- CN1075519A CN1075519A CN 92101119 CN92101119A CN1075519A CN 1075519 A CN1075519 A CN 1075519A CN 92101119 CN92101119 CN 92101119 CN 92101119 A CN92101119 A CN 92101119A CN 1075519 A CN1075519 A CN 1075519A
- Authority
- CN
- China
- Prior art keywords
- water
- rivers
- river mouth
- seawater
- mole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Images
Landscapes
- Revetment (AREA)
Abstract
The present invention relates to a kind of permanent passing stream device in river mouth, big rivers and creeks, practical application of the present invention CN88102458.9 number the application in construction method for coast walls, utilize trend to do natural phenomenons such as full poor and wave, with the seawater guiding river mouth of putting aside, can be often and for good and all sweep stream.
Description
The object of the invention is to utilize natural force, and often and for good and all the sand that extra large portion deposition is gone in the many river mouths, great river of sand flow plays souring.
At present, pile up for the sand that causes the river mouth plugging reason, be that delta is to rely on to have the dredger of enough abilities to remove rapidly, if great rivers, its sand amount is very big, and it is shallow to add water level, in any case existing operation ship deals with always difficult, expense is also expensive, and therefore, real current situation almost is to remain untouched with its accumulation.Because this situation, so when general ship's navigation is only limited to full sea.Arrive the upstream gradually along with rising phenomenon on the riverbed, dangerous local dykes and dams are increased gradually, and the danger of breaking dike because of flood increases.
This be one along with the time is gone through the big more work of long more difficulty, therefore be necessary to develop as early as possible the elemental method of utilizing.What at first expect is to utilize moon gravitation, i.e. the fluctuation of tidewater is poor, but it is not enough only depending on it.There are spring tide, neap phenomenon.Therefore on the sea large and small ripple is often arranged.In order to prevent this ripple, existing wave absorption dike and mole are constructed the Yue Bodi that ripple is taken into, utilizes these ripple current, and this device must replenish seawater.
Therefore, Large Storage Tanks setting-out pond 17 is set, to replenish the gravitation energy that seawater falls, washed away in one day at least twice, and the river mouth sand was piled up, gradually upstream from end river mouth, downstream, as shown in Figure 4, offer artificial prompt water route 27 establishing two dyke central authorities, in the erosion in length and breadth of water outlet phase and use small-sized underwater sand-shifting ship (Chinese patent application 88101947.X) to realize reducing the riverbed at ordinary times, the rivers and creeks water damage is effected a radical cure fully by later on.
26S Proteasome Structure and Function to this device major part describes below.
As shown in Figure 1, all there is lowest water level (L.W in the past in sea anyplace.L) and highest water level (H.W.L), medium water level is made as (M.W.L).Bulkhead wall method for constructing in the past adopts this quadrat method; Utilize a large amount of marine stone, it is made up, form the basis, on this basis, install concrete caisson, filler in the case by the diver.There is the shortcoming of leaking from space between stone in this method, pile up the construction method for coast walls (application number 88102458.9) of area use by the concrete in water filling to the sand that is limited to of Patent Office of the People's Republic of China's application, because cement block fully enters, leakage is not had fully, therefore adopt this method.
For the seawater that cement block 8 inside that are positioned at higher level are set flows into road 5, therefore, the above part of the partial cement block end face of the reinforced concrete pile 1 of central authorities is removed (with reference to Fig. 2 A-A, B-B).
This higher level's cement block 8 is than other cement block 2 height, because of the access that seawater is flowed into road 5 is located at wall portion, so for for the purpose of strengthening, top board is set, base plate and the surrounding wall that flows into road 5.They are the same with other cement block 2, also make the back in other place and install.Therefore, making lowest water level (L.W.L) consistent is to solve by regulating from the height of the partial cement block 2 of last number.For this cause, higher level's cement block 8 and finish from each operations (separation) below the third level such as the installation of the partial cement block 2 of last number are with cement block 9, concrete in water filling, packing material 12 after, again through more than 6 months, treat that wall body fully avales, the stable height that just carries out is afterwards regulated.In addition, below higher level's cement block 8, be provided with and connect recess 4, connect convex portion 3 but needn't be provided with in the above.Cement block 8 usefulness of both sides are connected securely by steel concrete top panel 13.With packing material 12 abundant water connection compactings, apply with basic rubble 14 then, reinforced concrete box 11 is set, flow into road 5 with the seawater of both sides and be connected.
