by welding manner
306 are connected through positioning plate 307 with driving handwheel 308 for columnar structured and right side, pass through on the left of the driven roller 306
It is connected in the middle part of embedded mode and driving gear 305, the main transmission bar 4 includes limited block 401, sliding slot 402, guide rod
403, Tooth Surface 404, the limited block 401 are rectangular configuration and are installed on guide rod 403 or so two by welding manner
Side and bottom is parallel to each other, the Tooth Surface 404 are set to 403 top of guide rod and are an integral molding structure, the sliding slot
402 are set to 403 middle part of guide rod and are an integral molding structure, and the protection bottom plate 11 is equipped with positioning pin 1101, bottom plate plate body
1102, set that there are two the through-hole of activity installing positioning pin 1101, the bottom plate plate bodys in the middle part of the bottom plate plate body 1102
1102 is rectangular configurations and upper end is installed on 2 bottom of fixed derrick by welding manner and is mutually perpendicular to accessory drive bar 5, institute
3 bottom of construction basket stated is additionally provided with more than two location holes 309, and multiple location holes 309 are parallel and are mutually perpendicular to pacify
Loaded on 3 top of construction basket and it is an integral molding structure.
The present invention provides a kind of hanging basket for bridge construction, its working principle is that: it as shown in figs. 1-7, can by mounting bracket 1
It is fixed on bridge edge railing for fixed derrick 2, is then fixed by 2 pairs of construction baskets 3 of fixed derrick, the main biography being equipped with
4 integral middle of lever be equipped with sliding slot 402,3 rear end of construction basket being equipped with by upper block 304, lower tumbler 301 respectively with main transmission
Bar 4, accessory drive bar 5 sliding slot 402 fastened, thus make construct basket 3 be convenient for by main transmission bar 4, accessory drive bar 5 into
Row moves left and right guiding, and then 4 surface of main transmission bar is equipped with Tooth Surface 404, and the driver 8 being equipped with is solid by positioning plate 307
It is scheduled on construction 3 upper end of basket, drives driven roller 306 to be driven by driving handwheel 308, and rotational driving gear 305 and main biography
The Tooth Surface 404 that lever 4 is equipped with is intermeshed, and construction personnel can control construction basket 3 according to driving handwheel 308
Move left and right, two be equipped with protect bottom plate 11 by fixed derrick 2 be installed on construction 3 bottom of basket, pass through positioning pin 1101
Through construction basket 3 and bottom plate plate body 1102, to play positioning action, it can effectively prevent construction basket 3 from voluntarily sliding, be promoted
The safety of construction.
Upper roller 303 of the present invention is also known as roller, is widely used in such as circular screen printer, digital-code printer, mine
Conveying equipment, all kinds of transmission transportation systems such as papermaking, package packing machine and sorting conveying equipment in.
Problems solved by the invention be existing technology can not it is convenient, quickly move left and right Hanging Basket, lead to boundary of works area
It can not further get a promotion, affect working efficiency, the present invention is combined with each other by above-mentioned component, realizes construction basket
Locomotive function, whole operation is convenient, quick, more effectively improves the regional scope of construction, accelerates working efficiency, specifically
It is as described below:
The lower tumbler 301 sets there are two and as circular configuration and is installed under 3 left side of construction basket by lower roller 302
End, the upper block 304 set there are two and as circular configuration and are installed on 3 left side of construction basket by upper roller 303
Upper end, the positioning plate 307 are installed on construction 3 left side top of basket by welding manner, and the driven roller 306 is cylindrical shape
Structure and right side are connected through positioning plate 307 with driving handwheel 308, on the left of the driven roller 306 by embedded mode and
It is connected in the middle part of driving gear 305, the limited block 401 is rectangular configuration and is installed on guide rod 403 by welding manner
The left and right sides and bottom is parallel to each other, the Tooth Surface 404 is set to 403 top of guide rod and is an integral molding structure, described
Sliding slot 402 be set to the middle part of guide rod 403 and be an integral molding structure.
The above shows and describes the basic principles and main features of the present invention and the advantages of the present invention, for this field skill
For art personnel, it is clear that invention is not limited to the details of the above exemplary embodiments, and without departing substantially from spirit of the invention or
In the case where essential characteristic, the present invention can be realized in other specific forms.Therefore, in all respects, should all incite somebody to action
Embodiment regards exemplary as, and is non-limiting, the scope of the present invention by appended claims rather than on state
Bright restriction, it is intended that including all changes that fall within the meaning and scope of the equivalent elements of the claims in the present invention
It is interior.Any reference signs in the claims should not be construed as limiting the involved claims.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped
Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should
It considers the specification as a whole, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art
The other embodiments being understood that.