CN107520483B - Drilling equipment is used in a kind of installation of building monitoring instrument - Google Patents

Drilling equipment is used in a kind of installation of building monitoring instrument Download PDF

Info

Publication number
CN107520483B
CN107520483B CN201710724522.XA CN201710724522A CN107520483B CN 107520483 B CN107520483 B CN 107520483B CN 201710724522 A CN201710724522 A CN 201710724522A CN 107520483 B CN107520483 B CN 107520483B
Authority
CN
China
Prior art keywords
shell
motor
rack gear
hole
gear
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710724522.XA
Other languages
Chinese (zh)
Other versions
CN107520483A (en
Inventor
查宇
刘红玉
张好
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuzhou rongchuangda Electronic Technology Co., Ltd
Original Assignee
Jiangsu Shifeng Enterprise Management Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Shifeng Enterprise Management Consulting Co Ltd filed Critical Jiangsu Shifeng Enterprise Management Consulting Co Ltd
Priority to CN201710724522.XA priority Critical patent/CN107520483B/en
Publication of CN107520483A publication Critical patent/CN107520483A/en
Application granted granted Critical
Publication of CN107520483B publication Critical patent/CN107520483B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25HWORKSHOP EQUIPMENT, e.g. FOR MARKING-OUT WORK; STORAGE MEANS FOR WORKSHOPS
    • B25H1/00Work benches; Portable stands or supports for positioning portable tools or work to be operated on thereby
    • B25H1/0021Stands, supports or guiding devices for positioning portable tools or for securing them to the work
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23BTURNING; BORING
    • B23B45/00Hand-held or like portable drilling machines, e.g. drill guns; Equipment therefor
    • B23B45/02Hand-held or like portable drilling machines, e.g. drill guns; Equipment therefor driven by electric power
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23BTURNING; BORING
    • B23B47/00Constructional features of components specially designed for boring or drilling machines; Accessories therefor

Abstract

The present invention relates to a kind of drilling equipments more particularly to a kind of installation of building monitoring instrument to use drilling equipment.The technical problem to be solved in the present invention is to provide a kind of building monitoring instrument installation drilling equipments.In order to solve the above-mentioned technical problems, the present invention provides such a building monitoring instrument installation drilling equipments, include shell etc.;It is equipped with the first in command among shell right wall, first through hole is provided among shell left wall, pushing mechanism is equipped in shell, shell left wall is equipped with perforating mechanism.Invention achieves the effects of safety relatively more steady when can freely adjust height and drilling.

Description

Drilling equipment is used in a kind of installation of building monitoring instrument
Technical field
The present invention relates to a kind of drilling equipments more particularly to a kind of installation of building monitoring instrument to use drilling equipment.
Background technique
Monitoring system is using most one of systems in security system, and the building site being more suitble on the market now monitors system System is handheld video communication equipment, and video monitoring is mainstream now.From earliest simulation monitoring to burning hot digital supervision a few years ago Network Video Surveillance in the ascendant till now again, has occurred earth-shaking variation.From the technical point of view, video monitoring system is sent out Exhibition is divided into first generation analog video monitoring system, " PC+ multimedia card " digital video monitor system is based on to the second generation, to the Three generations is based entirely on IP network video monitoring system.
Installation is exactly that mechanical or equipment is fixed on certain position according to certain program, specification.
Drilling refers to the operation processed and portalled on solid material with drill bit.
Nowadays, the most used drilling equipment usually requires to grasp drilling, very inconvenient, even if using solid The drilling equipment set still remains device vibration amplitude larger not stable enough safety when cannot freely adjust height and drilling The shortcomings that, therefore need to research and develop one kind relatively more steady safety building monitoring instrument installation when can freely adjust height and drilling and use Drilling equipment.
Summary of the invention
(1) technical problems to be solved
Device vibration width when the present invention cannot freely adjust height and drilling to overcome existing drilling equipment to exist Larger not stable enough safe disadvantage is spent, the technical problem to be solved in the present invention is to provide a kind of building monitoring instruments to install with brill Aperture apparatus.
(2) technical solution
In order to solve the above-mentioned technical problems, the present invention provides such a building monitoring instrument installation drilling equipment, Include shell, the first in command, pushing mechanism and perforating mechanism, be equipped with the first in command among shell right wall, among shell left wall It is provided with first through hole, pushing mechanism is equipped in shell, shell left wall is equipped with perforating mechanism.
Preferably, pushing mechanism includes the first sliding rail, the first sliding block, the first rack gear, strut, first motor and the first tooth It takes turns, bottom is equipped with the first sliding rail in shell, and slidingtype is connected with the first sliding block on the first sliding rail, and the first slider top is equipped with first Rack gear, the first rack gear pass through first through hole, and shell inner right wall is equipped with strut, and strut left end is equipped with first motor, and first motor is defeated Shaft is equipped with first gear, and first gear is engaged with the first rack gear.
Preferably, perforating mechanism includes movable plate, guide rod, fixed block, the second motor, shaft and drill bit, the first rack gear Left end is equipped with movable plate, pilot hole is provided on movable plate, two sides are symmetrically arranged with guide rod to shell left wall up and down, and guide rod passes through guiding Hole, guide rod left end are equipped with fixed block, the second motor are equipped among movable plate left wall, shaft are connected on the second motor, shaft is left End is equipped with drill bit.
Preferably, further include first support, bottom plate and wheel, be equipped with first support among outer casing bottom, under first support End is equipped with bottom plate, is symmetrically arranged with wheel at left and right sides of bottom base plate.
It preferably, further include having the first hollow cylinder, the first contact plate, the first elastic component, the second contact plate and the second elasticity Part, periphery is equipped with the second elastic component on guide rod, and the second elastic component right end is connect with movable plate, and the second elastic component left end is connected with the One hollow cylinder, the first hollow cylinder right wall are provided with the second through-hole, and guide rod passes through the second through-hole, and guide rod left end is equipped with the first contact plate, First hollow cylinder inner left wall is equipped with the first elastic component, and the first elastic component right end is connected with the second contact plate, the first contact plate and the Two contact plates are corresponding.
Preferably, further include have second support, the second hollow cylinder, the second sliding rail, the second sliding block, the second rack gear, support plate, Third motor, second gear and third bracket, are equipped with second support at the top of bottom plate, and outer casing bottom is equipped with third bracket, and second Frame and third stent outer are cased with the first hollow cylinder, and two walls have fourth hole and third through-hole to the first hollow cylinder up and down, Second support passes through third through-hole, and third bracket passes through fourth hole, and left and right wall is equipped with the second sliding rail in the first hollow cylinder, the Slidingtype is connected with the second sliding block on the inside of two sliding rails, and second support top and third frame bottom are equipped with support plate, support plate It is equipped with the second rack gear, the second rack gear is connect with the second sliding block, and rear wall is equipped with third motor in the first hollow cylinder, and third motor is defeated Shaft is equipped with second gear, and between the second rack gear, second gear engages second gear with the second rack gear.
It preferably, further include having cabinet, case lid and second handle, bottom plate top right side is equipped with cabinet, and cabinet is located at first On the right side of hollow cylinder, top of the box rotary type is connected with case lid, and case lid top center is equipped with second handle.
Preferably, the material of drill bit is steel alloy.
Preferably, the material of shell is stainless steel.
Working principle: when needing to construction and installation monitoring instrument, the first in command is grasped, drilling equipment level is taken Get up, the position for needing to punch on perforating mechanism alignment wall, and is contacted with wall, then start pushing mechanism and puncher Structure, pushing mechanism and perforating mechanism instrument are used cooperatively, and after hole is drilled, starting pushing mechanism exits wall, close perforating mechanism, Drilling equipment is horizontally arranged.
Because pushing mechanism includes the first sliding rail, the first sliding block, the first rack gear, strut, first motor and first gear, Bottom is equipped with the first sliding rail in shell, and slidingtype is connected with the first sliding block on the first sliding rail, and the first slider top is equipped with the first tooth Item, the first rack gear pass through first through hole, and shell inner right wall is equipped with strut, and strut left end is equipped with first motor, first motor output Axis is equipped with first gear, and first gear engages with the first rack gear, so when needing to construction and installation monitoring instrument, starts the One motor rotates clockwise, and motor drives the first rack gear to be moved to the left, while the first sliding block being driven to be moved to the left, and thus pushes and beats Holes mechanism moves downward, and auxiliary perforating mechanism is punched, and after hole is accomplished fluently, starting first motor is rotated counterclockwise, it is possible thereby to So that the first rack gear moves right, perforating mechanism is driven to reset, after the first rack gear retracts original position, closes first motor.
Because perforating mechanism includes movable plate, guide rod, fixed block, the second motor, shaft and drill bit, the first rack gear left end Equipped with movable plate, pilot hole is provided on movable plate, two sides are symmetrically arranged with guide rod to shell left wall up and down, and guide rod passes through pilot hole, leads Bar left end is equipped with fixed block, and the second motor is equipped among movable plate left wall, is connected with shaft on the second motor, shaft left end is equipped with Drill bit, so starting pushing mechanism when needing to drill hole on wall, pushing mechanism is moved to the left movable plate, and guide rod has Guiding role, bit inclination when preventing from drilling start the second motor, and the second motor drives drill bit rotation, it is possible thereby to wall Punching after hole is drilled, closes the second motor, starting pushing mechanism drives movable plate to move right, so that movable plate is moved to original The position come.
Because further including having first support, bottom plate and wheel, first support, first support lower end are equipped among outer casing bottom Equipped with bottom plate, it is symmetrically arranged with wheel at left and right sides of bottom base plate, so pushing drilling when needing to construction and installation monitoring instrument Under device to the building for needing to install monitoring instrument, after placing, worker can carry out drilling operation.
Because further including having the first hollow cylinder, the first contact plate, the first elastic component, the second contact plate and the second elastic component, Periphery is equipped with the second elastic component on guide rod, and the second elastic component right end is connect with movable plate, and the second elastic component left end is connected with first Hollow cylinder, the first hollow cylinder right wall are provided with the second through-hole, and guide rod passes through the second through-hole, and guide rod left end is equipped with the first contact plate, the One hollow cylinder inner left wall is equipped with the first elastic component, and the first elastic component right end is connected with the second contact plate, the first contact plate and second Contact plate is corresponding, so when carrying out drilling operation to wall, the first contact plate and the contact of the second contact plate, the first elastic component with Second elastic component is shunk, and the first elastic component and the second elastic component have buffer function, and bring shakes when can reduce drilling, is made Device is more stable when must drill.
Because further including having second support, the second hollow cylinder, the second sliding rail, the second sliding block, the second rack gear, support plate, Three motors, second gear and third bracket, bottom plate top are equipped with second support, and outer casing bottom is equipped with third bracket, second support It is cased with the first hollow cylinder with third stent outer, two walls have fourth hole and third through-hole to the first hollow cylinder up and down, the Two brackets pass through third through-hole, and third bracket passes through fourth hole, and left and right wall is equipped with the second sliding rail in the first hollow cylinder, and second Slidingtype is connected with the second sliding block on the inside of sliding rail, and at the top of second support and third frame bottom is equipped with support plate, in support plate Equipped with the second rack gear, the second rack gear is connect with the second sliding block, and rear wall is equipped with third motor, the output of third motor in the first hollow cylinder Axis is equipped with second gear, and between the second rack gear, second gear engages second gear with the second rack gear, so when needing to pacify When filling monitoring instrument, starting third motor is rotated counterclockwise, and drives the second rack gear of right to move upwards, the second rack gear of left It moves downward, so that third bracket rises, it is possible thereby to rise shell, drills convenient for the building to eminence, drill After, starting third motor rotates clockwise, so that the second rack gear retracts origin-location, closes third motor.
Because further including having cabinet, case lid and second handle, bottom plate top right side is equipped with cabinet, and it is hollow that cabinet is located at first Cylinder right side, top of the box rotary type are connected with case lid, and case lid top center is equipped with second handle, so when auxiliary tool is more When, case lid can be opened, tool is put into cabinet, people is facilitated to carry, while also can protect tool.
Because the material of drill bit be steel alloy, steel alloy have high intensity, high tenacity, wear-resisting, high temperature resistant, etc. particularity Can, the service life of drill bit can be extended.
Because the material of shell is stainless steel, stainless steel has rustless property, it is possible to prevent shell from getting rusty, extend and use Time.
Control mode of the invention is automatically controlled by controller, the skill that the control circuit of controller passes through this field Art personnel's simple programming can be realized, and belong to the common knowledge of this field, and the present invention is mainly used to protect mechanical device, institute Control mode and circuit connection are not explained with the present invention.
(3) beneficial effect
Invention achieves the effect of safety relatively more steady when can freely adjust height and drilling, wheel can be convenient shifting Dynamic drilling equipment, the second rack gear and second gear are used cooperatively, and drilling equipment is raised and reduced, convenient for different height The building of degree drills, and it further includes having guide rod that the first elastic component and the second elastic component, which play buffer function in drilling, can be with So that boring procedure is more stable.
Detailed description of the invention
Fig. 1 is the first schematic view of the front view of the invention.
Fig. 2 is the schematic view of the front view of pushing meanss of the present invention.
Fig. 3 is the schematic view of the front view of perforating device of the present invention.
Fig. 4 is second of schematic view of the front view of the invention.
Fig. 5 is the first part schematic view of the front view of the invention.
Fig. 6 is second of part schematic view of the front view of the invention.
Fig. 7 is the third part schematic view of the front view of the invention.
The label in accompanying drawing is: 1- shell, the 2- first in command, 3- first through hole, 4- pushing mechanism, the first sliding rail of 40-, The first sliding block of 41-, the first rack gear of 42-, 43- strut, 44- first motor, 45- first gear, 5- perforating mechanism, 50- movable plate, 51- pilot hole, 52- guide rod, 53- fixed block, the second motor of 54-, 55- shaft, 56- drill bit, 6- first support, 7- bottom plate, 8- Wheel, the first hollow cylinder of 9-, the second through-hole of 10-, the first contact plate of 11-, the first elastic component of 12-, the second contact plate of 13-, 14- Two elastic components, 15- second support, the second hollow cylinder of 16-, 17- third through-hole, the second sliding rail of 18-, the second sliding block of 19-, 20- Two rack gears, 21- support plate, 22- third motor, 23- second gear, 24- third bracket, 25- fourth hole, 26- cabinet, 27- Case lid, 28- second handle.
Specific embodiment
The present invention is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1
A kind of building monitoring instrument installation drilling equipment includes shell 1, the first in command 2, pushes as shown in figs. 1-7 Mechanism 4 and perforating mechanism 5,1 right wall of shell centre are equipped with the first in command 2, are provided with first through hole 3, shell 1 among 1 left wall of shell Interior to be equipped with pushing mechanism 4,1 left wall of shell is equipped with perforating mechanism 5.
Embodiment 2
A kind of building monitoring instrument installation drilling equipment includes shell 1, the first in command 2, pushes as shown in figs. 1-7 Mechanism 4 and perforating mechanism 5,1 right wall of shell centre are equipped with the first in command 2, are provided with first through hole 3, shell 1 among 1 left wall of shell Interior to be equipped with pushing mechanism 4,1 left wall of shell is equipped with perforating mechanism 5.
Pushing mechanism 4 includes the first sliding rail 40, the first sliding block 41, the first rack gear 42, strut 43, first motor 44 and One gear 45, bottom is equipped with the first sliding rail 40 in shell 1, and slidingtype is connected with the first sliding block 41 on the first sliding rail 40, and first is sliding The first rack gear 42 is equipped at the top of block 41, the first rack gear 42 passes through first through hole 3, and 1 inner right wall of shell is equipped with strut 43, and strut 43 is left End is equipped with first motor 44, and 44 output shaft of first motor is equipped with first gear 45, and first gear 45 is engaged with the first rack gear 42.
Embodiment 3
A kind of building monitoring instrument installation drilling equipment includes shell 1, the first in command 2, pushes as shown in figs. 1-7 Mechanism 4 and perforating mechanism 5,1 right wall of shell centre are equipped with the first in command 2, are provided with first through hole 3, shell 1 among 1 left wall of shell Interior to be equipped with pushing mechanism 4,1 left wall of shell is equipped with perforating mechanism 5.
Pushing mechanism 4 includes the first sliding rail 40, the first sliding block 41, the first rack gear 42, strut 43, first motor 44 and One gear 45, bottom is equipped with the first sliding rail 40 in shell 1, and slidingtype is connected with the first sliding block 41 on the first sliding rail 40, and first is sliding The first rack gear 42 is equipped at the top of block 41, the first rack gear 42 passes through first through hole 3, and 1 inner right wall of shell is equipped with strut 43, and strut 43 is left End is equipped with first motor 44, and 44 output shaft of first motor is equipped with first gear 45, and first gear 45 is engaged with the first rack gear 42.
Perforating mechanism 5 includes movable plate 50, guide rod 52, fixed block 53, the second motor 54, shaft 55 and drill bit 56, and One rack gear, 42 left end is equipped with movable plate 50, and pilot hole 51 is provided on movable plate 50, and 1 left wall of shell is symmetrically arranged with guide rod in two sides up and down 52, guide rod 52 passes through pilot hole 51, and 52 left end of guide rod is equipped with fixed block 53, is equipped with the second motor 54 among 50 left wall of movable plate, Shaft 55 is connected on second motor 54,55 left end of shaft is equipped with drill bit 56.
Embodiment 4
A kind of building monitoring instrument installation drilling equipment includes shell 1, the first in command 2, pushes as shown in figs. 1-7 Mechanism 4 and perforating mechanism 5,1 right wall of shell centre are equipped with the first in command 2, are provided with first through hole 3, shell 1 among 1 left wall of shell Interior to be equipped with pushing mechanism 4,1 left wall of shell is equipped with perforating mechanism 5.
Pushing mechanism 4 includes the first sliding rail 40, the first sliding block 41, the first rack gear 42, strut 43, first motor 44 and One gear 45, bottom is equipped with the first sliding rail 40 in shell 1, and slidingtype is connected with the first sliding block 41 on the first sliding rail 40, and first is sliding The first rack gear 42 is equipped at the top of block 41, the first rack gear 42 passes through first through hole 3, and 1 inner right wall of shell is equipped with strut 43, and strut 43 is left End is equipped with first motor 44, and 44 output shaft of first motor is equipped with first gear 45, and first gear 45 is engaged with the first rack gear 42.
Perforating mechanism 5 includes movable plate 50, guide rod 52, fixed block 53, the second motor 54, shaft 55 and drill bit 56, and One rack gear, 42 left end is equipped with movable plate 50, and pilot hole 51 is provided on movable plate 50, and 1 left wall of shell is symmetrically arranged with guide rod in two sides up and down 52, guide rod 52 passes through pilot hole 51, and 52 left end of guide rod is equipped with fixed block 53, is equipped with the second motor 54 among 50 left wall of movable plate, Shaft 55 is connected on second motor 54,55 left end of shaft is equipped with drill bit 56.
Further include first support 6, bottom plate 7 and wheel 8, is equipped with first support 6,6 lower end of first support among 1 bottom of shell Equipped with bottom plate 7, wheel 8 is symmetrically arranged at left and right sides of 7 bottom of bottom plate.
It further include having the first hollow cylinder 9, the first contact plate 11, the first elastic component 12, the second contact plate 13 and the second elasticity Part 14, periphery is equipped with the second elastic component 14 on guide rod 52, and 14 right end of the second elastic component is connect with movable plate 50, the second elastic component 14 Left end is connected with the first hollow cylinder 9, and 9 right wall of the first hollow cylinder is provided with the second through-hole 10, and guide rod 52 passes through the second through-hole 10, guide rod 52 left ends are equipped with the first contact plate 11, and 9 inner left wall of the first hollow cylinder is equipped with the first elastic component 12, the connection of 12 right end of the first elastic component There is the second contact plate 13, the first contact plate 11 is corresponding with the second contact plate 13.
It further include having second support 15, the second hollow cylinder 16, the second sliding rail 18, the second sliding block 19, the second rack gear 20, support Plate 21, third motor 22, second gear 23 and third bracket 24 are equipped with second support 15 at the top of bottom plate 7, and 1 bottom of shell is equipped with The first hollow cylinder 9, about 9 two wall of the first hollow cylinder difference are cased on the outside of third bracket 24, second support 15 and third bracket 24 It is provided with fourth hole 25 and third through-hole 17, second support 15 passes through third through-hole 17, and third bracket 24 passes through fourth hole 25, Left and right wall is equipped with the second sliding rail 18 in first hollow cylinder 9, and 18 inside slidingtype of the second sliding rail is connected with the second sliding block 19, and second 15 top of bracket and 24 bottom of third bracket are equipped with support plate 21, and support plate 21 is equipped with the second rack gear 20, the second rack gear 20 It is connect with the second sliding block 19, rear wall is equipped with third motor 22 in the first hollow cylinder 9, and 22 output shaft of third motor is equipped with the second tooth Wheel 23, between the second rack gear 20, second gear 23 engages second gear 23 with the second rack gear 20.
It further include having cabinet 26, case lid 27 and second handle 28,7 top right side of bottom plate is equipped with cabinet 26, and cabinet 26 is located at First hollow cylinder, 9 right side, 26 top rotary type of cabinet are connected with case lid 27, and 27 top center of case lid is equipped with second handle 28.
The material of drill bit 56 is steel alloy.
The material of shell 1 is stainless steel.
Working principle: when needing to construction and installation monitoring instrument, grasping the first in command 2, drilling equipment level It takes up, perforating mechanism 5 is directed at the position on wall needed to punch, and contact with wall, then start pushing mechanism 4 and beat Holes mechanism 5, pushing mechanism 4 and 5 instrument of perforating mechanism are used cooperatively, and after hole is drilled, starting pushing mechanism 4 exits wall, are closed Perforating mechanism 5, is horizontally arranged drilling equipment.
Because pushing mechanism 4 includes the first sliding rail 40, the first sliding block 41, the first rack gear 42, strut 43, first motor 44 With first gear 45, bottom is equipped with the first sliding rail 40 in shell 1, and slidingtype is connected with the first sliding block 41 on the first sliding rail 40, the The first rack gear 42 is equipped at the top of one sliding block 41, the first rack gear 42 passes through first through hole 3, and 1 inner right wall of shell is equipped with strut 43, strut 43 left ends are equipped with first motor 44, and 44 output shaft of first motor is equipped with first gear 45, first gear 45 and the first rack gear 42 Engagement, so starting first motor 44 rotates clockwise, and motor drives the first rack gear when needing to construction and installation monitoring instrument 42 are moved to the left, while the first sliding block 41 being driven to be moved to the left, and thus perforating mechanism 5 are pushed to move downward, and assist perforating mechanism 5 It is punched, after hole is accomplished fluently, starting first motor 44 is rotated counterclockwise, it is possible thereby to the first rack gear 42 is moved right, band Dynamic perforating mechanism 5 resets, and after the first rack gear 42 retracts original position, closes first motor 44.
Because perforating mechanism 5 includes movable plate 50, guide rod 52, fixed block 53, the second motor 54, shaft 55 and drill bit 56,42 left end of the first rack gear is equipped with movable plate 50, and pilot hole 51 is provided on movable plate 50, and 1 left wall of shell is symmetrically set two sides up and down There is guide rod 52, guide rod 52 passes through pilot hole 51, and 52 left end of guide rod is equipped with fixed block 53, the second electricity is equipped among 50 left wall of movable plate Machine 54 is connected with shaft 55 on second motor 54, and 55 left end of shaft is equipped with drill bit 56, so opening when needing to drill hole on wall Dynamic pushing mechanism 4, pushing mechanism 4 are moved to the left movable plate 50, and guide rod 52 has guiding role, drill bit 56 when preventing from drilling Inclination starts the second motor 54, and the second motor 54 drives drill bit 56 to rotate, it is possible thereby to punch to wall, after hole is drilled, closes Second motor 54, starting pushing mechanism 4 drives movable plate 50 to move right, so that movable plate 50 is moved to original position.
Because further including having first support 6, bottom plate 7 and wheel 8, it is equipped with first support 6 among 1 bottom of shell, first 6 lower end of frame is equipped with bottom plate 7, is symmetrically arranged with wheel 8 at left and right sides of 7 bottom of bottom plate, so when needing to give construction and installation monitoring instrument When, it pushes under drilling equipment to the building for needing to install monitoring instrument, after placing, worker can carry out drilling operation.
Because further including having the first hollow cylinder 9, the first contact plate 11, the first elastic component 12, the second contact plate 13 and second Elastic component 14, periphery is equipped with the second elastic component 14 on guide rod 52, and 14 right end of the second elastic component is connect with movable plate 50, and second is elastic 14 left end of part is connected with the first hollow cylinder 9, and 9 right wall of the first hollow cylinder is provided with the second through-hole 10, and guide rod 52 passes through the second through-hole 10, 52 left end of guide rod is equipped with the first contact plate 11, and 9 inner left wall of the first hollow cylinder is equipped with the first elastic component 12,12 right end of the first elastic component It is connected with the second contact plate 13, the first contact plate 11 is corresponding with the second contact plate 13, so when carrying out drilling operation to wall, First contact plate 11 and the contact of the second contact plate 13, the first elastic component 12 and the second elastic component 14 are shunk, the first elastic component 12 and Second elastic component 14 has buffer function, and bring shakes when can reduce drilling, so that device is more stable when drilling.
Because further include have second support 15, the second hollow cylinder 16, the second sliding rail 18, the second sliding block 19, the second rack gear 20, Support plate 21, third motor 22, second gear 23 and third bracket 24 are equipped with second support 15,1 bottom of shell at the top of bottom plate 7 Equipped with third bracket 24, the first hollow cylinder 9, about 9 two wall of the first hollow cylinder are cased on the outside of second support 15 and third bracket 24 Fourth hole 25 and third through-hole 17 are had, second support 15 passes through third through-hole 17, and third bracket 24 passes through four-way Hole 25, left and right wall is equipped with the second sliding rail 18 in the first hollow cylinder 9, and 18 inside slidingtype of the second sliding rail is connected with the second sliding block 19, the top of second support 15 and 24 bottom of third bracket are equipped with support plate 21, and support plate 21 is equipped with the second rack gear 20, and second Rack gear 20 is connect with the second sliding block 19, and rear wall is equipped with third motor 22 in the first hollow cylinder 9, and 22 output shaft of third motor is equipped with Second gear 23, between the second rack gear 20, second gear 23 engages second gear 23 with the second rack gear 20, so when needing When installing monitoring instrument, starting third motor 22 is rotated counterclockwise, and the second rack gear 20 of right is driven to move upwards, and the of left Two rack gears 20 move downward so that third bracket 24 rise, it is possible thereby to make shell 1 rise, convenient for the building to eminence into Row drilling, after drilling, starting third motor 22 is rotated clockwise, so that the second rack gear 20 retracts origin-location, closes the Three motors 22.
Because further including having cabinet 26, case lid 27 and second handle 28,7 top right side of bottom plate is equipped with cabinet 26, cabinet 26 Positioned at 9 right side of the first hollow cylinder, 26 top rotary type of cabinet is connected with case lid 27, and 27 top center of case lid is equipped with second handle 28, so case lid 27 can be opened when auxiliary tool is more, tool is put into cabinet 26, people is facilitated to carry, while It can protect tool.
Because the material of drill bit 56 be steel alloy, steel alloy have high intensity, high tenacity, wear-resisting, high temperature resistant, etc. particularity Can, the service life of drill bit 56 can be extended.
Because the material of shell 1 is stainless steel, stainless steel has rustless property, it is possible to prevent shell 1 from getting rusty, extension makes Use the time.
Control mode of the invention is automatically controlled by controller, the skill that the control circuit of controller passes through this field Art personnel's simple programming can be realized, and belong to the common knowledge of this field, and the present invention is mainly used to protect mechanical device, institute Control mode and circuit connection are not explained with the present invention.
The preferred embodiment of the present invention above described embodiment only expresses, the description thereof is more specific and detailed, but simultaneously Limitations on the scope of the patent of the present invention therefore cannot be interpreted as.It should be pointed out that for those of ordinary skill in the art For, without departing from the inventive concept of the premise, several deformations can also be made, improves and substitutes, these belong to this hair Bright protection scope.Therefore, the scope of protection of the patent of the invention shall be subject to the appended claims.

Claims (5)

1. a kind of building monitoring instrument installation drilling equipment, which is characterized in that include shell (1), the first in command (2), push away Motivation structure (4) and perforating mechanism (5), shell (1) right wall centre are equipped with the first in command (2), are provided with first among shell (1) left wall Through-hole (3), shell (1) is interior to be equipped with pushing mechanism (4), and shell (1) left wall is equipped with perforating mechanism (5);Pushing mechanism (4) includes First sliding rail (40), the first sliding block (41), the first rack gear (42), strut (43), first motor (44) and first gear (45), outside Shell (1) interior bottom is equipped with the first sliding rail (40), and slidingtype is connected with the first sliding block (41), the first sliding block on the first sliding rail (40) (41) top is equipped with the first rack gear (42), and the first rack gear (42) passes through first through hole (3), and shell (1) inner right wall is equipped with strut (43), strut (43) left end is equipped with first motor (44), and first motor (44) output shaft is equipped with first gear (45), the first tooth Wheel (45) is engaged with the first rack gear (42);Perforating mechanism (5) includes movable plate (50), guide rod (52), fixed block (53), second Motor (54), shaft (55) and drill bit (56), the first rack gear (42) left end are equipped with movable plate (50), are provided with and lead on movable plate (50) To hole (51), shell (1) left wall is symmetrically arranged with guide rod (52) two sides up and down, and guide rod (52) passes through pilot hole (51), guide rod (52) Left end is equipped with fixed block (53), is equipped with the second motor (54) among movable plate (50) left wall, is connected with and turns on the second motor (54) Axis (55), shaft (55) left end are equipped with drill bit (56);It further include first support (6), bottom plate (7) and wheel (8), shell (1) bottom First support (6) are equipped among portion, first support (6) lower end is equipped with bottom plate (7), is symmetrically arranged at left and right sides of bottom plate (7) bottom Wheel (8);Further include have the first hollow cylinder (9), the first contact plate (11), the first elastic component (12), the second contact plate (13) and Second elastic component (14), periphery is equipped with the second elastic component (14), the second elastic component (14) right end and movable plate on guide rod (52) (50) it connects, the second elastic component (14) left end is connected with the first hollow cylinder (9), and the first hollow cylinder (9) right wall is provided with the second through-hole (10), guide rod (52) passes through the second through-hole (10), and guide rod (52) left end is equipped with the first contact plate (11), in the first hollow cylinder (9) Left wall is equipped with the first elastic component (12), and the first elastic component (12) right end is connected with the second contact plate (13), the first contact plate (11) It is corresponding with the second contact plate (13).
2. a kind of building monitoring instrument installation drilling equipment according to claim 1, which is characterized in that further include having the Two brackets (15), the second hollow cylinder (16), the second sliding rail (18), the second sliding block (19), the second rack gear (20), support plate (21), Third motor (22), second gear (23) and third bracket (24), bottom plate (7) top are equipped with second support (15), shell (1) bottom Portion is equipped with third bracket (24), is cased with the first hollow cylinder (9), the first hollow cylinder on the outside of second support (15) and third bracket (24) (9) two walls have fourth hole (25) and third through-hole (17) up and down, and second support (15) passes through third through-hole (17), the Three brackets (24) pass through fourth hole (25), and the interior left and right wall of the first hollow cylinder (9) is equipped with the second sliding rail (18), the second sliding rail (18) inside slidingtype is connected with the second sliding block (19), and at the top of second support (15) and third bracket (24) bottom is equipped with support Plate (21), support plate (21) are equipped with the second rack gear (20), and the second rack gear (20) is connect with the second sliding block (19), the first hollow cylinder (9) interior rear wall is equipped with third motor (22), and third motor (22) output shaft is equipped with second gear (23), second gear (23) position Between the second rack gear (20), second gear (23) is engaged with the second rack gear (20).
3. a kind of building monitoring instrument installation drilling equipment according to claim 2, which is characterized in that further include having case Body (26), case lid (27) and second handle (28), bottom plate (7) top right side are equipped with cabinet (26), and it is empty that cabinet (26) is located at first On the right side of heart cylinder (9), rotary type is connected with case lid (27) at the top of cabinet (26), and case lid (27) top center is equipped with second handle (28).
4. a kind of building monitoring instrument installation drilling equipment according to claim 3, which is characterized in that drill bit (56) Material is steel alloy.
5. a kind of building monitoring instrument installation drilling equipment according to claim 4, which is characterized in that shell (1) Material is stainless steel.
CN201710724522.XA 2017-08-22 2017-08-22 Drilling equipment is used in a kind of installation of building monitoring instrument Active CN107520483B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710724522.XA CN107520483B (en) 2017-08-22 2017-08-22 Drilling equipment is used in a kind of installation of building monitoring instrument

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710724522.XA CN107520483B (en) 2017-08-22 2017-08-22 Drilling equipment is used in a kind of installation of building monitoring instrument

Publications (2)

Publication Number Publication Date
CN107520483A CN107520483A (en) 2017-12-29
CN107520483B true CN107520483B (en) 2019-01-11

Family

ID=60681846

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710724522.XA Active CN107520483B (en) 2017-08-22 2017-08-22 Drilling equipment is used in a kind of installation of building monitoring instrument

Country Status (1)

Country Link
CN (1) CN107520483B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108544668A (en) * 2018-04-23 2018-09-18 蒋孟春 A kind of building monitoring monitoring mark installation drilling device

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108480717B (en) * 2018-03-30 2020-07-03 虞雅 Hand-held high-speed drill gun
CN110227843B (en) * 2019-06-19 2020-07-24 浙江年代建设工程有限公司 A type of being convenient for use drilling equipment for building engineering
CN110560732A (en) * 2019-09-22 2019-12-13 杭州金知科技有限公司 New material metal sheet drilling equipment
CN110586985A (en) * 2019-09-30 2019-12-20 江苏玖泰电力实业有限公司 Top plate drilling lifting frame
CN110586986A (en) * 2019-10-22 2019-12-20 徐州念渠工程机械有限公司 Top plate drilling lifting frame
CN112620732A (en) * 2020-12-21 2021-04-09 盐城市恒动组合机床有限公司 Protective structure of drilling power head

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006312215A (en) * 2005-05-09 2006-11-16 Reform Gijutsu Kenkyusho:Kk Drilling device
CN204686105U (en) * 2015-06-05 2015-10-07 湖北省建工第五建设有限公司 The positioning supports bracket of boring bar tool
CN204735750U (en) * 2015-07-13 2015-11-04 赖河波 Electric drill strikes to bore uses vertical bracing bracket
CN106513767A (en) * 2016-12-25 2017-03-22 南昌浩牛科技有限公司 Industrial steel plate side edge drilling device
CN206267793U (en) * 2016-12-20 2017-06-20 嘉善弘欣化工厂(普通合伙) A kind of building lot construction high stable type drilling equipment
CN206286602U (en) * 2016-11-14 2017-06-30 无锡溥汇机械科技有限公司 Drilling machine fixing device is used in a kind of steel construction handling

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050152756A1 (en) * 2004-01-12 2005-07-14 Ronald Howard Universal pressure drill and srew runner

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006312215A (en) * 2005-05-09 2006-11-16 Reform Gijutsu Kenkyusho:Kk Drilling device
CN204686105U (en) * 2015-06-05 2015-10-07 湖北省建工第五建设有限公司 The positioning supports bracket of boring bar tool
CN204735750U (en) * 2015-07-13 2015-11-04 赖河波 Electric drill strikes to bore uses vertical bracing bracket
CN206286602U (en) * 2016-11-14 2017-06-30 无锡溥汇机械科技有限公司 Drilling machine fixing device is used in a kind of steel construction handling
CN206267793U (en) * 2016-12-20 2017-06-20 嘉善弘欣化工厂(普通合伙) A kind of building lot construction high stable type drilling equipment
CN106513767A (en) * 2016-12-25 2017-03-22 南昌浩牛科技有限公司 Industrial steel plate side edge drilling device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108544668A (en) * 2018-04-23 2018-09-18 蒋孟春 A kind of building monitoring monitoring mark installation drilling device

Also Published As

Publication number Publication date
CN107520483A (en) 2017-12-29

Similar Documents

Publication Publication Date Title
CN107520483B (en) Drilling equipment is used in a kind of installation of building monitoring instrument
CN208844953U (en) A kind of safety device for reserved opening of constructing
CN109030075A (en) A kind of Soil K+adsorption equipment of drill bit easy to disassemble
CN107807277A (en) A kind of intelligent spectrum analyzer with safeguard function easy to remove
CN207560550U (en) A kind of modularization pedestal of cabinet
CN212462438U (en) Two-way open-type switch board
CN211850741U (en) A safe hanging flower basket for high-rise outer wall fitment construction
CN208634724U (en) A kind of monitoring device being convenient to clean
CN108756266A (en) A kind of foundation construction of high-rise buildings anti-drop device
CN211345590U (en) Outer quick-witted installing support of pull formula air conditioner
CN112137350A (en) House structure model display device for building
CN211489267U (en) Mould turning device
CN210659886U (en) Fireproof rolling shutter door
CN107695185B (en) A kind of lockset substrate stamping and hole location synchronous processing mechanism
CN215545175U (en) Automatic feeding device of drilling equipment
CN208941742U (en) Cooking utensil
CN212428552U (en) Convenient to use's power maintenance ladder
CN105692486B (en) A kind of Well cover unlatching tool
CN208029246U (en) A kind of alarm host machine
CN213787432U (en) A analysis and detection device for children's action
CN110811190A (en) Drawer switch cabinet capable of preventing drawer from being damaged due to inclination
CN217238879U (en) Intelligent fire alarm system
CN215387170U (en) Multipurpose movable fire-fighting cabinet with illumination and indication functions
CN114389195A (en) Electrical control cabinet convenient to overhaul
CN212367689U (en) Electrical equipment control cabinet for hydraulic engineering

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20181102

Address after: 312400 No. 76, Xin Yan village, Jin Ting Town, Shengzhou, Shaoxing, Zhejiang

Applicant after: Wang Chengye

Address before: 315200 505 Yuxiu Road, Zhenhai District, Ningbo, Zhejiang

Applicant before: Cha Yu

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20181128

Address after: 221000 Shimao Square Inner Commercial Street 2, Office 1, Office 2, Building 1-910, Yunlong District, Xuzhou City, Jiangsu Province

Applicant after: Jiangsu Shifeng Enterprise Management Consulting Co., Ltd.

Address before: 312400 No. 76, Xin Yan village, Jin Ting Town, Shengzhou, Shaoxing, Zhejiang

Applicant before: Wang Chengye

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20191112

Address after: Room c506a-18, University Business Park, No. 99, University Road, Xuzhou hi tech Industrial Development Zone, 221000 Jiangsu Province

Patentee after: Xuzhou rongchuangda Electronic Technology Co., Ltd

Address before: 221000 Xuzhou City, Jiangsu Province, Yunlong District Shimao Plaza Business Street 2 and Office 1, Office 2 Building 1-910

Patentee before: Jiangsu Shifeng Enterprise Management Consulting Co., Ltd.

TR01 Transfer of patent right