Shown in Fig. 2 c, water proof curtain 6 is installed on the wall body, imbed water proof curtain supporting tube 32 in the off-lying sea side, water proof curtain 6 is crushed on side convex wall wall 15 and the convex floor 16 by hydraulic pressure, closely be adjacent to it, when the inlet that flows into road 5 from the seawater of off-lying sea side entered tidewater with pressure and full sea towards trend water, water proof curtain 6 was taking advantage of current to shake in the seawater middle reaches, seawater can not reverse backflow, forms one-way flow.Therefore,,, also can rely on wave motion, pushing water proof curtain 6 and entering if wave is arranged even during ebb tide; During full sea, be not only inflow, wave energy also enters as shown in fig. 1, and wave is crossed on the steel concrete top panel 13 and passed through, and is accumulated in the reservoir pressure pond 17.There is the problem that shoals in design ground baseline 10 at the bottom of the pond, and therefore, should dig deeplyer at first.
It is concrete that flow velocity amplifies wave amplitude water route 19 3 faces, can not leak water, 17 seawater that overflow are stored in here from the pond, owing to be provided with the door 35 that intercepts water, before full water, can remain in this, always referring to Fig. 3, here, the material of water proof curtain 6 has the intensity of iron and steel sample again gently to the degree that can float in the water, almost can forever not corrode.Generally, have many materials available on market, mainly can enumerate special rubber, polyester, nylon etc., it is also very good that materials such as nylon are coated on the carbon fibre formed material.
In the full water occasion, because the door that intercepts water 35 water surface rising occurred, the height of door so the height of sidewall 24 should be equivalent to intercept water.
Intercepting water should be the bar gate type water valve on door 35 the structure principle, and because water is shallow, hydraulic pressure is also little, so use water proof curtain 6.
Shown in Fig. 3 C-C, on the very wide water route, be infeasible only, therefore, often its branch made proper width with a water proof curtain 6, coaster and post 36 with band miniature motor (can reverse) are suspending in midair, with coaster in the water 37 interlock, the two ends of water proof curtain 6 rope with nylon system is connected, make two horizontal ends of each water proof curtain 6 overlapping, hydraulic pressure is pressed on it on side convex wall wall 15 and the convex floor 16, keeps full water state.
As shown in Figure 3, rivers and creeks main flow 20 is not necessarily parallel with reservoir pressure pond 17 sometimes, is parallel or meet at right angles with the coastline (see among Fig. 3 20 ') with it so it is changed to move.
Pith with anti-tide dike 31 protection coastlines.Scroll-type water channel 34 is to spread stone on the dykes and dams surface with the sand protuberance, and dykes and dams are protected.Seawater during full sea at ebb tide, and is elongated to the distance extension of outlet, can utilize this extension, lures and makes ocean current.The trend power of two groups of water channels 34 is lumped together a step towards sending accreting sand.
As shown in Figure 4, big rivers and creeks occasion, smooth downstream part length is very long, and it is impossible that the riverbed is reduced.Therefore, can the riverbed be descended, only utilize often poor effect of natural phenomena, and can't correct irregular flow, if the central authorities of two dykes 26 offer artificial prompt water route 27 as water channel in the rivers and creeks, then shown in Fig. 4 b, the ship navigation possibility that becomes, need not rely on manpower, utilize application number, can make to rise on the riverbed once again to stop for the small-sized water-bed sand among the 88101947.X promotes ship.By this victory water route 27 is set, secondary levee dam 28 is set, the earth 29 of deposition directly becomes the farmland, and bring back to life in many farmlands, and government investment begins to regain.
River mouth, the big rivers and creeks permanent erosion device that utilizes the present invention to propose can be obtained following effect:
1. can solve unsolved for a long time river mouth clogging.
2. can realize that the riverbed descends.
3. irregular flow particularly disappears in the burst the dikes danger of bottom of curve part, can not cause brokenly dike.
4. shipping recovery.
5. harness the river thoroughly in the rivers and creeks, and drainings such as dwelling house ground, farmland are good.
6. as byproduct, new land produces, and can build up desirable city farmland.
7. the farmland recovery is expected to recoup capital outlay near many riverss and creekss.
8. owing to utilizing natural force, so dyke is built expense and the upkeep cost of harnessing the river are very low, good economical benefit.
Below accompanying drawing is briefly explained.
Fig. 1 gets over ripple dike 18 sectional drawings;
Fig. 2 represents to go up most lattice cement block 8, wherein,
A is the A-A plan view,
B is the B-B front view,
C is the C-C sectional side view,
D is the D-D sectional drawing;
Fig. 3 is apparatus of the present invention figure, wherein,
A is the a-a longitudinal plan,
B is the b-b sectional drawing,
C is door 35 the c-c sectional drawing that intercepts water,
D is the d-d sectional drawing,
F is door 35 the plan view that intercepts water,
G is door 35 the sectional side view that intercepts water;
Fig. 4 is the planning chart in artificial prompt water route 27, wherein,
A is a plan view,
B is the E-E sectional drawing.
Code name is as follows among each figure:
The 1st, reinforced concrete pile, the 2nd, cellular cement block, the 3rd, connect protuberance, the 4th, connect recess, the 5th, seawater flows into road, the 6th, water proof curtain, the 7th, cross ripple, the 8th, go up the lattice cement block most, the 9th, separate and use cement block, the 10th, design ground baseline, the 11st, reinforced concrete box, the 12nd, packing material, the 13rd, steel concrete top panel, the 14th, basic blinding, the 15th, side convex wall wall, the 16th, the convex floor, the 17th, the reservoir pressure pond, the 18th, cross the ripple dykes and dams, the 19th, flow velocity amplifies wave amplitude water route, the 20th, rivers and creeks main channel, the 21st, river mouth, rivers and creeks, the 22nd, point, the 23rd, the plan line at the bottom of the water route, the 24th, stop the waterwall wall, the 25th, training wall, the 26th, rivers and creeks dykes and dams, the 27th, artificial prompt water route, 28 secondary levee dams, the 29th, earth, the 30th, fill in concrete inward, the 31st, anti-tide dike, the 32nd, water proof curtain supporting tube, the 33rd, the electrodynamic type overfall, the 34th, the scroll-type water channel, the 35th, door intercepts water, the 36th, the coaster and the post of band miniature motor, the 37th, coaster in the water.
Claims (2)
1, a kind of system that prevents the sedimentation of rivers Haikou, it is characterized in that mole being set near rivers estuary place, the reservoir pressure pond is set behind the mole, be arranged at the height that is equivalent to mean tide tlevel of mole and run through the water channel of mole, one-way cock is set in the water channel, thereby comprises also that in addition a water channel is set guides the water in reservoir pressure pond into somewhere, rivers estuary upstream increasing estuary place's discharge and water velocity.
2, the system as claimed in claim 1 is characterized in that described one way valve comprises flexible water proof curtain.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 92101119 CN1075519A (en) | 1992-02-18 | 1992-02-18 | Permanent erosion plant in river mouth |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 92101119 CN1075519A (en) | 1992-02-18 | 1992-02-18 | Permanent erosion plant in river mouth |
Publications (1)
Publication Number | Publication Date |
---|---|
CN1075519A true CN1075519A (en) | 1993-08-25 |
Family
ID=4938970
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 92101119 Withdrawn CN1075519A (en) | 1992-02-18 | 1992-02-18 | Permanent erosion plant in river mouth |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN1075519A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1764760B (en) * | 2003-04-07 | 2010-04-21 | 赤井一昭 | Water-control and water conservancy system using tide generator by 'sea hollow (utsuro)' |
CN104358230A (en) * | 2014-07-09 | 2015-02-18 | 广州中国科学院工业技术研究院 | Slit preventing and desilting device and method for harbor basin |
CN108104049A (en) * | 2017-12-18 | 2018-06-01 | 珠江水利委员会珠江水利科学研究院 | A kind of unidirectional flow control device for river cross-section |
-
1992
- 1992-02-18 CN CN 92101119 patent/CN1075519A/en not_active Withdrawn
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1764760B (en) * | 2003-04-07 | 2010-04-21 | 赤井一昭 | Water-control and water conservancy system using tide generator by 'sea hollow (utsuro)' |
CN104358230A (en) * | 2014-07-09 | 2015-02-18 | 广州中国科学院工业技术研究院 | Slit preventing and desilting device and method for harbor basin |
CN104358230B (en) * | 2014-07-09 | 2016-08-24 | 广州中国科学院工业技术研究院 | A kind of basin silt-proof desilting apparatus and method |
CN108104049A (en) * | 2017-12-18 | 2018-06-01 | 珠江水利委员会珠江水利科学研究院 | A kind of unidirectional flow control device for river cross-section |
CN108104049B (en) * | 2017-12-18 | 2023-08-18 | 珠江水利委员会珠江水利科学研究院 | Unidirectional flow control device for river section |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
AU2014200674B2 (en) | Submarine construction for tsunami and flooding protection, for tidal energy and energy storage, and for fish farming | |
Hanson et al. | Coastal erosion: an escalating environmental threat | |
US20100074687A1 (en) | Pipeline Protection and Levee Module System | |
Sorensen et al. | Control of erosion, inundation, and salinity intrusion caused by sea level rise | |
CN114622514B (en) | Artificial dredging tidal bay system for ecological restoration of muddy coast | |
JPS61294009A (en) | Protective apparatus wherein energy disipating element is mounted on bank | |
CN1075519A (en) | Permanent erosion plant in river mouth | |
Burcharth et al. | Types and functions of coastal structures | |
CN100366825C (en) | Suspension sand-trap mud-filtering water protecting device | |
KR20230045588A (en) | Offshore building structure and its construction method | |
Silvester | COASTAL DEFENCE. | |
Wamsley et al. | Coastal barrier island breaching, Part 2: Mechanical breaching and breach closure | |
Charlier et al. | Beach protection and restoration part I: hard structures and beach erosion | |
Herron Jr | Case history of Mission Bay Inlet, San Diego, California | |
RU203078U1 (en) | WAVE SUPPRESSOR | |
Scheel | Tidal energy and large-scale fish farming, benefits of novel tsunami and flooding barriers | |
Flick et al. | Performance documentation of the Longard Tube at Del Mar, California 1980–1983 | |
Morelli | Collection and analysis of historical data on shoreline evolution at the sites of Ravenna, Cesenatico and Rimini | |
Vrijling | 15 Floods in The Netherlands | |
Toyoshima | New type blocks for seawall slope protection | |
Holmberg | Alternative to traditional ways of treating shoreline erosion | |
SU1100359A1 (en) | Shore-protecting spur | |
WO2016173613A1 (en) | Submarine cylinder barrier to stop flooding from tsunami and tropical storms | |
Passino et al. | Environmental aspects connected with “high water” protection of Venice | |
SAND | INTRODUCTION TO COASTAL ENGINEERING Page I OVERVIEW OF COASTAL ENGINEERING AND THE SPM. 1-1 II THE COASTAL AREA... 1-2 III THE BEACH AND NEARSHORE SYSTEM. 1-4 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C03 | Withdrawal of patent application (patent law 1993) | ||
WW01 | Invention patent application withdrawn after publication |