The content of the invention
For the deficiency of above-mentioned technology, the present invention proposes a kind of bridge facility.
A kind of bridge facility of the present invention, including the storage tank being fixedly mounted on stand, stand angle bottom are fixed
Provided with firm block, each firm block bottom is equipped with slipmat, and first is provided with one by one from top to bottom in the storage tank
Water storehouse, the second water storehouse and installation storehouse, be provided with the top of first water storehouse lead to first water storehouse lead inlet pipe,
The installation orlop portion is provided with delivery line, and being provided with first led between first water storehouse and the second water storehouse leads to
Groove, it is provided with second led between second water storehouse and installation storehouse and leads to groove, second water storehouse is centrally located at institute
State first and lead to groove lower right and be rotatably mounted with the first rotating shaft being connected with generator, positioned at described the in the installation storehouse
Two, which lead to groove lower right, is rotatably mounted with the second rotating shaft, and rotation is installed with the first rotating shaft and the second rotating shaft
Portion, multiple pivoting leafs that the rotating part includes pivoted housing and is uniformly arranged on the outside of the pivoted housing, the pivoted housing and described the
One rotating shaft is fixedly connected with the second rotating shaft, and the first rotating shaft and the second rotating shaft pass the storage tank and be separately installed with backward
First gear and second gear, are provided with cingulum in the first gear and second gear, and described first leads to groove and second logical
Even groove upper end is respectively arranged with the first fitting recess and the second fitting recess, and first fitting recess and the second fitting recess left end pass through the
Three rotating shafts are respectively rotatably provided with the first folding valve and the second folding valve, divide in first water storehouse and the second water storehouse
First management and control portion and the second management and control portion are not installed, the first management and control portion includes upper rocker piece, upper cotton rope and upper ejector pin, described
Upper cotton rope one end is fixed on the upper rocker piece lower end, and the other end is fixedly connected with the first folding valve right-hand member, and described second
Management and control portion includes lower rocker piece, lower cotton rope and lower push rod, and described lower cotton rope one end is fixed on the lower rocker piece lower end, the other end
It is fixedly connected with the second folding valve right-hand member,
Upper guide groove is respectively arranged with further technical scheme, first water storehouse and the second water storehouse both sides end wall with
Guide groove, slide respectively in the upper guide groove and lower guide channel and sliding block and lower sliding block are installed, it is solid between two upper sliding blocks
Dingan County is equipped with upper connective pole, and lower connective pole, the upper connective pole and lower connective pole point are installed between two lower sliding blocks
It is not fixedly connected with the upper rocker piece and lower rocker piece.
Further technical scheme, first water storehouse, the second water storehouse and installation orlop portion are respectively arranged with first
Scarf, the second scarf and the 3rd scarf, first scarf are located at the 3rd rotating shaft left end and are installed with
Projection, the upper protruding block right-hand member are installed with magnetite, and second scarf is located at the 3rd rotating shaft left end and fixes peace
Equipped with lower protruding block, the lower protruding block right-hand member is installed with lower magnetite, and the first folding valve and the second folding valve upper surface are leaned on
Iron-stone is fixedly installed at nearly 3rd rotating shaft.
Further technical scheme, described first lead to groove and second lead to groove lower end be respectively arranged with conduit and under lead
Pipe, the equal face pivoting leaf of upper conduit and downcomer.
Further technical scheme, the pivoting leaf end are provided with oppositely arranged bent plate, pushed away so as to increase current
Power.
Further technical scheme, upper ejector pin and the lower push rod end be provided with it is spherical, and the upper ejector pin and under
Push rod is tilted to the right setting.
The beneficial effects of the invention are as follows;
Apparatus of the present invention can concentrate on sewage in the first water storehouse, can when the water in the first water storehouse reach a certain height
The first folding valve is opened, after the first folding valve is opened, current can drive first rotating shaft to rotate and make generator operation, the
Water in one water storehouse can be flowed into the second water storehouse, and after the first folding valve leads to groove by first closes, described second is logical
Even groove is opened, and current can lead to from described second to be flowed out in groove and drive second axis of rotation, and second rotating shaft is led to
Crossing cingulum can drive the first rotating shaft to rotate, and thus can act on generator again, so as to make generator task again, and
Water after use can flow out from delivery line, delivery line can be connected into cistern;Apparatus of the present invention first can concentrate bridge sewage
Accumulation of energy, then generated electricity during blowdown using current, and caused electric energy can be directly used for bridge electricity consumption device
Power supply, can greatly reduce the waste of civil power.
Embodiment
All features disclosed in this specification, or disclosed all methods or during the step of, except mutually exclusive spy
Beyond sign and/or step, it can combine in any way.
This specification(Including any accessory claim, summary and accompanying drawing)Disclosed in any feature, except non-specifically chatting
State, can alternative features equivalent by other or with similar purpose replaced.I.e., unless specifically stated otherwise, each feature
It is an example in a series of equivalent or similar characteristics.
As shown in Figures 1 to 4, a kind of bridge facility of apparatus of the present invention, including the water storage being fixedly mounted on stand 10
Case 18, described 10 jiaos of bottoms of stand are fixed with firm block 101, and each firm bottom of block 101 is equipped with slipmat 102,
The firm block 101 is used to increasing with the contact area on ground, stability during so as to improve support, and passes through the slipmat
102 can effectively prevent ground wet and slippery and the skiddings of appearance, and the first storage is provided with one by one from top to bottom in the storage tank 18
Sump 20, the second water storehouse 17 and installation storehouse 12, the top of the first water storehouse 20, which is provided with, leads to first water storehouse 20
Lead inlet pipe 21, the installation bottom of storehouse 12 is provided with delivery line 37, between the water storehouse 17 of the first water storehouse 20 and second
It is provided with first led to and leads to groove 26, being provided with second led between second water storehouse 17 and installation storehouse 12 leads to groove
32, second water storehouse 17, which is centrally located at described first and leads to the lower right of groove 26, is rotatably mounted with what is be connected with generator
First rotating shaft 28, lead to the lower right of groove 32 positioned at described second and be rotatably mounted with the second rotating shaft 34 in the installation storehouse 12,
Rotating part is installed with the rotating shaft 34 of first rotating shaft 28 and second, the rotating part includes pivoted housing 27 and uniformly peace
Multiple pivoting leafs 29 mounted in the outside of pivoted housing 27, the pivoted housing 27 is fixed with the rotating shaft 34 of first rotating shaft 28 and second to be connected
Connect, the rotating shaft 34 of first rotating shaft 28 and second passes the storage tank 18 and is separately installed with first gear and second backward
Gear, cingulum is installed in the first gear and second gear, described first, which leads to groove 26 and second, leads to the upper end of groove 32 point
The first fitting recess 35 and the second fitting recess are not provided with, and the fitting recess left end of the first fitting recess 35 and second passes through the 3rd rotating shaft
First folding valve 42 and the second folding valve 13 be respectively rotatably installed, in the water storehouse 17 of the first water storehouse 20 and second
It is separately installed with the first management and control portion and the second management and control portion, the first management and control portion and the second management and control portion are respectively controlling described
One folding valve 42 and the second folding valve 13, the first management and control portion includes upper rocker piece 23, upper cotton rope 25 and upper ejector pin 47, described
Upper one end of cotton rope 25 is fixed on the lower end of upper rocker piece 23, and the other end is fixedly connected with the right-hand member of the first folding valve 42, institute
Stating the second management and control portion includes lower rocker piece 40, lower cotton rope 38 and lower push rod 39, and described lower one end of cotton rope 38 is fixed on described float downward
The lower end of motion block 40, the other end are fixedly connected with the right-hand member of the second folding valve 13,
Valuably or exemplarily, wherein, it is respectively arranged with the both sides end wall of 20 and second water storehouse of the first water storehouse 17
Upper guide groove 19 and lower guide channel 16, slide respectively in the upper guide groove 19 and lower guide channel 16 and sliding block 36 and lower sliding block are installed
31, connective pole 24 is installed between two upper sliding blocks 36, is installed with down in succession between two lower sliding blocks 31
Bar 30, the upper connective pole 24 and lower connective pole 30 are fixedly connected with the upper rocker piece 23 and lower rocker piece 40 respectively.
Valuably or exemplarily, wherein, first water storehouse 20, the second water storehouse 17 and the installation bottom of storehouse 12 are distinguished
The first scarf 22, the second scarf 15 and the 3rd scarf 11 are provided with, first scarf 22 is located at described 3rd turn
Axle left end is installed with upper protruding block 45, and the right-hand member of upper protruding block 45 is installed with magnetite 44, second scarf 15
Lower protruding block 14 is installed with positioned at the 3rd rotating shaft left end, the right-hand member of lower protruding block 14 is installed with lower magnetite, described
First folding valve 42 and the upper surface of the second folding valve 13 are fixedly installed iron-stone 46 at the 3rd rotating shaft.
Valuably or exemplarily, wherein, described first, which leads to groove 26 and second, leads to the lower end of groove 32 and is respectively arranged with
Conduit 41 and downcomer 33, the equal face pivoting leaf 29 of the upper conduit 41 and downcomer 33.
Valuably or exemplarily, wherein, the end of pivoting leaf 29 is provided with oppositely arranged bent plate 290, so as to
Increase hydro-flow thrust.
Valuably or exemplarily, wherein, upper ejector pin 47 and lower push rod 39 end is provided with spherical 43, and described
Upper ejector pin 47 and lower push rod 39 are tilted to the right setting.
During apparatus of the present invention original state, the first folding valve 42 and the second folding valve 13 lead to described first respectively
Groove 26 and second leads to groove 32 and blocked, and the upper rocker piece 23 and lower rocker piece are respectively in itself gravity and upper connective pole 24
Be located at the water storage of the first water storehouse 20 and second under the Action of Gravity Field of lower connective pole 30, upper sliding block 36 and lower sliding block 31
The bottom of storehouse 17, and on the upper ejector pin 47 and lower push rod 39 it is spherical respectively with the first folding valve 42 and the second folding valve 13
Upper surface offsets.
In use, lead the water storage into first water storehouse 20 of inlet pipe 21 by described, with the rise of water level, it is described on
Rocker piece 23 can follow water level to rise, and after the upper cotton rope 25 is tensioned, after water level continues rising, the upper rocker piece 23 can lead to
Cotton rope 25 is crossed to pivot the first folding valve 42 to the left, when the first folding valve 42 pivots to the left, the upper magnetite 44
The adsorbable iron-stone 46, so that the first folding valve 42 is opened, after the first folding valve 42 is opened, described first
Water in water storehouse 20 leads to from described first to be flowed into groove 26 in second water storehouse 17, the process that water flows downward out
In, current can impact the pivoting leaf 29, and so as to drive the first rotating shaft 28 to rotate, the rotation of first rotating shaft 28 makes can
Act on generator and make generator operation, with the water level decreasing of first water storehouse 20, in second water storehouse 17
Water level constantly raise, during water level decreasing in first water storehouse 20, the upper rocker piece 23 constantly declines, the floating
During motion block 23 declines, spherical 43 on the upper ejector pin 47 may act on the first folding valve 42, and described first opens
Thuban turn can be driven to by closing valve 42, when the first folding valve 42 leads to groove 26 by described first to be blocked, second storage
Water level in sump 17 reaches high point, and the lower rocker piece 40 is pulled up the second folding valve 13 by the lower cotton rope 38
Rise, and after the second folding valve 13 pivots to the left, lead to groove 32 by described second and open, current lead to groove 32 from described second
In be flowed into it is described installation storehouse 12 in, current be flowed into it is described installation storehouse 12 in during, current can impact the lower section
Pivoting leaf 29, the pivoting leaf 29 can drive second rotating shaft 34 to rotate, and second rotating shaft 34 can drive when rotating
Second gear rotates, and the second gear can drive the first gear to rotate by cingulum, and the first gear can when rotating
The first rotating shaft 28 is driven, the first rotating shaft 28 can make generator operation when rotating, when in second water storehouse 17
After water outflow, the second folding valve 13 can return to original state.
The beneficial effects of the invention are as follows:Apparatus of the present invention can concentrate on sewage in the first water storehouse, when the first water storehouse
In water when reaching a certain height, can open the first folding valve, after the first folding valve is opened, current can drive first turn
Axle is rotated and makes generator operation, and the water in the first water storehouse can be flowed into the second water storehouse, when the first folding valve is by first
After leading to groove closing, described second, which leads to groove, is opened, and current can lead to from described second to flow out in groove and drive described second
Axis of rotation, second rotating shaft can drive the first rotating shaft to rotate, thus can act on generator again by cingulum, from
And generator task again can be made, and the water after use can flow out from delivery line, delivery line can be connected into cistern;The present invention
Bridge sewage first can be concentrated accumulation of energy by device, then be generated electricity during blowdown using current, and caused electric energy can
The power supply of bridge electricity consumption device is directly used in, the waste of civil power can be greatly reduced.
General principle, principal character and the advantages of the present invention of the present invention has been shown and described above.The technology of the industry
For personnel it should be appreciated that the present invention is not limited to the above embodiments, that described in above-described embodiment and specification is the present invention
Principle, without departing from the spirit and scope of the present invention, various changes and modifications of the present invention are possible, these change and
Improvement is both fallen within claimed invention.The claimed scope of the invention is by appended claims and its equivalent circle
It is fixed.