CN107506214A - The update method and more new system of a kind of group system controller - Google Patents

The update method and more new system of a kind of group system controller Download PDF

Info

Publication number
CN107506214A
CN107506214A CN201710764952.4A CN201710764952A CN107506214A CN 107506214 A CN107506214 A CN 107506214A CN 201710764952 A CN201710764952 A CN 201710764952A CN 107506214 A CN107506214 A CN 107506214A
Authority
CN
China
Prior art keywords
controller
processing module
renewal
new
event
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710764952.4A
Other languages
Chinese (zh)
Other versions
CN107506214B (en
Inventor
王佳琪
李美欣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou Yunhai Information Technology Co Ltd
Original Assignee
Zhengzhou Yunhai Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Yunhai Information Technology Co Ltd filed Critical Zhengzhou Yunhai Information Technology Co Ltd
Priority to CN201710764952.4A priority Critical patent/CN107506214B/en
Publication of CN107506214A publication Critical patent/CN107506214A/en
Application granted granted Critical
Publication of CN107506214B publication Critical patent/CN107506214B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F8/00Arrangements for software engineering
    • G06F8/60Software deployment
    • G06F8/65Updates

Landscapes

  • Engineering & Computer Science (AREA)
  • Software Systems (AREA)
  • General Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Computer Security & Cryptography (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Stored Programmes (AREA)

Abstract

This application discloses a kind of update method of group system controller, including:Controller receives more new command;Wherein, the quantity of the controller is at least 2;The renewal operation of the 3rd processing module is performed to the 3rd processing module of the controller according to the more new command according to preset order, obtains updating state controller;First processing module renewal operation is performed to the first processing module of the renewal state controller according to the more new command, obtains new controller;By the way that controller is divided into first processing module, Second processing module and the 3rd processing module, the 3rd processing module and first processing module are upgraded respectively in upgrading, due in upgrading using be not unified upgrading by the way of, it is small to the function effect of cluster in upgrading, the duration of interruption of work is also shorter, can reach higher upgrading efficiency.The application also provides a kind of more new system of group system controller, has above beneficial effect.

Description

The update method and more new system of a kind of group system controller
Technical field
The application is related to controller technology field, the update method of more particularly to a kind of group system controller and renewal system System.
Background technology
With the development of cloud computing technology, server process data increase, while server process performance requirement is continuous Improve, in the server network of cloud computing, individual node controller gradually can not meet requirement.Therefore, using multiple sections Base site controller forms cluster network, and the process performance of cluster network can be made to improve while have very high sexual valence in cost Than.
But multiple Node Controllers are being got up by express network interconnection, group system is formed, is needed when controller , it is necessary to which single controller is upgraded when upgrading, it is necessary to which cluster is dismissed.And with regard to nothing after cluster dismission Method carries out the processing work of event.And when the time of controller upgrading is longer, prolonged handling process can be caused to interrupt, It is unfavorable for the work of group system.
Therefore, the Important Problems that the upgrading duration of group system controller is ability cloud personnel concern how are shortened.
The content of the invention
The purpose of the application is to provide the update method and more new system of a kind of group system controller, by by controller It is divided into first processing module, Second processing module and the 3rd processing module, in upgrading respectively to the 3rd processing module and the One processing module is upgraded, due in upgrading using be not unified upgrading by the way of, in upgrading to the function of cluster Influence small, the duration of interruption of work is also shorter, can reach higher upgrading efficiency.
In order to solve the above technical problems, the application provides a kind of update method of group system controller, including:Controller Receive more new command;Wherein, the quantity of the controller is at least 2;
The 3rd processing mould is performed to the 3rd processing module of the controller according to the more new command according to preset order Block renewal operation, obtains updating state controller;
First processing module is performed more to the first processing module of the renewal state controller according to the more new command New operation, obtains new controller;
Wherein, reception event and the functional module for checking event will be carried out in controller as first processing module, will be controlled The functional module of filter event is carried out in device processed as Second processing module, the functional module of event execution will be carried out in controller As the 3rd processing module.
Optionally, it is described obtain it is described renewal state controller after, in addition to:
When the first processing module of the renewal state controller receives event, controlled to the more new state New 3rd processing module of device sends the event;
New 3rd processing module performs to the event.
Optionally, it is described that the 3rd processing module of the controller is performed according to the more new command according to preset order The renewal operation of 3rd processing module, obtain updating state controller, including:
Clustering functionality is suspended according to the preset order according to the more new command;
Replacement operation is performed to the 3rd processing module according to the more new command, obtains the more new state control Device, and recover clustering functionality.
Optionally, more new command described in the basis performs first to the first processing module of the renewal state controller Processing module renewal operation, obtains new controller, including:
Terminate when the 3rd processing module renewal of all controllers operates execution, all more new state controls Device processed is stopped;
Renewal operation is performed to all first processing modules according to the more new command, obtains the new controller, And resume work.
The application also provides a kind of more new system of group system controller, including:
Instruction reception unit is updated, more new command is received for controller;Wherein, the quantity of the controller is at least 2;
First renewal operation execution unit, for according to preset order according to more new command to the controller the Three processing modules perform the renewal operation of the 3rd processing module, obtain updating state controller;
Second renewal operation execution unit, for according to the more new command to it is described update state controller first at Manage module and perform first processing module renewal operation, obtain new controller;
Wherein, reception event and the functional module for checking event will be carried out in controller as first processing module, will be controlled The functional module of filter event is carried out in device processed as Second processing module, the functional module of event execution will be carried out in controller As the 3rd processing module.
Optionally, in addition to:
Receive and send processing unit, for receiving event when the first processing module of the renewal state controller When, send the event to new 3rd processing module of the renewal state controller;
Event performs processing unit, for being performed using new 3rd processing module to the event.
Optionally, the first renewal operation execution unit includes:
Function suspends subelement, suspends clustering functionality according to the preset order for the more new command according to;
Subelement is replaced in renewal, is performed replacement operation to the 3rd processing module for the more new command according to, is obtained To the renewal state controller, and recover clustering functionality.
Optionally, the second renewal operation execution unit includes:
Be stopped subelement, and knot is performed for the 3rd processing module renewal operation when all controllers Beam, all renewal state controllers are stopped;
Renewal operation subelement, renewal behaviour is performed to all first processing modules for the more new command according to Make, obtain the new controller, and resume work.
A kind of update method of group system controller provided herein, including controller receive more new command; Wherein, the quantity of the controller is at least 2;According to preset order according to the more new command to the 3rd of the controller Processing module performs the renewal operation of the 3rd processing module, obtains updating state controller;According to the more new command to it is described more The first processing module of new state controller performs first processing module renewal operation, obtains new controller;Wherein, by controller The middle functional module for carrying out reception event and checking event will carry out the work(of filter event as first processing module in controller Energy module will carry out the functional module of event execution as the 3rd processing module as Second processing module in controller.
By the way that controller is divided into first processing module, Second processing module and the 3rd processing module, in the upgrading time-division It is other that 3rd processing module and first processing module are upgraded, due in upgrading using be not unified upgrading by the way of, Small to the function effect of cluster in upgrading, the duration of interruption of work is also shorter, can reach higher upgrading efficiency.
Brief description of the drawings
, below will be to embodiment or existing in order to illustrate more clearly of the embodiment of the present application or technical scheme of the prior art There is the required accompanying drawing used in technology description to be briefly described, it should be apparent that, drawings in the following description are only this The embodiment of application, for those of ordinary skill in the art, on the premise of not paying creative work, can also basis The accompanying drawing of offer obtains other accompanying drawings.
Fig. 1 is a kind of flow chart of the update method for group system controller that the embodiment of the present application provides;
Fig. 2 is at a kind of renewal state controller of the update method for group system controller that the embodiment of the present application provides The flow chart of director's part;
Fig. 3 is a kind of the 3rd processing module renewal of the update method for group system controller that the embodiment of the present application provides The flow chart of operation;
Fig. 4 is a kind of first processing module renewal of the update method for group system controller that the embodiment of the present application provides The flow chart of operation;
Fig. 5 is a kind of structural representation of the more new system for group system controller that the embodiment of the present application provides.
Embodiment
The core of the application is to provide the update method and more new system of a kind of group system controller, by by controller It is divided into first processing module, Second processing module and the 3rd processing module, in upgrading respectively to the 3rd processing module and the One processing module is upgraded, due in upgrading using be not unified upgrading by the way of, in upgrading to the function of cluster Influence small, the duration of interruption of work is also shorter, can reach higher upgrading efficiency.
To make the purpose, technical scheme and advantage of the embodiment of the present application clearer, below in conjunction with the embodiment of the present application In accompanying drawing, the technical scheme in the embodiment of the present application is clearly and completely described, it is clear that described embodiment is Some embodiments of the present application, rather than whole embodiments.Based on the embodiment in the application, those of ordinary skill in the art The every other embodiment obtained under the premise of creative work is not made, belong to the scope of the application protection.
Fig. 1 is refer to, Fig. 1 is a kind of flow of the update method for group system controller that the embodiment of the present application provides Figure.
S101, controller receive more new command;Wherein, the quantity of controller is at least 2;
This step is intended to, and controller is received more new command, is to update this operation to be triggered in group system, Therefore, more new command can be the renewal bag sent to group system, can be the instruction of a notification properties, can serve as The more new command of the present embodiment, no longer chase after herein suitable.
It should be noted that being usually to be made up of multiple controllers in group system, can there is one in multiple controllers The individual controller as master controller, form the controller form of total score;Can also be the control that multiple controllers realize sane level Device form.But the controller compositional model of quovis modo, controller therein needs to receive more new command, to open The flow of dynamic renewal.And the transfer mode and Transfer Medium of more new command should solve the problems, such as to do depending on specific application environment Selection, is no longer repeated herein.
S102, the 3rd processing module is performed more to the 3rd processing module of controller according to more new command according to preset order New operation, obtain updating state controller;
On the basis of step S101, this step is intended to, and controller is received after more new command according to more new command to the Three processing modules are updated operation.For the technical program in design, the 3rd new processing module can be at compatible old first Manage module and carry out event handling with Second processing module, therefore in this step, the 3rd processing module of controller is first carried out Renewal operation, obtains the controller of more new state, that is, contains old first processing module and Second processing module and newly The 3rd processing module.
It is to enter in sequence due to being the controller in group system, therefore for the 3rd renewal for handling module of rubbing OK.Wherein, preset order can be updated operation successively by controller is single in a certain order, sequentially can be pre- The number order first set can also be according to the order for the time for adding group system, be set depending on concrete condition, herein Do not repeat.
Can also be that multiple controllers are updated operation in a certain order, the wherein quantity of controller can basis In current cluster depending on the quantity of controller, that is, when the amount controller in cluster is more, in a number of controller The normal work of group system will not be greatly affected during renewal.Using the quantity of the controller that can be updated now as same The quantity of Shi Gengxin controller.Certainly, this quantity can be one.
Therefore, the quantity of the controller of renewal should regard the scale of specific cluster simultaneously in this step, handle thing The urgency level of part selects, and no longer limits herein.
At no point in the update process, can be updated according to information is carried in more new command, for example, more new command is exactly one Renewal bag, just it is updated using renewal bag;Or the address of the bag of renewal is carried in more new command, it is necessary to which controller voluntarily obtains Take the renewal bag that renewal uses.The acquisition modes that different applicable cases select different renewal bags should be regarded, are no longer done herein superfluous State.
S103, first processing module renewal behaviour is performed to the first processing module for updating state controller according to more new command Make, obtain new controller;
On the basis of step S102, this step is intended to, and renewal state controller is updated, its process i.e. right The first processing module of more new state control is updated to obtain new controller.
It should be noted that can be updated the renewal state controller of whole in the present embodiment, that is, Perform the renewal of the first module again after all controllers perform the renewal operation of the 3rd processing module.It can also be a fixed number After the renewal state controller renewal of amount, these renewal state controllers are updated.Due to first processing module Renewal speed is very fast, and overall be updated to it will not also cause very big influence to group system, and in group system The time that the renewal of angle apparently first processing module is interrupted can be ignored, therefore, according to the environment of concrete application, and The renewal state controller that the working characteristics selection of group system is now updated, is no longer repeated herein.
Wherein, renewal of the renewal for controller mainly by updating first processing module and the 3rd processing module is complete Into, therefore be exactly mainly to include in new controller, new first processing module and the 3rd new processing module.
Wherein, reception event and the functional module for checking event will be carried out in controller as first processing module, will be controlled The functional module of filter event is carried out in device processed as Second processing module, the functional module of event execution will be carried out in controller As the 3rd processing module.
It is unrelated with specific event because Second processing module only plays a role in filtering, therefore in the renewal process of controller In Second processing module is not updated.
Therefore, to sum up, by the way that controller is divided into first processing module, Second processing module and the 3rd processing module, The 3rd processing module and first processing module are upgraded respectively in upgrading, because what is used in upgrading is not unified rise The mode of level, small to the function effect of cluster in upgrading, the duration of interruption of work is also shorter, can reach higher upgrading Efficiency.
Fig. 2 is refer to, Fig. 2 is a kind of renewal shape of the update method for group system controller that the embodiment of the present application provides State controller handles the flow chart of event.
With reference to a upper embodiment, the present embodiment is one done for a upper embodiment after renewal state controller is obtained Expand explanation, other parts are substantially the same with a upper embodiment, and same section may be referred to an embodiment, no longer do herein superfluous State.
The present embodiment can include:
S201, when the first processing module for updating state controller receives event, to the new of renewal state controller 3rd processing module sends event;
This step is intended to, and event handling is carried out by updating state controller.
In the present embodiment, renewal state controller is all with the 3rd new processing module and old first processing module Controller.Wherein, the 3rd new processing module is capable of the event of compatible the 3rd old processing module, that is, at old first Reason module can receive the event between cluster, and the 3rd new processing module is delivered to by Second processing module, and the new the 3rd Processing module is handled with regard to part as to this.
S202, new 3rd processing module perform to event.
On the basis of step S201, this step is intended to, and event is handled by new 3rd processing module.
It should be noted that in the renewal process of whole cluster, can be deposited before upgrading to first processing module In the controller of a number of more new state, now the controller can carry out the processing of event, that is to say, that in cluster system Unite in this stage of renewal, can there is a controller of three kinds of states, old controller, the controller that updates and more New state controller, wherein old controller and renewal state controller can be carried out to event, the controller updated is then Time can not be handled, but the quantity of controller that any time point is updating can be kept within the specific limits, this Lacking this number of controller can't make a big impact to the work of group system.And other two kinds can continue work The controller of work, for whole group system still in normal work.Therefore being not in systems group system should be more The situation of prolonged operating interruptions caused by newly.
Fig. 3 is refer to, Fig. 3 is at the 3rd of a kind of update method for group system controller that the embodiment of the present application provides the Manage the flow chart of module renewal operation.
With reference to a upper embodiment, the present embodiment is to be directed in a upper embodiment how to perform the renewal operation of the 3rd processing module An explanation is done, other parts are substantially the same with a upper embodiment, and same section may be referred to an embodiment, herein no longer Repeat.
The present embodiment can include:
S301, clustering functionality is suspended according to preset order according to more new command;
This step is intended to be suspended controller according to preset order.
Wherein, clustering functionality is the function and normal use that are interacted with other controllers in a cluster network Function.Due to when controller updates, keeping clustering functionality to cause the disorder and processing time error of cluster network, therefore Need the clustering functionality of the pause controller.
S302, replacement operation is performed to the 3rd processing module according to more new command, obtains updating state controller, and recover Clustering functionality.
On the basis of step S301, this step is intended to the controller after pause function being updated operation to obtain more New state controller, and recover clustering functionality.
Wherein, in general renewal operation, as the code for part and data are replaced operation, make by controller Spontaneous progress.Replacement operation in the present embodiment is essentially identical.
For wherein recovery operation can be the spontaneous startup clustering functionality of controller after renewal, be added to group system In be operated or transmitted completion signal after the completion of updating, the controller is added in network by other controllers.
Fig. 4 is refer to, Fig. 4 is at the first of a kind of update method for group system controller that the embodiment of the present application provides Manage the flow chart of module renewal operation.
With reference to a upper embodiment, the present embodiment is to be directed in a upper embodiment how to perform first processing module renewal operation An explanation is done, other parts are substantially the same with a upper embodiment, and same section may be referred to an embodiment, herein no longer Repeat.
The present embodiment can include:
S401, when the 3rd processing module renewal operation execution of all controllers terminates, all renewal state controllers stop Only work;
This step is intended to, and all renewal state controllers are stopped.
S402, renewal operation is performed to all first processing modules according to more new command, obtains new controller, and recover work Make.
On the basis of step S401, this step is intended to be updated behaviour to the first processing module for updating state controller Make, obtain new controller.
The embodiment of the present application provides a kind of update method of group system controller, by the way that controller is divided at first Module, Second processing module and the 3rd processing module are managed, in upgrading respectively to the 3rd processing module and first processing module Upgraded, due in upgrading using be not unified upgrading by the way of, it is small to the function effect of cluster in upgrading, in The duration of disconnected work is also shorter, can reach higher upgrading efficiency.
A kind of more new system of the group system controller provided below the embodiment of the present application is introduced, and is described below The more new system of group system controller a kind of can be mutual with a kind of above-described update method of group system controller To should refer to.
Fig. 5 is refer to, Fig. 5 is that a kind of structure of the more new system for group system controller that the embodiment of the present application provides is shown It is intended to.
The present embodiment can include:
Instruction reception unit 100 is updated, more new command is received for controller;Wherein, the quantity of controller is at least 2 It is individual;
First renewal operation execution unit 200, for according to preset order according to more new command at the 3rd of controller the Manage module and perform the renewal operation of the 3rd processing module, obtain updating state controller;
Second renewal operation execution unit 300, for handling mould to updating the first of state controller according to more new command Block performs first processing module renewal operation, obtains new controller;
Wherein, reception event and the functional module for checking event will be carried out in controller as first processing module, will be controlled The functional module of filter event is carried out in device processed as Second processing module, the functional module of event execution will be carried out in controller As the 3rd processing module.
Optionally, can also include:
Receive send processing unit, for when update state controller first processing module receive event when, Xiang Geng New 3rd processing module of new state controller sends event;
Event performs processing unit, for being performed using new 3rd processing module to event.
Optionally, the first renewal operation execution unit can include:
Function suspends subelement, for suspending clustering functionality according to preset order according to more new command;
Subelement is replaced in renewal, for performing replacement operation to the 3rd processing module according to more new command, obtains updating shape State controller, and recover clustering functionality.
Optionally, the second renewal operation execution unit can include:
Be stopped subelement, terminates for the 3rd processing module renewal operation execution when all controllers, Suo Yougeng New state controller is stopped;
Renewal operation subelement, for all first processing modules to be performed with renewal operation according to more new command, obtain new Controller, and resume work.
Each embodiment is described by the way of progressive in specification, and what each embodiment stressed is and other realities Apply the difference of example, between each embodiment identical similar portion mutually referring to.For device disclosed in embodiment Speech, because it is corresponded to the method disclosed in Example, so description is fairly simple, related part is referring to method part illustration .
Professional further appreciates that, with reference to the unit of each example of the embodiments described herein description And algorithm steps, can be realized with electronic hardware, computer software or the combination of the two, in order to clearly demonstrate hardware and The interchangeability of software, the composition and step of each example are generally described according to function in the above description.These Function is performed with hardware or software mode actually, application-specific and design constraint depending on technical scheme.Specialty Technical staff can realize described function using distinct methods to each specific application, but this realization should not Think to exceed scope of the present application.
Directly it can be held with reference to the step of method or algorithm that the embodiments described herein describes with hardware, processor Capable software module, or the two combination are implemented.Software module can be placed in random access memory (RAM), internal memory, read-only deposit Reservoir (ROM), electrically programmable ROM, electrically erasable ROM, register, hard disk, moveable magnetic disc, CD-ROM or technology In any other form of storage medium well known in field.
The update method and more new system of a kind of group system controller provided herein have been carried out in detail above Introduce.Specific case used herein is set forth to the principle and embodiment of the application, the explanation of above example It is only intended to help and understands the present processes and its core concept.It should be pointed out that the ordinary skill people for the art For member, on the premise of the application principle is not departed from, some improvement and modification can also be carried out to the application, these improve and Modification is also fallen into the application scope of the claims.

Claims (8)

  1. A kind of 1. update method of group system controller, it is characterised in that including:
    Controller receives more new command;Wherein, the quantity of the controller is at least 2;
    The 3rd processing module is performed more to the 3rd processing module of the controller according to the more new command according to preset order New operation, obtain updating state controller;
    First processing module renewal behaviour is performed to the first processing module of the renewal state controller according to the more new command Make, obtain new controller;
    Wherein, reception event and the functional module of the event of inspection will be carried out in controller as first processing module, by controller It is middle carry out filter event functional module be used as Second processing module, using in controller progress event execution functional module as 3rd processing module.
  2. 2. update method according to claim 1, it is characterised in that it is described obtain it is described renewal state controller after, Also include:
    When the first processing module of the renewal state controller receives event, to the renewal state controller New 3rd processing module sends the event;
    New 3rd processing module performs to the event.
  3. 3. update method according to claim 2, it is characterised in that it is described according to preset order according to the more new command The renewal operation of 3rd processing module is performed to the 3rd processing module of the controller, obtains updating state controller, including:
    Clustering functionality is suspended according to the preset order according to the more new command;
    Replacement operation is performed to the 3rd processing module according to the more new command, obtains the renewal state controller, and Recover clustering functionality.
  4. 4. update method according to claim 3, it is characterised in that more new command described in the basis is to the renewal shape The first processing module of state controller performs first processing module renewal operation, obtains new controller, including:
    Terminate when the 3rd processing module renewal of all controllers operates execution, all renewal state controllers It is stopped;
    Renewal operation is performed to all first processing modules according to the more new command, obtains the new controller, and it is extensive Return to work work.
  5. A kind of 5. more new system of group system controller, it is characterised in that including:
    Instruction reception unit is updated, more new command is received for controller;Wherein, the quantity of the controller is at least 2;
    First renewal operation execution unit, for according to preset order according to more new command at the 3rd of the controller the Manage module and perform the renewal operation of the 3rd processing module, obtain updating state controller;
    Second renewal operation execution unit, mould is handled to the first of the renewal state controller for the more new command according to Block performs first processing module renewal operation, obtains new controller;
    Wherein, reception event and the functional module of the event of inspection will be carried out in controller as first processing module, by controller It is middle carry out filter event functional module be used as Second processing module, using in controller progress event execution functional module as 3rd processing module.
  6. 6. more new system according to claim 5, it is characterised in that also include:
    Receive send processing unit, for when it is described renewal state controller the first processing module receive event when, The event is sent to new 3rd processing module of the renewal state controller;
    Event performs processing unit, for being performed using new 3rd processing module to the event.
  7. 7. more new system according to claim 6, it is characterised in that the first renewal operation execution unit includes:
    Function suspends subelement, suspends clustering functionality according to the preset order for the more new command according to;
    Subelement is replaced in renewal, is performed replacement operation to the 3rd processing module for the more new command according to, is obtained institute Renewal state controller is stated, and recovers clustering functionality.
  8. 8. more new system according to claim 7, it is characterised in that the second renewal operation execution unit includes:
    Be stopped subelement, terminates for the 3rd processing module renewal operation execution when all controllers, institute There is the renewal state controller to be stopped;
    Renewal operation subelement, renewal operation is performed to all first processing modules for the more new command according to, obtained To the new controller, and resume work.
CN201710764952.4A 2017-08-30 2017-08-30 Updating method and updating system of cluster system controller Active CN107506214B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710764952.4A CN107506214B (en) 2017-08-30 2017-08-30 Updating method and updating system of cluster system controller

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710764952.4A CN107506214B (en) 2017-08-30 2017-08-30 Updating method and updating system of cluster system controller

Publications (2)

Publication Number Publication Date
CN107506214A true CN107506214A (en) 2017-12-22
CN107506214B CN107506214B (en) 2021-05-25

Family

ID=60693339

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710764952.4A Active CN107506214B (en) 2017-08-30 2017-08-30 Updating method and updating system of cluster system controller

Country Status (1)

Country Link
CN (1) CN107506214B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108768726A (en) * 2018-05-30 2018-11-06 郑州云海信息技术有限公司 A kind of upgrade method and device of server cluster

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105224371A (en) * 2015-10-21 2016-01-06 浪潮(北京)电子信息产业有限公司 A kind of update method of storage management software and system
CN105791337A (en) * 2014-12-19 2016-07-20 华为数字技术(苏州)有限公司 Upgrading method, device and cluster system
CN106803790A (en) * 2016-12-06 2017-06-06 浙江大华技术股份有限公司 The upgrade control method and device of a kind of group system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105791337A (en) * 2014-12-19 2016-07-20 华为数字技术(苏州)有限公司 Upgrading method, device and cluster system
CN105224371A (en) * 2015-10-21 2016-01-06 浪潮(北京)电子信息产业有限公司 A kind of update method of storage management software and system
CN106803790A (en) * 2016-12-06 2017-06-06 浙江大华技术股份有限公司 The upgrade control method and device of a kind of group system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108768726A (en) * 2018-05-30 2018-11-06 郑州云海信息技术有限公司 A kind of upgrade method and device of server cluster

Also Published As

Publication number Publication date
CN107506214B (en) 2021-05-25

Similar Documents

Publication Publication Date Title
EP3065055B1 (en) Healing cloud services during upgrades
CN106803790B (en) A kind of upgrade control method and device of group system
CN106663030A (en) Scalable fault resilient communications within distributed clusters
CN104468521B (en) Online moving method, device and system
CN106462450A (en) Notification about virtual machine live migration to VNF manager
CN102369688A (en) Method for adjusting resources dynamically and scheduling device
CN102508717B (en) Memory scheduling method and memory scheduling device for multi-core processor
CN104601680B (en) A kind of method for managing resource and device
CN105429776A (en) Method and system for virtual network function management
CN105988858A (en) Virtual machine resource scheduling method, device and system
CN106774277A (en) A kind of data sharing method between many Virtual Controllers
CN103647656A (en) Billing node load control method, data access control method and node
TWI456944B (en) Management method and system using the same
CN110377232A (en) A kind of method, apparatus and system for disposing distributed storage cluster
CN102662723A (en) A virtual machine internal storage migration method based on down time threshold
WO2024077881A1 (en) Scheduling method and system for neural network training, and computer-readable storage medium
CN106385330A (en) Network function virtualization composer realization method and device
CN104793981B (en) A kind of online snapshot management method and device of cluster virtual machine
CN105262604B (en) Virtual machine migration method and equipment
CN102158545A (en) Resource pool management method and device
CN107506214A (en) The update method and more new system of a kind of group system controller
CN108933844A (en) The method and apparatus of DHCP service is provided
CN105791337B (en) A kind of upgrade method, equipment and group system
CN103051478A (en) Large-capacity telecommunication network management system as well as setting and application methods thereof
EP3316518B1 (en) Method and device for upgrading virtual network element, and computer storage medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant