- CN107543030A CN107543030A CN201610839163.8A CN201610839163A CN107543030A CN 107543030 A CN107543030 A CN 107543030A CN 201610839163 A CN201610839163 A CN 201610839163A CN 107543030 A CN107543030 A CN 107543030A
- Authority
- CN
- China
- Prior art keywords
- liquid nitrogen
- water
- nitrogen
- bath type
- normal temperature
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Filling Or Discharging Of Gas Storage Vessels (AREA)
- Separation By Low-Temperature Treatments (AREA)
Abstract
本发明公开了一种基于常温的水浴式液氮汽化系统,包括自增压液氮贮槽、液氮输液管路、汽化池、水浴式汽化器、氮气输出管路,其中,通过对液氮贮槽进行升压,压差通过液氮输液管路将液氮贮槽中的液氮输入到水浴式汽化器中,汽化器放置在充满常温水的汽化池水面下,利用热容量大的水对液氮进行汽化换热,通过氮气输出管路形成稳定的气流输出。本发明产生的氮气气流量大,系统运行稳定,运行成本低,能源消耗少。
Description
技术领域
本发明属于航天器噪声环境试验技术领域,具体涉及一种基于常温的液氮汽化方法。
背景技术
航天器在发射和飞行阶段会经历严酷的噪声环境,噪声环境会诱发严重的振动响应,航天器的破坏或失效与振动响应的激烈程度密切相关。航天器噪声环境试验是模拟航天器经历噪声环境、检测航天器设计可靠性的必备手段,在航天器研制进程中具有重要作用,航天器噪声环境试验一般在混响室噪声试验系统中进行。大功率声源是混响室噪声试验系统的必要设备,大功率声源一般采用将气体的机械能转换为声能,稳定流速的气源是试验系统重要的组成部分。航天器噪声环境试验要求的试验空间大,声压级高,这就要求混响室噪声试验系统应具备相当大规模的气源系统,例如,一个1000m3混响室,要达到153dB的总声压级,其标准状态下的气流量约为300m3/min,同时还要求一定的持续时间。另外,气源的选择要考虑洁净度要求、综合经济性能、环境污染等方面。
大型气源系统一般采用大型空压机压缩空气或液氮汽化办法获取,对于大型航天器噪声环境试验所需气源规模,空压机压缩空气方法气流量很难满足应用需求,空气易受环境污染,而且设备占用空间大,能耗高。常规液氮汽化方法一般采用空气对流换热方法,空气热容量较低,对于大流量气源应用所需汽化换热设备规模庞大,另外,这一方法受空气环境温度影响较大,在冬季低温时间,液氮汽化速度较慢,很难满足高气流量应用需求。
发明内容
本发明利用水热量大的特点,提供了一种采用常温水浴式液氮汽化方法,该方法能够获得大流量、洁净氮气源,用于大型航天器噪声环境试验。
本发明采用的技术解决方案如下:
基于常温的水浴式液氮汽化系统,包括自增压液氮贮槽、液氮输液管路、汽化池、水浴式汽化器、氮气输出管路,其中,通过对液氮贮槽进行升压,压差通过液氮输液管路将液氮贮槽中的液氮输入到水浴式汽化器中,汽化器放置在充满常温水的汽化池水面下,利用热容量大的水对液氮进行汽化换热,通过氮气输出管路形成稳定的气流输出。
其中,液氮贮槽自带自增压设备,设计压力选择1.8MPa,根据试验耗气量设计贮槽容积,试验中氮气总消耗量的计算公式如下:
V=Lw×t×Nt
式中V为氮气总消耗量,Lw为单次试验氮气消耗量,t为单次试验时间,Nt为试验工况数,氮气总消耗量转换为液氮的计算公式为:
VL=V/β
式中VL为液氮总消耗量,β为液氮汽化的膨胀系数,取为676。液氮总消耗量即为设计的液氮贮槽容积。
其中,液氮输液管路采用耐低温管材,一般选择0Cr18Ni9不锈钢材料,液氮输液管路的液氮管径如下:
式中v为液氮流速,一般v≤2m/s,β为液氮汽化的膨胀系数,取为676。
其中,水浴式汽化器由盘管和支架组成,其中蛇形排列的盘管受到支架的支撑。
进一步地,盘管总长度为:
其中r为盘管半径,S为换热面积,盘管厚度应考虑工作压力进行选择,汽化器总体尺寸应结合汽化池尺寸及盘管总长度等进行具体设计。
其中,液氮输液管路和氮气输出管路上分别设置有低温阀门和手动阀门。
本发明与现有技术相比的优点在于:本发明利用水热容量大的特定,可进行超大热负荷汽化换热,从而获取高速稳定的洁净氮气流,受环境温度影响较小。方法原理简单可行,系统运行稳定,常温水资源可重复利用,运行成本低,无其它能源消耗。
附图说明
图1为本发明的基于常温的水浴式液氮汽化系统的结构示意图;
其中,1、自增压液氮贮槽;2、低温阀门;3、液氮输液管路;4、汽化池;5、水浴式汽化器;6、常温水;7、氮气输出管路;8、手动阀门。
图2为本发明的基于常温的水浴式液氮汽化系统中汽化器的结构示意图。
其中,21、盘管;22、支架。
具体实施方式
以下介绍的是作为本发明所述内容的具体实施方式,下面通过具体实施方式对本发明的所述内容作进一步的阐明。当然,描述下列具体实施方式只为示例本发明的不同方面的内容,而不应理解为限制本发明范围。
如图1所示,基于常温的水浴式液氮汽化方法涉及的系统设备包括:自增压液氮贮槽1、低温阀门2、液氮输液管路3、汽化池4、水浴式汽化器5、常温水6、氮气输出管路7、手动阀门8。通过对液氮贮槽1进行升压,压差通过液氮输液管路3将液氮贮槽中的液氮输入到水浴式汽化器5中,汽化器5放置在充满常温水的汽化池4水面下,利用热容量大的水对液氮进行汽化换热,通过氮气输出管路7形成稳定的气流输出,液氮输液管路3和氮气输出管路7上分别设置有低温阀门2和手动阀门8。
如图2所示,水浴式汽化器由盘管21和支架22组成,其中蛇形排列的盘管21受到支架22的支撑。
实施案例
(1)系统设备能力设计
对于耗气量400Nm3/min的混响室,单次噪声试验耗气时间为5分钟,试验次数10计算,
氮气密度:ρ=1.2507kg/m3
氮气流量:400Nm3/min
质量流:M=1.2507×24000=30016.8kg/h
则氮气总耗气量为:
V=Lw×t×Nt=400×5×10=20000m3
液氮总消耗量为:
VL=V/β=20000/676≈30m3
因此设计选用30m3的自增压液氮贮槽。
液氮输液管路选择0Cr18Ni9不锈钢材料,液氮管径计算公式如下:
考虑设计裕度,选用DN125mm管径的输液管路。
液氮换热过程分为两个阶段,一个为气化换热阶段,由饱和液体气化为饱和气体即103.73K氮气;另一个阶段为饱和气体升温为出口0℃度氮气。
气化热负荷:
Q1=M(h气-h液)
Q1=30016.8(87+64)=4532536.8kJ/h=1082823Kcal/h
升温热负荷:
Q2=Mcp(T2-T1)Q2=30016.8×1.4×(273-103.73)=7143998kJ/h=1706701Kcal/h
于是得到总的热负荷:
Q=Q1+Q2=2789524Kcal/h
液氮温度-170℃,出口氮气温度0℃,按水温20±5℃,计算得到的对数平均温度为:
传热系数取为:
γ=120Kcal/m2·h·K。
于是得到水浴式汽化器的换热面积为:
考虑一定的设计裕度,换热面积可取为400m2。汽化器采用盘管结构形式,盘管总长度为:
(2)试验方法案例
试验中,汽化池4中注满常温水6,将30m3自增压液氮贮槽1升压至0.5MPa,打开低温阀门2和手动阀门8,液氮通过DN125mm液氮输液管路3,注入到400m2换热面积水浴式汽化器5中,汽化后的氮气通过DN300氮气输出管路7形成稳定400Nm3/min氮气流。
其中,与气流量密切相关的另一个参数就是汽化器的换热面积,参考德国施林德尔《换热器设计手册》第三卷,其计算方法如下:
式中S为汽化器换热面积,Q为总热负荷,ΔT为对数平均温度,γ为传热系数,一般取为120~150Kcal/m2·h·K。液氮换热过程分为两个阶段,一个为气化换热阶段,由饱和液体气化为饱和气体即103.73K氮气;另一个阶段为饱和气体升温为出口0℃度氮气。
液氮焓值(103.73K):
h液=-64kJ/kg
饱和氮气焓值(103.73K):
h气=87kJ/kg
则气化热负荷:
Q1=M(h气-h液)
升温热负荷:
Q2=McP(T2-T1)
于是得到总的热负荷:
Q=Q1+Q2
其中:cp——比热容,1.4kJ/kg·K
T1——氮气饱和温度,K
T2——氮气出口温度,K
式中M为质量流,M=Lw×ρ,ρ为氮气密度。液氮贮槽内是气、液两相混合,因此液氮温度属于饱和温度,在工作压力1.0MPa下,液氮的饱和温度为103.73K(~-170℃)。
其中对数平均温度计算公式为
T1,i——水初始温度,T1,o——换热后水温度
T2,i——液氮入口温度,T2,o——出口氮气温度
利用该系统能获取洁净、高速、稳定和持续的氮气流,系统运行稳定,常温水资源可重复利用,运行成本低,无其它能源消耗。在液氮贮槽压力0.5MPa,汽化器换热面积440m2条件下,可以获取400m3/min高速稳定的氮气流。
Claims (7)
1.基于常温的水浴式液氮汽化系统,包括自增压液氮贮槽、液氮输液管路、汽化池、水浴式汽化器、氮气输出管路,其中,通过对液氮贮槽进行升压,压差通过液氮输液管路将液氮贮槽中的液氮输入到水浴式汽化器中,汽化器放置在充满常温水的汽化池水面下,利用热容量大的水对液氮进行汽化换热,通过氮气输出管路形成稳定的气流输出。
2.如权利要求1所述的基于常温的水浴式液氮汽化系统,其中,液氮贮槽自带自增压设备,设计压力选择1.8MPa,根据试验耗气量设计贮槽容积,计算公式如下:
V=Lw×t×Nt
式中V为氮气总消耗量,Lw为单次试验氮气消耗量,t为单次试验时间,Nt为试验工况数。
3.如权利要求1所述的基于常温的水浴式液氮汽化系统,其中,液氮输液管路采用耐低温管材,液氮输液管路的液氮管径如下:
<mrow>
<mi>D</mi>
<mo>&GreaterEqual;</mo>
<mn>1.13</mn>
<msqrt>
<mrow>
<msub>
<mi>L</mi>
<mi>w</mi>
</msub>
<mo>/</mo>
<mi>&beta;</mi>
<mi>v</mi>
</mrow>
</msqrt>
</mrow>
式中v为液氮流速,v≤2m/s,β为液氮汽化的膨胀系数,取为676。
4.如权利要求3所述的基于常温的水浴式液氮汽化系统,其中,耐低温管材采用0Cr18Ni9不锈钢材料。
5.如权利要求1所述的基于常温的水浴式液氮汽化系统,其中,水浴式汽化器由盘管和支架组成,其中蛇形排列的盘管受到支架的支撑。
6.如权利要求5所述的基于常温的水浴式液氮汽化系统,其中,盘管总长度为:
<mrow>
<mi>l</mi>
<mo>=</mo>
<mfrac>
<mi>S</mi>
<mrow>
<mn>2</mn>
<mi>&pi;</mi>
<mi>r</mi>
</mrow>
</mfrac>
</mrow>
其中r为盘管半径,S为换热面积。
7.如权利要求1所述的基于常温的水浴式液氮汽化系统,其中,液氮输液管路和氮气输出管路上分别设置有低温阀门和手动阀门。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610839163.8A CN107543030A (zh) | 2016-09-21 | 2016-09-21 | 基于常温的水浴式液氮汽化方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610839163.8A CN107543030A (zh) | 2016-09-21 | 2016-09-21 | 基于常温的水浴式液氮汽化方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107543030A true CN107543030A (zh) | 2018-01-05 |
Family
ID=60966684
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610839163.8A Pending CN107543030A (zh) | 2016-09-21 | 2016-09-21 | 基于常温的水浴式液氮汽化方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107543030A (zh) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5461315A (en) * | 1977-10-21 | 1979-05-17 | Mitsui Eng & Shipbuild Co Ltd | Liquid petroleum gas gasifying device |
CN2914012Y (zh) * | 2006-05-09 | 2007-06-20 | 陈太文 | 低温液体气化器的换热管 |
CN201107162Y (zh) * | 2007-12-04 | 2008-08-27 | 北京卫星环境工程研究所 | 大型混响室气源系统 |
CN202501191U (zh) * | 2012-03-16 | 2012-10-24 | 合肥巨网工业气体有限公司 | 水浴式节能液氮汽化系统 |
CN105508873A (zh) * | 2016-02-18 | 2016-04-20 | 北京航天发射技术研究所 | 一种低温容器汽化器自增压系统和方法 |
CN105644812A (zh) * | 2016-02-25 | 2016-06-08 | 上海宇航系统工程研究所 | 可在常压大空间内实现低露点的环境模拟方法及系统 |
-
2016
- 2016-09-21 CN CN201610839163.8A patent/CN107543030A/zh active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5461315A (en) * | 1977-10-21 | 1979-05-17 | Mitsui Eng & Shipbuild Co Ltd | Liquid petroleum gas gasifying device |
CN2914012Y (zh) * | 2006-05-09 | 2007-06-20 | 陈太文 | 低温液体气化器的换热管 |
CN201107162Y (zh) * | 2007-12-04 | 2008-08-27 | 北京卫星环境工程研究所 | 大型混响室气源系统 |
CN202501191U (zh) * | 2012-03-16 | 2012-10-24 | 合肥巨网工业气体有限公司 | 水浴式节能液氮汽化系统 |
CN105508873A (zh) * | 2016-02-18 | 2016-04-20 | 北京航天发射技术研究所 | 一种低温容器汽化器自增压系统和方法 |
CN105644812A (zh) * | 2016-02-25 | 2016-06-08 | 上海宇航系统工程研究所 | 可在常压大空间内实现低露点的环境模拟方法及系统 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Ruangtrakoon et al. | Experimental studies of a steam jet refrigeration cycle: effect of the primary nozzle geometries to system performance | |
Zheng et al. | Numerical and experimental investigation of a helical coil heat exchanger for seawater-source heat pump in cold region | |
Scott et al. | An experimental investigation of an ejector for validating numerical simulations | |
CN101915776B (zh) | 混凝土热扩散率的测定方法及试验装置 | |
Zhang et al. | Experimental investigation on the geometric structure with perforated baffle for thermal stratification of the water tank | |
US7802430B1 (en) | Condensers efficiency through novel PCS technology | |
CN106896134A (zh) | 一种双介质超临界低温热工性能测试平台 | |
Zheng et al. | Experimental investigation of the heat transfer characteristics of a helical coil heat exchanger for a seawater-source heat pump | |
Tang et al. | Study on evolution laws of two-phase choking flow and entrainment performance of steam ejector oriented towards MED-TVC desalination system | |
Kang et al. | Numerical investigation on flow condensation process during interphase mixing in oxygen pipeline of liquid rocket | |
Zhao et al. | Study of a compact falling film evaporation/condensation alternate-arrayed desalination system | |
CN107543030A (zh) | 基于常温的水浴式液氮汽化方法 | |
Kitrattana et al. | Investigation on improvement potential of steam ejector performance in refrigeration cycle via constant rate of momentum change design method | |
Ito et al. | A blowdown cryogenic cavitation tunnel and CFD treatment for flow visualization around a foil | |
Fukiba et al. | New defrosting method using jet impingement for precooled turbojet engines | |
Chekh et al. | Cavitation in nozzle: The effect of pressure on the vapor content | |
Jin et al. | Numerical simulation and experimental study on internal depressurization flow characteristics of a multi-layer sleeve regulating valve | |
Kok et al. | Experimental investigation of thermal-mixing phenomena of a coaxial jet with cylindrical obstacles | |
Milman et al. | Investigation of parallel operation of vacuum condenser sections with nonuniform cooling | |
Yang et al. | Study on cavitation of liquid nitrogen in pumps induced by coupling of pressure drop and external temperature | |
Honus et al. | Verification of the analytical design model of a subcritical air ejector and assessment of the behavior of the manufactured machine under different operating conditions | |
RU2489638C1 (ru) | Газораспределительная станция | |
Carofano | An analytical and experimental study of the flow of air-water and steam-water mixtures in a converging-diverging nozzle | |
Zhang et al. | Effect of height difference on the performance of two-phase thermosyphon loop used in air-conditioning system | |
Zhang et al. | Numerical and experimental investigation of flow induced vibration of an ejector considering cavitation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20180105 |