CN107558325A - Heavy grade road permeable pavement is slow to ooze structure and its construction method - Google Patents
Heavy grade road permeable pavement is slow to ooze structure and its construction method Download PDFInfo
- Publication number
- CN107558325A CN107558325A CN201710700333.9A CN201710700333A CN107558325A CN 107558325 A CN107558325 A CN 107558325A CN 201710700333 A CN201710700333 A CN 201710700333A CN 107558325 A CN107558325 A CN 107558325A
- Authority
- CN
- China
- Prior art keywords
- permeable pavement
- slow
- heavy grade
- grade road
- ooze
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 20
- 239000002689 soil Substances 0.000 claims abstract description 26
- 230000015572 biosynthetic process Effects 0.000 claims abstract description 21
- 239000004576 sand Substances 0.000 claims abstract description 14
- 239000002344 surface layer Substances 0.000 claims abstract description 12
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 14
- 239000011347 resin Substances 0.000 claims description 4
- 229920005989 resin Polymers 0.000 claims description 4
- 238000011026 diafiltration Methods 0.000 abstract description 2
- 230000000694 effects Effects 0.000 description 10
- 230000013011 mating Effects 0.000 description 5
- 230000008595 infiltration Effects 0.000 description 4
- 238000001764 infiltration Methods 0.000 description 4
- 239000010410 layer Substances 0.000 description 4
- 238000000034 method Methods 0.000 description 4
- 230000014759 maintenance of location Effects 0.000 description 3
- 230000035699 permeability Effects 0.000 description 3
- 239000004698 Polyethylene Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- -1 polyethylene Polymers 0.000 description 2
- 229920000915 polyvinyl chloride Polymers 0.000 description 2
- 239000004800 polyvinyl chloride Substances 0.000 description 2
- 230000011218 segmentation Effects 0.000 description 2
- 230000008859 change Effects 0.000 description 1
- 230000007797 corrosion Effects 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000001934 delay Effects 0.000 description 1
- 230000003111 delayed effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 239000003673 groundwater Substances 0.000 description 1
- 238000005213 imbibition Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 229920000573 polyethylene Polymers 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 238000000746 purification Methods 0.000 description 1
- 239000004575 stone Substances 0.000 description 1
- 238000011144 upstream manufacturing Methods 0.000 description 1
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A30/00—Adapting or protecting infrastructure or their operation
- Y02A30/60—Planning or developing urban green infrastructure
Abstract
The present invention oozes structure and its construction method for a kind of heavy grade road permeable pavement is slow, heavy grade road permeable pavement is slow to be oozed structure and mats formation along road grade in native soil, gravel aquifer is laid in native soil, coarse sand screed-coat is laid on gravel aquifer, permeable pavement surface layer is laid on coarse sand screed-coat, is arranged at intervals with gravel aquifer multiple in the waterproof baffle being vertically arranged.This is slow to ooze structure and can retain and infiltrate rainwater and avoid it downstream lower is collected too quickly, strengthens store function, promotes rainwater diafiltration, it is ensured that permeable pavement can play a role on a large scale.
Description
Technical field
The present invention relates to sponge city urban pavement engineering field, more particularly to a kind of heavy grade road permeable pavement is slow oozes
Structure and its construction method.
Background technology
In recent years, country advocates the construction in " sponge city " energetically.Sponge city refer to city can as sponge,
Adapt to environmental change and tackle natural calamity etc. with good " elasticity ", water suction, water storage, infiltration, water purification when raining, need
By the water stored " release " and it is used when wanting.Sponge city can effectively alleviate urban waterlogging, prevent that level of ground water from declining
Harm.
Porous pavement is a kind of road surface load-carrying members that can pass through water.Permeable pavement has following two functions:Water seepage function,
Rainfall runoff is permeated in lower soil;Peak clipping function, can interim water storage, treat that rainwater is discharged into draining by peak runoff later
System.In the prior art, permeable pavement structure generally comprises the coarse sand screed-coat above native soil and permeable surface layer, existing
The terrain slope requirement of water paving structure is less than 3%, 5% is most very much not should be greater than, to ensure that the subregion of permeable pavement will not
Bear too high hydraulic pressure.
And many regional physical features gradients is larger, especially heavy grade road of the terrain slope requirement more than 5%, rainwater is along slope
Degree is rapid to flow down, and it is non-perpendicular under ooze, reduce the overall infiltration rainfall in permeable pavement region, the infiltration effect of permeable pavement is big
Give a discount.
Thus, the present inventor relies on experience and the practice for being engaged in relevant industries for many years, proposes that a kind of heavy grade road is permeable
Mat formation it is slow ooze structure and its construction method, the defects of to overcome prior art.
The content of the invention
Delay it is an object of the invention to provide a kind of heavy grade road permeable pavement and ooze structure and its construction method, overcome existing
Have rainwater present in technology along the gradient flow down too fast, infiltration effect difference the problem of, this is slow to ooze structure and can retain and infiltrate rainwater and keep away
Exempting from it, downstream lower is collected too quickly, strengthens store function, promotes rainwater diafiltration, it is ensured that permeable pavement can play on a large scale
Effect.
The object of the present invention is achieved like this, and a kind of heavy grade road permeable pavement is slow to ooze structure;The heavy grade road
Road permeable pavement is slow to be oozed structure and mats formation along road grade in native soil, and gravel aquifer, the gravel are laid in the native soil
Coarse sand screed-coat is laid on stone aquifer, permeable pavement surface layer is laid on the coarse sand screed-coat, between the gravel aquifer is interior
It is multiple in the waterproof baffle being vertically arranged every being provided with.
In the better embodiment of the present invention, the bottom of each waterproof baffle, which is fixed, is inserted in the native soil
It is interior, the top of the gravel aquifer is extended down on the top of each waterproof baffle.
In the better embodiment of the present invention, the two neighboring waterproof baffle is along the spacing on horizontal length direction
For 5~10m.
In the better embodiment of the present invention, the width dimensions of each waterproof baffle are more than the permeable pavement face
The width dimensions of layer.
In the better embodiment of the present invention, the waterproof baffle is concrete baffle plate or resin baffle plate.
The purpose of the present invention can also be achieved in that a kind of heavy grade road permeable pavement delays the construction method for oozing structure,
The construction method includes:
The native soil in step a, smooth region to be mated formation;
Step b, mat formation above native soil gravel aquifer, be arranged at intervals multiple waterproof baffles, the bottom of each waterproof baffle
Portion, which plugs, to be fixed in native soil, prolongs the top for being through to gravel aquifer on the top of each waterproof baffle;
Step c, carry out conventional porous pavement above gravel aquifer to mat formation operation, order lays coarse sand screed-coat and thoroughly
Water is mated formation surface layer.
From the above mentioned, heavy grade road permeable pavement provided by the invention is slow oozes structure and its construction method has and had as follows
Beneficial effect:
(1) heavy grade road permeable pavement of the invention is slow oozes in structure, gravel aquifer can useful storage, interval is set
The waterproof baffle put can be segmented the rainwater that gravel aquifer is penetrated into retention, prevent that the rainwater in gravel aquifer is downward too quickly
Trip lower is collected, and avoids causing excessive seepage pressure to downstream lower, makes heavy grade road permeable pavement is slow to ooze the upper of structure
Trip, which gives full play to, oozes storage effect, improves the slow overall infiltrating performance for oozing structure of heavy grade road permeable pavement, it is ensured that heavy grade
Road permeable pavement is slow, which to ooze structure, can play permeable effect on a large scale;
(2) heavy grade road permeable pavement of the invention is slow oozes in structure, and the cost of waterproof baffle is relatively low, laying method letter
Just, quantities is small for folk prescription, the spacing of waterproof baffle can be suitably adjusted according to road grade and ground rainfall intensity of mating formation, in great Po
Degree road area gives full play to the permeability performance of permeable pavement;Waterproof baffle is inserted in original from the extension of gravel aquifer top down
In soil layer, the slow structural stability for oozing structure of heavy grade road permeable pavement will not be destroyed;
(3) the slow permeable pavement region oozed structure and be more than 5% suitable for the gradient of heavy grade road permeable pavement of the invention;
(4) heavy grade road permeable pavement of the invention is slow oozes structure and is with a wide range of applications, big slope of the invention
The construction method that degree road permeable pavement is slow to ooze structure is simple, and construction cost is low, is advantageous to wide popularization and application.
Brief description of the drawings
The following drawings is only intended to, in doing schematic illustration and explanation to the present invention, not delimit the scope of the invention.Wherein:
Fig. 1:For the slow schematic diagram for oozing structure of heavy grade road permeable pavement of the present invention.
In figure:
100th, heavy grade road permeable pavement is slow oozes structure;
1st, native soil;
2nd, gravel aquifer;
3rd, coarse sand screed-coat;
4th, permeable pavement surface layer;
5th, waterproof baffle;
6th, rainwater.
Embodiment
In order to which technical characteristic, purpose and the effect of the present invention is more clearly understood, now control illustrates this hair
Bright embodiment.
As shown in figure 1, the present invention provides, a kind of heavy grade road permeable pavement is slow to ooze structure 100, it is necessary to illustrate, this
(gradient refers to the degree delayed suddenly of ground table unit to the gradient that heavy grade in application refers to more than 5%, generally domatic vertical height
The ratio for spending H and horizontal length L represents that the gradient is often expressed as a percentage, as shown in fig. 1), heavy grade road permeable pavement
It is slow to ooze structure 100 and mat formation along road grade in native soil 1, gravel aquifer 2, the upper berth of gravel aquifer 2 are laid in native soil 1
If coarse sand screed-coat 3, permeable pavement surface layer 4 is laid on coarse sand screed-coat 3, is arranged at intervals with gravel aquifer 2 multiple in perpendicular
The waterproof baffle 5 directly set.The heavy grade road permeable pavement of the present invention is slow to be oozed in structure 100, and gravel aquifer 2 can be effective
The slow structure 100 of oozing of heavy grade road permeable pavement is divided into multistage, realizes that segmentation retention is penetrated into by water storage, multiple waterproof baffles 5
The rainwater 6 of gravel aquifer 2, prevent that rainwater 6 too quickly downstream collect by lower, waterproof baffle 5 can effectively store by cutting gear
Water so that each segmentation oozes rainwater under continuing, and avoids causing excessive seepage pressure to downstream lower, makes heavy grade road permeable
The slow upstream for oozing structure 100 of mating formation gives full play to and oozes storage effect, improves that heavy grade road permeable pavement is slow to ooze the whole of structure 100
Body infiltrating performance, it is ensured that heavy grade road permeable pavement is slow, which to ooze structure 100, to play a role on a large scale;The heavy grade of the present invention
The slow permeable pavement region oozed structure 100 and be more than 5% suitable for the gradient of road permeable pavement;The heavy grade road of the present invention is permeable
Mat formation it is slow ooze structure 100 and be with a wide range of applications, such as square, greenbelt in little residential region, park green land and permeable walking
Road etc..
Further, as shown in figure 1, the bottom of each waterproof baffle 5 is inserted in native soil 1, on the top of each waterproof baffle 5
It is extended down to the top of gravel aquifer 2.
Further, two neighboring waterproof baffle 5 is 5~10m along the spacing on horizontal length direction, and the distance values can be with
Made the appropriate adjustments according to road grade and ground rainfall intensity of mating formation.
Further, in order to ensure the dash effect of waterproof baffle, the width dimensions of each waterproof baffle 5 are more than permeable pavement face
The width dimensions of layer 4.
Further, waterproof baffle 5 is concrete baffle plate or resin baffle plate, and the material of resin baffle plate can be polyethylene (letter
Referred to as PE, prior art, water imbibition is small, corrosion-resistant) or polyvinyl chloride (referred to as PVC, prior art, yield is big, and cost is low).
The cost of waterproof baffle 5 is relatively low, and laying method is simple and convenient, and quantities is small, can be strong according to road grade and ground rainfall of mating formation
The spacing of the appropriate adjustment waterproof baffle 5 of degree, the permeability performance of permeable pavement is given full play in heavy grade road area.Waterproof baffle
5 are inserted in native soil 1 from the extension of the top down of gravel aquifer 2, will not destroy that heavy grade road permeable pavement is slow to ooze structure
100 structural stability.
The construction method that the heavy grade road permeable pavement of the present invention is slow to ooze structure 100 is as follows:
The native soil 1 in step a, smooth region to be mated formation;
Step b, mat formation above native soil 1 gravel aquifer 2, one group of waterproof baffle 5, each water proof gear are set at interval of 5m
The bottom of plate 5, which plugs, to be fixed in native soil 1, prolongs the top for being through to gravel aquifer 2 on the top of each waterproof baffle 5, respectively
The width dimensions of waterproof baffle 5 are more than the width dimensions of permeable pavement surface layer;
Step c, conventional porous pavement is carried out above gravel aquifer 2 to mat formation operation:The order above gravel aquifer 2
Coarse sand screed-coat 3 and permeable pavement surface layer 4 are laid, and compacting process is implemented to coarse sand screed-coat 3 and permeable pavement surface layer 4.
The construction method that the heavy grade road permeable pavement of the present invention is slow to ooze structure 100 is simple, and construction cost is low, is advantageous to
Wide popularization and application.
From the above mentioned, heavy grade road permeable pavement provided by the invention is slow oozes structure and its construction method has and had as follows
Beneficial effect:
(1) heavy grade road permeable pavement of the invention is slow oozes in structure, gravel aquifer can useful storage, interval is set
The waterproof baffle put can be segmented the rainwater that gravel aquifer is penetrated into retention, prevent that the rainwater in gravel aquifer is downward too quickly
Trip lower is collected, and avoids causing excessive seepage pressure to downstream lower, makes heavy grade road permeable pavement is slow to ooze the upper of structure
Trip, which gives full play to, oozes storage effect, improves the slow overall infiltrating performance for oozing structure of heavy grade road permeable pavement, it is ensured that heavy grade
Road permeable pavement is slow, which to ooze structure, can play permeable effect on a large scale;
(2) heavy grade road permeable pavement of the invention is slow oozes in structure, and the cost of waterproof baffle is relatively low, laying method letter
Just, quantities is small for folk prescription, the spacing of waterproof baffle can be suitably adjusted according to road grade and ground rainfall intensity of mating formation, in great Po
Degree road area gives full play to the permeability performance of permeable pavement;Waterproof baffle is inserted in original from the extension of gravel aquifer top down
In soil layer, the slow structural stability for oozing structure of heavy grade road permeable pavement will not be destroyed;
(3) the slow permeable pavement region oozed structure and be more than 5% suitable for the gradient of heavy grade road permeable pavement of the invention;
(4) heavy grade road permeable pavement of the invention is slow oozes structure and is with a wide range of applications, big slope of the invention
The construction method that degree road permeable pavement is slow to ooze structure is simple, and construction cost is low, is advantageous to wide popularization and application.
The schematical embodiment of the present invention is the foregoing is only, is not limited to the scope of the present invention.It is any
Those skilled in the art, made equivalent variations and modification on the premise of the design of the present invention and principle is not departed from,
The scope of protection of the invention should be belonged to.
Claims (6)
1. a kind of heavy grade road permeable pavement is slow to ooze structure;Characterized in that, the heavy grade road permeable pavement is slow to ooze knot
Structure is mated formation in native soil along road grade, and gravel aquifer is laid in the native soil, and laying is thick on the gravel aquifer
Sand screed-coat, permeable pavement surface layer is laid on the coarse sand screed-coat, be arranged at intervals with the gravel aquifer multiple in perpendicular
The waterproof baffle directly set.
2. heavy grade road permeable pavement as claimed in claim 1 is slow to ooze structure, it is characterised in that each waterproof baffle
Bottom is fixed and is inserted in the native soil, and the top of the gravel aquifer is extended down on the top of each waterproof baffle.
3. heavy grade road permeable pavement as claimed in claim 1 is slow to ooze structure, it is characterised in that the two neighboring water proof
Baffle plate is 5~10m along the spacing on horizontal length direction.
4. heavy grade road permeable pavement as claimed in claim 1 is slow to ooze structure, it is characterised in that each waterproof baffle
Width dimensions are more than the width dimensions of the permeable pavement surface layer.
5. heavy grade road permeable pavement as claimed in claim 1 is slow to ooze structure, it is characterised in that the waterproof baffle is mixed
Coagulate native baffle plate or resin baffle plate.
6. a kind of slow construction method for oozing structure of heavy grade road permeable pavement as described in any one of claim 1 to 5, it is special
Sign is that the construction method includes:
The native soil in step a, smooth region to be mated formation;
Step b, mat formation above native soil gravel aquifer, be arranged at intervals multiple waterproof baffles, the bottom of each waterproof baffle is inserted
If being fixed in native soil, prolong the top for being through to gravel aquifer on the top of each waterproof baffle;
Step c, carry out conventional porous pavement above gravel aquifer to mat formation operation, order lays coarse sand screed-coat and permeable paving
Fill surface layer.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710700333.9A CN107558325A (en) | 2017-08-16 | 2017-08-16 | Heavy grade road permeable pavement is slow to ooze structure and its construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710700333.9A CN107558325A (en) | 2017-08-16 | 2017-08-16 | Heavy grade road permeable pavement is slow to ooze structure and its construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107558325A true CN107558325A (en) | 2018-01-09 |
Family
ID=60975581
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710700333.9A Pending CN107558325A (en) | 2017-08-16 | 2017-08-16 | Heavy grade road permeable pavement is slow to ooze structure and its construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107558325A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111101419A (en) * | 2020-01-21 | 2020-05-05 | 河海大学 | Full water-permeable pavement structure suitable for large gradient |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101767911A (en) * | 2010-01-21 | 2010-07-07 | 同济大学 | Method and device for strengthening treatment of slope interception |
CN205115951U (en) * | 2015-10-14 | 2016-03-30 | 武汉理工大学 | Porous pavement that can be used to driveway |
CN105544344A (en) * | 2015-12-10 | 2016-05-04 | 天津泰达盐碱地绿化研究中心有限公司 | Method for enhancing water permeability of permeable pavement of urban gentle slope |
CN205804483U (en) * | 2016-07-15 | 2016-12-14 | 毕友德 | A kind of hydraulic engineering antiscour ecological revetment |
CN207062690U (en) * | 2017-08-16 | 2018-03-02 | 中冶京诚工程技术有限公司 | Heavy grade road permeable pavement is slow to ooze structure |
-
2017
- 2017-08-16 CN CN201710700333.9A patent/CN107558325A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101767911A (en) * | 2010-01-21 | 2010-07-07 | 同济大学 | Method and device for strengthening treatment of slope interception |
CN205115951U (en) * | 2015-10-14 | 2016-03-30 | 武汉理工大学 | Porous pavement that can be used to driveway |
CN105544344A (en) * | 2015-12-10 | 2016-05-04 | 天津泰达盐碱地绿化研究中心有限公司 | Method for enhancing water permeability of permeable pavement of urban gentle slope |
CN205804483U (en) * | 2016-07-15 | 2016-12-14 | 毕友德 | A kind of hydraulic engineering antiscour ecological revetment |
CN207062690U (en) * | 2017-08-16 | 2018-03-02 | 中冶京诚工程技术有限公司 | Heavy grade road permeable pavement is slow to ooze structure |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111101419A (en) * | 2020-01-21 | 2020-05-05 | 河海大学 | Full water-permeable pavement structure suitable for large gradient |
CN111101419B (en) * | 2020-01-21 | 2021-11-30 | 河海大学 | Full water-permeable pavement structure suitable for large gradient |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205063005U (en) | Can carry out novel rainwater well that compensates to groundwater | |
CN206352331U (en) | The concave herbaceous field structure of sponge the idea of the city | |
CN103981785A (en) | Pervious concrete paving system with penetration and drainage guide tubes | |
CN202265891U (en) | Permeable rainwater drainage pipe | |
CN105064496A (en) | Self-utilization rainwater detention storage tank | |
CN202323612U (en) | Dank floor tile | |
CN207062690U (en) | Heavy grade road permeable pavement is slow to ooze structure | |
CN106498923A (en) | Consolidation sand filling bag composite pile system and its construction method from after draining | |
CN107558325A (en) | Heavy grade road permeable pavement is slow to ooze structure and its construction method | |
CN201080590Y (en) | Water seepage floor tile | |
CN205295848U (en) | Firm type ecology system of mating formation of permeating water | |
CN105544344B (en) | A method of enhancing city gentle slope porous pavement permeability performance | |
CN104878827A (en) | Road drainage structure | |
CN209759918U (en) | Road surface structure suitable for sponge city | |
CN203866664U (en) | Permeable concrete pavement system with permeation and drainage guide pipes | |
CN111535098A (en) | Rainwater drainage system for green belts and sidewalks of town roads and construction method | |
CN208362838U (en) | A kind of porous pavement | |
CN206173762U (en) | Urban road dewatering system | |
CN206090204U (en) | Height ecological road surface structure of permeating water | |
CN205399118U (en) | Polyurethane rubble is resistant to pass through level ground anti -skidding colored road surface of permeating water | |
CN109657407B (en) | Method for calculating section size of grass planting ditch for enhancing water seepage function of dry grass planting ditch | |
CN207531447U (en) | road green belt | |
CN107119789A (en) | A kind of novel linear gutter structure mated formation for saturating draining | |
KR20140098583A (en) | Flood reduction and penetration for promoting the penetration type road system | |
CN208733763U (en) | The rain sewage collection system of high-pile beam Wharf Platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180109 |