CN107545116A CN201710810506.2A CN201710810506A CN107545116A CN 107545116 A CN107545116 A CN 107545116A CN 201710810506 A CN201710810506 A CN 201710810506A CN 107545116 A CN107545116 A CN 107545116A
Authority
CN
China
Prior art keywords
scd file
expansion
model
interval
information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710810506.2A
Other languages
Chinese (zh)
Other versions
CN107545116B (en
Inventor
余祥坤
董怀普
史正阳
纪陵
蒋衍君
鲁万新
刘文彪
罗志娟
芮国俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing SAC Automation Co Ltd
PowerChina Hubei Electric Engineering Co Ltd
Original Assignee
HUBEI ELECTRIC POWER SURVEY AND DESIGN INST
Nanjing SAC Automation Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUBEI ELECTRIC POWER SURVEY AND DESIGN INST, Nanjing SAC Automation Co Ltd filed Critical HUBEI ELECTRIC POWER SURVEY AND DESIGN INST
Priority to CN201710810506.2A priority Critical patent/CN107545116B/en
Publication of CN107545116A publication Critical patent/CN107545116A/en
Application granted granted Critical
Publication of CN107545116B publication Critical patent/CN107545116B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses a kind of intelligent substation reorganization and expansion change impact analysis method based on model decoupling, including:Interval information is obtained according to original SCD file, when in the absence of interval information, by creating voltage class, interval and virtual primary conductive equipment, virtual primary conductive equipment is bound with secondary device, obtains and is spaced belonging to secondary device;The spacing devices that reorganization and expansion is had influence on are determined, unrelated interval is spaced into between-line spacing with influence and decoupled, unrelated gap model is obtained and influences gap model;To influenceing gap model addition expansion spacing model, nothing to do with gap model merges after completing configuration, is combined into a new SCD file;By comparing original and new SCD file, impact analysis is carried out, it is determined that involving scope.The present invention realizes to be reduced tradition directly modification SCD causes to change by mistake to the gap model that put into operation or mistake changes risk by changing specific model configuration file, is met the security management and control demand of transformer station's reorganization and expansion SCD file change, is reduced the complexity of SCD file application.

Description

A kind of intelligent substation reorganization and expansion change impact analysis method based on model decoupling
Technical field
The invention belongs to power system automation technology field, and in particular to a kind of intelligent substation based on model decoupling Reorganization and expansion change impact analysis method.
Background technology
Increasingly perfect with intelligent substation correlation technique, intelligent substation steps into the extensive practical stage, former The network data flow for having the packed height coupling of directly perceived, separate data is substituted, the whole station being aggregated to form by each ICD SCD file replaces direct basis of the design drawing as debugging, O&M and reorganization and expansion.
SCD (Substation Configuration Description) is whole station CONFIG.SYS, and it is contained Whole transformer station whole IED device configuration informations, communication information and virtual secondary circuit annexation.In the system integration and test stage, It is all IED device configurations, the basis of interoperability checking, is equipment operation, daily O&M, engineering in the substation operation stage Manage the important configuration file relied on.Currently, SCD file can meet secondary equipment of intelligent converting station and the system integration well The demand of application, it is the unified data source of whole station, describes the communication between all IED exemplary configuration and messaging parameter, IED Configuration and transforming plant primary system architecture, and signal related information.
Intelligent substation technology determines that the O&M process of intelligent substation configures highly dependent upon the SCL based on XML technology File, such as SCD, CID, ICD file.When transformer station's reorganization and expansion is related to the modification and upgrading of SCD file, due to SCD file The reason such as the coupling of different application type information and the configuration of equipment room Quadratic Imaginary loop complex relationship be present, it is difficult to define SCD file Amended coverage, objectively cause the phenomenon of " pulling one hair and move the whole body ".
Therefore, when carrying out reorganization and expansion to transformer station and O&M overhauls, it is necessary to further inquire into highly integrated SCD texts The decomposition measure of part, there is provided isolating partition configuration information changes the means of coverage, reduces the complexity of SCD file application, The scope that change for SCD file influences is analyzed, and can preferably properly protect measure, while is reduced unnecessary big The power failure of area and debugging efforts repeatedly.
Such as the upgrading of certain engineering main transformer protection, model file renewal.Descend assembling to put again after SCD file renewal, complete master Become protection and each side combining unit, the whole group checking test of intelligent terminal.Tranformer protection needs to jump section gap, segmentation simultaneously Intelligent terminal is in running status, and according to theory analysis, we only need to verify the related equipment of Transformer Protection IED in SCD Empty terminal situation of change, the independent checking of change be present.But in Practical Project, because configuration tool lacks necessary technology Means go to verify, the scheme taken be still actual transmission checking tranformer protection can correct tripping correlation intelligent terminal, really Recognize it is errorless after recover power transmission again.The method of this " seeing is believing " expand transformation the cycle, really using expand power failure range as Cost, it is ensured that protection act behavior correctness.
And for example certain 220kV double-bus intelligent station Enlargement engineering line segregation, SCD file need to increase interval circuit guarantor newly Shield, combining unit, intelligent terminal.Empty terminal line is connected after importing ICD files, the empty terminal loop of bus protection becomes Change, it is necessary to which again lower fill process layer configuration file.Due to the impact analysis function after empty terminal change in existing SCD configuration tools It is not implemented, assembling, which postpones us, under bus protection does not have effective means to go the configuration variation of intellectual analysis bus protection to influence ripple And scope, unique uniformity verification method are whole group transmissions.For expansion spacing, original spacing devices are that operation is set It is standby, to complete the drive experiments between reorganization and expansion equipment and operational outfit, it is necessary to operational outfit is stopped transport, this needs to expand power failure model Enclose, even whole station has a power failure sometimes.
The content of the invention
In view of the above-mentioned problems, the present invention proposes a kind of intelligent substation reorganization and expansion change impact analysis based on model decoupling Method, during intelligent substation reorganization and expansion, realize that unrelated gap model is separated with influenceing gap model, by changing specific mould Type configuration file, reducing tradition, directly modification SCD file causes to change by mistake to the gap model that put into operation or mistake changes risk, meets power transformation The security management and control demand of reorganization and expansion SCD file of standing change, shields the modification to the equipment that put into operation, is contrasted by version, carries out shadow Analysis is rung, it is determined that involving scope, generates analysis report, the empty loop information in SCD file is subjected to visual displaying, reduced The complexity of SCD file, facilitates field engineering personnel to debug.
Above-mentioned technical purpose is realized, reaches above-mentioned technique effect, the present invention is achieved through the following technical solutions:
A kind of intelligent substation reorganization and expansion change impact analysis method based on model decoupling, comprises the following steps:
S1:Original SCD file is parsed, interval information is obtained, so as to obtain spacing devices;
S2:The impacted spacing devices of reorganization and expansion are determined, unrelated interval and influence interval are decoupled, obtain unrelated Every model SCD file and influence gap model SCD file;
S3:To influenceing gap model SCD file addition expansion spacing model, and correlation is carried out to expansion spacing model and matched somebody with somebody Put, obtain new influence gap model SCD file;
S4:New influence gap model SCD file nothing to do with gap model SCD file is merged, is combined into one Complete new SCD file;
S5:By being compared to original SCD file and new SCD file, impact analysis is carried out, it is determined that involve scope, generation point Analysis report, so as to complete the intelligent substation reorganization and expansion change impact analysis based on model decoupling.
Further, the step S1 specifically includes following steps:
S1.1:Original SCD file is parsed, if in the absence of transformer station's Substation element informations and interval Bay elements letter Breath, then step S1.2 is turned to, otherwise directly to step S1.4;
S1.2:Transformer station's Substation elements are created, are created and transformer station's phase under transformer station's Substation elements Corresponding voltage class Voltage Level elements, then created under voltage class Voltage Level elements corresponding It is spaced Bay elements;
S1.3:Virtual primary conductive equipment Conducting Equipment are created in the case where being spaced Bay elements;
S1.4:IED equipment all in SCD file is added in corresponding interval, and is put into virtual primary conductive and sets Under standby Conducting Equipment;
S1.5:From transformer station's Substation element informations obtain voltage class Voltage Level element informations and Bay element informations are spaced, a secondary device binding information is obtained from the Bay elements of interval, and then obtain secondary device information, most The interval belonging to secondary device is determined eventually, that is, obtains all spacing devices.
Further, the step S2 specifically includes following steps:
S2.1:Determine the impacted spacing devices of reorganization and expansion;
S2.2:Decoupled to influenceing interval nothing to do with interval, obtain influenceing gap model SCD file and unrelated interval mould Type SCD file, the IED of related interval is only included in described influence gap model SCD file and unrelated gap model SCD file Device model information and interval between empty loop information and communication configuration information, the empty loop information be IED equipment it Between communication link, communication is configured to messaging parameter between IED equipment communications.
Further, the step S3 specifically includes following steps:
S3.1:In gap model SCD file is influenceed, expansion spacing element is created, while created under expansion spacing element Build virtual primary conductive equipment Conducting Equipment;
S3.2:The IED device models needed for expansion spacing are added in the expansion spacing element of establishment;
S3.3:Empty loop information and the communication configuration information in foregoing expansion spacing are configured, forms expansion spacing model SCD file;
S3.4:Believe in the empty loop for configuring foregoing expansion spacing model SCD file and influenceing between gap model SCD file Breath, wherein, for influenceing to be spaced existing empty loop information, limitation is modified, and guarantee has configured not entering for completion Row modification.
Further, the step S4 specifically includes following steps:
S4.1:Unrelated gap model SCD file, the new interval information influenceed in gap model SCD file are obtained respectively, And be compared, obtain newly-increased expansion spacing element;
S4.2:Unrelated gap model SCD file is added in the new SCD file for needing to merge;
S4.3:The IED device models that expansion spacing increases newly are added in new SCD file, while newly-increased communication is matched somebody with somebody Confidence breath is added in new SCD file relevant position;
S4.4:Compare the former void for influenceing interval module SCD file and new influence gap model SCD file, obtaining addition Loop information, and the empty loop information is added in new SCD file, the content of addition is preserved, completes what is formed for reorganization and expansion New SCD file.
Further, the step S5 specifically includes following steps:
S5.1:Original SCD file and new SCD file are compared, comparing content includes IED equipment communication configuration informations With empty loop information;
S5.2:Contrast locating is distinguished to the grade to setting to GOOSE links changing range and SV links changing range;
S5.3:Comparison result is confirmed, confirm coverage, for the equipment before decoupling without influence on and hair Change more;
S5.4:According to comparison result, analysis report is exported, the basic letter of had altered IED equipment is included in report Breath, including:Empty loop modification information, empty loop send client information and receive client information and empty loop sending direction, convenient existing Field debugging.
Further, in the step S5.2, to GOOSE link changing range contrast locatings to DA levels, becoming to SV links More scope contrast locating is to DO levels.
Further, described a kind of intelligent substation reorganization and expansion change impact analysis method based on model decoupling, also Including step S6, reorganization and expansion configuration file is exported, is filled under configuration file, is specially:
S6.1:The configuration file of expansion spacing model is exported from new SCD file;
S6.2:Operation debugging is carried out by being attached under configuration file in IED equipment.
Further, described a kind of intelligent substation reorganization and expansion change impact analysis method based on model decoupling, also Including step S7, peace arranges debugging, specially:
S7.1:Female difference debugging:The SV for putting into bus differential protection expansion spacing receives soft pressing plate, GOOSE exports soft pressing plate, locking The soft pressing plate of reclosing, the soft pressing plate at other intervals exit;
S7.2:The combining unit of input expansion spacing, intelligent terminal, the maintenance pressing plate of protection device, are filled with bus differential protection It is consistent to put inspecting state, to expansion spacing plus simulation current flow;
S7.3:After completing female difference debugging, the soft pressing plate of bus differential protection expansion spacing SV receptions is exited, GOOSE exports soft pressing plate;
S7.4:Recover the soft pressing plate of bus differential protection function and the soft pressing plates of SV, exit the soft pressing plate of maintenance;
S7.5:Whether observation difference stream is abnormal, if without exception, the interval GOOSE that puts into operation exports soft pressing plate.
Beneficial effects of the present invention:
(1) the intelligent substation reorganization and expansion change impact analysis method based on model decoupling of the invention, lead to during reorganization and expansion The specific interval configuration file of modification is crossed, reducing tradition, directly modification SCD causes to change by mistake to the gap model that put into operation or mistake changes wind Danger, meet the security management and control demand of transformer station's reorganization and expansion SCD file change;
(2) the intelligent substation reorganization and expansion change impact analysis method based on model decoupling of the invention, there is provided between isolation Every the means of configuration information change coverage, the complexity of SCD file application is reduced, changes what is influenceed for SCD file Scope is analyzed, and can preferably properly protect measure, while reduces the power failure and debugging repeatedly of unnecessary large area Work.
(3) the intelligent substation reorganization and expansion change impact analysis method based on model decoupling of the invention, passes through version ratio It is right, SCD reorganization and expansion coverages are determined, further checking will not impact to unrelated interval, reduce the tune at unnecessary interval Trial work is made.
