CN107554036A - The production technology of Wet One-step ceiling flange - Google Patents

The production technology of Wet One-step ceiling flange Download PDF

Info

Publication number
CN107554036A
CN107554036A CN201710790293.1A CN201710790293A CN107554036A CN 107554036 A CN107554036 A CN 107554036A CN 201710790293 A CN201710790293 A CN 201710790293A CN 107554036 A CN107554036 A CN 107554036A
Authority
CN
China
Prior art keywords
ceiling
control
semi
flange
skylight
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710790293.1A
Other languages
Chinese (zh)
Inventor
陈舒宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WUXI JIXING AUTO PARTS CO Ltd
Original Assignee
WUXI JIXING AUTO PARTS CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUXI JIXING AUTO PARTS CO Ltd filed Critical WUXI JIXING AUTO PARTS CO Ltd
Priority to CN201710790293.1A priority Critical patent/CN107554036A/en
Publication of CN107554036A publication Critical patent/CN107554036A/en
Pending legal-status Critical Current

Links

Landscapes

  • Vehicle Interior And Exterior Ornaments, Soundproofing, And Insulation (AREA)

Abstract

The present invention relates to a kind of production technology of Wet One-step ceiling flange, belong to technical field of automotive trim.Its step is:Upper strata glass and lower floor's glass is taken to be respectively fed to glue spreader and carry out plastic roll;PU is taken to be sent into softening water dispenser, softening water dispenser is to the uniform sprinkling catalyst of PU;It is compressing that the material laid is sent into mould;Compressing semi-finished product are entered into vacuum adsorbed cooling and shaping;Molding semi product after cooling and shaping is subjected to high pressure waterjet;Water is cut into semi-finished product and is placed on progress skylight flange operation on flanger;The ceiling for having turned over side is placed on the vertical tool of group and positioned, robot gluing on ceiling, the positioning that skylight frame and clamp seat are then carried out with press box frock is suppressed;The artificial bound edge in ceiling forward position.Present invention accomplishes beautiful and clean design requirement, the production technology of bound edge roof liner is simplified.

Description

The production technology of Wet One-step ceiling flange
Technical field
The present invention relates to a kind of production technology of automotive upholstery, more particularly to a kind of production work of Wet One-step ceiling flange Skill, belong to technical field of automotive trim.
Background technology
Automobile ceiling is installed on the decoration on metal plate at the top of automobile cabin, plays sound-absorbing, heat-insulated, beautification driving cabin etc. Feature, increasingly pursuing high-performance, environment-friendly type, lightweight and energy-saving epoch, automotive trim as car conour into A key factor of car, therefore the requirement more and more higher to automotive upholstery are selected for people.In the production technology of existing ceiling In, the skylight position of ceiling influences ceiling because ceiling fabric is high pressure waterjet after-contraction produces flash, leakage base material the problems such as Exterior quality.Existing moulding process is primarily present problems with:
1st, ceiling fabric high pressure waterjet after-contraction produce flash, leakage base material the problems such as;
2nd, knitted composite fabric shrinks the position generation undulating pleats for making ceiling trimming position intensity weaker.
The content of the invention
The purpose of the present invention is to overcome the deficiencies in the prior art, there is provided a kind of production process is efficient, quick, saving The production technology of the Wet One-step ceiling flange of production cost.
Technical scheme, the production technology of Wet One-step ceiling flange, step are as follows:
A, plastic roll:Take upper strata Chopped Strand Mat to be respectively fed to glue spreader with lower floor's Chopped Strand Mat and carry out plastic roll;The electric machine frequency control of glue spreader System is controlled 40 ~ 50 in 20 ~ 40Hz, the up-down roller clearance control of glue spreader in 1.0 ~ 1.2mm, the bowl temperature of glue spreader DEG C, glass one side plastic roll, upper strata glass glue amount is controlled in 18 ~ 20g/m2, lower floor's glass glue amount control is in 70 ~ 80g/m2, pass through glass Fine spread meets the rigid requirements of ceiling;
B, soften:PU is sent into softening water dispenser, softening water dispenser uniformly sprays catalyst to PU upper and lower surfaces, softens the electricity of water dispenser Unit frequency control is controlled in 110 ~ 130g/m in 40 ~ 60Hz, the catalytic amount of sprinkling2
C, it is compressing:Material is laid by transfer matic, the superiors are knitted composite fabric, and the second layer is upper strata Chopped Strand Mat, the Three layers are PU, and the 4th layer is lower floor's Chopped Strand Mat, and layer 5 is lower floor's Chopped Strand Mat, and bottom is multiple PE film non-woven fabrics;By what is laid It is compressing that material is sent into mould, when compressing upper mould temperature control at 115 ~ 125 DEG C, lower mould temperature control 130 ~ 140 DEG C, briquetting pressure control is controlled at 50 ~ 60 seconds in 8 ~ 10Mpa, molding time, and compressing semi-finished product are made;
D, cooling and shaping:Molding semi product is entered into vacuum adsorbed cooling and shaping, at 40 ~ 50 seconds, vacuum was inhaled for cool time control Power is controlled in 0.4 ~ 0.6MPa;
E, high pressure waterjet:Ceiling semi-finished product after cooling and shaping are subjected to high pressure waterjet, cutting hydraulic pressure control 40000 ~ 50000psi, cutting pressure control is in 0.6 ~ 0.8MPa;
F, flange:Water is cut into the semi-finished product back side upward, is placed on flanger, the baking temperature temperature control of flanger at 320 ~ 360 DEG C, Dry warm time control to control in 35 ~ 40s in 35 ~ 45s, molding time, the pressure control of flanger is in 0.4 ~ 0.6MPa;
G, post-process:The ceiling semi-finished product that skylight has been turned over to side are placed on the vertical tool of group and positioned, the gluing on ceiling, then Carry out the compacting positioning of skylight frame and clamp seat;At the same time, to ceiling forward position glue spraying, and bound edge operation is carried out.
Notch processing will be carried out to four corners of skylight in step e, incision length 10-15mm, open every 5mm and cut together Mouthful, effect is easy for the position and does flange processing.
In step f, processing parameter setting is good, dries after temperature reaches standard value and carries out flange operation;Comprise the following steps that: The first step is that the heating arrangements of flanger come downwards to skylight edge, 35 ~ 45s of heating is carried out to it, second step is flanger Skylight edge is turned down press moulding mechanism and 35 ~ 40s of pressurize, the A faces at skylight edge is turned down toward B faces and is binded with B faces.
In step a, the C-B glue of glue model BASF 1978 that plastic roll uses;The catalyst model used in step b It is the C-A catalyst of BASF 1978;The glue model WD8549 PUR glue that glue spraying uses in step g, forward position bound edge use The glue of glue model 3M 1388.
Beneficial effects of the present invention:Automobile ceiling produced by the invention is not in that forward position and skylight trimming position produce hair Side, edge-curl phenomenon, and lower floor's base material leakage at trimming position, ceiling forward position and skylight position produce showing for undulating pleats As;Both beautiful and clean design requirement had been met, in turn simplify the production technology of ceiling.
Embodiment
This patent is described further with reference to specific embodiment.
The ceiling fabric that following examples use is provided by Jinhua Wal automobile decoration piece Co., Ltd.Following examples use Chopped Strand Mat by Nanjing daybreak composite limited company provide.The PU that following examples use is high by the lucky emerging wooden bridge in Wuxi Molecular material Science and Technology Ltd. provides.The multiple PE films non-woven fabrics that following examples use is by the good victory limited public affairs of non-woven fabrics of Changzhou Department provides.
Embodiment 1
Beautiful 4008 automobile ceiling of Wuhan DPCA is produced, its production technology comprises the following steps:
A, plastic roll:Upper strata glass and lower floor's glass is taken to be respectively fed to glue spreader and carry out plastic roll;The electric machine frequency control of roller machine exists 20Hz, the up-down roller clearance control of glue spreader use type at 40 DEG C, plastic roll in 1.2mm, the bowl temperature control of glue spreader Number it is the C-B glue of BASF 1978, glass one side plastic roll, upper glass glue amount control is in 20g/m2, lower glass glue amount, which controls, to exist 70g/m2, the rigid requirements of ceiling are met by glass spread;
B, soften:PU is sent into softening water dispenser, softening water dispenser uniformly sprays the C-A of BASF 1978 catalysis to PU upper and lower surfaces Agent, the electric machine frequency control for softening water dispenser are controlled in 110g/m in 40Hz, the catalytic amount of sprinkling2
C, it is compressing:Material is laid by transfer matic, the superiors are knitted composite fabric, and the second layer is upper strata Chopped Strand Mat, the Three layers are PU, and the 4th layer is lower floor's Chopped Strand Mat, and layer 5 is lower floor's Chopped Strand Mat, and bottom is multiple PE film non-woven fabrics;By what is laid Material feeding mould is compressing, and upper mould temperature sets 120 DEG C when compressing, and lower mould temperature sets 135 DEG C, shaping pressure Power sets 8MPa, and molding time is set in 60 seconds, and compressing semi-finished product are made;
D, cooling and shaping:Molding semi product is entered into vacuum adsorbed cooling and shaping, 50 seconds cool times, pull of vacuum control exists 0.4MPa;
E, high pressure waterjet:Ceiling semi-finished product after cooling and shaping are subjected to high pressure waterjet, cutting hydraulic pressure control is cut in 50000psi Pressure control is cut in 0.8MPa, four corners of skylight will be carried out with notch processing, incision length 15mm, opened together every 5mm Otch, effect are easy for the position and do flange processing.
F, flange:Water is cut into the semi-finished product back side upward, is placed on flanger, the baking temperature temperature of flanger set 320 DEG C ~ 360 DEG C, warm time setting 45s is dried, molding time setting 40s, the pressure control of flanger is in 0.4MPa.Processing parameter setting It is good, dry after temperature reaches standard value and carry out flange operation.
G, post-process:The ceiling semi-finished product for having turned over side are placed on the vertical tool of group and positioned, are existed using gluing robot WD8549 PUR glue is played on ceiling, the compacting that skylight frame and clamp seat are then carried out using press box frock is positioned, at the same time, people Work sprays the glue of 3M 1388 to ceiling forward position, carries out bound edge operation.
There is following performance parameter with the assembly of the ceiling and assembling fittings:
1st, fire resistance meets D45 1333, < 100mm/min;
2nd, sound absorption qualities meet D49 1977, E levels;
3rd, smell meets D10 5517 requirement, test result≤2.7;
4th, the rigidity of ceiling module meets IHPC_MPGI09_0061 5.4.3.4.1 requirement;
5th, presentation quality meets IHPC_MPGI09_0061-5.4.5.5 requirement.
Embodiment 2
Beautiful 5008 automobile ceiling of Wuhan DPCA is produced, its production technology comprises the following steps:
A, plastic roll:Upper strata glass and lower floor's glass is taken to be respectively fed to glue spreader and carry out plastic roll;The electric machine frequency control of roller machine exists 20Hz, the up-down roller clearance control of glue spreader use type at 40 DEG C, plastic roll in 1.2mm, the bowl temperature control of glue spreader Number it is the C-B glue of BASF 1978, glass one side plastic roll, upper glass glue amount control is in 20g/m2, lower glass glue amount, which controls, to exist 75g/m2, the rigid requirements for reaching ceiling are glued by glass;
B, soften:PU is sent into softening water dispenser, softening water dispenser uniformly sprays the C-A of BASF 1978 catalysis to PU upper and lower surfaces Agent, the electric machine frequency control for softening water dispenser are controlled in 110g/m in 40Hz, the catalytic amount of sprinkling2
C, it is compressing:Material is laid by transfer matic, the superiors are knitted composite fabric, and the second layer is upper strata Chopped Strand Mat, the Three layers are PU, and the 4th layer is lower floor's Chopped Strand Mat, and layer 5 is lower floor's Chopped Strand Mat, and bottom is multiple PE film non-woven fabrics;By what is laid Material feeding mould is compressing, and upper mould temperature sets 125 DEG C when compressing, and lower mould temperature sets 135 DEG C, shaping pressure Power sets 8MPa, and molding time is set in 60 seconds, and compressing semi-finished product are made;
D, cooling and shaping:Molding semi product is entered into vacuum adsorbed cooling and shaping, 50 seconds cool times, pull of vacuum control exists 0.4MPa;
E, high pressure waterjet:Ceiling semi-finished product after cooling and shaping are subjected to high pressure waterjet, cutting hydraulic pressure control is cut in 50000psi Pressure control is cut in 0.8MPa, four corners of skylight will be carried out with notch processing, incision length 12mm, opened together every 5mm Otch, effect are easy for the position and do flange processing.
F, flange:It is face-up that water is cut into semi-finished product B, is placed on flanger, the baking temperature temperature setting 320 ~ 360 of flanger DEG C, warm time setting 37s is dried, molding time setting 35s, the pressure control of flanger is in 0.4MPa.Processing parameter setting is good, dries Temperature carries out flange operation after reaching standard value.
G, post-process:The ceiling semi-finished product for having turned over side are placed on the vertical tool of group and positioned, are existed using gluing robot WD8549 PUR glue is played on ceiling, the compacting that skylight frame and clamp seat are then carried out using press box frock is positioned, at the same time, people Work sprays the glue of 3M 1388 to ceiling forward position, carries out bound edge operation.
There is following performance parameter with the assembly of the ceiling and assembling fittings:
1st, fire resistance meets D45 1333, < 100mm/min;
2nd, sound absorption qualities meet D49 1977, E levels;
3rd, smell meets D10 5517 requirement, test result≤2.7;
4th, the rigidity of ceiling module meets IHPC_MPGI09_0061 5.4.3.4.1 requirement;
5th, presentation quality meets IHPC_MPGI09_0061-5.4.5.5 requirement.
Embodiment 3
The production technology of Wet One-step ceiling flange, step are as follows:
A, plastic roll:Take upper strata Chopped Strand Mat to be respectively fed to glue spreader with lower floor's Chopped Strand Mat and carry out plastic roll;The electric machine frequency control of glue spreader System is in 30Hz, and the up-down roller clearance control of glue spreader is in 1.1mm, and the bowl temperature control of glue spreader is at 45 DEG C, glass one side Plastic roll, upper strata glass glue amount are controlled in 19g/m2, lower floor's glass glue amount control is in 75g/m2, meet to push up by glass spread Fluffy rigid requirements;
B, soften:PU is sent into softening water dispenser, softening water dispenser uniformly sprays catalyst to PU upper and lower surfaces, softens the electricity of water dispenser Unit frequency control is controlled in 120g/m in 50Hz, the catalytic amount of sprinkling2
C, it is compressing:Material is laid by transfer matic, the superiors are knitted composite fabric, and the second layer is upper strata Chopped Strand Mat, the Three layers are PU, and the 4th layer is lower floor's Chopped Strand Mat, and layer 5 is lower floor's Chopped Strand Mat, and bottom is multiple PE film non-woven fabrics;By what is laid Material be sent into mould it is compressing, when compressing upper mould temperature control at 120 DEG C, lower mould temperature control at 135 DEG C, into Type Stress control is controlled at 55 seconds in 9MPa, molding time, and compressing semi-finished product are made;
D, cooling and shaping:Molding semi product is entered into vacuum adsorbed cooling and shaping, cool time control was at 45 seconds, pull of vacuum control System is in 0.5MPa;
E, high pressure waterjet:Ceiling semi-finished product after cooling and shaping are subjected to high pressure waterjet, cutting hydraulic pressure control is cut in 45000psi Pressure control is cut in 0.7MPa;Notch processing will be carried out to four corners of skylight, incision length 10-15mm, one is opened every 5mm Road otch, effect are easy for the position and do flange processing;
F, flange:Water is cut into the semi-finished product back side upward, is placed on flanger, the baking temperature temperature control of flanger at 320 ~ 360 DEG C, Dry warm time control to control in 38s in 40s, molding time, the pressure control of flanger is in 0.5MPa;Processing parameter setting is good, Dry after temperature reaches standard value and carry out flange operation;Comprise the following steps that:The first step is that the heating arrangements of flanger come downwards to Skylight edge, carries out 35 ~ 45s of heating to it, second step be flanger press moulding mechanism to the turnover of skylight edge and pressurize 35 ~ 40s, the A faces at skylight edge are made to turn down toward B faces and be binded with B faces;
G, post-process:The ceiling semi-finished product that skylight has been turned over to side are placed on the vertical tool of group and positioned, the gluing on ceiling, then Carry out the compacting positioning of skylight frame and clamp seat;At the same time, to ceiling forward position glue spraying, and bound edge operation is carried out.

Claims (3)

1. the production technology of Wet One-step ceiling flange, it is characterized in that step is as follows:
A, plastic roll:Take upper strata Chopped Strand Mat to be respectively fed to glue spreader with lower floor's Chopped Strand Mat and carry out plastic roll;The electric machine frequency control of glue spreader System is controlled 40 ~ 50 in 20 ~ 40Hz, the up-down roller clearance control of glue spreader in 1.0 ~ 1.2mm, the bowl temperature of glue spreader DEG C, glass one side plastic roll, upper strata glass glue amount is controlled in 18 ~ 20g/m2, lower floor's glass glue amount control is in 70 ~ 80g/m2, pass through glass Fine spread meets the rigid requirements of ceiling;
B, soften:PU is sent into softening water dispenser, softening water dispenser uniformly sprays catalyst to PU upper and lower surfaces, softens the electricity of water dispenser Unit frequency control is controlled in 110 ~ 130g/m in 40 ~ 60Hz, the catalytic amount of sprinkling2
C, it is compressing:Material is laid by transfer matic, the superiors are knitted composite fabric, and the second layer is upper strata Chopped Strand Mat, the Three layers are PU, and the 4th layer is lower floor's Chopped Strand Mat, and layer 5 is similarly lower floor's Chopped Strand Mat, and bottom is compound PE films non-woven fabrics;Will paving The material feeding mould put well is compressing, and upper mould temperature control is at 115 ~ 125 DEG C when compressing, lower mould temperature control At 130 ~ 140 DEG C, briquetting pressure control is controlled at 50 ~ 60 seconds in 8 ~ 10MPa, molding time, and compressing semi-finished product are made;
D, cooling and shaping:Molding semi product is entered into vacuum adsorbed cooling and shaping, at 40 ~ 50 seconds, vacuum was inhaled for cool time control Power is controlled in 0.4 ~ 0.6MPa;
E, high pressure waterjet:Ceiling semi-finished product after cooling and shaping are subjected to high pressure waterjet, cutting hydraulic pressure control 40000 ~ 50000psi, cutting pressure control is in 0.6 ~ 0.8MPa;
F, flange:Water is cut into the semi-finished product back side upward, is placed on flanger, the baking temperature temperature control of flanger at 320 ~ 360 DEG C, Dry warm time control to control in 35 ~ 40s in 35 ~ 45s, molding time, the pressure control of flanger is in 0.4 ~ 0.6MPa;
G, post-process:The ceiling semi-finished product that skylight has been turned over to side are placed on the vertical tool of group and positioned, the gluing on ceiling, then Carry out the compacting positioning of skylight frame and clamp seat;At the same time, to ceiling forward position glue spraying, and bound edge operation is carried out.
2. the production technology of Wet One-step ceiling flange as claimed in claim 1, it is characterized in that:To skylight four in step e Corner will carry out notch processing, incision length 10-15mm, open one of otch every 5mm, effect is easy for the position and does flange Processing.
3. the production technology of Wet One-step ceiling flange as claimed in claim 1, it is characterized in that:In step f, technological parameter is set Set, dry after temperature reaches standard value and carry out flange operation;Comprise the following steps that:The first step is under the heating arrangements of flanger Row carries out 35 ~ 45s of heating to it, second step is that the press moulding mechanism of flanger is turned down and protected to skylight edge to skylight edge 35 ~ 40s is pressed, the A faces at skylight edge is turned down toward B faces and is binded with B faces.
CN201710790293.1A 2017-09-05 2017-09-05 The production technology of Wet One-step ceiling flange Pending CN107554036A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710790293.1A CN107554036A (en) 2017-09-05 2017-09-05 The production technology of Wet One-step ceiling flange

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710790293.1A CN107554036A (en) 2017-09-05 2017-09-05 The production technology of Wet One-step ceiling flange

Publications (1)

Publication Number Publication Date
CN107554036A true CN107554036A (en) 2018-01-09

Family

ID=60978012

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710790293.1A Pending CN107554036A (en) 2017-09-05 2017-09-05 The production technology of Wet One-step ceiling flange

Country Status (1)

Country Link
CN (1) CN107554036A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110421940A (en) * 2019-09-06 2019-11-08 无锡吉兴汽车声学部件科技有限公司 A kind of automobile ceiling skylight reinforcing frame and its hot-die punch forming process
CN113103711A (en) * 2021-05-17 2021-07-13 无锡吉兴汽车部件有限公司 Automobile roof and preparation method and application thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102381256A (en) * 2011-09-10 2012-03-21 无锡吉兴汽车声学部件科技有限公司 Wet-method roof producing process by glass fibers spread with adhesive
CN102442046A (en) * 2011-09-10 2012-05-09 无锡吉兴汽车声学部件科技有限公司 Production process for cutting and edge wrapping of once-formed skylight of automobile roof
CN103434251A (en) * 2013-08-09 2013-12-11 无锡吉兴汽车声学部件科技有限公司 One-step forming process for roof by wet method
CN104162975A (en) * 2013-05-16 2014-11-26 臻越自动化技术(上海)有限公司 Turning device and edge covering equipment
CN104162976A (en) * 2013-05-16 2014-11-26 臻越自动化技术(上海)有限公司 Turning device and edge covering equipment
CN204775041U (en) * 2015-07-10 2015-11-18 上海长安汽车工程技术有限公司 Top canopy surface of sunroof department expects to bordure structure

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102381256A (en) * 2011-09-10 2012-03-21 无锡吉兴汽车声学部件科技有限公司 Wet-method roof producing process by glass fibers spread with adhesive
CN102442046A (en) * 2011-09-10 2012-05-09 无锡吉兴汽车声学部件科技有限公司 Production process for cutting and edge wrapping of once-formed skylight of automobile roof
CN104162975A (en) * 2013-05-16 2014-11-26 臻越自动化技术(上海)有限公司 Turning device and edge covering equipment
CN104162976A (en) * 2013-05-16 2014-11-26 臻越自动化技术(上海)有限公司 Turning device and edge covering equipment
CN103434251A (en) * 2013-08-09 2013-12-11 无锡吉兴汽车声学部件科技有限公司 One-step forming process for roof by wet method
CN204775041U (en) * 2015-07-10 2015-11-18 上海长安汽车工程技术有限公司 Top canopy surface of sunroof department expects to bordure structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110421940A (en) * 2019-09-06 2019-11-08 无锡吉兴汽车声学部件科技有限公司 A kind of automobile ceiling skylight reinforcing frame and its hot-die punch forming process
CN113103711A (en) * 2021-05-17 2021-07-13 无锡吉兴汽车部件有限公司 Automobile roof and preparation method and application thereof

Similar Documents

Publication Publication Date Title
CN101337434B (en) Production method of automobile skylight sun-shield
CN102442046B (en) Production process for cutting and edge wrapping of once-formed skylight of automobile roof
CN105196663B (en) A kind of auto sound-insulating and thermal-insulating pad and its production technology
CN101648548A (en) Wet production process of low-density soft polyurethane foam top lining
CN101654059A (en) Method for producing roof sun visor of automobile
CN105034531A (en) Production technology of car carpets
CN104608428A (en) Paper honeycomb compound board for automobile interior decoration material and manufacturing method thereof
CN106346936A (en) Production technology of automobile carpet
CN102848694B (en) Vehicle roof skylight edging manufacture method
CN106079819A (en) A kind of production technology of automobile ceiling forward position bound edge
CN103101255A (en) Light composite board, production method and application thereof
CN104029458A (en) Production process for automobile roof laminated with low-VOC (volatile organic compound) non-woven fabric
CN104002879B (en) Cover plate of spare tire of automobile and processing technique, process equipment
CN102381256B (en) Wet-method roof producing process of spreaded glass fibers with adhesive
CN110421940A (en) A kind of automobile ceiling skylight reinforcing frame and its hot-die punch forming process
CN106042586A (en) Skin covering molding process of automotive interior trim board and automotive interior trim board
CN102795086B (en) Technology for producing automobile ceiling with skylight by coating glass fibers
CN107554036A (en) The production technology of Wet One-step ceiling flange
CN105015078A (en) Wet method top line secondary molding edge bounding production process
CN106184043A (en) A kind of ultrasound riveting skylight frame and the automobile ceiling production method of mushroom hasp
CN104192041A (en) Method for producing light automobile acoustic carpet
CN109610090A (en) The production method of sound insulating pad under a kind of blanket car carpeting
CN107672239A (en) A kind of production method of automotive interior roof
CN107891639A (en) A kind of high sound-absorbing polyurethane automobile ceiling of high intensity and preparation method thereof
CN202863297U (en) Automobile B pillar trim panel member

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination