CN107520196A - A kind of energy-saving pre-treatment water droplet blowing-down device - Google Patents

A kind of energy-saving pre-treatment water droplet blowing-down device Download PDF

Info

Publication number
CN107520196A
CN107520196A CN201710998965.8A CN201710998965A CN107520196A CN 107520196 A CN107520196 A CN 107520196A CN 201710998965 A CN201710998965 A CN 201710998965A CN 107520196 A CN107520196 A CN 107520196A
Authority
CN
China
Prior art keywords
workpiece
gas transmission
slide
delivery room
blowing device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201710998965.8A
Other languages
Chinese (zh)
Inventor
郎巍
陈佳金
朱顺伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Huali Intelligent Equipment Co Ltd
Original Assignee
Zhejiang Huali Intelligent Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Huali Intelligent Equipment Co Ltd filed Critical Zhejiang Huali Intelligent Equipment Co Ltd
Priority to CN201710998965.8A priority Critical patent/CN107520196A/en
Publication of CN107520196A publication Critical patent/CN107520196A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B5/00Cleaning by methods involving the use of air flow or gas flow
    • B08B5/02Cleaning by the force of jets, e.g. blowing-out cavities
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05DPROCESSES FOR APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05D3/00Pretreatment of surfaces to which liquids or other fluent materials are to be applied; After-treatment of applied coatings, e.g. intermediate treating of an applied coating preparatory to subsequent applications of liquids or other fluent materials
    • B05D3/002Pretreatement
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F26DRYING
    • F26BDRYING SOLID MATERIALS OR OBJECTS BY REMOVING LIQUID THEREFROM
    • F26B21/00Arrangements or duct systems, e.g. in combination with pallet boxes, for supplying and controlling air or gases for drying solid materials or objects

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

A kind of energy-saving pre-treatment water droplet blowing-down device, including workpiece delivery room, workpiece hoisting mechanism, inflatable body and workpiece are in fortune testing agency;The workpiece delivery room includes two blocks of side plates and is connected to the top plate of the side plate;The workpiece hoisting mechanism includes the fixed installation frame above the workpiece delivery room, the guide rail located at the fixed installation inframe, the hoist cable for being slidably connected to the slide of the guide rail, being connected to the hanging head of the slide and being connected to the hanging head;The indoor blow gun that the gas transmission is in charge of is in charge of and be connected to the inflatable body including air pump, the gas transmission for being connected to the gas transmission main of the air pump, being connected to the gas transmission main and stretching into the workpiece delivery room;The workpiece includes detection sensor and magnetic valve in fortune testing agency.The present invention is simple in construction, easy to use, detects and whether there is on production line in fortune workpiece, intelligent opening blows water operation, and energy-saving, rationally distributed, overall construction intensity is higher, has a safety feature.

Description

A kind of energy-saving pre-treatment water droplet blowing-down device
Technical field
The present invention relates to Coating Pretreatment technical field, specifically a kind of energy-saving pre-treatment water droplet blowing-down device.
Background technology
In Coating Pretreatment process, due to the irregular and many blind hole or pit of workpiece surface, have water and remain in The surface of workpiece, if the water of these positions is not dried, it will cause follow-up spraying quality bad therefore normal after cleaning It can often set and blow water conservancy project position, reach the purpose for drying, clearing up workpiece.The traditional machine for blowing water conservancy project sequence dress is more simple and crude, peace be present Full hidden danger, and can not intelligent control utilize compressed air, cause the process energy waste larger.
The content of the invention
The technical purpose of the present invention is to provide a kind of energy-saving pre-treatment water droplet blowing-down device solve legacy equipment structure The problem of simple and crude backwardness, high energy consumption, security reliability difference.
The concrete technical scheme of the present invention is as follows:A kind of energy-saving pre-treatment water droplet blowing-down device, including workpiece delivery room, Workpiece hoisting mechanism, inflatable body and workpiece are in fortune testing agency;The workpiece delivery room includes two blocks of side plates and is connected to institute The top plate of side plate is stated, is provided with the middle part of the top plate and is set along the top plate length direction and the top plate is separated into a left side completely It is right two-part longitudinally through road;The workpiece hoisting mechanism include fixed installation frame above the workpiece delivery room, Located at it is described fixed installation inframe guide rail, be slidably connected to the slide of the guide rail, be connected to the slide hanging head and It is connected to the hoist cable of the hanging head;The inflatable body includes air pump, is connected to the gas transmission main of the air pump, is connected to institute The indoor blow gun that the gas transmission is in charge of is in charge of and is connected in the gas transmission stated gas transmission main and stretched into the workpiece delivery room;It is described Workpiece includes being used to detect whether the hoist cable has in the detection sensor of fortune workpiece and located at the gas transmission in fortune testing agency House steward and the magnetic valve for being connected to the detection sensor.
Preferably, the detection sensor is included on the top plate positioned at the displacement longitudinally through road both sides Sensor.
Preferably, the detection sensor includes the pulling force sensor on the slide.
Preferably, the indoor blow gun is provided with pressure-regulating valve.
Stretched into vertically in the workpiece delivery room preferably, the gas transmission is in charge of along two blocks of side plates;On the side plate Provided with fixed seat, the fixed seat is fixedly connected with chuck, and the chuck is interposed in the gas transmission and is in charge of.
Preferably, extend hoist cable postive stop baffle vertically positioned at the top plate portion longitudinally through road both sides.
Preferably, the fixed installation frame is provided with rail mounting groove, track installation is provided with the rail mounting groove Plate, the guide rail are fixedly connected on the track mount plate.
Preferably, the guide rail is provided with two sections, the both ends of the slide are slidably connected with two sections of guide rails respectively.
Preferably, the hanging head includes being connected to the connecting rod of the slide and the extension located at the connecting rod lower end Suo Zhu, the lower end bifurcated of the connecting rod form left branching rod and right pole, and the hanging cable post is worn to connect simultaneously is fixed on the left branch Bar and the right pole.
Preferably, the upper end of the connecting rod is branched into two sections and is fixedly connected with the slide, the connecting rod Stage casing is a straight section;One end of the hanging cable post be provided with support touch the left branching rod/right pole limited cap and the other end is provided with To the spacing shim for touching the right pole/left branching rod, being provided with positioned at the end of the spacing shim for the hanging cable post is perpendicular Straight cutting hole, the detachable locking bolt of insertion in the vertical jack, the detachable locking bolt is is bent into upper and lower ends with being more than institute State the screens head of vertical jack bore and the snap section in the remainder insertion vertical jack, the spacing shim is located at institute State between detachable locking bolt and the right pole/left branching rod.
The technological merit of the present invention is that the energy-saving pre-treatment water droplet blowing-down device is simple in construction, easy to use, examines Survey production line on whether there is fortune workpiece, intelligent opening blow water operation, it is energy-saving, it is rationally distributed, overall construction intensity compared with Height, have a safety feature.
Brief description of the drawings
Fig. 1 is the overall structure diagram of the embodiment of the present invention;
The partial structural diagram of Fig. 2 positions embodiment of the present invention;
Each toponym corresponding to numbering is respectively in figure:1- workpiece deliveries room, 11- side plates, 111- fixed seats, 112- chucks, 12- top plates, 121- hoist cable postive stop baffles, for 13- longitudinally through road, frame, 21- guide rails, 22- slides, 23- hangings is fixedly mounted in 2- Head, 231- connecting rods, 2311- left branching rods, the right poles of 2312-, 232- hanging cable posts, 24- hoist cables, 25- rail mounting grooves, 26- rails Road installing plate, 3- air pumps, 31- gas transmission mains, 32- gas transmissions are in charge of, blow gun in 33- rooms, 331- pressure-regulating valves, 4- detection sensings Device, 5- magnetic valves.
Embodiment
Below in conjunction with accompanying drawing, by specific embodiment, the invention will be further described:
See Fig. 1, Fig. 2, a kind of energy-saving pre-treatment water droplet blowing-down device, including workpiece delivery room 1, workpiece hoisting mechanism, air blowing Mechanism and workpiece are in fortune testing agency;Workpiece delivery room 1 includes two blocks of side plates 11 and is connected to the top plate 12 of side plate 11, top plate 12 Middle part is two-part longitudinally through road 13 provided with being set along the length direction of top plate 12 and top plate 12 being separated into left and right completely;Position Extend hoist cable postive stop baffle 121 in the straightened portion of top plate 12 longitudinally through the both sides of road 13.Workpiece hoisting mechanism includes being located at The fixed installation frame 2 of the top of workpiece delivery room 1, the guide rail 21 in fixed installation frame 2, the slide for being slidably connected to guide rail 21 22nd, it is connected to the hanging first 23 of slide 22 and is connected to the hoist cable 24 of hanging first 23;Inflatable body includes air pump 3, is connected to gas The gas transmission main 31 of pump 3, the gas transmission for being connected to gas transmission main 31 and stretching into workpiece delivery room 1 are in charge of 32 and are connected to gas transmission point The indoor blow gun 33 of pipe 32, indoor blow gun 33 are provided with pressure-regulating valve 331;Gas transmission is in charge of 32 and stretched vertically along two blocks of side plates 11 Enter in workpiece delivery room 1;Side plate 11 is provided with fixed seat 111, and fixed seat 111 is fixedly connected with chuck 112, and chuck 112 is sandwiched It is in charge of in gas transmission on 32.
Workpiece includes being used to detect whether hoist cable 24 has in the detection sensor 4 of fortune workpiece and located at defeated in fortune testing agency Gas house steward 31 and the magnetic valve 5 for being connected to detection sensor 4.Detection sensor 4 can be to be passed through on top plate 12 positioned at longitudinal direction Wear the displacement transducer of 13 both sides.Detection sensor 4 can also be the pulling force sensor on slide 22.
Frame 2 is fixedly mounted and is provided with rail mounting groove 25, track mount plate 26 is provided with rail mounting groove 25, guide rail 21 is solid Surely it is connected to track mount plate 26.Guide rail 21 is provided with two sections, and the both ends of slide 22 are slidably connected with two sections of guide rails 21 respectively.Hanging First 23 include being connected to the connecting rod 231 of slide 22 and the hanging cable post 232 located at the lower end of connecting rod 231, the lower end of connecting rod 231 Bifurcated forms left branching rod 2311 and right pole 2312, and hanging cable post 232 is worn to connect simultaneously is fixed on left branching rod 2311 and right pole 2312, Whole workpiece hoisting mechanism is structurally consummate, and intensity is good, safe and reliable to operation, and stability is preferable.The upper end of connecting rod 231 is branched into Two sections and it is fixedly connected with slide 22, the stage casing of connecting rod 231 is a straight section;One end of hanging cable post 232, which is provided with to support, touch left branch The limited cap of the right pole 2312 of bar 2311/ and the other end is provided with the spacing shim for supporting and touching the right left branching rod 2311 of pole 2312/, hang Suo Zhu's 232 is provided with vertical jack positioned at the end of spacing shim, and detachable locking bolt, detachable locking bolt are inserted in vertical jack To be bent into snap section of the upper and lower ends with the screens head for being more than vertical jack bore and in the vertical jack of remainder insertion, Spacing shim is located between detachable locking bolt and the left branching rod 2311 of right pole 2312/, and the spacing measure of these multistages to hang head 23 structurally consummate, intensity height, use are reliable and stable.

Claims (10)

  1. A kind of 1. energy-saving pre-treatment water droplet blowing-down device, it is characterised in that:Including workpiece delivery room(1), workpiece hoisting mechanism, Inflatable body and workpiece are in fortune testing agency;The workpiece delivery room(1)Including two blocks of side plates(11)Be connected to the side plate (11)Top plate(12), the top plate(12)Middle part is provided with along the top plate(12)Length direction sets and by the top plate (12)It is two-part longitudinally through road that left and right is separated into completely(13);The workpiece hoisting mechanism includes being located at the workpiece delivery Room(1)The fixed installation frame of top(2), located at the fixed installation frame(2)Interior guide rail(21), be slidably connected to the guide rail (21)Slide(22), be connected to the slide(22)Hanging head(23)Be connected to the hanging head(23)Hoist cable (24);The inflatable body includes air pump(3), be connected to the air pump(3)Gas transmission main(31), to be connected to the gas transmission total Pipe(31)And stretch into the workpiece delivery room(1)In gas transmission be in charge of(32)It is in charge of with the gas transmission is connected to(32)Interior blow Mouth(33);The workpiece includes being used to detect the hoist cable in fortune testing agency(24)Whether detection sensor in fortune workpiece is had (4)With located at the gas transmission main(31)And it is connected to the detection sensor(4)Magnetic valve(5).
  2. A kind of 2. pre-treatment energy-conservation water-blowing device according to claim 1, it is characterised in that:The detection sensor(4) Including located at the top plate(12)Above positioned at described longitudinally through road(13)The displacement transducer of both sides.
  3. A kind of 3. pre-treatment energy-conservation water-blowing device according to claim 1, it is characterised in that:The detection sensor(4) Including located at the slide(22)On pulling force sensor.
  4. A kind of 4. pre-treatment energy-conservation water-blowing device according to claim 1, it is characterised in that:The indoor blow gun(33)On Provided with pressure-regulating valve(331).
  5. A kind of 5. pre-treatment energy-conservation water-blowing device according to claim 1, it is characterised in that:The gas transmission is in charge of(32)Edge Two blocks of side plates(11)The workpiece delivery room is stretched into vertically(1)In;The side plate(11)It is provided with fixed seat(111), it is described Fixed seat(111)It is fixedly connected with chuck(112), the chuck(112)The gas transmission is interposed in be in charge of(32)On.
  6. A kind of 6. pre-treatment energy-conservation water-blowing device according to claim 1, it is characterised in that:Positioned at described longitudinally through road (13)The top plate of both sides(12)Straightened portion extends hoist cable postive stop baffle(121).
  7. A kind of 7. pre-treatment energy-conservation water-blowing device according to claim 1, it is characterised in that:The fixed installation frame(2) It is provided with rail mounting groove(25), the rail mounting groove(25)In be provided with track mount plate(26), the guide rail(21)It is fixed It is connected to the track mount plate(26).
  8. A kind of 8. pre-treatment energy-conservation water-blowing device according to claim 1, it is characterised in that:The guide rail(21)Provided with two Section, the slide(22)Both ends respectively with two sections of guide rails(21)It is slidably connected.
  9. A kind of 9. pre-treatment energy-conservation water-blowing device according to claim 1, it is characterised in that:The hanging head(23)Including It is connected to the slide(22)Connecting rod(231)With located at the connecting rod(231)The hanging cable post of lower end(232), the company Extension bar(231)Lower end bifurcated form left branching rod(2311)With right pole(2312), the hanging cable post(232)Wear simultaneously and connect fixation In the left branching rod(2311)And the right pole(2312).
  10. A kind of 10. pre-treatment energy-conservation water-blowing device according to claim 9, it is characterised in that:The connecting rod(231)'s Upper end be branched into two sections and with the slide(22)It is fixedly connected, the connecting rod(231)Stage casing be a straight section;The hanging cable Post(232)One end be provided with support touch the left branching rod(2311)/ right pole(2312)Limited cap and the other end be provided with support patch State right pole in residence(2312)/ left branching rod(2311)Spacing shim, the hanging cable post(232)Positioned at the spacing shim The end is provided with vertical jack, and the detachable locking bolt of insertion in jack vertically, the detachable locking bolt is two above and below being bent into The end snap section in the remainder insertion vertical jack, limit with the screens head for being more than the vertical jack bore Position pad is positioned at the detachable locking bolt and the right pole(2312)/ left branching rod(2311)Between.
CN201710998965.8A 2017-10-24 2017-10-24 A kind of energy-saving pre-treatment water droplet blowing-down device Withdrawn CN107520196A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710998965.8A CN107520196A (en) 2017-10-24 2017-10-24 A kind of energy-saving pre-treatment water droplet blowing-down device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710998965.8A CN107520196A (en) 2017-10-24 2017-10-24 A kind of energy-saving pre-treatment water droplet blowing-down device

Publications (1)

Publication Number Publication Date
CN107520196A true CN107520196A (en) 2017-12-29

Family

ID=60685318

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710998965.8A Withdrawn CN107520196A (en) 2017-10-24 2017-10-24 A kind of energy-saving pre-treatment water droplet blowing-down device

Country Status (1)

Country Link
CN (1) CN107520196A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114653558A (en) * 2022-05-25 2022-06-24 苏州柳溪机电工程有限公司 Water blowing system for coating production line

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007298223A (en) * 2006-04-28 2007-11-15 Tatsumi Ono Drying and baking device for painting utilizing superheated steam
CN201954920U (en) * 2011-01-28 2011-08-31 微密科技(宜兴)有限公司 Automatic blow-drying device
CN202160582U (en) * 2011-06-07 2012-03-14 天津市经武肉类食品有限公司 Transportation lifting hook
CN203018932U (en) * 2012-11-14 2013-06-26 合肥市田源精铸有限公司 Suspension beam suspending device for welding machine
CN204478779U (en) * 2015-01-22 2015-07-15 唐晓萍 A kind of hot blast air quantity controller
CN105890309A (en) * 2016-05-18 2016-08-24 张素平 Automatic drying device for threads for knitting processing
CN106766836A (en) * 2016-12-16 2017-05-31 无锡同方人工环境有限公司 Fan coiled heat-exchanger water examines automatic water-blowing device
CN107012490A (en) * 2017-06-14 2017-08-04 惠州恒德远实业有限公司 A kind of plated item water trap
CN208195113U (en) * 2017-10-24 2018-12-07 浙江华立智能装备股份有限公司 A kind of energy-saving pre-treatment water droplet blowing-down device

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007298223A (en) * 2006-04-28 2007-11-15 Tatsumi Ono Drying and baking device for painting utilizing superheated steam
CN201954920U (en) * 2011-01-28 2011-08-31 微密科技(宜兴)有限公司 Automatic blow-drying device
CN202160582U (en) * 2011-06-07 2012-03-14 天津市经武肉类食品有限公司 Transportation lifting hook
CN203018932U (en) * 2012-11-14 2013-06-26 合肥市田源精铸有限公司 Suspension beam suspending device for welding machine
CN204478779U (en) * 2015-01-22 2015-07-15 唐晓萍 A kind of hot blast air quantity controller
CN105890309A (en) * 2016-05-18 2016-08-24 张素平 Automatic drying device for threads for knitting processing
CN106766836A (en) * 2016-12-16 2017-05-31 无锡同方人工环境有限公司 Fan coiled heat-exchanger water examines automatic water-blowing device
CN107012490A (en) * 2017-06-14 2017-08-04 惠州恒德远实业有限公司 A kind of plated item water trap
CN208195113U (en) * 2017-10-24 2018-12-07 浙江华立智能装备股份有限公司 A kind of energy-saving pre-treatment water droplet blowing-down device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114653558A (en) * 2022-05-25 2022-06-24 苏州柳溪机电工程有限公司 Water blowing system for coating production line

Similar Documents

Publication Publication Date Title
CN105401714B (en) A kind of attachment type raise scaffold and elevating method
CN106703264A (en) Indoor mechanical automation mounting method for super high-rise unit curtain walls
KR102185253B1 (en) Apparatus and Method for pulling out pipes buried in buildings
CN110228743A (en) Two-to-one suspension is set in elevator traction than building hoist and its operational method
CN109056564A (en) Railway sound barrier installs special equipment and application method
CN205846671U (en) A kind of cable testing bridge being prone to folding and unfolding cable
CN202704877U (en) Hoisting device with adjustable cantilever
CN107520196A (en) A kind of energy-saving pre-treatment water droplet blowing-down device
CN208195113U (en) A kind of energy-saving pre-treatment water droplet blowing-down device
CN202658867U (en) Overhanging construction platform
CN108560510A (en) Surface low road movable overhaul platform in a kind of power station
CN108675170A (en) Roofing monorail crane and its construction method
CN204858396U (en) Frame is overhauld to transmission line landing stage formula
CN207194493U (en) A kind of steel roof truss protective rope fixing device
CN106284961A (en) Small-sized attachment type raise scaffold
CN206607930U (en) A kind of chest expander device of mechanical parking equipment
CN2853731Y (en) Rail device with hook for drawing material upstairs
CN109279522A (en) Movable units body glass curtain wall cantilevered hanging device
CN104948125B (en) A kind of wellhead assembly of translation churn
CN208308249U (en) A kind of fixed device of air hose promotion
CN208472681U (en) Surface low road movable overhaul platform in a kind of power station
CN208350525U (en) Anchor rod drawing force checking device
CN107994501B (en) A kind of strain tower of transmission line replacement cross-arm main material stressing device and application method
CN206069146U (en) A kind of Multifunctional construction platform
CN201923647U (en) Pipe kicking device of oil-field derrick pipe conveying machine

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20171229

WW01 Invention patent application withdrawn after publication