CN107542240A - A kind of installation system of dot point porcelain plate - Google Patents

A kind of installation system of dot point porcelain plate Download PDF

Info

Publication number
CN107542240A
CN107542240A CN201710704106.3A CN201710704106A CN107542240A CN 107542240 A CN107542240 A CN 107542240A CN 201710704106 A CN201710704106 A CN 201710704106A CN 107542240 A CN107542240 A CN 107542240A
Authority
CN
China
Prior art keywords
extension
vertical
horizontal
fastening part
extending
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710704106.3A
Other languages
Chinese (zh)
Inventor
蒙政强
杨仟厦
杜尔宏
詹路英
陈金波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGDONG GREEN BUILDING TECHNOLOGY ENGINEERING Co Ltd
Original Assignee
GUANGDONG GREEN BUILDING TECHNOLOGY ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGDONG GREEN BUILDING TECHNOLOGY ENGINEERING Co Ltd filed Critical GUANGDONG GREEN BUILDING TECHNOLOGY ENGINEERING Co Ltd
Priority to CN201710704106.3A priority Critical patent/CN107542240A/en
Publication of CN107542240A publication Critical patent/CN107542240A/en
Pending legal-status Critical Current

Links

Landscapes

  • Finishing Walls (AREA)

Abstract

A kind of installation system of dot point porcelain plate;Metope is installed on including keel shoe, dry-hanging component, bolt assembly and positioning adhesive tape, the keel shoe, the dry-hanging component is fixed on the keel shoe by the bolt assembly;The dry-hanging component includes main suspension member, upper fastener and lower fastener;The positioning adhesive tape is installed between the upper fastener and lower fastener, and the lower surface of described horizontal-extending one is close in its upper surface, and the upper surface of described horizontal-extending two is close in its lower surface.One block of porcelain plate pins down fixation by lower fastener, carrier, upper fastener and the carrier of different dry-hanging components successively from top to bottom so that the mounting structure of porcelain plate is stable, and dry-hanging component is simple in construction, easy for construction during installation, is easy to improve installation effectiveness.

Description

A kind of installation system of dot point porcelain plate
Technical field
The present invention relates to the dry-hang mounting structure field of sheet material, more particularly to a kind of installation system of dot point porcelain plate.
Background technology
The installation method of sheet material generally has two kinds of wet combining method and dry-hanging method, and current Major Epidemic is dry-hanging method.And do It is several that extension method mainly distributes nail type, open flume type and back bolt type.Because the mounting means of this several method is required to open on sheet material The junction of groove or perforate, these flutings or perforate will produce serious stress concentration, be easier to give birth to destruction.Simultaneously as plate Tension, the bending strength of material in itself are relatively low, so, these sheet materials are essentially all to use thicker stone slab, that is, to increase The method to add thickness solves these intensity vulnerability issues.So caused by result be exactly that stone material weight is very big, and make suspension member and Supporting structure also becomes heavy, and whole curtain wall system is too fat to move to can't bear, and has both caused big waste of material, cost increase, security Also it is deteriorated, installment work is become difficult, it is often more important that above-mentioned existing dried hanging hang structure, the porcelain in big face domain can not be adapted to The installation of plate.
The content of the invention
For drawbacks described above, it is an object of the invention to propose a kind of installation system of dot point porcelain plate.
To use following technical scheme up to this purpose, the present invention:
A kind of installation system of dot point porcelain plate;It is described including keel shoe, dry-hanging component, bolt assembly and positioning adhesive tape Keel shoe is installed on metope, and the dry-hanging component is fixed on the keel shoe by the bolt assembly;
The dry-hanging component includes main suspension member, upper fastener and lower fastener;
The main suspension member includes vertically-mounted portion and carrier, and two carriers are fixed on described with being distributed up and down The same side in vertically-mounted portion, the upper fastener and lower fastener clamp two undertakings for being fixed on the main suspension member respectively Portion;
The carrier includes first level extension, the first vertical extension and the second horizontal extension, and described first One end of horizontal extension is vertically connected on the side in the vertically-mounted portion, and its other end is outwards horizontal-extending;Described first The lower end of vertical extension is vertically connected on the other end of the first level extension, and its upper end extends straight up, institute State between vertically-mounted portion and the relative two side of the first vertical extension and the upper surface of the first level extension Form holding tank;The left end of second horizontal extension is vertically connected on the upper end of the described first vertical extension, and it is right End is outwards horizontal-extending;
The upper fastener include upper vertical fastening part, upper horizontal fastening part, vertical extension one, it is horizontal-extending one and Vertical extension two, one end of the upper horizontal fastening part is vertically fixed on the left side of the upper vertical fastening part, and its is another End is outwards horizontal-extending;The upper end of the vertical extension one is vertically connected on the other end of the upper horizontal fastening part, and its Lower end extends straight down;The upper vertical fastening part and one relative two side of extension and the upper level vertically Upper spiral-lock groove is formed between the lower surface of fastening part;
The upper spiral-lock groove adaptability is installed on outside the described first vertical extension and second horizontal extension, together When, one adaptability of the extension vertically is installed in the holding tank, and the right side wall of the vertical extension one props up institute The left side wall of the first vertical extension is stated, the lower surface of the vertical extension one props up the upper of the first level extension End face;
Described horizontal-extending one one end is vertically fixed on the lower section on the right side of the upper vertical fastening part, and its is another One end horizontally outward extends;The lower end of the vertical extension two is vertically connected on the other end of described horizontal-extending one, and Its upper end extends straight up;The upper vertical fastening part and two relative two sides of extension and the level vertically Upper brick body mounting groove, the upper brick body mounting groove opening upwards are formed between the upper surface of extension one;
The lower fastener include lower vertical fastening part, lower horizontal fastening part, vertical extension three, it is horizontal-extending two and Vertical extension four, one end of the lower horizontal fastening part is vertically fixed on the left side of the lower vertical fastening part, and its is another End is outwards horizontal-extending;The upper end of the vertical extension three is vertically connected on the other end of the lower horizontal fastening part, and its Lower end extends straight down;The lower vertical fastening part and three relative two sides of extension and the lower level vertically Lower spiral-lock groove is formed between the lower surface of fastening part;
The lower spiral-lock groove adaptability is installed on outside the described first vertical extension and second horizontal extension, together When, three adaptability of the extension vertically are installed in the holding tank, and the right side wall of the vertical extension three props up institute The left side wall of the first vertical extension is stated, the lower surface of the vertical extension three props up the upper of the first level extension End face;
Described horizontal-extending two one end is vertically fixed on the top on the right side of the lower vertical fastening part, and its is another One end horizontally outward extends;The upper end of the vertical extension four is vertically connected on the other end of described horizontal-extending two, and Its lower end extends straight down;The lower vertical fastening part and four relative two sides of extension and the level vertically Lower brick body mounting groove is formed between the lower surface of extension two, Open Side Down for the lower brick body mounting groove;
It is described positioning adhesive tape be installed between the upper fastener and lower fastener, and its upper surface be close to it is described horizontal-extending The upper surface of described horizontal-extending two is close in the lower surface of one, its lower surface.
Preferably, in addition to L-type suspension member, its be by the vertical fixed L shape structures formed of horizontal side wall and upright side walls, Vertically-mounted portion, the upright side walls and the keel shoe described in the screw bolt passes of the bolt assembly, and by described The dry-hanging component is fixed on the keel shoe by the nut of bolt assembly, and the horizontal side wall of the L types suspension member is weldingly fixed on The keel shoe.
Preferably, adhesive layer is provided between the left side wall in the upright side walls of the L-type suspension member and the vertically-mounted portion.
Preferably, the keel shoe includes main joist and crossbeam, and the main joist is installed on metope and along vertical direction Extension, the beam vertical is fixed on the main joist, and extends along horizontal direction;The dry-hanging component and the L-type are hung Part is fixed on the crossbeam, and the upper surface of the L-type suspension member is weldingly fixed on the crossbeam.
Preferably, the right side wall of the upper vertical fastening part and the lower vertical fastening part, which is designed with accommodating brick gum, sticks The dovetail groove of agent, the dovetail groove are caved inward shape by the right side wall of the upper vertical fastening part and the lower vertical fastening part Into some dovetail grooves are spaced distribution.
Preferably, the carrier also includes the second vertical extension, and the upper end of the second vertical extension vertically connects The right-hand member of second horizontal extension is connected on, and its lower end extends straight down;
The right side wall of described second vertical extension of two carriers be respectively held against the upper vertical fastening part and The left side wall of the lower vertical fastening part.
Preferably, the height of the extension one vertically and the vertical extension three is more than the described first vertical extension The height in portion so that the upper fastener and lower fastener clamp when being fixed on two carriers respectively, the upper horizontal fastener Between portion and second horizontal extension, and perpendicular between the lower horizontal fastening part and second horizontal extension Nogata is designed with being spaced upwards.
Preferably, the vertical extension one is not propped up described perpendicular with the vertical extension three parts by the adhesive tape The right side wall of straight installation portion.
Adhesive tape mounting groove is designed with preferable vertical one left side wall with the vertical extension three of extension, The adhesive tape is arranged in the adhesive tape mounting groove.
Preferably, sequentially pass through the lower horizontal fastening part from top to bottom provided with fixing bolt and second level is prolonged It is fixed after extending portion.
One block of porcelain plate is pind down by lower fastener, carrier, upper fastener and the carrier of different dry-hanging components successively from top to bottom It is fixed so that the mounting structure of porcelain plate is stable, and dry-hanging component is simple in construction, easy for construction during installation, is easy to improve installation effect Rate.
After two blocks of neighbouring porcelain plates install, positioning adhesive tape is installed between the upper fastener and lower fastener, And the lower surface of described horizontal-extending one is close in its upper surface, the upper surface of described horizontal-extending two is close in its lower surface, Neutral silicone weather proofing sealant is filled between two pieces of porcelain plate opposing sidewalls, is on the one hand to fill up between adjacent two blocks of porcelain plates Gap, be on the other hand to improve the bulk strength of assembling structure.
Brief description of the drawings
Fig. 1 is the scheme of installation of one embodiment of installation system in the present invention;
Fig. 2 is the top view of one embodiment of installation system in the present invention;
Fig. 3 is the scheme of installation of one embodiment of dry-hanging component in the present invention;
Fig. 4 is the structural representation of one embodiment of main suspension member in the present invention;
Fig. 5 is the structural representation of one embodiment of lower fastener in the present invention.
Wherein:Keel shoe 1, main joist 101, crossbeam 102;
Dry-hanging component 2, main suspension member 21, vertically-mounted portion 210, carrier 211, first level extension 2111, first is perpendicular Straight extension 2112, the second horizontal extension 2113, the second vertical extension 2114, holding tank 212;Upper fastener 22, it is upper vertical Fastening part 220, upper horizontal fastening part 221 is vertical to extend one 222, horizontal-extending one 223, extends two 224 vertically, on Spiral-lock groove 225, upper brick body mounting groove 226;Lower fastener 23, lower vertical fastening part 230, lower horizontal fastening part 231, vertical extension Three 232, horizontal-extending two 233, extension four 234 vertically, lower spiral-lock groove 235, lower brick body mounting groove 236;
Bolt assembly 3, position adhesive tape 4;L-type suspension member 5, horizontal side wall 51, upright side walls 52;Dovetail groove 6, adhesive tape 7, Gu Determine bolt 8, porcelain plate 9, brick back of the body adhesive 10, neutral silicone weather proofing sealant 11, adhesive layer 12.
Embodiment
Further illustrate technical scheme below in conjunction with the accompanying drawings and by embodiment.
As shown in Figures 1 and 2, a kind of installation system of dot point porcelain plate;Including keel shoe 1, dry-hanging component 2, bolt group Part 3 and positioning adhesive tape 4, the keel shoe 1 are installed on metope, and the dry-hanging component 2 is fixed on institute by the bolt assembly 3 State keel shoe 1;
As shown in Fig. 3, Fig. 4 and Fig. 5, the dry-hanging component 2 includes main suspension member 21, upper fastener 22 and lower fastener 23;
The main suspension member 21 includes vertically-mounted portion 210 and carrier 211, and two carriers are distributed ground about 211 The same side in the vertically-mounted portion 210 is fixed on, the upper fastener 22 and lower fastener 23 clamp respectively is fixed on the main extension Two carriers 211 of part 21;
It is horizontal-extending that the carrier 211 includes first level extension 2111, the first vertical extension 2112 and second Portion 2113, one end of the first level extension 2111 are vertically connected on the side in the vertically-mounted portion 210, and its is another End is outwards horizontal-extending;The lower end of the first vertical extension 2112 is vertically connected on the first level extension 2111 The other end, and its upper end extends straight up, and the vertically-mounted portion 210 and the first vertical extension 2112 are relative Two side and the first level extension 2111 upper surface between formed holding tank 212;Second horizontal extension 2113 left end is vertically connected on the upper end of the described first vertical extension 2112, and its right-hand member is outwards horizontal-extending;
The upper fastener 22 includes upper vertical fastening part 220, upper horizontal fastening part 221, vertical extension one 222, level Extension one 223 and vertical extension two 224, one end of the upper horizontal fastening part 221 are vertically fixed on the upper vertical button The left side in part portion 220, and its other end is outwards horizontal-extending;The vertical upper end for extending one 222 is vertically connected on described The other end of upper horizontal fastening part 221, and its lower end extends straight down;The upper vertical fastening part 220 and described prolong vertically Stretch and upper spiral-lock groove 225 is formed between a 222 relative two sides and the lower surface of the upper horizontal fastening part 221;
The upper adaptability of spiral-lock groove 225 is installed on the described first vertical extension 2112 and described second horizontal-extending Outside portion 2113, meanwhile, one 222 adaptability of the extension vertically are installed in the holding tank 212, and the vertical extension The right side wall of one 222 props up the left side wall of the described first vertical extension 2112, the vertical lower end for extending one 222 Face props up the upper surface of the first level extension 2111;
Described horizontal-extending one 223 one end is vertically fixed on the lower section on the right side of the upper vertical fastening part 220, And its other end horizontally outward extends;The vertical lower end for extending two 224 is vertically connected on described horizontal-extending one 223 other end, and its upper end extends straight up;The upper vertical fastening part 220 and two 224 phases of extension vertically To two side and the upper surface of described horizontal-extending one 223 between form upper brick body mounting groove 226, the upper brick body peace The opening upwards of tankage 226;
The lower fastener 23 includes lower vertical fastening part 230, lower horizontal fastening part 231, vertical extension three 232, level Extension two 233 and vertical extension four 234, one end of the lower horizontal fastening part 231 are vertically fixed on the lower vertical button The left side in part portion 230, and its other end is outwards horizontal-extending;The vertical upper end for extending three 232 is vertically connected on described The other end of lower horizontal fastening part 231, and its lower end extends straight down;The lower vertical fastening part 230 and described prolong vertically Stretch and lower spiral-lock groove 235 is formed between three 232 relative two sides and the lower surface of the lower horizontal fastening part 231;
The lower adaptability of spiral-lock groove 235 is installed on the described first vertical extension 2112 and described second horizontal-extending Outside portion 2113, meanwhile, three 232 adaptability of the extension vertically are installed in the holding tank 212, and the vertical extension The right side wall of three 232 props up the left side wall of the described first vertical extension 2112, the vertical lower end for extending three 232 Face props up the upper surface of the first level extension 2111;
Described horizontal-extending two 233 one end is vertically fixed on the top on the right side of the lower vertical fastening part 230, And its other end horizontally outward extends;The vertical upper end for extending four 234 is vertically connected on described horizontal-extending two 233 other end, and its lower end extends straight down;The lower vertical fastening part 230 and four 234 phases of extension vertically To two side and the lower surface of described horizontal-extending two 233 between form lower brick body mounting groove 236, the lower brick body peace Open Side Down for tankage 236;
The positioning adhesive tape 4 is installed between the upper fastener 22 and lower fastener 23, and the level is close in its upper surface The lower surface that extension is one 223, the upper surface of described horizontal-extending two 233 is close in its lower surface.
Installation system in the technical program, for installation of the two blocks of neighbouring porcelain plates 9 on metope.
Illustrated below using the specific installation of one block of porcelain plate 9 as embodiment, during installation, first pass through following methods elder generation Two dry-hanging components are arranged on metope according to the position of measure respectively:
That is, keel shoe 1 is fixed on metope by bolt or similar fixture, then the bolt by bolt assembly 4 Fixed after through vertically-mounted portion 210 with the nut of bolt assembly 4, vertically-mounted portion 210 installs and then by upper fastener 22 and lower fastener 23 clamp two carriers 211 for being fixed on the main suspension member 21 respectively.
It is opened to the mounting groove of sunken inside respectively at the middle part of the upper and lower end face of porcelain plate 9, same porcelain plate 9 divides from top to bottom Do not connected by the lower fastener 23 of two dry-hanging components 2 and upper fastener 22.Wherein, the vertical extension of lower fastener 23 is caught in for four 234 In the mounting groove of the upper surface of porcelain plate 9, the right side wall of lower vertical fastening part 230 is fixed by the back side of adhesive and porcelain plate 9;On The vertical extension of fastener 22 is caught in the mounting groove of the lower surface of porcelain plate 9 for two 224, and horizontal-extending one 223 is that porcelain plate 9 provides Upward support force, the right side wall of upper vertical fastening part 220 are fixed by the back side of adhesive and porcelain plate 9.
Again, lower fastener 23 and upper fastener 22 clamp on the carrier 211 fixed to each autonomous suspension member 21 respectively, respective Main suspension member 21 is fixedly mounted on metope by vertically-mounted portion 210 respectively.The first level extension 2111 of lower fastener 23 is Vertical extension provides upward support force for three 232, is produced between the side wall of holding tank 212 and the vertical side wall for extending three 232 The life frictional force opposite with gravity direction suffered by porcelain plate 9;The first level extension 2111 of upper fastener 22 is vertical extension one 222 provide upward support force, are produced and the institute of porcelain plate 9 between the side wall of holding tank 212 and the vertical side wall for extending one 222 By the opposite frictional force of gravity direction.
One block of porcelain plate 9 is from top to bottom successively by the lower fastener 23 of different dry-hanging components 2, carrier 211, the and of upper fastener 22 Carrier 211 pins down fixation so that the mounting structure of porcelain plate 9 is stable, and dry-hanging component 2 is simple in construction, construction party during installation Just, it is easy to improve installation effectiveness.
After two blocks of neighbouring porcelain plates 9 install, positioning adhesive tape 4 is installed on the upper fastener 22 and lower fastener Between 23, and the lower surface of described horizontal-extending one 223 is close in its upper surface, and its lower surface is close to described horizontal-extending two The upper surface in portion 233, neutral silicone weather proofing sealant 11 is filled between two pieces of opposing sidewalls of porcelain plate 9, is on the one hand to fill up Gap between adjacent two blocks of porcelain plates 9, on the other hand it is to improve the bulk strength of assembling structure.
Also include L-type suspension member 5, it is vertically to fix the L-shaped structure formed, institute by horizontal side wall 51 and upright side walls 52 Vertically-mounted portion 210, the upright side walls 52 and the keel shoe 1 described in the screw bolt passes of bolt assembly 3 are stated, and is led to The dry-hanging component 2 is fixed on the keel shoe 1, the horizontal side wall of the L-type suspension member 5 by the nut for crossing the bolt assembly 3 51 are weldingly fixed on the keel shoe 1.
(installation in vertically-mounted portion 210 is fixed, it is necessary to which the surface of the part of connection fixed thereto is coarse as much as possible, It can promote to produce enough frictional force between the two to ensure the intensity of both fixations.Increase L-type suspension member 5, can be by the table of adaptation Surface roughness is processed on L-type suspension member 5, and to meet the installation of L-type suspension member 5, the surface without keel shoe 1 is overall or local The surface roughness of adaptation is processed, improves processing efficiency.
Adhesive layer 12 is provided between the left side wall in the upright side walls 52 of the L-type suspension member 5 and the vertically-mounted portion 210.
Adhesive layer is set, increases the fixing point between upright side walls 52 and the left side wall in vertically-mounted portion 210, improves two Fixed intensity between person.Preferably, the material of adhesive layer 12 is PA66 here, and PA66 has higher fusing point, in higher temperatures Degree can also keep stronger strength and stiffness, strengthen its glueability.
The keel shoe 1 includes main joist 101 and crossbeam 102, and the main joist 101 is installed on metope and along vertical Direction extends, and the crossbeam 102 is vertically fixed on the main joist 101, and extends along horizontal direction;The dry-hanging component 2 The crossbeam 102 is fixed on the L-type suspension member 5, and the upper surface of the L-type suspension member 5 is weldingly fixed on the crossbeam 102.
Main joist 101 and crossbeam 102 connect into orthogonal skeleton structure, easy for installation, and, further to strengthen The stability of structure, crossbeam 102 is fixed on by way of welding on main joist 101, and the side end face of the L-type suspension member 5 leads to Cross bolt assembly 3 and be fixed on the crossbeam 102, end face is weldingly fixed on the crossbeam 102 thereon.
The right side wall of the upper vertical fastening part 220 and the lower vertical fastening part 230 is designed with accommodating brick back of the body adhesive 10 dovetail groove 6, the dovetail groove 6 from the right side wall of the upper vertical fastening part 220 and the lower vertical fastening part 230 to Sunken inside is formed, and some dovetail grooves 6 are spaced distribution.
The right side wall of upper vertical fastening part 220 and lower vertical fastening part 230 is fixed by the back side of adhesive and porcelain plate 9, The dovetail groove 6 of inside groove is set up in both right side walls, to increase the receiving space of adhesive, the installation for strengthening porcelain plate 9 is strong Degree, it is preferred that brick back of the body adhesive 10 here is modified epoxy.
The carrier 211 also includes the second vertical extension 2114, and the upper end of the second vertical extension 2114 is hung down The direct-connected right-hand member for being connected on second horizontal extension 2113, and its lower end extends straight down;
The right side wall of described second vertical extension 2114 of two carriers 211 is respectively held against described vertical The left side wall of fastening part 220 and the lower vertical fastening part 230.
Two the second vertical extensions 2114 between upper vertical fastening part 220 and lower vertical fastening part 230, produce respectively The life frictional force opposite with gravity direction suffered by porcelain plate 9, further improve the stability of installation.
The extension one 222 vertically and the vertical height for extending three 232 are more than the described first vertical extension 2112 height so that the upper fastener 22 and lower fastener 23 clamp when being fixed on two carriers 211 respectively, described Between upper horizontal fastening part 221 and second horizontal extension 2113, and the lower horizontal fastening part 231 and described In the vertical direction is designed with being spaced between two horizontal extensions 2113.
Between the upper horizontal fastening part 221 and second horizontal extension 2113, and the lower horizontal fastening part In the vertical direction is designed with being spaced between 231 and second horizontal extension 2113, rather than directly against contact, one Aspect is the adjustment of the position of porcelain plate 9 when conveniently installing, and is on the other hand gas by interval holding porcelain plate mounting structure everywhere Circulation is smooth, avoids some position product negative pressure and influences installation strength.
The extension one 222 vertically and the vertical extension are propped up for three 232 described perpendicular by the adhesive tape 7 respectively The right side wall of straight installation portion 210.
Adhesive tape 7 is set, rather than makes extension one 222 vertically and vertical extension three 232 straight with vertically-mounted portion 210 Contact, by this flexible media of adhesive tape, the effect of reduction noise is played for the mounting structure of porcelain plate 9.
Vertical extend is designed with adhesive tape mounting groove on one 222 and the vertical left side wall for extending three 232, The adhesive tape 7 is arranged in the adhesive tape mounting groove.
During installation, first adhesive tape 7 is snapped fitted in adhesive tape mounting groove, one 222 and vertical extension three will extended vertically 232 when being caught in mounting groove 12, action that adhesive tape 7 is caught in this i.e. vertical extension one 222 and vertical extension three Between 232 and the right side wall in vertically-mounted portion 210, the process being entirely caught in accelerates peace with the elastic deformation of adhesive tape 7 The speed of dress, and be caught in rear adhesive tape 7 and recover deformation, enhance the stabilization of mounting structure.
The lower horizontal fastening part 231 and second horizontal extension are sequentially passed through from top to bottom provided with fixing bolt 8 It is fixed after 2113.
Every block of porcelain plate 9 is installed last, then is passed through the in the vertical direction of fixing bolt 8 and strengthened lower fastener 23 and main suspension member Fixation between 21, further improve the stabilization of mounting structure.
The bottom on described horizontal-extending one 223 right side for being vertically connected on the upper vertical fastening part 220, it is described The top on horizontal-extending two 233 right sides for being vertically connected on the lower vertical fastening part 230.
Lower fastener 23 and upper fastener 22 include the upper surface and lower surface of porcelain plate 9, to produce between adjacent porcelain plate 9 respectively Life interferes, rational deployment mounting structure, improves installation effectiveness and intensity.
The upper horizontal fastening part 221 is connected to the medium position of the upper vertical fastening part 220, the lower horizontal button Part portion 231 is connected to the upper position of the lower vertical fastening part 230;
Upper fastener 22 is supported on the lower surface of porcelain plate 9, it is necessary to share larger support force, and upper horizontal fastening part 221 is connected The medium position of vertical fastening part 220 is connected on, optimizes the distribution of power.Lower fastener 2 is wrapped in the upper surface of porcelain plate 9, described Lower horizontal fastening part 231 is connected to the upper position of the lower vertical fastening part 230, can more take into account the margin location of fixed porcelain plate 9 Put, strengthen installation effect.
The main suspension member 21, upper fastener 22 and lower fastener 23 are aluminum alloy material.
The technical principle of the present invention is described above in association with specific embodiment.These descriptions are intended merely to explain the present invention Principle, and limiting the scope of the invention can not be construed in any way.Based on explanation herein, this area Technical staff would not require any inventive effort the other embodiments that can associate the present invention, and these modes are all It will fall under the scope of the present invention.

Claims (10)

  1. A kind of 1. installation system of dot point porcelain plate, it is characterised in that:Including keel shoe, dry-hanging component, bolt assembly and positioning Adhesive tape, the keel shoe are installed on metope, and the dry-hanging component is fixed on the keel shoe by the bolt assembly;
    The dry-hanging component includes main suspension member, upper fastener and lower fastener;
    The main suspension member includes vertically-mounted portion and carrier, and two carriers are fixed on the vertical peace with being distributed up and down The same side in dress portion, the upper fastener and lower fastener clamp two carriers for being fixed on the main suspension member respectively;
    The carrier includes first level extension, the first vertical extension and the second horizontal extension, the first level One end of extension is vertically connected on the side in the vertically-mounted portion, and its other end is outwards horizontal-extending;Described first is vertical The lower end of extension is vertically connected on the other end of the first level extension, and its upper end extends straight up, described perpendicular Formed between straight installation portion and the relative two side of the first vertical extension and the upper surface of the first level extension Holding tank;The left end of second horizontal extension is vertically connected on the upper end of the described first vertical extension, and its right-hand member to It is outer horizontal-extending;
    The upper fastener includes upper vertical fastening part, upper horizontal fastening part, vertical extension one, horizontal-extending one and prolonged vertically Two are stretched, one end of the upper horizontal fastening part is vertically fixed on the left side of the upper vertical fastening part, and its other end is outside It is horizontal-extending;The upper end of the vertical extension one is vertically connected on the other end of the upper horizontal fastening part, and its lower end is erected Directly extend downwardly;The upper vertical fastening part and one relative two side of extension vertically and the upper horizontal fastening part Upper spiral-lock groove is formed between lower surface;
    The upper spiral-lock groove adaptability is installed on outside the described first vertical extension and second horizontal extension, meanwhile, institute State one adaptability of extension vertically to be installed in the holding tank, and the right side wall of the vertical extension one props up described first The left side wall of vertical extension, the lower surface of the vertical extension one prop up the upper surface of the first level extension;
    Described horizontal-extending one one end is vertically fixed on the lower section on the right side of the upper vertical fastening part, and its other end water It is flat to stretch out;The lower end of the vertical extension two is vertically connected on the other end of described horizontal-extending one, and its upper end Extend straight up;The upper vertical fastening part and two relative two sides of extension vertically and described horizontal-extending one Upper surface between form upper brick body mounting groove, the upper brick body mounting groove opening upwards;
    The lower fastener includes lower vertical fastening part, lower horizontal fastening part, vertical extension three, horizontal-extending two and prolonged vertically Four are stretched, one end of the lower horizontal fastening part is vertically fixed on the left side of the lower vertical fastening part, and its other end is outside It is horizontal-extending;The upper end of the vertical extension three is vertically connected on the other end of the lower horizontal fastening part, and its lower end is erected Directly extend downwardly;The lower vertical fastening part and three relative two sides of extension vertically and the lower horizontal fastening part Lower spiral-lock groove is formed between lower surface;
    The lower spiral-lock groove adaptability is installed on outside the described first vertical extension and second horizontal extension, meanwhile, institute State three adaptability of extension vertically to be installed in the holding tank, and the right side wall of the vertical extension three props up described first The left side wall of vertical extension, the lower surface of the vertical extension three prop up the upper surface of the first level extension;
    Described horizontal-extending two one end is vertically fixed on the top on the right side of the lower vertical fastening part, and its other end water It is flat to stretch out;The upper end of the vertical extension four is vertically connected on the other end of described horizontal-extending two, and its lower end Extend straight down;The lower vertical fastening part and four relative two sides of extension vertically and described horizontal-extending two Lower surface between form lower brick body mounting groove, Open Side Down for the lower brick body mounting groove;
    The positioning adhesive tape is installed between the upper fastener and lower fastener, and its upper surface is close to described horizontal-extending one The upper surface of described horizontal-extending two is close in lower surface, its lower surface.
  2. 2. installation system according to claim 1, it is characterised in that:Also include L-type suspension member, it is by horizontal side wall and erected The vertical fixed L-shaped structure formed of straight sidewall, it is vertically-mounted portion described in the screw bolt passes of the bolt assembly, described vertical Side wall and the keel shoe, and the dry-hanging component is fixed on by the keel shoe, the L by the nut of the bolt assembly The horizontal side wall of type suspension member is weldingly fixed on the keel shoe.
  3. 3. installation system according to claim 2, it is characterised in that:The upright side walls of the L-type suspension member with it is described vertical Adhesive layer is provided between the left side wall of installation portion.
  4. 4. installation system according to claim 2, it is characterised in that:The keel shoe includes main joist and crossbeam, described Main joist is installed on metope and extended along vertical direction, and the beam vertical is fixed on the main joist, and along level side To extension;The dry-hanging component and the L-type suspension member are fixed on the crossbeam, and the upper surface of the L-type suspension member is welded and fixed In the crossbeam.
  5. 5. installation system according to claim 1, it is characterised in that:The upper vertical fastening part and the lower vertical fastener The right side wall in portion is designed with accommodating the dovetail groove of brick back of the body adhesive, and the dovetail groove is by the upper vertical fastening part and described lower perpendicular The right side wall of straight fastening part caves inward to be formed, and some dovetail grooves are spaced distribution.
  6. 6. installation system according to claim 1, it is characterised in that:The carrier also includes the second vertical extension, The upper end of the second vertical extension is vertically connected on the right-hand member of second horizontal extension, and its lower end is prolonged straight down Stretch;
    The right side wall of described second vertical extension of two carriers is respectively held against the upper vertical fastening part and described The left side wall of vertical fastening part down.
  7. 7. the installation system according to claim 1 or 6, it is characterised in that:The vertical extension one is prolonged vertically with described Stretch three height be more than the described first vertical extension height so that the upper fastener and lower fastener clamp be fixed on respectively During two carriers, between the upper horizontal fastening part and second horizontal extension, and the lower horizontal fastener In the vertical direction is designed with being spaced between portion and second horizontal extension.
  8. 8. installation system according to claim 1, it is characterised in that:The vertical extension one extends three vertically with described Portion props up the right side wall in the vertically-mounted portion by the adhesive tape respectively.
  9. 9. installation system according to claim 8, it is characterised in that:The vertical extension one extends three vertically with described Adhesive tape mounting groove is designed with the left side wall in portion, the adhesive tape is arranged in the adhesive tape mounting groove.
  10. 10. installation system according to claim 1, it is characterised in that:Sequentially pass through institute from top to bottom provided with fixing bolt Fixed after stating lower horizontal fastening part and second horizontal extension.
CN201710704106.3A 2017-08-17 2017-08-17 A kind of installation system of dot point porcelain plate Pending CN107542240A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710704106.3A CN107542240A (en) 2017-08-17 2017-08-17 A kind of installation system of dot point porcelain plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710704106.3A CN107542240A (en) 2017-08-17 2017-08-17 A kind of installation system of dot point porcelain plate

Publications (1)

Publication Number Publication Date
CN107542240A true CN107542240A (en) 2018-01-05

Family

ID=60970839

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710704106.3A Pending CN107542240A (en) 2017-08-17 2017-08-17 A kind of installation system of dot point porcelain plate

Country Status (1)

Country Link
CN (1) CN107542240A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109386060A (en) * 2018-10-26 2019-02-26 中清大科技股份有限公司 The connection component and its assembly method of wallboard and structural body

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0860834A (en) * 1994-08-24 1996-03-05 Ig Tech Res Inc Water drip used as start member in common
CN202152494U (en) * 2011-07-01 2012-02-29 苏州金螳螂幕墙有限公司 Short-slot type dry hanging stone curtain wall
CN202866072U (en) * 2012-11-02 2013-04-10 上海江河幕墙系统工程有限公司 Slippage preventing back bolt dry hanging system
CN203531190U (en) * 2013-09-27 2014-04-09 北京磊鑫建筑工程有限公司 Anti-seismic aluminum alloy stone hanging part
CN203924573U (en) * 2014-04-28 2014-11-05 苏州美瑞德建筑装饰有限公司 Can regulate and control stone material dry suspending installation system
CN204199504U (en) * 2014-09-30 2015-03-11 苏州美瑞德建筑装饰有限公司 A kind of stone material dry suspending structure
CN206034834U (en) * 2016-08-12 2017-03-22 广州市米伽建筑材料科技有限公司 Component is hung futilely to outer wall fluting
CN106592838A (en) * 2017-01-25 2017-04-26 张建中 Back rib decorating plate dry hanging system

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0860834A (en) * 1994-08-24 1996-03-05 Ig Tech Res Inc Water drip used as start member in common
CN202152494U (en) * 2011-07-01 2012-02-29 苏州金螳螂幕墙有限公司 Short-slot type dry hanging stone curtain wall
CN202866072U (en) * 2012-11-02 2013-04-10 上海江河幕墙系统工程有限公司 Slippage preventing back bolt dry hanging system
CN203531190U (en) * 2013-09-27 2014-04-09 北京磊鑫建筑工程有限公司 Anti-seismic aluminum alloy stone hanging part
CN203924573U (en) * 2014-04-28 2014-11-05 苏州美瑞德建筑装饰有限公司 Can regulate and control stone material dry suspending installation system
CN204199504U (en) * 2014-09-30 2015-03-11 苏州美瑞德建筑装饰有限公司 A kind of stone material dry suspending structure
CN206034834U (en) * 2016-08-12 2017-03-22 广州市米伽建筑材料科技有限公司 Component is hung futilely to outer wall fluting
CN106592838A (en) * 2017-01-25 2017-04-26 张建中 Back rib decorating plate dry hanging system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109386060A (en) * 2018-10-26 2019-02-26 中清大科技股份有限公司 The connection component and its assembly method of wallboard and structural body
CN109386060B (en) * 2018-10-26 2024-04-09 中清大科技股份有限公司 Connecting assembly of wallboard and structural body and assembling method thereof

Similar Documents

Publication Publication Date Title
WO2006036998A3 (en) Overhead storage system
CN109487935A (en) A kind of Curtainwall connector
CN107542240A (en) A kind of installation system of dot point porcelain plate
WO2012041003A1 (en) Steam generator and assembly method thereof
WO2010062510A3 (en) Multi-circuit electrified ceiling grid
CN106499201A (en) A kind of dismountable safety rope tool-type holding clamp and its using method
CN207177174U (en) A kind of installation system of dot point porcelain plate
CN107461013A (en) A kind of dry-hanging component of dot point porcelain plate
CN205421890U (en) Die carrier bearing beam
CN207092460U (en) A kind of dry-hanging component of dot point porcelain plate
CN107700778A (en) A kind of dry-hanging component of groove formula porcelain plate
CN207896905U (en) A kind of connector for flat uniaxial photovoltaic bracket
CN206784725U (en) Large span assembled open-type builds bottom plate I-beam erection support and mounting assembly
CN214531447U (en) Ceiling mounting framework
CN208202294U (en) Furred ceiling conversion layer structure
CN107675853A (en) A kind of installation system of groove formula porcelain plate
CN103669658A (en) Replaceable back groove fixing type stone curtain wall
CN209511788U (en) Pendent lamp mounting structure
CN207006599U (en) A kind of balcony solar water container suspension arrangement
CN209723360U (en) A kind of suspension and support fixed structure for steel construction flange plate
CN206888312U (en) Assembled open-type builds the general erection support and mounting assembly of bottom plate
CN207772861U (en) A kind of engine drawing device of easy access
CN205976115U (en) Novel outer hanging curtain
CN201635228U (en) Novel flash rack ceiling system
CN107675854A (en) A kind of dry-hanging component of back-trough formula porcelain plate

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180105