CN107520483A - One kind building monitoring instrument installation drilling equipment - Google Patents

One kind building monitoring instrument installation drilling equipment Download PDF

Info

Publication number
CN107520483A
CN107520483A CN201710724522.XA CN201710724522A CN107520483A CN 107520483 A CN107520483 A CN 107520483A CN 201710724522 A CN201710724522 A CN 201710724522A CN 107520483 A CN107520483 A CN 107520483A
Authority
CN
China
Prior art keywords
shell
rack
support
motor
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710724522.XA
Other languages
Chinese (zh)
Other versions
CN107520483B (en
Inventor
查宇
刘红玉
张好
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuzhou rongchuangda Electronic Technology Co., Ltd
Original Assignee
查宇
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 查宇 filed Critical 查宇
Priority to CN201710724522.XA priority Critical patent/CN107520483B/en
Publication of CN107520483A publication Critical patent/CN107520483A/en
Application granted granted Critical
Publication of CN107520483B publication Critical patent/CN107520483B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25HWORKSHOP EQUIPMENT, e.g. FOR MARKING-OUT WORK; STORAGE MEANS FOR WORKSHOPS
    • B25H1/00Work benches; Portable stands or supports for positioning portable tools or work to be operated on thereby
    • B25H1/0021Stands, supports or guiding devices for positioning portable tools or for securing them to the work
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23BTURNING; BORING
    • B23B45/00Hand-held or like portable drilling machines, e.g. drill guns; Equipment therefor
    • B23B45/02Hand-held or like portable drilling machines, e.g. drill guns; Equipment therefor driven by electric power
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23BTURNING; BORING
    • B23B47/00Constructional features of components specially designed for boring or drilling machines; Accessories therefor

Abstract

The present invention relates to a kind of drilling equipment, more particularly to a kind of building monitoring instrument installation drilling equipment.The technical problem to be solved in the present invention is to provide one kind to build monitoring instrument installation drilling equipment.In order to solve the above-mentioned technical problem, the invention provides such a building monitoring instrument installation drilling equipment, shell etc. is included;The first in command is provided among shell right wall, first through hole is provided among shell left wall, is provided with pushing mechanism in shell, shell left wall is provided with perforating mechanism.Invention achieves the effect of relatively more steady safety when can freely adjust height and drilling.

Description

One kind building monitoring instrument installation drilling equipment
Technical field
The present invention relates to a kind of drilling equipment, more particularly to a kind of building monitoring instrument installation drilling equipment.
Background technology
Monitoring system is the building site monitoring system being more adapted on the market now using one of most system in safety-protection system System is handheld video communication equipment, and video monitoring is main flow now.From earliest simulation monitoring to burning hot digital supervision a few years ago Network Video Surveillance in the ascendant till now again, there occurs earth-shaking change.From the technical point of view, video monitoring system is sent out Exhibition is divided into first generation analog video monitoring system, and " PC+ multimedia cards " digital video monitor system is based on to the second generation, to the Three generations is based entirely on IP network video monitoring system.
Installation is exactly that machinery or equipment are fixed on certain position according to certain program, specification.
Drilling refers to process the operation portalled on solid material with drill bit.
Nowadays, the most used drilling equipment usually requires to grasp drilling, very inconvenient, even if using solid The drilling equipment set, device vibration amplitude larger not steady enough safety when cannot freely adjust height and drilling still be present The shortcomings that, therefore need relatively more steady safety building monitoring instrument installation when research and development one kind can freely adjust height and drilling badly and use Drilling equipment.
The content of the invention
(1) technical problems to be solved
Device vibrations width when the present invention cannot freely adjust height and drilling to overcome existing drilling equipment to exist The shortcomings that larger not steady safe enough is spent, the technical problem to be solved in the present invention is to provide one kind building monitoring instrument installation to bore Aperture apparatus.
(2) technical scheme
In order to solve the above-mentioned technical problem, monitoring instrument installation drilling equipment is built the invention provides such a, Include shell, the first in command, pushing mechanism and perforating mechanism, be provided with the first in command among shell right wall, among shell left wall First through hole is provided with, is provided with pushing mechanism in shell, shell left wall is provided with perforating mechanism.
Preferably, pushing mechanism includes the first slide rail, the first sliding block, the first rack, pole, the first motor and the first tooth Wheel, shell inner bottom part are provided with the first slide rail, and slidingtype is connected with the first sliding block on the first slide rail, and the first slider top is provided with first Rack, the first rack pass through first through hole, and shell inner right wall is provided with pole, and pole left end is provided with the first motor, and the first motor is defeated Shaft is provided with first gear, and first gear engages with the first rack.
Preferably, perforating mechanism includes movable plate, guide rod, fixed block, the second motor, rotating shaft and drill bit, the first rack Left end is provided with movable plate, pilot hole is provided with movable plate, both sides are arranged with guide rod to shell left wall up and down, and guide rod, which passes through, to be oriented to Hole, guide rod left end are provided with fixed block, the second motor are provided among movable plate left wall, and rotating shaft is connected with the second motor, and rotating shaft is left End is provided with drill bit.
Preferably, in addition to first support, bottom plate and wheel, first support is provided among outer casing bottom, under first support End is provided with bottom plate, and wheel is arranged with left and right sides of bottom base plate.
Preferably, the first hollow cylinder, the first contact plate, the first elastic component, the second contact plate and the second elasticity are also included Part, periphery is provided with the second elastic component on guide rod, and the second elastic component right-hand member is connected with movable plate, and the second elastic component left end is connected with the One hollow cylinder, the first hollow cylinder right wall are provided with the second through hole, and guide rod passes through the second through hole, and guide rod left end is provided with the first contact plate, First hollow cylinder inner left wall is provided with the first elastic component, and the first elastic component right-hand member is connected with the second contact plate, the first contact plate and Two contact plates are corresponding.
Preferably, also include second support, the second hollow cylinder, the second slide rail, the second sliding block, the second rack, supporting plate, 3rd motor, second gear and the 3rd support, are provided with second support at the top of bottom plate, and outer casing bottom is provided with the 3rd support, second Frame and the 3rd stent outer are cased with the first hollow cylinder, and two walls have fourth hole and third through-hole to the first hollow cylinder up and down, Second support passes through third through-hole, and the 3rd support passes through fourth hole, and left and right wall is equipped with the second slide rail in the first hollow cylinder, and Slidingtype is connected with the second sliding block on the inside of two slide rails, and second support top and the 3rd frame bottom are equipped with supporting plate, supporting plate The second rack is provided with, the second rack is connected with the second sliding block, and rear wall is provided with the 3rd motor in the first hollow cylinder, and the 3rd motor is defeated Shaft is provided with second gear, and between the second rack, second gear engages second gear with the second rack.
Preferably, casing, case lid and the second in command are also included, bottom plate top right side is provided with casing, and casing is located at first On the right side of hollow cylinder, casing top rotary type is connected with case lid, and case lid crown center is provided with the second in command.
Preferably, the material of drill bit is steel alloy.
Preferably, the material of shell is stainless steel.
Operation principle:When needing to construction and installation monitoring instrument, the first in command is grasped, drilling equipment level is taken Get up, the position for needing to punch on perforating mechanism alignment wall, and contacted with wall, then start pushing mechanism and puncher Structure, pushing mechanism and perforating mechanism instrument are used cooperatively, and after hole drill is good, is started pushing mechanism and are exited wall, close perforating mechanism, Drilling equipment is horizontal positioned good.
Because pushing mechanism includes the first slide rail, the first sliding block, the first rack, pole, the first motor and first gear, Shell inner bottom part is provided with the first slide rail, and slidingtype is connected with the first sliding block on the first slide rail, and the first slider top is provided with the first tooth Bar, the first rack pass through first through hole, and shell inner right wall is provided with pole, and pole left end is provided with the first motor, the output of the first motor Axle is provided with first gear, and first gear engages with the first rack, so when needing to construction and installation monitoring instrument, starts the One motor is rotated clockwise, and the rack of motor driven first is moved to the left, while drives the first sliding block to be moved to the left, and is thus promoted and is beaten To left movement, auxiliary perforating mechanism is punched holes mechanism, after hole is accomplished fluently, is started the first motor and is rotated counterclockwise, it is possible thereby to So that the first rack moves right, drive perforating mechanism to reset, after the first rack retracts original position, close the first motor.
Because perforating mechanism includes movable plate, guide rod, fixed block, the second motor, rotating shaft and drill bit, the first rack left end Provided with movable plate, pilot hole is provided with movable plate, shell left wall is arranged with guide rod in both sides up and down, and guide rod passes through pilot hole, led Bar left end is provided with fixed block, is provided with the second motor among movable plate left wall, is connected with rotating shaft on the second motor, rotating shaft left end is provided with Drill bit, so when needing to drill hole on wall, start pushing mechanism, pushing mechanism causes movable plate to be moved to the left, and guide rod has Guide effect, bit inclination when preventing from drilling, start the second motor, the second motor driven drill bit rotates, it is possible thereby to wall Punching, after hole drill is good, the second motor is closed, start pushing mechanism and drive movable plate to move right so that movable plate is moved to original The position come.
Because also including first support, bottom plate and wheel, first support, first support lower end are provided among outer casing bottom Provided with bottom plate, wheel is arranged with left and right sides of bottom base plate, so when needing to construction and installation monitoring instrument, promotes drilling Device to need install monitoring instrument building under, after placing, worker can carry out drilling operation.
Because also including the first hollow cylinder, the first contact plate, the first elastic component, the second contact plate and the second elastic component, Periphery is provided with the second elastic component on guide rod, and the second elastic component right-hand member is connected with movable plate, and the second elastic component left end is connected with first Hollow cylinder, the first hollow cylinder right wall are provided with the second through hole, and guide rod passes through the second through hole, and guide rod left end is provided with the first contact plate, the One hollow cylinder inner left wall is provided with the first elastic component, and the first elastic component right-hand member is connected with the second contact plate, the first contact plate and second Contact plate is corresponding, so when carrying out drilling operation to wall, the first contact plate and the contact of the second contact plate, the first elastic component with Second elastic component shrinks, and the first elastic component and the second elastic component have cushioning effect, can reduce the vibrations brought during drilling, make Device is more stable when must drill.
Because also include second support, the second hollow cylinder, the second slide rail, the second sliding block, the second rack, supporting plate, Three motors, second gear and the 3rd support, bottom plate top are provided with second support, and outer casing bottom is provided with the 3rd support, second support The first hollow cylinder is cased with the 3rd stent outer, two walls have fourth hole and third through-hole to the first hollow cylinder up and down, the Two supports pass through third through-hole, and the 3rd support passes through fourth hole, and left and right wall is equipped with the second slide rail in the first hollow cylinder, and second Slidingtype is connected with the second sliding block on the inside of slide rail, and at the top of second support and the 3rd frame bottom is equipped with supporting plate, in supporting plate Provided with the second rack, the second rack is connected with the second sliding block, and rear wall is provided with the 3rd motor, the output of the 3rd motor in the first hollow cylinder Axle is provided with second gear, and between the second rack, second gear engages second gear with the second rack, so working as needs to pacify When filling monitoring instrument, start the 3rd motor and rotate counterclockwise, drive the second rack of right to move upwards, the second rack of left Move downward so that the 3rd support rise, it is possible thereby to so that shell rise, be easy to drill to the building of eminence, drill After, start the 3rd motor and rotate clockwise so that the second rack retracts origin-location, closes the 3rd motor.
Because also including casing, case lid and the second in command, bottom plate top right side is provided with casing, and casing is hollow positioned at first Cylinder right side, casing top rotary type are connected with case lid, and case lid crown center is provided with the second in command, so when aid is more When, case lid can be opened, instrument is put into casing, is convenient for people to carry, while instrument can also be protected.
Because the material of drill bit is steel alloy, steel alloy have high intensity, high tenacity, wear-resisting, high temperature resistant, etc. particularity Energy, the service life of drill bit can be extended.
Because the material of shell is stainless steel, stainless steel has rustless property, it is possible to prevents shell from getting rusty, extends and use Time.
The control mode of the present invention is automatically controlled by controller, the skill that the control circuit of controller passes through this area Art personnel simple programming can be achieved, and belong to the common knowledge of this area, and the present invention is mainly used to protect mechanical device, institute Control mode is not explained with the present invention to connect with circuit.
(3) beneficial effect
Invention achieves the effect of relatively more steady safety when can freely adjust height and drilling, wheel can be moved conveniently Dynamic drilling equipment, the second rack and second gear are used cooperatively so that drilling equipment can be raised and reduced, and be easy to different height The building of degree is drilled, and the first elastic component and the second elastic component play cushioning effect in drilling, also include guide rod, can be with So that boring procedure is more steady.
Brief description of the drawings
Fig. 1 is the first main structure diagram of the present invention.
Fig. 2 is the main structure diagram of pushing meanss of the present invention.
Fig. 3 is the main structure diagram of perforating device of the present invention.
Fig. 4 is second of main structure diagram of the present invention.
Fig. 5 is the first part main structure diagram of the present invention.
Fig. 6 is second of part main structure diagram of the present invention.
Fig. 7 is the third part main structure diagram of the present invention.
Mark in accompanying drawing for:1- shells, the 2- first in command, 3- first through hole, 4- pushing mechanisms, the slide rails of 40- first, The sliding blocks of 41- first, the racks of 42- first, 43- poles, the motors of 44- first, 45- first gears, 5- perforating mechanisms, 50- movable plates, 51- pilot holes, 52- guide rods, 53- fixed blocks, the motors of 54- second, 55- rotating shafts, 56- drill bits, 6- first supports, 7- bottom plates, 8- Wheel, the hollow cylinders of 9- first, the through holes of 10- second, the contact plates of 11- first, the elastic components of 12- first, the contact plates of 13- second, 14- Two elastic components, 15- second supports, the hollow cylinders of 16- second, 17- third through-holes, the slide rails of 18- second, the sliding blocks of 19- second, 20- Two racks, 21- supporting plates, the motors of 22- the 3rd, 23- second gears, the supports of 24- the 3rd, 25- fourth holes, 26- casings, 27- Case lid, the 28- second in command.
Embodiment
The present invention is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1
One kind building monitoring instrument installation drilling equipment, as shown in figs. 1-7, include shell 1, the first in command 2, promote Mechanism 4 and perforating mechanism 5, the right wall of shell 1 centre are provided with the first in command 2, first through hole 3, shell 1 are provided among the left wall of shell 1 Interior to be provided with pushing mechanism 4, the left wall of shell 1 is provided with perforating mechanism 5.
Embodiment 2
One kind building monitoring instrument installation drilling equipment, as shown in figs. 1-7, include shell 1, the first in command 2, promote Mechanism 4 and perforating mechanism 5, the right wall of shell 1 centre are provided with the first in command 2, first through hole 3, shell 1 are provided among the left wall of shell 1 Interior to be provided with pushing mechanism 4, the left wall of shell 1 is provided with perforating mechanism 5.
Pushing mechanism 4 includes the first slide rail 40, the first sliding block 41, the first rack 42, pole 43, the first motor 44 and One gear 45, the inner bottom part of shell 1 are provided with the first slide rail 40, and slidingtype is connected with the first sliding block 41 on the first slide rail 40, and first slides The top of block 41 is provided with the first rack 42, and the first rack 42 passes through first through hole 3, and the inner right wall of shell 1 is provided with pole 43, and pole 43 is left End is provided with the first motor 44, and the output shaft of the first motor 44 is provided with first gear 45, and first gear 45 engages with the first rack 42.
Embodiment 3
One kind building monitoring instrument installation drilling equipment, as shown in figs. 1-7, include shell 1, the first in command 2, promote Mechanism 4 and perforating mechanism 5, the right wall of shell 1 centre are provided with the first in command 2, first through hole 3, shell 1 are provided among the left wall of shell 1 Interior to be provided with pushing mechanism 4, the left wall of shell 1 is provided with perforating mechanism 5.
Pushing mechanism 4 includes the first slide rail 40, the first sliding block 41, the first rack 42, pole 43, the first motor 44 and One gear 45, the inner bottom part of shell 1 are provided with the first slide rail 40, and slidingtype is connected with the first sliding block 41 on the first slide rail 40, and first slides The top of block 41 is provided with the first rack 42, and the first rack 42 passes through first through hole 3, and the inner right wall of shell 1 is provided with pole 43, and pole 43 is left End is provided with the first motor 44, and the output shaft of the first motor 44 is provided with first gear 45, and first gear 45 engages with the first rack 42.
Perforating mechanism 5 includes movable plate 50, guide rod 52, fixed block 53, the second motor 54, rotating shaft 55 and drill bit 56, the The left end of one rack 42 is provided with movable plate 50, and pilot hole 51 is provided with movable plate 50, and the left wall of shell 1 is arranged with guide rod in both sides up and down 52, guide rod 52 passes through pilot hole 51, and the left end of guide rod 52 is provided with fixed block 53, the second motor 54 is provided among the left wall of movable plate 50, Rotating shaft 55 is connected with second motor 54, the left end of rotating shaft 55 is provided with drill bit 56.
Embodiment 4
One kind building monitoring instrument installation drilling equipment, as shown in figs. 1-7, include shell 1, the first in command 2, promote Mechanism 4 and perforating mechanism 5, the right wall of shell 1 centre are provided with the first in command 2, first through hole 3, shell 1 are provided among the left wall of shell 1 Interior to be provided with pushing mechanism 4, the left wall of shell 1 is provided with perforating mechanism 5.
Pushing mechanism 4 includes the first slide rail 40, the first sliding block 41, the first rack 42, pole 43, the first motor 44 and One gear 45, the inner bottom part of shell 1 are provided with the first slide rail 40, and slidingtype is connected with the first sliding block 41 on the first slide rail 40, and first slides The top of block 41 is provided with the first rack 42, and the first rack 42 passes through first through hole 3, and the inner right wall of shell 1 is provided with pole 43, and pole 43 is left End is provided with the first motor 44, and the output shaft of the first motor 44 is provided with first gear 45, and first gear 45 engages with the first rack 42.
Perforating mechanism 5 includes movable plate 50, guide rod 52, fixed block 53, the second motor 54, rotating shaft 55 and drill bit 56, the The left end of one rack 42 is provided with movable plate 50, and pilot hole 51 is provided with movable plate 50, and the left wall of shell 1 is arranged with guide rod in both sides up and down 52, guide rod 52 passes through pilot hole 51, and the left end of guide rod 52 is provided with fixed block 53, the second motor 54 is provided among the left wall of movable plate 50, Rotating shaft 55 is connected with second motor 54, the left end of rotating shaft 55 is provided with drill bit 56.
Also include first support 6, bottom plate 7 and wheel 8, first support 6, the lower end of first support 6 are provided among the bottom of shell 1 Provided with bottom plate 7, wheel 8 is arranged with left and right sides of the bottom of bottom plate 7.
Also include the first hollow cylinder 9, the first contact plate 11, the first elastic component 12, the second contact plate 13 and the second elasticity Part 14, periphery is provided with the second elastic component 14 on guide rod 52, and the right-hand member of the second elastic component 14 is connected with movable plate 50, the second elastic component 14 Left end is connected with the first hollow cylinder 9, and the right wall of the first hollow cylinder 9 is provided with the second through hole 10, and guide rod 52 passes through the second through hole 10, guide rod 52 left ends are provided with the first contact plate 11, and the inner left wall of the first hollow cylinder 9 is provided with the first elastic component 12, the connection of the right-hand member of the first elastic component 12 There is the second contact plate 13, the first contact plate 11 is corresponding with the second contact plate 13.
Also include second support 15, the second hollow cylinder 16, the second slide rail 18, the second sliding block 19, the second rack 20, support Plate 21, the 3rd motor 22, the support 24 of second gear 23 and the 3rd, the top of bottom plate 7 are provided with second support 15, and the bottom of shell 1 is provided with 3rd support 24, second support 15 and the outside of the 3rd support 24 are cased with the first hollow cylinder 9, the first hollow cylinder two walls difference about 9 Fourth hole 25 and third through-hole 17 are provided with, second support 15 passes through third through-hole 17, and the 3rd support 24 passes through fourth hole 25, Left and right wall is equipped with the second slide rail 18 in first hollow cylinder 9, and the inner side slidingtype of the second slide rail 18 is connected with the second sliding block 19, and second The top of support 15 and the bottom of the 3rd support 24 are equipped with supporting plate 21, and supporting plate 21 is provided with the second rack 20, the second rack 20 It is connected with the second sliding block 19, rear wall is provided with the 3rd motor 22 in the first hollow cylinder 9, and the output shaft of the 3rd motor 22 is provided with the second tooth Wheel 23, between the second rack 20, second gear 23 engages second gear 23 with the second rack 20.
Also include casing 26, case lid 27 and the second in command 28, the top right side of bottom plate 7 is provided with casing 26, and casing 26 is located at The right side of first hollow cylinder 9, the top rotary type of casing 26 are connected with case lid 27, and the crown center of case lid 27 is provided with the second in command 28.
The material of drill bit 56 is steel alloy.
The material of shell 1 is stainless steel.
Operation principle:When needing to construction and installation monitoring instrument, the first in command 2 is grasped, drilling equipment is horizontal Take up, perforating mechanism 5 is directed at the position for needing to punch on wall, and contacted with wall, then start pushing mechanism 4 and beat Holes mechanism 5, pushing mechanism 4 and the instrument of perforating mechanism 5 are used cooperatively, and after hole drill is good, is started pushing mechanism 4 and are exited wall, close Perforating mechanism 5 is horizontal positioned good drilling equipment.
Because pushing mechanism 4 includes the first slide rail 40, the first sliding block 41, the first rack 42, pole 43, the first motor 44 With first gear 45, the inner bottom part of shell 1 is provided with the first slide rail 40, and slidingtype is connected with the first sliding block 41 on the first slide rail 40, the The top of one sliding block 41 is provided with the first rack 42, and the first rack 42 passes through first through hole 3, and the inner right wall of shell 1 is provided with pole 43, pole 43 left ends are provided with the first motor 44, and the output shaft of the first motor 44 is provided with first gear 45, the rack 42 of first gear 45 and first Engagement, so when needing to construction and installation monitoring instrument, start the first motor 44 and rotate clockwise, the rack of motor driven first 42 are moved to the left, while drive the first sliding block 41 to be moved to the left, and thus promote perforating mechanism 5 to aid in perforating mechanism 5 to left movement Punched, after hole is accomplished fluently, start the first motor 44 and rotate counterclockwise, it is possible thereby to so that the first rack 42 moves right, band Dynamic perforating mechanism 5 resets, and after the first rack 42 retracts original position, closes the first motor 44.
Because perforating mechanism 5 includes movable plate 50, guide rod 52, fixed block 53, the second motor 54, rotating shaft 55 and drill bit 56, the left end of the first rack 42 is provided with movable plate 50, and pilot hole 51 is provided with movable plate 50, and the left wall of shell 1 is symmetrically set both sides up and down There is guide rod 52, guide rod 52 passes through pilot hole 51, and the left end of guide rod 52 is provided with fixed block 53, the second electricity is provided among the left wall of movable plate 50 Machine 54, rotating shaft 55 is connected with the second motor 54, the left end of rotating shaft 55 is provided with drill bit 56, so when needing to drill hole on wall, opened Dynamic pushing mechanism 4, pushing mechanism 4 cause movable plate 50 to be moved to the left, and guide rod 52 has guide effect, drill bit 56 when preventing from drilling Tilt, start the second motor 54, the second motor 54 drives drill bit 56 to rotate, it is possible thereby to be punched to wall, after hole drill is good, closes Second motor 54, start pushing mechanism 4 and drive movable plate 50 to move right so that movable plate 50 is moved to original position.
It is provided with first support 6 because also including first support 6, bottom plate 7 and wheel 8, among the bottom of shell 1, first The lower end of frame 6 is provided with bottom plate 7, and wheel 8 is arranged with left and right sides of the bottom of bottom plate 7, so working as needs to give construction and installation monitoring instrument When, promote drilling equipment arrive need installation monitoring instrument building under, after placing, worker can carry out drilling operation.
Because also include the first hollow cylinder 9, the first contact plate 11, the first elastic component 12, the second contact plate 13 and second Elastic component 14, periphery is provided with the second elastic component 14 on guide rod 52, and the right-hand member of the second elastic component 14 is connected with movable plate 50, and second is elastic The left end of part 14 is connected with the first hollow cylinder 9, and the right wall of the first hollow cylinder 9 is provided with the second through hole 10, and guide rod 52 passes through the second through hole 10, The left end of guide rod 52 is provided with the first contact plate 11, and the inner left wall of the first hollow cylinder 9 is provided with the first elastic component 12, the right-hand member of the first elastic component 12 The second contact plate 13 is connected with, the first contact plate 11 is corresponding with the second contact plate 13, so when carrying out drilling operation to wall, First contact plate 11 and the second contact plate 13 contact, and the first elastic component 12 shrinks with the second elastic component 14, the first elastic component 12 with Second elastic component 14 has cushioning effect, can reduce the vibrations brought during drilling so that device is more stable during drilling.
Because also include second support 15, the second hollow cylinder 16, the second slide rail 18, the second sliding block 19, the second rack 20, Supporting plate 21, the 3rd motor 22, the support 24 of second gear 23 and the 3rd, the top of bottom plate 7 are provided with second support 15, the bottom of shell 1 Provided with the 3rd support 24, second support 15 and the outside of the 3rd support 24 are cased with the first hollow cylinder 9, the first hollow cylinder two walls about 9 Fourth hole 25 and third through-hole 17 are had, second support 15 passes through third through-hole 17, and the 3rd support 24 passes through four-way Hole 25, left and right wall is equipped with the second slide rail 18 in the first hollow cylinder 9, and the inner side slidingtype of the second slide rail 18 is connected with the second sliding block 19, the top of second support 15 and the bottom of the 3rd support 24 are equipped with supporting plate 21, and supporting plate 21 is provided with the second rack 20, and second Rack 20 is connected with the second sliding block 19, and rear wall is provided with the 3rd motor 22 in the first hollow cylinder 9, and the output shaft of the 3rd motor 22 is provided with Second gear 23, between the second rack 20, second gear 23 engages second gear 23 with the second rack 20, so when needs When monitoring instrument is installed, starts the 3rd motor 22 and rotate counterclockwise, drive the second rack 20 of right to move upwards, the of left Two racks 20 move downward so that the 3rd support 24 rises, it is possible thereby to so that shell 1 rises, is easy to enter the building of eminence Row drilling, after drilling, start the 3rd motor 22 and rotate clockwise so that the second rack 20 retracts origin-location, closes the Three motors 22.
Because also including casing 26, case lid 27 and the second in command 28, the top right side of bottom plate 7 is provided with casing 26, casing 26 Positioned at the right side of the first hollow cylinder 9, the top rotary type of casing 26 is connected with case lid 27, and the crown center of case lid 27 is provided with the second in command 28, so when aid is more, case lid 27 can be opened, instrument is put into casing 26, is convenient for people to carry, while Instrument can be protected.
Because the material of drill bit 56 is steel alloy, steel alloy have high intensity, high tenacity, wear-resisting, high temperature resistant, etc. particularity Energy, the service life of drill bit 56 can be extended.
Because the material of shell 1 is stainless steel, stainless steel has rustless property, it is possible to prevents shell 1 from getting rusty, extension makes Use the time.
The control mode of the present invention is automatically controlled by controller, the skill that the control circuit of controller passes through this area Art personnel simple programming can be achieved, and belong to the common knowledge of this area, and the present invention is mainly used to protect mechanical device, institute Control mode is not explained with the present invention to connect with circuit.
Embodiment described above only expresses the preferred embodiment of the present invention, and its description is more specific and detailed, but simultaneously Therefore the limitation to the scope of the claims of the present invention can not be interpreted as.It should be pointed out that for one of ordinary skill in the art For, without departing from the inventive concept of the premise, some deformations can also be made, improves and substitutes, these belong to this hair Bright protection domain.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.

Claims (9)

1. one kind building monitoring instrument installation drilling equipment, it is characterised in that include shell (1), the first in command (2), push away Motivation structure (4) and perforating mechanism (5), shell (1) right wall centre are provided with the first in command (2), first are provided among shell (1) left wall Through hole (3), shell (1) is interior to be provided with pushing mechanism (4), and shell (1) left wall is provided with perforating mechanism (5).
A kind of 2. building monitoring instrument installation drilling equipment according to claim 1, it is characterised in that pushing mechanism (4) the first slide rail (40), the first sliding block (41), the first rack (42), pole (43), the first motor (44) and the first tooth are included To take turns (45), shell (1) inner bottom part is provided with the first slide rail (40), and slidingtype is connected with the first sliding block (41) on the first slide rail (40), The first rack (42) is provided with the top of first sliding block (41), the first rack (42) passes through first through hole (3), and shell (1) inner right wall is set There is pole (43), pole (43) left end is provided with the first motor (44), and the first motor (44) output shaft is provided with first gear (45), First gear (45) engages with the first rack (42).
A kind of 3. building monitoring instrument installation drilling equipment according to claim 2, it is characterised in that perforating mechanism (5) movable plate (50), guide rod (52), fixed block (53), the second motor (54), rotating shaft (55) and drill bit (56) are included, first Rack (42) left end is provided with movable plate (50), pilot hole (51) is provided with movable plate (50), both sides are symmetrical up and down for shell (1) left wall Provided with guide rod (52), guide rod (52) passes through pilot hole (51), and guide rod (52) left end is provided with fixed block (53), movable plate (50) left wall Centre is provided with the second motor (54), rotating shaft (55) is connected with the second motor (54), rotating shaft (55) left end is provided with drill bit (56).
4. a kind of building monitoring instrument installation drilling equipment according to claim 3, it is characterised in that also including first Support (6), bottom plate (7) and wheel (8), shell (1) bottom centre are provided with first support (6), and first support (6) lower end is provided with bottom Plate (7), bottom plate (7) bottom left and right sides are arranged with wheel (8).
5. a kind of building monitoring instrument installation drilling equipment according to claim 4, it is characterised in that also include the One hollow cylinder (9), the first contact plate (11), the first elastic component (12), the second contact plate (13) and the second elastic component (14), guide rod (52) periphery is provided with the second elastic component (14) on, and the second elastic component (14) right-hand member is connected with movable plate (50), the second elastic component (14) left end is connected with the first hollow cylinder (9), and the first hollow cylinder (9) right wall is provided with the second through hole (10), and guide rod (52) is through the Two through holes (10), guide rod (52) left end are provided with the first contact plate (11), and the first hollow cylinder (9) inner left wall is provided with the first elastic component (12), the first elastic component (12) right-hand member is connected with the second contact plate (13), and the first contact plate (11) and the second contact plate (13) are right Should.
6. a kind of building monitoring instrument installation drilling equipment according to claim 5, it is characterised in that also include the Two supports (15), the second hollow cylinder (16), the second slide rail (18), the second sliding block (19), the second rack (20), supporting plate (21), 3rd motor (22), second gear (23) and the 3rd support (24), bottom plate (7) top are provided with second support (15), shell (1) bottom Portion is provided with the 3rd support (24), and second support (15) on the outside of the 3rd support (24) with being cased with the first hollow cylinder (9), the first hollow cylinder (9) two walls have fourth hole (25) and third through-hole (17) up and down, and second support (15) passes through third through-hole (17), the Three supports (24) pass through fourth hole (25), and the interior left and right wall of the first hollow cylinder (9) is equipped with the second slide rail (18), the second slide rail (18) inner side slidingtype is connected with the second sliding block (19), and second support (15) top and the 3rd support (24) bottom are equipped with support Plate (21), supporting plate (21) are provided with the second rack (20), and the second rack (20) is connected with the second sliding block (19), the first hollow cylinder (9) interior rear wall is provided with the 3rd motor (22), and the 3rd motor (22) output shaft is provided with second gear (23), second gear (23) position Between the second rack (20), second gear (23) engages with the second rack (20).
7. a kind of building monitoring instrument installation drilling equipment according to claim 6, it is characterised in that also include case Body (26), case lid (27) and the second in command (28), bottom plate (7) top right side are provided with casing (26), and casing (26) is empty positioned at first On the right side of heart cylinder (9), rotary type is connected with case lid (27) at the top of casing (26), and case lid (27) crown center is provided with the second in command (28)。
8. a kind of building monitoring instrument installation drilling equipment according to claim 7, it is characterised in that drill bit (56) Material is steel alloy.
9. a kind of building monitoring instrument installation drilling equipment according to claim 8, it is characterised in that shell (1) Material is stainless steel.
CN201710724522.XA 2017-08-22 2017-08-22 Drilling equipment is used in a kind of installation of building monitoring instrument Active CN107520483B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710724522.XA CN107520483B (en) 2017-08-22 2017-08-22 Drilling equipment is used in a kind of installation of building monitoring instrument

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710724522.XA CN107520483B (en) 2017-08-22 2017-08-22 Drilling equipment is used in a kind of installation of building monitoring instrument

Publications (2)

Publication Number Publication Date
CN107520483A true CN107520483A (en) 2017-12-29
CN107520483B CN107520483B (en) 2019-01-11

Family

ID=60681846

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710724522.XA Active CN107520483B (en) 2017-08-22 2017-08-22 Drilling equipment is used in a kind of installation of building monitoring instrument

Country Status (1)

Country Link
CN (1) CN107520483B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108480717A (en) * 2018-03-30 2018-09-04 李淑娟 A kind of hand-held high speed drill rifle
CN110227843A (en) * 2019-06-19 2019-09-13 刘承福 A kind of type drilling equipment easy to use for architectural engineering
CN110560732A (en) * 2019-09-22 2019-12-13 杭州金知科技有限公司 New material metal sheet drilling equipment
CN110586985A (en) * 2019-09-30 2019-12-20 江苏玖泰电力实业有限公司 Top plate drilling lifting frame
CN110586986A (en) * 2019-10-22 2019-12-20 徐州念渠工程机械有限公司 Top plate drilling lifting frame

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108544668A (en) * 2018-04-23 2018-09-18 蒋孟春 A kind of building monitoring monitoring mark installation drilling device

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050152756A1 (en) * 2004-01-12 2005-07-14 Ronald Howard Universal pressure drill and srew runner
JP2006312215A (en) * 2005-05-09 2006-11-16 Reform Gijutsu Kenkyusho:Kk Drilling device
CN204686105U (en) * 2015-06-05 2015-10-07 湖北省建工第五建设有限公司 The positioning supports bracket of boring bar tool
CN204735750U (en) * 2015-07-13 2015-11-04 赖河波 Electric drill strikes to bore uses vertical bracing bracket
CN106513767A (en) * 2016-12-25 2017-03-22 南昌浩牛科技有限公司 Industrial steel plate side edge drilling device
CN206267793U (en) * 2016-12-20 2017-06-20 嘉善弘欣化工厂(普通合伙) A kind of building lot construction high stable type drilling equipment
CN206286602U (en) * 2016-11-14 2017-06-30 无锡溥汇机械科技有限公司 Drilling machine fixing device is used in a kind of steel construction handling

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050152756A1 (en) * 2004-01-12 2005-07-14 Ronald Howard Universal pressure drill and srew runner
JP2006312215A (en) * 2005-05-09 2006-11-16 Reform Gijutsu Kenkyusho:Kk Drilling device
CN204686105U (en) * 2015-06-05 2015-10-07 湖北省建工第五建设有限公司 The positioning supports bracket of boring bar tool
CN204735750U (en) * 2015-07-13 2015-11-04 赖河波 Electric drill strikes to bore uses vertical bracing bracket
CN206286602U (en) * 2016-11-14 2017-06-30 无锡溥汇机械科技有限公司 Drilling machine fixing device is used in a kind of steel construction handling
CN206267793U (en) * 2016-12-20 2017-06-20 嘉善弘欣化工厂(普通合伙) A kind of building lot construction high stable type drilling equipment
CN106513767A (en) * 2016-12-25 2017-03-22 南昌浩牛科技有限公司 Industrial steel plate side edge drilling device

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108480717A (en) * 2018-03-30 2018-09-04 李淑娟 A kind of hand-held high speed drill rifle
CN110227843A (en) * 2019-06-19 2019-09-13 刘承福 A kind of type drilling equipment easy to use for architectural engineering
CN110560732A (en) * 2019-09-22 2019-12-13 杭州金知科技有限公司 New material metal sheet drilling equipment
CN110586985A (en) * 2019-09-30 2019-12-20 江苏玖泰电力实业有限公司 Top plate drilling lifting frame
CN110586986A (en) * 2019-10-22 2019-12-20 徐州念渠工程机械有限公司 Top plate drilling lifting frame

Also Published As

Publication number Publication date
CN107520483B (en) 2019-01-11

Similar Documents

Publication Publication Date Title
CN107520483A (en) One kind building monitoring instrument installation drilling equipment
CN107100543B (en) A kind of simple easily rock drilling machinery
CN106907560B (en) A kind of textile machine support device with warning function
CN206732198U (en) One kind exempts from suspended ceiling drilling device of ascending a height
CN203296777U (en) Simulation experiment device of tunnel boring machine
CN109746974B (en) Double-station punching equipment for electronic product circuit board
CN107052402A (en) One kind exempts from suspended ceiling drilling device of ascending a height
CN109030075A (en) A kind of Soil K+adsorption equipment of drill bit easy to disassemble
CN206689467U (en) A kind of industrial machinery installation positioning drilling equipment
CN206455205U (en) A kind of hardware Plate Production automatic punching equipment
CN108418098A (en) Removable out power distribution cabinet
CN208641864U (en) A kind of adjustable capacitor touch screen Defoaming machine support platform
CN207673278U (en) A kind of four arms rock perforating device and the four arm rock puncheres equipped with the device
CN105064936A (en) Multifunctional righting device for workover operation
CN207493093U (en) A kind of high jump crossbar for sports support
CN207549154U (en) A kind of architectural engineering drill
CN208805377U (en) A kind of Soil K+adsorption equipment of drill bit easy to disassemble
CN210351908U (en) GPRS-based thermal remote management system
CN209691208U (en) A kind of natural gas exploitation simulator
CN208408600U (en) Drilling device is used in a kind of processing of back door lock wrench shaft
CN212458153U (en) Blasting damping device for tunnel construction
CN210791556U (en) Upward drilling support
CN209511927U (en) A kind of electric safety device of hydraulic lamp stand
CN209355063U (en) A kind of fire-proof mud device that anti-toy bites
CN106289730B (en) The assembly simulation experimental rig of pallet fire grate bar

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20181102

Address after: 312400 No. 76, Xin Yan village, Jin Ting Town, Shengzhou, Shaoxing, Zhejiang

Applicant after: Wang Chengye

Address before: 315200 505 Yuxiu Road, Zhenhai District, Ningbo, Zhejiang

Applicant before: Cha Yu

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20181128

Address after: 221000 Shimao Square Inner Commercial Street 2, Office 1, Office 2, Building 1-910, Yunlong District, Xuzhou City, Jiangsu Province

Applicant after: Jiangsu Shifeng Enterprise Management Consulting Co., Ltd.

Address before: 312400 No. 76, Xin Yan village, Jin Ting Town, Shengzhou, Shaoxing, Zhejiang

Applicant before: Wang Chengye

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20191112

Address after: Room c506a-18, University Business Park, No. 99, University Road, Xuzhou hi tech Industrial Development Zone, 221000 Jiangsu Province

Patentee after: Xuzhou rongchuangda Electronic Technology Co., Ltd

Address before: 221000 Xuzhou City, Jiangsu Province, Yunlong District Shimao Plaza Business Street 2 and Office 1, Office 2 Building 1-910

Patentee before: Jiangsu Shifeng Enterprise Management Consulting Co., Ltd.

TR01 Transfer of patent right