(4) the intelligent substation reorganization and expansion change impact analysis method based on model decoupling of the invention, passes through version pair Than, impact analysis is carried out, it is determined that involving scope, generates analysis report, SCD empty loop information is subjected to visual displaying, The complexity of SCD file is reduced, facilitates field engineering personnel to debug.
Brief description of the drawings
Fig. 1 is the schematic flow sheet of an embodiment of the present invention.
Embodiment
In order to make the purpose , technical scheme and advantage of the present invention be clearer, with reference to embodiments, to the present invention It is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, it is not used to Limit the present invention.
The application principle of the present invention is explained in detail below in conjunction with the accompanying drawings.
The network data flow of the packed height coupling of the existing original data directly perceived, separate of intelligent substation is replaced Generation, the whole station SCD file being aggregated to form by each ICD replace direct basis of the design drawing as debugging, O&M and reorganization and expansion, it Contain whole transformer station whole IED device configuration informations, communication information and virtual secondary circuit annexation;Change in transformer station Enlarging, when being related to the modification and upgrading of SCD file, because SCD file has the coupling of different application type information and equipment room two The reasons such as secondary empty loop complex relationship configuration, it is difficult to define the amended coverage of SCD file, objectively cause and " lead one The phenomenon of hair and dynamic whole body ".For expansion spacing, original spacing devices are operational outfits, to complete reorganization and expansion equipment with Drive experiments between operational outfit, it is necessary to operational outfit is stopped transport, this is needed to expand power failure range, and even whole station is stopped sometimes Electricity.
In view of the above problems, the present invention proposes a kind of intelligent substation reorganization and expansion change based on model decoupling and influences to divide Analysis method, interval information is obtained according to original SCD file first, when interval information is not present in original SCD file, create voltage Grade, interval and virtual primary conductive equipment, and virtual primary conductive equipment is bound with secondary device, obtain interval and set It is standby;Secondly, the spacing devices that reorganization and expansion is had influence on are determined, unrelated interval is spaced into between-line spacing with influence and decoupled, obtains nothing Close gap model and influence gap model;Again, to influenceing gap model addition expansion spacing model, after completing configuration, with Unrelated gap model merges, and is combined into a complete new SCD file;Finally by the SCD file ratio to two versions It is right, impact analysis is carried out, it is determined that involving scope, analysis report is generated, facilitates engineering staff to debug.
As shown in figure 1, specifically include following steps:
S1:Original SCD file is parsed, obtains interval information, that is, obtains the related information of first and second equipment in interval, from And spacing devices are obtained, the related information of first and second described equipment is existed only in the primary conductive equipment under interval;Due to Substation information and interval information is not present in the SCD file of many transformer stations, in order to it is compatible the fact that, supported in of the invention Create voltage class with interval, while according to transformer station Substation-voltage class Voltage Level-interval Bay- Primary conductive equipment Conducting Equipment layer of structure is modeled;
Specifically, the step S1 comprises the following steps:
S1.1:Original SCD file is parsed, is designated as V1.0 versions, if transformer station is not present in original SCD file Substation element informations and interval Bay element informations, then turn to step S1.2, otherwise directly to step S1.5;
S1.2:Transformer station's Substation elements are created, are created under Substation elements corresponding with transformer station Voltage class Voltage Level elements, then create corresponding interval under voltage class Voltage Level elements Bay elements;Wherein, the daughter element for being spaced Bay elements is one or two binding informations, and two can be obtained according to one or two binding informations Secondary device information, this makes it possible to the interval determined belonging to secondary device;
S1.3:Virtual primary conductive equipment Conducting Equipment are created in the case where being spaced Bay elements, due to Primary conductive equipment is defined IEC61850, in order to expand primary conductive equipment, the primary conductive equipment of expansion Started with E, it is E Virtual to define virtual primary conductive equipment Conducting Equipment types;
S1.4:IED equipment all in SCD file is added in corresponding interval Bay elements, and is put into virtually once Under conductive equipment Conducting Equipment;
S1.5:From transformer station's Substation element informations obtain voltage class VoltageLevel element informations and Every Bay element informations, one or two binding informations are obtained from the Bay elements of interval, and then obtain secondary device information, it is final to determine Spacing devices belonging to secondary device, that is, obtain all spacing devices.
S2:The impacted spacing devices of reorganization and expansion are determined, unrelated interval and influence interval are decoupled, obtain unrelated Every model SCD file and influence gap model SCD file;Wherein, described reorganization and expansion includes reconstruction interval and expansion spacing;
Specifically, the step S2 comprises the following steps:
S2.1:Determine the impacted spacing devices of reorganization and expansion;Intelligent substation reorganization and expansion has a variety of situations, such as: Circuit, bus, main transformer are likely to reorganization and expansion, but the equipment that every kind of reorganization and expansion situation influences is different, such as between increase Every with transformation line segregation, have influence at intervals of bus interval;Therefore, it is necessary to which field engineering personnel determines the interval influenceed;
S2.2:Decoupled to influenceing interval nothing to do with interval, obtain influenceing gap model SCD file and unrelated interval mould Type SCD file, described Uncoupled procedure do not repeat herein using prior art;Described influence gap model SCD file With the IED device model information of related interval is included in unrelated gap model SCD file, while further comprises interval between void Loop information and communication configuration information, communication link of the empty loop information between IED equipment, communication are configured to IED and set Messaging parameter between standby communication;
In the present invention, described unrelated gap model SCD file is provided simultaneously with phase with influenceing in gap model SCD file Same Template Information, so it is beneficial to import newly-increased IED device model templates conflict comparison (i.e. in unrelated interval SCD texts When part imports newly-increased model file, processing template conflict), described Template Information is in SCD file DataTypeTemplates element informations, main content are the data type of Definition Model file, while unrelated gap model SCD file with influenceing possess identical Header information in gap model SCD file, for file repair by described Header information Change record, including version, modification time, modification people, modification reason, modification content etc., " identical " is meant at unrelated interval Model SCD file preserves the partial information simultaneously with influenceing in gap model SCD file, it is therefore an objective to can inquire modification and go through History information, while in gap model SCD file is influenceed, import after newly-increased IED device models, it is necessary to add modification note Record, it is to need to handle part modification record in merging, is easy to write modification information when merging, for influenceing to be spaced between nothing to do with Existing empty terminal information, is retained in two model files respectively between, (influences void be present between the nothing to do with interval of interval Terminal related information, this partial information should be retained in two model files respectively, the empty terminal for being easy to limitation to complete Configuration information) it is easy to limit this side joint receiving end;
S3:To influenceing gap model SCD file addition expansion spacing model, and correlation is carried out to expansion spacing model and matched somebody with somebody Put, obtain new influence gap model SCD file;
Specifically, the step S3 specifically includes following steps:
S3.1:In gap model SCD file is influenceed, expansion spacing element is created, while created under expansion spacing element Build virtual primary conductive equipment Conducting Equipment;
S3.2:The IED device models needed for expansion spacing are added in the expansion spacing element of establishment;
S3.3:Empty loop information and the messaging parameter in foregoing expansion spacing are configured, including IP address, MAC are physically Location, APPID, gateway, subnet mask etc.;The configuration process is prior art, is not repeated herein;
S3.4:Configure foregoing expansion spacing model and influence the empty loop information between gap model, for influenceing to be spaced Existing empty loop information, limitation are modified, and what guarantee had configured completion is without modification, the configuration process Prior art, do not repeat herein.
S4:New influence gap model SCD file nothing to do with gap model SCD file is merged, is combined into one Complete new SCD file (V2.0 versions).
The step S4 specifically includes following steps:
S4.1:Unrelated gap model SCD file, the new interval information influenceed in gap model SCD file are obtained respectively, And be compared, obtain newly-increased expansion spacing element;
S4.2:Unrelated gap model SCD file is added in the new SCD file for needing to merge;
S4.3:The IED device models that expansion spacing increases newly are added in new SCD file, while newly-increased communication is matched somebody with somebody Confidence breath is added in new SCD file relevant position;
S4.4:Compare the former void for influenceing interval module SCD file and new influence gap model SCD file, obtaining addition Loop information, and the empty loop information is added in new SCD file, the content of addition is preserved, completes what is formed for reorganization and expansion New SCD file.
S5:By being compared to original SCD file and new SCD file, impact analysis is carried out, it is determined that involve scope, generation point Analysis report, so as to complete the reorganization and expansion change impact analysis based on model decoupling;Foregoing is literary to original SCD file and new SCD Part compares, and concrete implementation process is:When obtaining Template Information, logically node template is carried out to Template Information LNodeType, data object template DOType, data attribute template DAType, enumerate data template EnumType, four classes Not, classification is compared, and thinks for different for newly-increased data template;
The step S5 specifically includes following steps:
S5.1:Original SCD file and new SCD file are compared, comparing content includes IED equipment communication configuration informations With empty loop information
S5.2:Contrast locating is distinguished to the grade to setting to GOOSE links changing range and SV links changing range;It is preferred that Ground, to GOOSE link changing range contrast locatings to DA levels, to SV link changing range contrast locatings to DO levels;
S5.3:Comparison result is confirmed, confirm coverage, for the equipment before decoupling without influence on and hair Change more, i.e.,:Compared with V1.0 and V2.0 versions determine which equipment and empty loop for newly-increased modification either, Delete, then draw impact analysis result and analysis report;
S5.4:According to comparison result, analysis report is exported, the essential information of IED equipment is included in report, including:It is empty Loop modification information, empty loop send client information and receive client information and empty loop sending direction, facilitate field adjustable.
Step S6, reorganization and expansion configuration file is exported, is filled under configuration file, is specially:
S6.1:The configuration file of expansion spacing model is exported from new SCD file;
S6.2:Operation debugging is carried out by being attached under configuration file in IED equipment.
Step S7, peace arrange debugging, specially:
S7.1:Female difference debugging:The SV for putting into bus differential protection expansion spacing receives soft pressing plate, GOOSE exports soft pressing plate, locking The soft pressing plate of reclosing, the soft pressing plate at other intervals exit;
S7.2:The combining unit of input expansion spacing, intelligent terminal, the maintenance pressing plate of protection device, are filled with bus differential protection It is consistent to put inspecting state, to expansion spacing plus simulation current flow;
S7.3:After completing female difference debugging, the soft pressing plate of bus differential protection expansion spacing SV, GOOSE is exited;
S7.4:Recover the soft pressing plate of bus differential protection function and the soft pressing plates of SV, exit the soft pressing plate of maintenance;
S7.5:Whether observation difference stream is abnormal, if without exception, the interval GOOSE that puts into operation exports soft pressing plate.
The general principle and principal character and advantages of the present invention of the present invention has been shown and described above.The technology of the industry Personnel are it should be appreciated that the present invention is not limited to the above embodiments, and the simply explanation described in above-described embodiment and specification is originally The principle of invention, without departing from the spirit and scope of the present invention, various changes and modifications of the present invention are possible, these changes Change and improvement all fall within the protetion scope of the claimed invention.The claimed scope of the invention by appended claims and its Equivalent thereof.

Claims (9)

1. a kind of intelligent substation reorganization and expansion change impact analysis method based on model decoupling, it is characterised in that including following Step:
S1:Original SCD file is parsed, interval information is obtained, so as to obtain spacing devices;
S2:The impacted spacing devices of reorganization and expansion are determined, unrelated interval and influence interval are decoupled, obtain unrelated interval mould Type SCD file and influence gap model SCD file;
S3:To influenceing gap model SCD file addition expansion spacing model, and relevant configuration is carried out to expansion spacing model, obtained To new influence gap model SCD file;
S4:New influence gap model SCD file nothing to do with gap model SCD file is merged, is combined into one completely New SCD file;
S5:By being compared to original SCD file and new SCD file, impact analysis is carried out, it is determined that involve scope, generation analysis report Accuse, so as to complete the intelligent substation reorganization and expansion change impact analysis based on model decoupling.
2. a kind of intelligent substation reorganization and expansion change impact analysis method based on model decoupling according to claim 1, It is characterized in that:The step S1 specifically includes following steps:
S1.1:Original SCD file is parsed, if in the absence of transformer station's Substation element informations and being spaced Bay element informations, Step S1.2 is turned to, otherwise directly to step S1.4;
S1.2:Transformer station's Substation elements are created, are created under transformer station's Substation elements corresponding with transformer station Voltage class Voltage Level elements, then create corresponding interval under voltage class Voltage Level elements Bay elements;
S1.3:Virtual primary conductive equipment Conducting Equipment are created in the case where being spaced Bay elements;
S1.4:IED equipment all in SCD file is added in corresponding interval, and is put into virtual primary conductive equipment Under Conducting Equipment;
S1.5:Voltage class Voltage Level element informations and interval are obtained from transformer station's Substation element informations Bay element informations, a secondary device binding information is obtained from the Bay elements of interval, and then obtain secondary device information, it is final true Determine the interval belonging to secondary device, that is, to obtain all spacing devices.
A kind of 3. intelligent substation reorganization and expansion change impact analysis side based on model decoupling according to claim 1 or 2 Method, it is characterised in that:The step S2 specifically includes following steps:
S2.1:Determine the impacted spacing devices of reorganization and expansion;
S2.2:Decoupled to influenceing interval nothing to do with interval, obtain influenceing gap model SCD file and unrelated gap model SCD file, only the IED comprising related interval is set in described influence gap model SCD file and unrelated gap model SCD file Empty loop information and communication configuration information between standby model information and interval, the empty loop information is between IED equipment Communication link, communication is configured to messaging parameter between IED equipment communications.
4. a kind of intelligent substation reorganization and expansion change impact analysis method based on model decoupling according to claim 1, It is characterized in that:The step S3 specifically includes following steps:
S3.1:In gap model SCD file is influenceed, expansion spacing element is created, while void is created under expansion spacing element Intend primary conductive equipment Conducting Equipment;
S3.2:The IED device models needed for expansion spacing are added in the expansion spacing element of establishment;
S3.3:Empty loop information and the communication configuration information in foregoing expansion spacing are configured, forms expansion spacing model SCD texts Part;
S3.4:Configure foregoing expansion spacing model SCD file and influence the empty loop information between gap model SCD file, its In, for influenceing to be spaced existing empty loop information, limitation is modified, ensure to have configured completion without repairing Change.
5. a kind of intelligent substation reorganization and expansion change impact analysis method based on model decoupling according to claim 1, It is characterized in that:The step S4 specifically includes following steps:
S4.1:Unrelated gap model SCD file, the new interval information influenceed in gap model SCD file are obtained respectively, are gone forward side by side Row compares, and obtains newly-increased expansion spacing element;
S4.2:Unrelated gap model SCD file is added in the new SCD file for needing to merge;
S4.3:The IED device models that expansion spacing increases newly are added in new SCD file, while confidence is matched somebody with somebody into newly-increased communication Breath is added in new SCD file relevant position;
S4.4:Compare the former empty loop for influenceing interval module SCD file and new influence gap model SCD file, obtaining addition Information, and the empty loop information is added in new SCD file, preserves the content of addition, completes to be formed for reorganization and expansion new SCD file.
6. a kind of intelligent substation reorganization and expansion change impact analysis method based on model decoupling according to claim 1, It is characterized in that:The step S5 specifically includes following steps:
S5.1:Original SCD file and new SCD file are compared, comparing content includes IED equipment communications configuration information and void Loop information;
S5.2:Contrast locating is distinguished to the grade to setting to GOOSE links changing range and SV links changing range;
S5.3:Comparison result is confirmed, confirm coverage, for the equipment before decoupling without influence on and become More;
S5.4:According to comparison result, analysis report is exported, the essential information of had altered IED equipment, bag are included in report Include:Empty loop modification information, empty loop send client information and receive client information and empty loop sending direction, and convenient scene is adjusted Examination.
7. a kind of intelligent substation reorganization and expansion change impact analysis method based on model decoupling according to claim 6, It is characterized in that:In the step S5.2, to GOOSE link changing range contrast locatings to DA levels, to SV link changing ranges Contrast locating is to DO levels.
8. a kind of intelligent substation reorganization and expansion change impact analysis method based on model decoupling according to claim 1, It is characterized in that:Also include step S6, export reorganization and expansion configuration file, filled under configuration file, be specially:
S6.1:The configuration file of expansion spacing model is exported from new SCD file;
S6.2:Operation debugging is carried out by being attached under configuration file in IED equipment.
9. a kind of intelligent substation reorganization and expansion change impact analysis method based on model decoupling according to claim 1, It is characterized in that:Also include step S7, peace arranges debugging, specially:
S7.1:Female difference debugging:The SV for putting into bus differential protection expansion spacing receives soft pressing plate, GOOSE exports soft pressing plate, lock-reclosing The soft pressing plate of lock, the soft pressing plate at other intervals exit;
S7.2:The combining unit of input expansion spacing, intelligent terminal, the maintenance pressing plate of protection device, are examined with bus differential protection device State consistency is repaiied, to expansion spacing plus simulation current flow;
S7.3:After completing female difference debugging, the soft pressing plate of bus differential protection expansion spacing SV receptions is exited, GOOSE exports soft pressing plate;
S7.4:Recover the soft pressing plate of bus differential protection function and the soft pressing plates of SV, exit the soft pressing plate of maintenance;
S7.5:Whether observation difference stream is abnormal, if without exception, the interval GOOSE that puts into operation exports soft pressing plate.
CN201710810506.2A 2017-09-11 2017-09-11 Intelligent substation reconstruction and extension change influence analysis method based on model decoupling Active CN107545116B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710810506.2A CN107545116B (en) 2017-09-11 2017-09-11 Intelligent substation reconstruction and extension change influence analysis method based on model decoupling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710810506.2A CN107545116B (en) 2017-09-11 2017-09-11 Intelligent substation reconstruction and extension change influence analysis method based on model decoupling

Publications (2)

Publication Number Publication Date
CN107545116A true CN107545116A (en) 2018-01-05
CN107545116B CN107545116B (en) 2021-03-02

Family

ID=60963233

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710810506.2A Active CN107545116B (en) 2017-09-11 2017-09-11 Intelligent substation reconstruction and extension change influence analysis method based on model decoupling

Country Status (1)

Country Link
CN (1) CN107545116B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107517134A (en) * 2017-09-05 2017-12-26 国网河南省电力公司检修公司 A kind of transformer station's SCD file void terminal line correctness comparison method
CN108733767A (en) * 2018-04-18 2018-11-02 北京四方继保自动化股份有限公司 A kind of intelligent substation configuration file management-control method based on decoupling technology
CN110162562A (en) * 2019-05-22 2019-08-23 国家电网有限公司 Intelligence delineation system, method and intelligent substation
CN110865995A (en) * 2019-11-11 2020-03-06 国网安徽省电力公司 Method and device for reconstructing and extending SCD (substation configuration description) file based on decoupling and synthesizing transformer substation

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20140277788A1 (en) * 2012-07-31 2014-09-18 Causam Energy, Inc. System, method, and data packets for messaging for electric power grid elements over a secure internet protocol network
CN105956245A (en) * 2016-04-25 2016-09-21 中国电力科学研究院 Bay decoupling method for SCD model of intelligent substation
CN106355305A (en) * 2016-08-18 2017-01-25 许继集团有限公司 Decoupling method and device for smart substation SCD model information section

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20140277788A1 (en) * 2012-07-31 2014-09-18 Causam Energy, Inc. System, method, and data packets for messaging for electric power grid elements over a secure internet protocol network
CN105956245A (en) * 2016-04-25 2016-09-21 中国电力科学研究院 Bay decoupling method for SCD model of intelligent substation
CN106355305A (en) * 2016-08-18 2017-01-25 许继集团有限公司 Decoupling method and device for smart substation SCD model information section

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张海东等: "面向扩建场景的变电站配置描述模型间隔解耦技术探讨", 《电力系统自动化》 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107517134A (en) * 2017-09-05 2017-12-26 国网河南省电力公司检修公司 A kind of transformer station's SCD file void terminal line correctness comparison method
CN108733767A (en) * 2018-04-18 2018-11-02 北京四方继保自动化股份有限公司 A kind of intelligent substation configuration file management-control method based on decoupling technology
CN108733767B (en) * 2018-04-18 2021-08-24 北京四方继保自动化股份有限公司 Decoupling technology-based intelligent substation configuration file management and control method
CN110162562A (en) * 2019-05-22 2019-08-23 国家电网有限公司 Intelligence delineation system, method and intelligent substation
CN110162562B (en) * 2019-05-22 2021-10-08 国家电网有限公司 Intelligent delineation system and method and intelligent substation
CN110865995A (en) * 2019-11-11 2020-03-06 国网安徽省电力公司 Method and device for reconstructing and extending SCD (substation configuration description) file based on decoupling and synthesizing transformer substation
CN110865995B (en) * 2019-11-11 2022-09-09 国网安徽省电力公司 Method and device for reconstructing and extending SCD (substation configuration description) file based on decoupling and synthesizing transformer substation

Also Published As

Publication number Publication date
CN107545116B (en) 2021-03-02

Similar Documents

Publication Publication Date Title
CN107346917B (en) Secondary device based on virtual machine integrates joint debugging method
CN104133953B (en) Intelligent substation secondary design system
CN107545116A (en) A kind of intelligent substation reorganization and expansion change impact analysis method based on model decoupling
CN104123271B (en) Intelligent substation secondary design system based on Excel
CN106383958B (en) A kind of substation's anti-misoperation locking logic and intelligent Acceptance Test System
CN105426616B (en) One kind being based on the virtual terminator matching process of " six unifications " standard
Cavalieri et al. Integration of IEC 61850 SCL and OPC UA to improve interoperability in Smart Grid environment
CN104483842A (en) Regulation and control integrated automatic master station comparison method
CN106130185A (en) A kind of monitoring system of electric substation modeling method based on status monitoring information
CN105956245B (en) Intelligent substation SCD model interval decoupling method
CN105914890A (en) Transformer substation automation control system
CN106528961A (en) Method for automatically generating secondary equipment associating configuration based on system description
CN107332702A (en) A kind of SCD file visualization parsing automatic generation method based on network topology
CN106844432A (en) Data processing method and device
Ayello et al. Interoperability based on IEC 61850 standard: Systematic literature review, certification method proposal, and case study
CN110854687B (en) Uninterrupted power transmission reconstruction method for reconstruction and expansion of intelligent substation 3/2 wiring
CN113095059A (en) Method, device, equipment and storage medium for verifying substation configuration description file
CN106204326B (en) Power distribution terminal IED equipment detection method for power distribution system
CN109522045B (en) A kind of secondary system of intelligent substation quickly configuration method based on information flow chart
CN113553728A (en) Method and system for generating intelligent substation station control layer application system model
Yunguang et al. Research on secondary circuit identification technology and condition-based maintenance mode of intelligent substation
Song et al. Research on the data management and decision-making method of the intelligent substation system based on SCD
Sheikholeslami et al. Data communication interfaces in smart grid real-time simulations: challenges and solutions
Li et al. Research on designing methods of the secondary system in digital substation
CN106841842A (en) The method of testing and device in the empty loop of secondary device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20211214

Address after: 430000 1 new bridge four, Jin Yin Hu Street, Dongxihu District, Wuhan, Hubei

Patentee after: POWERCHINA HUBEI ELECTRIC ENGINEERING Corp.,Ltd.

Patentee after: Nanjing Guodian Nanzi Power Grid Automation Co., Ltd

Address before: 430004 No.1, Xinqiao 4th Road, Jinyinhu street, Dongxihu District, Wuhan City, Hubei Province

Patentee before: HUBEI ELECTRIC POWER SURVEY & DESIGN INSTITUTE

Patentee before: Nanjing Guodian Nanzi Power Grid Automation Co., Ltd