CN107516157A - A kind of service chart conflict checks processing method and processing device - Google Patents

A kind of service chart conflict checks processing method and processing device Download PDF

Info

Publication number
CN107516157A
CN107516157A CN201710617985.6A CN201710617985A CN107516157A CN 107516157 A CN107516157 A CN 107516157A CN 201710617985 A CN201710617985 A CN 201710617985A CN 107516157 A CN107516157 A CN 107516157A
Authority
CN
China
Prior art keywords
conflict
station
inspection
service chart
train
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710617985.6A
Other languages
Chinese (zh)
Inventor
杜恒
张强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Traffic Control Technology TCT Co Ltd
Original Assignee
Traffic Control Technology TCT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Traffic Control Technology TCT Co Ltd filed Critical Traffic Control Technology TCT Co Ltd
Priority to CN201710617985.6A priority Critical patent/CN107516157A/en
Publication of CN107516157A publication Critical patent/CN107516157A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/26Government or public services

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Tourism & Hospitality (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Marketing (AREA)
  • Development Economics (AREA)
  • General Business, Economics & Management (AREA)
  • Educational Administration (AREA)
  • Physics & Mathematics (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Game Theory and Decision Science (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The embodiment of the invention discloses a kind of service chart conflict to check processing method and processing device, and method includes:Train information operating point all in service chart is obtained, and all train information operating points are classified according to different stations, obtains train information operating point corresponding to each station;All conflict inspection projects at current station are obtained, according to the train information operating point at current station, all conflict inspection projects is pre-processed, obtain pre-processed results;According to the pre-processed results, conflict inspection is carried out to each conflict inspection project at current station successively.The embodiment of the present invention to all train information operating points according to station by classifying, all conflict inspection projects at the station are pre-processed in units of station, save pretreatment time, the conflict inspection of all conflict inspection projects is completed by once traveling through, the conflict audit function of service chart is realized, service chart conflict is drastically increased and checks efficiency.

Description

A kind of service chart conflict checks processing method and processing device
Technical field
The present embodiments relate to technical field of rail traffic, and in particular to a kind of service chart conflict check processing method and Device.
Background technology
Route map of train (hereinafter referred to as service chart) be represent train railway section run and AT STATION arrive send out or By the technological document at moment, it provides the program in each train number train occupation section, train each station arrival and set out (or passing through) moment, run time and dwell time of the train in section, be system-wide tissue train operation basis.Service chart It is the diagram of the time and space relation of train operation, is two-dimentional lines figure.
Service chart establishment can use automatic/manual type establishment.In most cases, the service chart worked out automatically by software In the absence of conflict, conflict situations are just likely to occur under Outliers out of the ordinary;There is the possibility to conflict in artificial establishment service chart Even more considerably increase.The service chart woven also can according to demand be adjusted before use of reaching the standard grade, optimized, and be changed to service chart During the possibility of service chart conflict also occurs.Service chart should possess conflict audit function, and to compilation, personnel prompt fortune Row figure, to reduce person works' complexity of making picture, improves service chart software ease for use with the presence or absence of conflict and conflict point.
During the embodiment of the present invention is realized, inventor has found that currently running figure conflicts inspection method with check item Mesh is that unit carries out conflict inspection, low for the service chart efficiency more than table number running number.
The content of the invention
Because above mentioned problem be present in existing method, the embodiment of the present invention propose a kind of service chart conflict check processing method and Device.
In a first aspect, the embodiment of the present invention proposes that a kind of service chart conflict checks processing method, including:
Train information operating point all in service chart is obtained, and according to different stations to all train information operating points Classified, obtain train information operating point corresponding to each station;
All conflict inspection projects at current station are obtained, according to the train information operating point at current station, to all punchings Prominent inspection project is pre-processed, and obtains pre-processed results;
According to the pre-processed results, conflict inspection is carried out to each conflict inspection project at current station successively.
Alternatively, the inspection project that conflicts is included to hair station time reasonableness check, dwell time reasonableness check, punching of stopping Prominent inspection, the operation conflict of adjacent train interval reasonableness check, adjacent train check the run time inspection between bicycle station.
Alternatively, methods described also includes:
If judgement knows that first object conflict inspection project has been completed conflict and checked, by the first object conflict inspection The state of project is arranged to inspected state;
If receiving the triggering command of service chart preservation, the state of each conflict inspection project is preserved, not to each Conflict inspection project carries out conflict inspection.
Alternatively, methods described also includes:
If judgement knows that the second goal conflict inspection project is unreasonable, target warning message corresponding to generation;
If receiving user clicks on the target warning message, and target warning message described in the service chart is corresponding Conflict point be highlighted.
Second aspect, the embodiment of the present invention also propose that a kind of service chart conflict checks processing unit, including:
Operating point sort module, for obtaining train information operating point all in service chart, and according to different stations pair All train information operating points are classified, and obtain train information operating point corresponding to each station;
Pretreatment module, for obtaining all conflict inspection projects at current station, according to the train information at current station Operating point, all conflict inspection projects are pre-processed, obtain pre-processed results;
Conflict checks module, for according to the pre-processed results, entering successively to each conflict inspection project at current station Row conflict checks.
Alternatively, the inspection project that conflicts is included to hair station time reasonableness check, dwell time reasonableness check, punching of stopping Prominent inspection, the operation conflict of adjacent train interval reasonableness check, adjacent train check the run time inspection between bicycle station.
Alternatively, described device also includes:
State setting module, if for judging to know that first object conflict inspection project has been completed conflict and checked, by institute The state for stating first object conflict inspection project is arranged to inspected state;
State preserving module, if the triggering command for receiving service chart preservation, to the shape of each conflict inspection project State is preserved, and does not carry out conflict inspection to each conflict inspection project.
Alternatively, described device also includes:
Warning message generation module, if for judging to know that the second goal conflict inspection project is unreasonable, generation is corresponding Target warning message;
Module is highlighted, if the target warning message is clicked on for receiving user, by institute in the service chart Conflict point corresponding to stating target warning message is highlighted.
The third aspect, the embodiment of the present invention also propose a kind of electronic equipment, including:
At least one processor;And
At least one memory being connected with the processor communication, wherein:
The memory storage has and by the programmed instruction of the computing device, the processor described program can be called to refer to Order is able to carry out the above method.
Fourth aspect, the embodiment of the present invention also propose a kind of non-transient computer readable storage medium storing program for executing, the non-transient meter Calculation machine readable storage medium storing program for executing stores computer program, and the computer program makes the computer perform the above method.
As shown from the above technical solution, the embodiment of the present invention to all train information operating points according to station by carrying out All conflict inspection projects at the station are pre-processed, save pretreatment time, pass through one by classification in units of station Secondary traversal completes the conflict inspection of all conflict inspection projects, realizes the conflict audit function of service chart, drastically increases fortune Row figure conflict checks efficiency.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing There is the required accompanying drawing used in technology description to be briefly described, it should be apparent that, drawings in the following description are only this Some embodiments of invention, for those of ordinary skill in the art, on the premise of not paying creative work, can be with Other accompanying drawings are obtained according to these figures.
Fig. 1 is the schematic flow sheet that a kind of service chart conflict that one embodiment of the invention provides checks processing method;
Fig. 2 is a kind of result schematic diagram for service chart conflict inspection that one embodiment of the invention provides;
Fig. 3 is a kind of service chart schematic diagram that one embodiment of the invention provides;
Fig. 4 is that a kind of service chart conflict that one embodiment of the invention provides checks schematic diagram data;
Fig. 5 is the structural representation that a kind of service chart conflict that one embodiment of the invention provides checks processing unit;
Fig. 6 is the logic diagram for the electronic equipment that one embodiment of the invention provides.
Embodiment
Below in conjunction with the accompanying drawings, the embodiment of the present invention is further described.Following examples are only used for more Clearly demonstrate technical scheme, and can not be limited the scope of the invention with this.
Fig. 1 shows that a kind of service chart conflict that the present embodiment provides checks the schematic flow sheet of processing method, including:
S101, train information operating point all in service chart is obtained, and according to different stations to all train informations Operating point is classified, and obtains train information operating point corresponding to each station.
Wherein, the train information operating point be different trains different stations difference between sending out the stopping time, including train Arrival time AT STATION, the dwell time of hair station time and train AT STATION of train AT STATION.
For example, train information operating point L1.CZ2.D.time is L1 cars CZ2 AT STATION arrival time.
It is described that all train information operating points are classified according to different stations, specially by all train informations Operating point is classified according to station.For example, the train information operating point related to station CZ1 is divided into one kind, will be with station Train information operating point related CZ2 is divided into another kind of, and the train information operating point related to station CZ3 is divided into another class, By that analogy.
S102, all conflict inspection projects for obtaining current station, according to the train information operating point at current station, to institute There is conflict inspection project to be pre-processed, obtain pre-processed results.
Wherein, the pretreatment includes the information being related in all conflict inspection projects is obtained and calculated.
Conflict inspection project include to hair station the time reasonableness check, dwell time reasonableness check, stop conflict inspection, Adjacent train interval reasonableness check, adjacent train operation conflict check the run time inspection between bicycle station.
Each conflict inspection project is checked respectively in the prior art, calculates corresponding information successively, and in the present embodiment The information being related in all conflict inspection projects disposably obtain and calculate, due to the related letter of each conflict inspection project Cease related, therefore the present embodiment can save substantial amounts of pretreatment time.
S103, according to the pre-processed results, conflict inspection is carried out to each conflict inspection project at current station successively.
Specifically, after being pre-processed to all conflict inspection projects, the related data of each conflict inspection project, example are obtained Such as L1 cars CZ2 arrival time, L1 cars CZ2 dwell time, the L1 cars CZ2 AT STATION AT STATION AT STATION hair station time, so Conflict inspection is carried out according to specific conflict inspection project afterwards, such as carries out L1 cars CZ2 AT STATION hair station time reasonability inspection When looking into, the L1 cars CZ2 arrival time L1.CZ2.D.time and L1 car CZ2 AT STATION AT STATION hair station time is obtained L1.CZ2.F.time, work as L1.CZ2.D.time>During L1.CZ2.F.time, it is believed that L1 AT STATION CZ2 to hair station the time do not conform to Reason.
Specifically, by taking L1.CZ2.D as an example, inspection project is as follows:
1) to hair station time reasonability:L1.CZ2.D next train running information point is L1.CZ2.F, when L1 is CZ2's The time of departure is then unreasonable earlier than arrival time, i.e.,:
Work as L1.CZ2.D.time>L1.CZ2.F.time, it is believed that L1 AT STATION CZ2 to hair station the time it is unreasonable.
2) dwell time:L1.CZ2.F.time-L1.CZ2.D.time:L1 cars CZ2 AT STATION dwell time, it is desirable to stop Stand time meet demand, i.e. 20s<L1.CZ2.F.time-L1.CZ2.D.time<60s.
3) stop conflict:L0 cars first get to the station CZ2, then L0 must have been moved off station when L1 is reached, i.e.,:
Work as L0.CZ2.D.time<L1.CZ2.D.time and L0.CZ2.F.time<L1.CZ2.F.time, or
Work as L0.CZ2.D.time>L1.CZ2.D.time and L0.CZ2.F.time>L1.CZ2.F.time,
Train number where thinking A and B place train numbers conflict in CZ2 without stopping.
4) adjacent train interval:L0 and L1 time difference need to be more than the maximum of minimum reciprocal time, i.e.,: B.time-A.time>90s
5) adjacent train operation conflict:It is required that adjacent train number operation line need to meet L0 cars first from station CZ1 cars without intersection Hair, then must first get to the station CZ2, i.e.,:
Work as L0.CZ1.F.time<L1.CZ1.F.time and L0.CZ2.D.time<L1.CZ2.D.time, or
Work as L0.CZ1.F.time>L1.CZ1.F.time and L0.CZ2.D.time>During L1.CZ2.D.time,
Think that L0 and L1 conflict between CZ1 to CZ2 without operation.
6) run time between bicycle station:The run time that train is run in section need to meet to require, i.e.,:100< preB.time-B.time<106。
After having checked, inspection result can be shown on interface, as shown in Figure 2.
Specifically, in the prior art, it is as follows for the checking step of 6 inspection projects:
A1, for inspection project one, travel through train station arrival times and the train stations time of departures, check hair Whether time reasonability of standing is reasonable;
A2, for inspection project two, travel through train station arrival times and the train stations time of departures, check hair Whether time reasonability of standing is reasonable;
A3, for inspection project three, travel through train station arrival times and the train stations time of departures, check hair Whether time reasonability of standing is reasonable;
A4, for inspection project four, travel through train station arrival times and the train stations time of departures, check hair Whether time reasonability of standing is reasonable;
A5, for inspection project five, travel through train station arrival times and the train stations time of departures, check hair Whether time reasonability of standing is reasonable;
A6, for inspection project six, travel through train station arrival times and the train stations time of departures, check hair Whether time reasonability of standing is reasonable.
That is, prior art is not classified to train stations arrival times and the train stations time of departures, to every Individual inspection project is required to travel through a train stations arrival time and the train stations time of departures.
As a comparison, the method for the service chart conflict inspection of the present embodiment comprises the following steps:
B1, train stations arrival times and the train stations time of departures classified by key assignments of station;
B2, for station A, the reasonability of 6 parameters of inspection project one to project six;
B3, for station B-N, repeat step two.
Above-mentioned six scopes of examination, are related to the arrival time of train and the time of departure, do not examine in the prior art Consider this correlation, above-mentioned six scopes of examination are checked one by one, each project is required to travel through m*n information, six inspections Complexity be m*n*6., therefore, can be in same train number, same station model because project 1-6 is time point parameter In enclosing, while inspection project 1-6 reasonability;That is, the present embodiment considers arriving for six scopes of examination and train first To stand time and time of departure correlation, an array is first traveled through before inspection, then six inspections are carried out simultaneously, therefore, this Shen The complexity of inspection please is m*n, checks that efficiency improves 6 times.
The realization of the present embodiment is based on train running information point, and all check items are completed in once traveling through.
Specifically, train running information point mainly includes:
L1.CZ2.D.time:CZ2 arrival times, L1.CZ2.D next train running information point are L1 cars AT STATION L1.CZ2.F (can be obtained, i.e. L1.CZ2.D.next=L1.CZ2.F) by next train running information point attribute;
L1.CZ2.F.time:L1 cars AT STATION stand the time by CZ2 hairs;
L1.CZ1.F.time:CZ1 hairs station time, L1.CZ1.F are L1.CZ2.D previous column car operations to L1 cars AT STATION Information point (can be obtained, i.e. L1.CZ2.D.pre=L1.CZ1.F) by previous column car operation information point attribute;
L1.CZ2.D.time-L1.CZ1.F.time:Section run time of the L1 cars from station CZ1 to station CZ2;
L1.CZ2.F.time-L1.CZ2.D.time:L1 cars CZ2 AT STATION dwell time;
L0.CZ2.D.time:L0 cars CZ2 arrival times AT STATION, wherein, L0 is L1 previous train;
L0.CZ2.F.time:L0 cars AT STATION stand the time by CZ2 hairs;
L0.CZ1.F.time:L0 cars AT STATION stand the time by CZ1 hairs;
L0.CZ1.F is L0.CZ2.D previous column car operation information point, and L0.CZ2.F is L0.CZ2.D next train fortune Row information point.
The upper operation information point (if present) of operation information point of arriving at a station is to dispatch a car, the next operation information for information point of dispatching a car Point (if present) is the operation information point that arrives at a station.Therefore only take all (or dispatching a car) information points of arriving at a station to do conflict and check and judge, by parking All train running information points that arrive at a station are classified in region, and according to time sequence.Below exemplified by taking up arrive at a station, descending and discrepancy Same way is taken to make a decision in storehouse.Wherein, CZm represents m-th of station, and Ln represents the n-th row train.
I.e.:CZ1:L0.CZ1.D、L1.CZ1.D、……、Ln.CZ1.D
CZ2:L0.CZ2.D、L1.CZ2.D、……、Ln.CZ2.D
……
CZm:L0.CZm.D、L1.CZm.D、……、Ln.CZm.D
Note:Stop jumping (by not parking) is there is also arriving at a station operation information point and to dispatch a car operation information point, simply 2 points of value It is equal, it is only different to hair-like state.
Train information operating point under each parking area is checked, travels through all train fortune under the parking area Row information point carries out conflict inspection.Check the interval reasonability of adjacent train number, whether stop conflicts, runs and conflict, With run time reasonability of all train numbers in each section.
The present embodiment can carry out conflict inspection with the short period to service chart, and check item includes:When all train numbers are to hair station Between reasonability, all table numbers go out storage interval reasonability, all adjacent train number interval reasonability and stop and whether conflict, transport Whether row conflicts, each section run time reasonability of all train numbers, etc..
The present embodiment to all train information operating points according to station by classifying, to the car in units of station All conflict inspection projects stood are pre-processed, and save pretreatment time, and all conflict inspections are completed by once traveling through The conflict inspection of project, the conflict audit function of service chart is realized, drastically increase service chart conflict and check efficiency.
Further, on the basis of above method embodiment, methods described also includes:
If S104, judgement know that first object conflict inspection project has been completed conflict and checked, the first object is rushed The state of prominent inspection project is arranged to inspected state;
If S105, the triggering command for receiving service chart preservation, the state of each conflict inspection project is preserved, no Conflict inspection is carried out to each conflict inspection project.
Specifically, the state for the inspection project that conflicts is the attribute of service chart, did not carried out conflict and checks and conflict inspection not By when, the conflict inspection state of this service chart is false, conflict check by it is rearmounted be true.Compilation personnel can be according to this Attribute directly obtains current service chart conflict situation, without carrying out conflict inspection again, reduces repeated work.
Conflict inspection state is associated with service chart, turns into a part for service chart, this state change means that service chart changes Become, but actually service chart does not have any change.Now compilation personnel will not preserve service chart manually, it is desirable to which conflict audit function Triggerable service chart automatically saves.If but often once conflicted inspection just preserve once, when scheme it is bigger when, expend the time compared with It is long, influence librarian use experience of making picture.And when compilation personnel carried out modification to service chart, such as to preserve modification, compilation person's meeting The figure after modification is preserved manually, and conflict audit function triggers again once preserves real category repeated work;Such as abandon changing, then this figure It should not be saved.To sum up, conflict checks that the opportunity that triggering preserves service chart should be:Service chart does not change and the inspection that conflicts State change.
Conflict checks that the opportunity that triggering preserves service chart should be:Service chart does not change and the inspection state change that conflicts. Service chart does not change and the situation for the inspection state change that conflicts, and does not mainly carry out conflict inspection also in newly one service chart of establishment Exist when looking into.When newly one service chart of establishment, conflict inspection state acquiescence is false, and the service chart is probably not ask Topic, after conflict inspection is carried out for the first time, conflict inspection state can become true.Service chart need not be now changed, still Modification conflict inspection state is needed, that is, the preservation attribute of service chart can also change.
As shown in Figures 3 and 4, F is operation map file, that is, selects the selectable file seen after " opening ", and F.p is operation Figure, i.e., the two dimensional image seen on interface, F.a checks whether for conflict belongs to F by attribute, p, a.
When user changes service chart, F.p changes, and user can voluntarily preserve, and program automatically saves F;When F.p does not occur Change, user carries out conflict inspection, if F.a changes, program automatically saves F, if F.a does not change, does not process.
Conflict is checked and not associated with preserving in the prior art, now can and F.a unchanged in F.p automatically save fortune when changing Row figure, service chart upload is only relevant with figure itself, will not trigger and upload because inspection result changes.The present embodiment is by service chart Conflict inspection state it is associated with service chart, and do not change in service chart but conflict inspection state change when upload preservation run Figure.
The present embodiment can screen the train running information point under same station, with the train running information under same station All projects to be checked are disposably checked based on point;And service chart preservation can be triggered automatically, preservation opportunity is:Service chart is not sent out Life changes and the inspection state change that conflicts.
Further, on the basis of above method embodiment, methods described also includes:
If S106, judgement know that the second goal conflict inspection project is unreasonable, target warning message corresponding to generation;
S107, if user's click target warning message is received, by target alarm signal described in the service chart Conflict point is highlighted corresponding to breath.
In the prior art, after conflict has checked, for each single item collision alert, user can only click on the word of alarm Information, the service chart of conflict can not be shown on the diagram.And in the present embodiment, after conflict has checked, user clicks on alarm Text information, corresponding operation can be first highlighted, and be rushed with enabling compilation personnel more clearly to position specific service chart Bump position.
The inspection result of prior art only does suggesting effect to compilation personnel, is associated with service chart small, and the present embodiment exists After system quotes each single item collision alert, user clicks on specific warning message, can navigate to specific service chart conflict point position Put.
The present embodiment presses parking area to train running information, and (parking area includes garage and station, in the present embodiment To put it more simply, only being illustrated with station) division, in units of train running information point, all items are completed by once traveling through Check, realize the conflict audit function of service chart, drastically increase service chart conflict and check efficiency.Service chart is automatic simultaneously Preserve, the highlighted prompting of conflict point, improve system usability.
Fig. 5 shows that a kind of service chart conflict that the present embodiment provides checks the structural representation of processing unit, the dress Put including:Operating point sort module 501, pretreatment module 502 and conflict check module 503, wherein:
The operating point sort module 501 is used to obtain train information operating point all in service chart, and according to difference Station is classified to all train information operating points, obtains train information operating point corresponding to each station;
The pretreatment module 502 is used for all conflict inspection projects for obtaining current station, according to the row at current station Car information operating point, all conflict inspection projects are pre-processed, obtain pre-processed results;
The conflict checks that module 503 is used for according to the pre-processed results, successively to each conflict inspection at current station Project carries out conflict inspection.
Specifically, the operating point sort module 501 obtains train information operating point all in service chart, and according to not All train information operating points are classified with station, obtain train information operating point corresponding to each station;The pre- place Reason module 502 obtains all conflict inspection projects at current station, according to the train information operating point at current station, to all punchings Prominent inspection project is pre-processed, and obtains pre-processed results;The conflict checks module 503 according to the pre-processed results, according to Secondary each conflict inspection project to current station carries out conflict inspection.
The present embodiment to all train information operating points according to station by classifying, to the car in units of station All conflict inspection projects stood are pre-processed, and save pretreatment time, and all conflict inspections are completed by once traveling through The conflict inspection of project, the conflict audit function of service chart is realized, drastically increase service chart conflict and check efficiency.
Further, on the basis of said apparatus embodiment, conflict inspection project is included to the time reasonability inspection of hair station Look into, dwell time reasonableness check, stop conflict inspections, adjacent train interval reasonableness check, adjacent train operation rush It is prominent to check the run time inspection between bicycle station.
Further, on the basis of said apparatus embodiment, described device also includes:
State setting module, if for judging to know that first object conflict inspection project has been completed conflict and checked, by institute The state for stating first object conflict inspection project is arranged to inspected state;
State preserving module, if the triggering command for receiving service chart preservation, to the shape of each conflict inspection project State is preserved, and does not carry out conflict inspection to each conflict inspection project.
Further, on the basis of said apparatus embodiment, described device also includes:
Warning message generation module, if for judging to know that the second goal conflict inspection project is unreasonable, generation is corresponding Target warning message;
Module is highlighted, if the target warning message is clicked on for receiving user, by institute in the service chart Conflict point corresponding to stating target warning message is highlighted.
Service chart conflict described in the present embodiment checks that processing unit can be used for performing above method embodiment, its principle Similar with technique effect, here is omitted.
Reference picture 6, the electronic equipment, including:Processor (processor) 601, memory (memory) 602 and total Line 603;
Wherein,
The processor 601 and memory 602 complete mutual communication by the bus 603;
The processor 601 is used to call the programmed instruction in the memory 602, to perform above-mentioned each method embodiment The method provided.
The present embodiment discloses a kind of computer program product, and the computer program product includes being stored in non-transient calculating Computer program on machine readable storage medium storing program for executing, the computer program include programmed instruction, when described program instruction is calculated When machine performs, computer is able to carry out the method that above-mentioned each method embodiment is provided.
The present embodiment provides a kind of non-transient computer readable storage medium storing program for executing, the non-transient computer readable storage medium storing program for executing Computer instruction is stored, the computer instruction makes the computer perform the method that above-mentioned each method embodiment is provided.
Device embodiment described above is only schematical, wherein the unit illustrated as separating component can To be or may not be physically separate, it can be as the part that unit is shown or may not be physics list Member, you can with positioned at a place, or can also be distributed on multiple NEs.It can be selected according to the actual needs In some or all of module realize the purpose of this embodiment scheme.Those of ordinary skill in the art are not paying creativeness Work in the case of, you can to understand and implement.
Through the above description of the embodiments, those skilled in the art can be understood that each embodiment can Realized by the mode of software plus required general hardware platform, naturally it is also possible to pass through hardware.Based on such understanding, on The part that technical scheme substantially in other words contributes to prior art is stated to embody in the form of software product, should Computer software product can store in a computer-readable storage medium, such as ROM/RAM, magnetic disc, CD, including some fingers Make to cause a computer equipment (can be personal computer, server, or network equipment etc.) to perform each implementation Method described in some parts of example or embodiment.
It should be noted that:The above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although reference The present invention is described in detail previous embodiment, it will be understood by those within the art that:It still can be right Technical scheme described in foregoing embodiments is modified, or carries out equivalent substitution to which part technical characteristic;And this A little modifications are replaced, and the essence of appropriate technical solution is departed from the spirit and model of various embodiments of the present invention technical scheme Enclose.

Claims (10)

1. a kind of service chart conflict checks processing method, it is characterised in that including:
Train information operating point all in service chart is obtained, and all train information operating points are carried out according to different stations Classification, obtains train information operating point corresponding to each station;
All conflict inspection projects at current station are obtained, according to the train information operating point at current station, all conflicts are examined The project of looking into is pre-processed, and obtains pre-processed results;
According to the pre-processed results, conflict inspection is carried out to each conflict inspection project at current station successively.
2. according to the method for claim 1, it is characterised in that conflict inspection project is included to the time reasonability inspection of hair station Look into, dwell time reasonableness check, stop conflict inspections, adjacent train interval reasonableness check, adjacent train operation rush It is prominent to check the run time inspection between bicycle station.
3. according to the method for claim 1, it is characterised in that methods described also includes:
If judgement knows that first object conflict inspection project has been completed conflict and checked, by first object conflict inspection project State be arranged to inspected state;
If receiving the triggering command of service chart preservation, the state of each conflict inspection project is preserved, not to each conflict Inspection project carries out conflict inspection.
4. according to the method for claim 1, it is characterised in that methods described also includes:
If judgement knows that the second goal conflict inspection project is unreasonable, target warning message corresponding to generation;
If receiving user clicks on the target warning message, by punching corresponding to target warning message described in the service chart Bump is highlighted.
5. a kind of service chart conflict checks processing unit, it is characterised in that including:
Operating point sort module, for obtaining train information operating point all in service chart, and according to different stations to all Train information operating point classified, obtain train information operating point corresponding to each station;
Pretreatment module, for obtaining all conflict inspection projects at current station, run according to the train information at current station Point, all conflict inspection projects are pre-processed, obtain pre-processed results;
Conflict checks module, for according to the pre-processed results, being rushed successively to each conflict inspection project at current station It is prominent to check.
6. device according to claim 5, it is characterised in that conflict inspection project is included to the time reasonability inspection of hair station Look into, dwell time reasonableness check, stop conflict inspections, adjacent train interval reasonableness check, adjacent train operation rush It is prominent to check the run time inspection between bicycle station.
7. device according to claim 5, it is characterised in that described device also includes:
State setting module, if for judging to know that first object conflict inspection project has been completed conflict and checked, by described the The state of one goal conflict inspection project is arranged to inspected state;
State preserving module, if the triggering command for receiving service chart preservation, the state of each conflict inspection project is entered Row preserves, and does not carry out conflict inspection to each conflict inspection project.
8. device according to claim 5, it is characterised in that described device also includes:
Warning message generation module, if for judging to know that the second goal conflict inspection project is unreasonable, mesh corresponding to generation Mark warning message;
Module is highlighted, if the target warning message is clicked on for receiving user, by mesh described in the service chart Conflict point corresponding to mark warning message is highlighted.
9. a kind of electronic equipment, it is characterised in that including:
At least one processor;And
At least one memory being connected with the processor communication, wherein:
The memory storage has can be by the programmed instruction of the computing device, and the processor calls described program instruction energy Enough perform the method as described in Claims 1-4 is any.
10. a kind of non-transient computer readable storage medium storing program for executing, it is characterised in that the non-transient computer readable storage medium storing program for executing is deposited Computer program is stored up, the computer program makes the computer perform the method as described in Claims 1-4 is any.
CN201710617985.6A 2017-07-26 2017-07-26 A kind of service chart conflict checks processing method and processing device Pending CN107516157A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710617985.6A CN107516157A (en) 2017-07-26 2017-07-26 A kind of service chart conflict checks processing method and processing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710617985.6A CN107516157A (en) 2017-07-26 2017-07-26 A kind of service chart conflict checks processing method and processing device

Publications (1)

Publication Number Publication Date
CN107516157A true CN107516157A (en) 2017-12-26

Family

ID=60722736

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710617985.6A Pending CN107516157A (en) 2017-07-26 2017-07-26 A kind of service chart conflict checks processing method and processing device

Country Status (1)

Country Link
CN (1) CN107516157A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111152818A (en) * 2020-01-03 2020-05-15 中国铁道科学研究院集团有限公司通信信号研究所 Operation diagram stage plan logic checking method
CN112172872A (en) * 2020-08-25 2021-01-05 通号城市轨道交通技术有限公司 Method and device for detecting train conflict, electronic equipment and storage medium
CN112660209A (en) * 2020-12-30 2021-04-16 北京市轨道交通建设管理有限公司 Automatic train running chart adjusting method and device, electronic equipment and medium
CN113928383A (en) * 2021-11-16 2022-01-14 交控科技股份有限公司 Rail transit operation diagram conflict detection method and device
CN114056390A (en) * 2020-07-31 2022-02-18 比亚迪股份有限公司 Method, device and storage medium for conflict display of train operation diagram

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102194162A (en) * 2011-03-25 2011-09-21 上海磁浮交通发展有限公司 Method for realizing automatic drawing of running chart of magnetic-levitation train
US20130212917A1 (en) * 2012-01-31 2013-08-22 International Business Machines Corporation Reorganizing display of a railway timetable diagram

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102194162A (en) * 2011-03-25 2011-09-21 上海磁浮交通发展有限公司 Method for realizing automatic drawing of running chart of magnetic-levitation train
US20130212917A1 (en) * 2012-01-31 2013-08-22 International Business Machines Corporation Reorganizing display of a railway timetable diagram

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
SUNDARAVALLI NARAYANASWAMI等: "Modelling disruptions and resolving conflicts optimally in a railway schedule", 《COMPUTERS & INDUSTRIAL ENGINEERING》 *
李强: "高速铁路列车运行图编制系统优化研究", 《中国优秀硕士学位论文全文数据库》 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111152818A (en) * 2020-01-03 2020-05-15 中国铁道科学研究院集团有限公司通信信号研究所 Operation diagram stage plan logic checking method
CN111152818B (en) * 2020-01-03 2021-12-28 中国铁道科学研究院集团有限公司通信信号研究所 Operation diagram stage plan logic checking method
CN114056390A (en) * 2020-07-31 2022-02-18 比亚迪股份有限公司 Method, device and storage medium for conflict display of train operation diagram
CN112172872A (en) * 2020-08-25 2021-01-05 通号城市轨道交通技术有限公司 Method and device for detecting train conflict, electronic equipment and storage medium
CN112172872B (en) * 2020-08-25 2022-11-29 通号城市轨道交通技术有限公司 Method, device, electronic equipment and storage medium for detecting train conflict
CN112660209A (en) * 2020-12-30 2021-04-16 北京市轨道交通建设管理有限公司 Automatic train running chart adjusting method and device, electronic equipment and medium
CN112660209B (en) * 2020-12-30 2023-04-07 北京市轨道交通建设管理有限公司 Automatic train running chart adjusting method and device, electronic equipment and medium
CN113928383A (en) * 2021-11-16 2022-01-14 交控科技股份有限公司 Rail transit operation diagram conflict detection method and device

Similar Documents

Publication Publication Date Title
CN107516157A (en) A kind of service chart conflict checks processing method and processing device
Ghilas et al. An adaptive large neighborhood search heuristic for the pickup and delivery problem with time windows and scheduled lines
Samà et al. A variable neighbourhood search for fast train scheduling and routing during disturbed railway traffic situations
Milinković et al. A fuzzy Petri net model to estimate train delays
Boysen et al. Shunting yard operations: Theoretical aspects and applications
Wang et al. Waiting for public transport services: Queueing analysis with balking and reneging behaviors of impatient passengers
CN112883640B (en) Digital twin station system, job scheduling method based on system and application
CN104884900A (en) Travel time information providing apparatus and travel time information providing method
CN108364143A (en) Allocator and delivery system
CN106652530A (en) Scheduling timetable generating method and apparatus
US12002360B2 (en) Method and apparatus for adjusting train diagram
Baou et al. Emergency evacuation planning in natural disasters under diverse population and fleet characteristics
López-Ramos Integrating network design and frequency setting in public transportation networks: a survey
CN112381277B (en) Outgoing line distribution method for connecting multiple lines and connecting high-speed railway junction station
CN107292635A (en) The returned ticket method and apparatus of electronic passenger ticket
Serra et al. Last-mile scheduling under uncertainty
Makhloufi et al. Simulation of mutualized urban logistics systems with real-time management
Zhang et al. Optimized Skip‐Stop Metro Line Operation Using Smart Card Data
CN111428902A (en) Method and device for determining transport route
CN113988485B (en) Site arrival amount prediction method and device, electronic equipment and computer readable medium
CN106741014B (en) A kind of railway transport of passengers train Query Information generates and processing method
Qin et al. Post disaster adaptation management in airport: A coordination of runway and hangar resources for relief cargo transports
Milbredt et al. Evaluating conditions and impact of intermodal traffic management involving airports and railways
Zhuo et al. Demand-driven integrated train timetabling and rolling stock scheduling on urban rail transit line
Deleplanque et al. Train management in freight shunting yards: Formalisation and literature review

Legal Events

Date Code Title Description
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20171226

RJ01 Rejection of invention patent application after publication