CN107524156A - A kind of cup column foundation core anti-float method - Google Patents

A kind of cup column foundation core anti-float method Download PDF

Info

Publication number
CN107524156A
CN107524156A CN201610441182.5A CN201610441182A CN107524156A CN 107524156 A CN107524156 A CN 107524156A CN 201610441182 A CN201610441182 A CN 201610441182A CN 107524156 A CN107524156 A CN 107524156A
Authority
CN
China
Prior art keywords
cup
rim
column foundation
float
depression bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610441182.5A
Other languages
Chinese (zh)
Other versions
CN107524156B (en
Inventor
邱战武
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC5 Group Shanghai Corp Ltd
Original Assignee
MCC5 Group Shanghai Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC5 Group Shanghai Corp Ltd filed Critical MCC5 Group Shanghai Corp Ltd
Priority to CN201610441182.5A priority Critical patent/CN107524156B/en
Publication of CN107524156A publication Critical patent/CN107524156A/en
Application granted granted Critical
Publication of CN107524156B publication Critical patent/CN107524156B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/10Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against soil pressure or hydraulic pressure
    • E02D31/12Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against soil pressure or hydraulic pressure against upward hydraulic pressure

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • Foundations (AREA)

Abstract

A kind of cup column foundation core anti-float method, it is characterised in that comprise the following steps:A, stay and set tension rib(6), b, weld bolt head, c, installation depression bar, d, pour rim of a cup post concrete:After the completion of above-mentioned steps a c work, rim of a cup base concrete is poured, cup column foundation core is in tension rib(6)Pulling force and depression bar pressure under will not float, form a kind of float Structure, do not changed with ensureing that rim of a cup lower concrete pours absolute altitude.The cup column foundation core anti-float method of the present invention has does tension rib using rim of a cup muscle, using to pull bar group tension rib thread head, depression bar is made using steel pipe, using 3 type cards and fixation is tightened to rod nut, material local use, it is operable without professional, utilizes anti-floating body, it is possible to reduce unnecessary dabbing processing, avoid secondary cleaning work, production efficiency is improved, saves construction cost, the advantages of being guaranteed with installation accuracy simple to operate.

Description

A kind of cup column foundation core anti-float method
Technical field
Basic core anti-float method in being constructed the present invention relates to a kind of civil engineering structure, is a kind of cup column foundation core anti-float method specifically.
Background technology
In building engineering construction; frequently encounter cup column foundation; particularly in industrial factory building, factory building is more from rim of a cup base for post, when rim of a cup base for post is constructed; rim of a cup core can when rim of a cup base concrete pours because of coagulation earth lateral pressure and caused by float; cause rim of a cup elevation of bottom higher than design requirement, and the installation of factory building columns can not be met, it is necessary to cut processing; it is time consuming, influence installation quality.
Therefore known cup column foundation core form of construction work there are problems that above-mentioned a variety of inconvenience and.
The content of the invention
The purpose of the present invention, it is to propose a kind of safe and reliable cup column foundation core anti-float method.
To achieve the above object, technical solution of the invention is:
A kind of cup column foundation core anti-float method, it is characterised in that comprise the following steps:
A, stay and set tension rib:In column foundation cushion cap reinforcement installation, the side sideline center of corresponding base for post rim of a cup, which is respectively stayed, to be set one and gos deep into column foundation cushion cap with base for post rim of a cup reinforcing bar same specification and the steel tie of size, one end of steel tie, and the other end flushes with rim of a cup foundation forms and back of the body side;
B, weld bolt head:After column foundation cushion cap concreting, rim of a cup reinforcement foundation is installed, rim of a cup core and back of the body side is installed, one section of Screw arbor with nut at both-ends is respectively welded and fixed on the top of two tension ribs;
Depression bar is installed c,:It is pressed in using two steel pipes as depression bar on rim of a cup core and back of the body side, and is placed on the both sides of Screw arbor with nut at both-ends, both ends is withheld into two steel pipes using 3 types, and tightened on Screw arbor with nut at both-ends with nut and fix 3 type cards;
D, rim of a cup post concrete is poured:After the completion of above-mentioned steps a-c work, rim of a cup base concrete is poured, cup column foundation core will not float under the pulling force of tension rib and the pressure of depression bar, form a kind of float Structure, not changed to ensure that rim of a cup lower concrete pours absolute altitude.
The cup column foundation core anti-float method of the present invention can also be further achieved by the following technical measures.
Foregoing method, wherein the Screw arbor with nut at both-ends is long 200mm full flight screw.
Foregoing method, wherein the steel pipe is scaffolding steel pipe.
After adopting the above technical scheme, the cup column foundation core anti-float method of the present invention has advantages below:
1st, tension rib is done using rim of a cup muscle, using to pull bar group tension rib thread head, makees depression bar using steel pipe, fixation is tightened using 3 type cards and to rod nut, material local use, is operable without professional;
2nd, anti-floating body is utilized, it is possible to reduce unnecessary dabbing processing, avoid secondary cleaning work, improve production efficiency, save construction cost;
3rd, simple to operate, installation accuracy is guaranteed.
Brief description of the drawings
Fig. 1 is the cup column foundation core anti-floating schematic diagram of the embodiment of the present invention;
Fig. 2 is A-A sectional views in Fig. 1;
Fig. 3 is P positions enlarged drawing in Fig. 1.
In figure:1 base for post rim of a cup, 2 steel pipes, 3 rim of a cup cores and back of the body side, 4 column foundation cushion caps, 5 rim of a cup foundation forms and back of the body side, 6 tension ribs, 7 Screw arbor with nut at both-ends, 8 cores, 9 nuts, 103 type cards.
Embodiment
With reference to embodiments and its accompanying drawing illustrates further to the present invention.
Embodiment 1
The kind cup column foundation core anti-float method of the present invention, comprises the following steps:
Referring now to Fig. 1-Fig. 3, Fig. 1 is the cup column foundation core anti-floating schematic diagram of the embodiment of the present invention, and Fig. 2 is A-A sectional views in Fig. 1, and Fig. 3 is P positions enlarged drawing in Fig. 1.A, stay and set tension rib 6:In column foundation 4 reinforcement installation of cushion cap, the side sideline center of corresponding base for post rim of a cup 1, which is respectively stayed, sets one with base for post rim of a cup reinforcing bar same specification and the steel tie 6 of size.
B, weld bolt head:After column foundation cushion cap concreting, rim of a cup reinforcement foundation is installed, installs rim of a cup core and rim of a cup side form, one section of Screw arbor with nut at both-ends 7 for being provided with the long full threads of 200mm is respectively welded and fixed on the top of two tension ribs 6.
Depression bar is installed c,:It is pressed in two steel pipes 2 as depression bar on rim of a cup core and back of the body side 3, and is placed on the both sides of Screw arbor with nut at both-ends 7, both ends is clasped into two steel pipes 2 using 3 type cards 10, and tightened on Screw arbor with nut at both-ends 7 with nut 9 and fix 3 type cards;
D, rim of a cup post concrete is poured:After the completion of above-mentioned steps a-c work, rim of a cup base concrete is poured, cup column foundation core will not float under the pulling force of tension rib 6 and the pressure of depression bar, form a kind of float Structure, not changed to ensure that rim of a cup lower concrete pours absolute altitude.The steel pipe 2 is scaffolding steel pipe.
The present invention has substantive distinguishing features and significant technological progress, cup column foundation core anti-float method of the invention, using tension rib and depression bar is set on rim of a cup core, forms a kind of anti-floating body, ensures that core is non-rising when rim of a cup base concrete pours.The cup column foundation core anti-float method of the present invention is more easy to ensure the precision of rim of a cup bottom absolute altitude than cutting processing method behind traditional rim of a cup bottom, it not only reliably ensure that the installation requirement of factory building columns, also reduce construction cost simultaneously, the construction period is saved, being particularly in architectural engineering in industrial building construction of hydropower has general applicability and typicalness.
Used in cup column foundation core anti-float method Baosteel Zhanjiang steel cold rolling engineering of the present invention, finished product reservoir area, the main buildings such as electrical sheet area are both designed as cup column foundation, quantities is big, quantity is more, require high plus Baosteel construction quality, if conventional treatment method is taken to cup column foundation, duration and installation quality requirement can not be met, live material is utilized through researching and analysing, using reinforcing bar, to drawhead, 3 type cards, to rod nut, a kind of simple anti-floating body of the combination settings such as scaffolding steel pipe, ensure that the bottom absolute altitude one-shot forming on rim of a cup basis meets design requirement, ensure factory building columns installation quality.This method not only reliably ensure that installation quality, while also reduce construction cost, save the construction period.
Above example is used for illustrative purposes only, rather than limitation of the present invention, person skilled in the relevant technique, without departing from the spirit and scope of the present invention, can also make various conversion or change.Therefore, all equivalent technical schemes should also belong to scope of the invention, should be limited by each claim.

Claims (3)

1. a kind of cup column foundation core anti-float method, it is characterised in that comprise the following steps:
A, stay and set tension rib(6):In column foundation cushion cap(4)During reinforcement installation, corresponding base for post rim of a cup(1)Side sideline center respectively stay and set one with base for post rim of a cup reinforcing bar same specification and the steel tie of size(6), column foundation cushion cap is goed deep into one end of steel tie(4), the other end and rim of a cup foundation forms and back of the body side(5)Flush;
B, weld bolt head:After column foundation cushion cap concreting, rim of a cup reinforcement foundation is installed, installs rim of a cup core and back of the body side(3), in two tension ribs(6)Top be respectively welded and fixed one section of Screw arbor with nut at both-ends(7);
Depression bar is installed c,:By two steel pipes(2)Rim of a cup core and back of the body side are pressed in as depression bar(3)On, and it is placed on Screw arbor with nut at both-ends(7)Both sides, both ends are used into 3 type cards(10)Clasp two steel pipes(2), and in Screw arbor with nut at both-ends(7)On use nut(9)Tighten and fix 3 type cards;
D, rim of a cup post concrete is poured:After the completion of above-mentioned steps a-c work, rim of a cup base concrete is poured, cup column foundation core is in tension rib(6)Pulling force and depression bar pressure under will not float, form a kind of float Structure, do not changed with ensureing that rim of a cup lower concrete pours absolute altitude.
2. cup column foundation core anti-float method as claimed in claim 1, it is characterised in that the Screw arbor with nut at both-ends(7)For long 200mm full flight screw.
3. cup column foundation core anti-float method as claimed in claim 1, it is characterised in that the steel pipe(2)For scaffolding steel pipe.
CN201610441182.5A 2016-06-20 2016-06-20 A kind of cup column foundation core model anti-float method Active CN107524156B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610441182.5A CN107524156B (en) 2016-06-20 2016-06-20 A kind of cup column foundation core model anti-float method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610441182.5A CN107524156B (en) 2016-06-20 2016-06-20 A kind of cup column foundation core model anti-float method

Publications (2)

Publication Number Publication Date
CN107524156A true CN107524156A (en) 2017-12-29
CN107524156B CN107524156B (en) 2019-06-14

Family

ID=60734341

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610441182.5A Active CN107524156B (en) 2016-06-20 2016-06-20 A kind of cup column foundation core model anti-float method

Country Status (1)

Country Link
CN (1) CN107524156B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108842799A (en) * 2018-06-26 2018-11-20 五冶集团上海有限公司 A kind of large size rim of a cup basis internal model board setting method
CN109339089A (en) * 2018-09-19 2019-02-15 中铁十六局集团城市建设发展有限公司 A kind of rim of a cup isolated footing cup core forming method
CN109778899A (en) * 2019-03-23 2019-05-21 中国二十二冶集团有限公司 Column foundation cup mouth core model anti-floating system and construction method
CN109797770A (en) * 2019-01-04 2019-05-24 中国华冶科工集团有限公司 A kind of independent rim of a cup foundation construction bracing means and reinforcement means
CN113073676A (en) * 2021-04-25 2021-07-06 中国十九冶集团有限公司 Formwork system for inverted-circular-truncated-cone-shaped cup opening of steel structure factory building column base and construction method
CN114016533A (en) * 2021-10-25 2022-02-08 中国建筑第五工程局有限公司 Construction structure and construction method of large-section bearing platform deep cup foundation
CN115592801A (en) * 2022-10-17 2023-01-13 广东预立预制构件有限公司(Cn) Pouring structure of precast concrete wall with door and window structure and pouring method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201730327U (en) * 2010-07-30 2011-02-02 中冶天工建设有限公司 Plug-type plinth round platform-shaped cup rabbet inner supporting die
CN202672733U (en) * 2012-08-01 2013-01-16 中天建设集团有限公司 Removable type waterproof screw for template engineering
CN103174156A (en) * 2013-04-10 2013-06-26 大连宜华建设集团有限公司 Independent basic construction inner template device with cup opening smaller than 600*600 mm<2> and construction method thereof
CN103174176A (en) * 2011-12-26 2013-06-26 贵阳铝镁设计研究院有限公司 Heightening method and structure of high cup opening prefabricated column foundation cup opening

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201730327U (en) * 2010-07-30 2011-02-02 中冶天工建设有限公司 Plug-type plinth round platform-shaped cup rabbet inner supporting die
CN103174176A (en) * 2011-12-26 2013-06-26 贵阳铝镁设计研究院有限公司 Heightening method and structure of high cup opening prefabricated column foundation cup opening
CN202672733U (en) * 2012-08-01 2013-01-16 中天建设集团有限公司 Removable type waterproof screw for template engineering
CN103174156A (en) * 2013-04-10 2013-06-26 大连宜华建设集团有限公司 Independent basic construction inner template device with cup opening smaller than 600*600 mm<2> and construction method thereof

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108842799A (en) * 2018-06-26 2018-11-20 五冶集团上海有限公司 A kind of large size rim of a cup basis internal model board setting method
CN109339089A (en) * 2018-09-19 2019-02-15 中铁十六局集团城市建设发展有限公司 A kind of rim of a cup isolated footing cup core forming method
CN109797770A (en) * 2019-01-04 2019-05-24 中国华冶科工集团有限公司 A kind of independent rim of a cup foundation construction bracing means and reinforcement means
CN109778899A (en) * 2019-03-23 2019-05-21 中国二十二冶集团有限公司 Column foundation cup mouth core model anti-floating system and construction method
CN113073676A (en) * 2021-04-25 2021-07-06 中国十九冶集团有限公司 Formwork system for inverted-circular-truncated-cone-shaped cup opening of steel structure factory building column base and construction method
CN114016533A (en) * 2021-10-25 2022-02-08 中国建筑第五工程局有限公司 Construction structure and construction method of large-section bearing platform deep cup foundation
CN115592801A (en) * 2022-10-17 2023-01-13 广东预立预制构件有限公司(Cn) Pouring structure of precast concrete wall with door and window structure and pouring method thereof

Also Published As

Publication number Publication date
CN107524156B (en) 2019-06-14

Similar Documents

Publication Publication Date Title
CN107524156A (en) A kind of cup column foundation core anti-float method
CN105464382A (en) Building block and constructional column integrated construction method and constructional column formwork building block
CN203096942U (en) Pre-cast nut for fabricated structure
CN102071747A (en) Joint of square steel tube concrete column and reinforced concrete floor and production method thereof
CN103568109A (en) Hole forming method of precast concrete hollow component
CN105666688A (en) Precast pile, pile body and production method
CN104563103A (en) Composite-reinforcement partially-prestressed concrete solid square pile and production method thereof
CN202416260U (en) Transverse prestressed reinforced structure of concrete aqueduct
CN204343677U (en) Detachable sleeve pipe die with reserved holes in construction site
CN203626104U (en) LPM hollow die construction anti-floating structure
CN203230178U (en) Column formwork and column hoop
CN105604339B (en) Secondary structure constructs column reinforcing method
CN104563496A (en) Construction structure of cylindrical die
CN206800981U (en) A kind of detachable builder&#39;s jack retainer ring
CN203876019U (en) Pore-forming member manufacturing preformed hole of precast concrete component
CN104908150B (en) A kind of piping shaft making template and the method based on factorial praluction piping shaft
CN204530749U (en) A kind of fixed structure of power press with fixed bed base
CN207620379U (en) A kind of side mould fixing device
CN204676748U (en) A kind of novel positioning anchor firmware
CN107327066A (en) The structure constrained for honeycomb core anti-floating
CN206503377U (en) A kind of movable railing of steel trestle
CN102220808A (en) Beam lowering construction method of frame structure
CN205421891U (en) Builder&#39;s jack back seat U type embedded ring
CN204326495U (en) A kind of structure of tool-type anchored end of Overhanging Outside Scaffold section steel beam
CN203531252U (en) Positioning bar for fixing main bars of frame column

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant