CN107503327B - Aileron type blocking dam - Google Patents

Aileron type blocking dam Download PDF

Info

Publication number
CN107503327B
CN107503327B CN201710850163.2A CN201710850163A CN107503327B CN 107503327 B CN107503327 B CN 107503327B CN 201710850163 A CN201710850163 A CN 201710850163A CN 107503327 B CN107503327 B CN 107503327B
Authority
CN
China
Prior art keywords
dam
key
type blocking
overflow port
wing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201710850163.2A
Other languages
Chinese (zh)
Other versions
CN107503327A (en
Inventor
龙建辉
李斌
杨志勇
刘宏奎
孙自强
赵阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Geological Engineering Survey Institute
Original Assignee
Taiyuan University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taiyuan University of Technology filed Critical Taiyuan University of Technology
Priority to CN201710850163.2A priority Critical patent/CN107503327B/en
Publication of CN107503327A publication Critical patent/CN107503327A/en
Application granted granted Critical
Publication of CN107503327B publication Critical patent/CN107503327B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B7/00Barrages or weirs; Layout, construction, methods of, or devices for, making same
    • E02B7/02Fixed barrages
    • E02B7/04Dams across valleys

Abstract

The present invention relates to debris flow technical fields, and in particular to a kind of aileron type blocking dam;Including key dam and the wing dam being arranged at left and right sides of key dam, the dam body of the key dam is equipped with overflow port, and the wing dam includes three sections of dam bodys that height of dam successively successively decreases, the key dam and wing dam upstream batter than being respectively 1:0.8 and 1:0.6, and downstream slope ratio is 1:0.2;3 excretion water hole of setting, is arranged, the slope ratio 1:0.1 of the drain hole 3 at triangle disposition at the dam body overflow port of the key dam;Several reinforcing bars along the arrangement of dam body longitudinal axis are additionally added in the key dam, one of knee wall is respectively arranged in the land side at key dam overflow port both ends, twice knee wall is respectively arranged in the land side on two flank dam, and the knee wall embedded depth of foundation is consistent with dam body foundation buried depth;The present invention overcomes gravity type blocking dams to dam site geological conditions and the higher disadvantage of dam abutment Rock And Soil intensity requirement, and the shearing strength of dam structure is high, and impact resistance is stronger, has preferably deceleration, energy dissipating to act on macrosolifluction.

Description

Aileron type blocking dam
Technical field
The present invention relates to debris flow technical fields, and in particular to a kind of aileron type blocking dam.
Background technique
After Wenchuan " 5.12 " earthquake, In Southwest China mud-rock flow mountain region disaster takes place frequently, raw to national economy and the people Life property brings heavy losses.At present In Southwest China face macrosolifluction disaster increase, middle-size and small-size mud-rock flow it is frequent Status.In the prevention and cure project of mud-rock flow, blocking dam is a kind of more extensive measure of application.Blocking dam is built to be intended to retain mud Stone raises ditch bed datum plane of erosion, back-silts and slows down local ditch bed longitudinal slope, to obtain firm ditch bank, stablizes landslide, and control is washed away, Ditch bed substance starting and other effects is prevented, solid matter supply can be reduced or separate water and soil, to reach inhibition mud-rock flow The purpose of being formed or reducing debris flow occurrence frequency and scale.Wherein gravity type blocking dam is a kind of main Types, and gravity type is blocked Dam construction technology is simpler, and has accumulated experience abundant in engineering practice.The deficiency for structure of routinely blocking for improvement, Scientific worker proposes some novel mud-rock flows and blocks structure, such as hingeless type arch dam, permeable arch dam, lattice guest's shilong dam, nothing Hinge type arch dam is mainly used in narrow cheuch, can improve the working environment of dam body, reduces project cost;Permeable arch dam is single Bent circle arch dam, is conducive to play the feature that dam body materials compression strength is high, tensile strength is low, but to dam abutment Rock And Soil intensity It is more demanding;Lattice guest shilong dam is a kind of flexible structure relative to gravity dam, and good integrity can be adjusted by itself to adapt to become Shape, but build in the upstream of multistage blocking dam, storage capacity is typically small. more.Although above-mentioned blocking dam can play the work of debris retaining drainage With, but the blocking dam of above-mentioned classification is built, including building traditional gravity type blocking dam, on the one hand require the exit or entrance of a clitch that there is typical case Cucurbit bealock orographic condition;On the other hand debris flow control works big for drainage area, more than solid material resource, build this kind of Not only quantity of masonry is big for blocking dam, but also requires high-intensitive Rock And Soil as dam abutment.Under special geological conditions, this is just limited The execution conditions of mud-rock flow blocking dam.
Gravity type blocking dam is generally arranged using the linear type perpendicular to primary fluid flow line direction.In order to resist mud-rock flow pair The active force that dam body generates, and meet the requirement such as structure monolithic stability and antiskid, antidumping by self gravity, work of constructing Skill is simpler, and has accumulated experience abundant in engineering practice, is widely used in the prevention and cure project of mud-rock flow.But again Power formula blocking dam is more demanding to dam site geological conditions, it is desirable that has typical cucurbit bealock orographic condition, Er Qieqi at dam site It is steeper to be built in channel longitudinal slope, the narrow location of cheuch needs width (axial top length) the high ratio on stringent dam more.If in special geologic condition Under build dam certain risk will be present and take time and effort.
Summary of the invention
The present invention is that solution traditional gravity type blocking dam is higher to dam site geological conditions and dam abutment Rock And Soil intensity requirement Technical problem provides a kind of aileron type blocking dam.
In order to solve the above technical problems, the technical scheme adopted by the invention is as follows: a kind of aileron type blocking dam, the aileron Type blocking dam includes key dam and the wing dam that is arranged at left and right sides of key dam and upstream bends, and the dam body of the key dam is equipped with overflow Mouthful, the wing dam includes the three sections of dam bodys successively to be successively decreased from the height of dam that key dam is arranged on the extending direction of two sides, the key dam and For wing dam upstream batter than being respectively 1:0.8 and 1:0.6, downstream slope ratio is 1:0.2;3 are arranged at the dam body overflow port of the key dam Water hole is drained, is arranged at triangle disposition, the slope ratio 1:0.1 of the drain hole;Several are additionally added in the key dam to indulge along dam body The reinforcing bar arranged to axis, the every end in the both ends of the reinforcing bar exceed the length of dam main body not less than 5m, the key dam overflow port One of knee wall is respectively arranged in the land side at both ends, and twice knee wall, the knee wall is respectively arranged in the land side on two flank dam Embedded depth of foundation is consistent with dam body foundation buried depth, and is not less than 2m.
The aileron type blocking dam, the setting protection cone at the dam abutment of aileron type blocking dam, the protection cone Buried depth is consistent with the buried depth of dam body, protects the radius at the cone bottom of cone not less than 5.0m, cone slope ratio is 1:0.75;Dam abutment both ends It is not less than 2.0m into soil layer, the above soil body of dam abutment is handled by 1:1 slope.
Usually in investigation debris flow gully regional geological environment condition.(including topography and geomorphology, formation lithology, hydrogeology, people Class engineering activity etc..);Find out debris flow formation condition.(including mud-rock flow channel conditions, material resource condition (material resource distribution characteristics, Material resource total amount and participate in debris flow amount statistics), water condition.) statistics debris flow characteristic value.(including mud-rock flow fluid weight Degree, debris flow and landslips, a mud-rock flow overcurrent total amount, a mud-rock flow solid are gone out object, debris flow velocity, mud-rock flow and are integrally rushed The calculating of the indexs such as power is hit, finally mud-rock flow development trend is predicted), on the basis of above-mentioned, block in view of gravity type The characteristic on dam, if investigated debris flow gully is without being suitble to the orographic condition for building linear type gravity dam and build gravity dam there are one Fixed risk can be used aileron type blocking dam and be administered.
Key dam and wing dam upstream batter are than being respectively 1:0.8 and 1:0.6;Such design of slope ratio can effectively improve dam body Ess-strain, and resist the ability in crack.The slope ratio on two sides and the wing dam upstream bent and wing dam avoids linear type gravity The problem that formula blocking dam causes structural shear strength low because length-width ratio is excessive, on the other hand greatly reduces quantity of masonry, saves Construction cost and time.Two sides and impact force, water pressure suffered by mud-rock flow, deposit pressure are also led in the wing dam upstream bent To key dam, internal force suffered by wing dam and dam abutment is reduced, shearing strength is high, and impact resistance is stronger, improves the steady of dam structure It is qualitative.3 excretion water holes, are arranged, the slope ratio 1:0.1 of drain hole, such design can quickly sluice, to large-scale mud at triangle disposition Rock glacier has preferably deceleration, energy dissipating effect.Since dam longitudinal axis is longer, and there is turning, dam body is higher, to reinforce its stability And amount of deflection, setting totally 6 knee wall, on the one hand knee wall can make dam body meet face stress distribution head-on more uniform, improve material Utilization rate;Another aspect support construction can effectively reduce the dynamic displacement of concrete dam body, to improve the rigidity of structure.
Compared with prior art the invention has the following advantages:
1, aileron type blocking dam overcome gravity type blocking dam to dam site geological conditions and dam abutment Rock And Soil intensity requirement compared with High disadvantage.
2, aileron type blocking dam effectively reduces the volume of dam body, saves material and duration.
3, the shearing strength of aileron type blocking dam dam structure is high, and impact resistance is stronger.
4, wing dam mainly plays constraint and guide functions, by impact force, water pressure suffered by mud-rock flow, deposit pressure guiding master Dam reduces internal force suffered by wing dam and dam abutment, improves the stability of dam structure.
5, aileron type blocking dam especially has preferably deceleration, energy dissipating to act on macrosolifluction.
Detailed description of the invention
Fig. 1 is aileron type blocking dam top view.
Fig. 2 is aileron type blocking dam front view.
Fig. 3 is the AA cross-section diagram of Fig. 2.
Fig. 4 is the BB cross-section diagram of Fig. 2.
Fig. 5 is the CC cross-section diagram of Fig. 2.
Fig. 6 is the DD cross-section diagram of Fig. 2.
It is marked in figure as follows:
1- key dam, 2- knee wall, 3- drain hole, 4- protect cone, 5- wing dam.
Specific embodiment
Below in conjunction with specific embodiment, the invention will be further described.
Embodiment 1
As depicted in figs. 1 and 2, a kind of aileron type blocking dam, including key dam 1 and setting are in the left and right sides of key dam 1 and upwards Swim the wing dam 5 of bending, the dam body of the key dam 1 is equipped with overflow port, the wing dam 5 include from key dam 1 on the extending direction of two sides Three sections of dam bodys that the height of dam of setting successively successively decreases, the key dam 1 and 5 upstream batter of wing dam are than being respectively 1:0.8 and 1:0.6, backwater Slope ratio is 1:0.2;3 excretion water hole 3 of setting, is arranged, the drain hole at triangle disposition at the dam body overflow port of the key dam 1 3 slope ratio 1:0.1;Several reinforcing bars along the arrangement of dam body longitudinal axis, the trend of the reinforcing bar are additionally added in the key dam 1 Vertical with the trend of mud-rock flow, the every end in the both ends of the reinforcing bar exceeds the length of dam main body not less than 5m, 1 overflow of key dam One of knee wall 2 is respectively arranged in the land side at mouth both ends, and twice knee wall 2, the branch is respectively arranged in the land side on two flank dam 5 2 embedded depth of foundation of buttress is consistent with dam body foundation buried depth, and is not less than 2m.
The aileron type blocking dam, setting protection cone 4, the protection cone 4 at the dam abutment of aileron type blocking dam Buried depth it is consistent with the buried depth of dam body, protection cone 4 cone bottom radius be not less than 5.0m, cone slope ratio be 1:0.75;Dam abutment Both ends enter soil layer not less than 2.0m, and the above soil body of dam abutment is handled by 1:1 slope, and carries out gib measure.Protect cone 4 Design the fastness of dam abutment can be enhanced destroy by rush of water to prevent dam abutment.
The dam foundation and dam body of the aileron type blocking dam are all made of C25 cyclopean concrete and build up, the dam body back at overflow port The thickness of water side 50cm width and overflow port excessively stream part surface 50cm do Wear-resistant Treatment, i.e. surface uses C30 microlith coagulation Soil is built up.
As shown in Figure 5 and Figure 6, the height of dam of 5 CC section part of wing dam is greater than the height of dam of DD section part.

Claims (3)

1. a kind of aileron type blocking dam, it is characterised in that: the aileron type blocking dam includes key dam (1) and is arranged in key dam (1) The dam body on the left and right sides and the wing dam (5) upstream bent, the key dam (1) is equipped with overflow port, and the wing dam (5) includes by leading Three sections of dam bodys that the height of dam that dam (1) is arranged on the extending direction of two sides successively successively decreases, key dam (1) He Yiba (5) upstream batter Than being respectively 1:0.8 and 1:0.6, downstream slope ratio is 1:0.2;3 excretion water hole of setting at the dam body overflow port of the key dam (1) (3), it is arranged at triangle disposition, the slope ratio 1:0.1 of the drain hole (3);Several are additionally added in the key dam (1) to indulge along dam body The reinforcing bar arranged to axis, the every end in the both ends of the reinforcing bar exceed the length of dam main body not less than 5m, key dam (1) overflow The land side at mouth both ends is respectively arranged one of knee wall (2), and twice knee wall (2) are respectively arranged in the land side on two flank dam (5), Knee wall (2) embedded depth of foundation is consistent with dam body foundation buried depth, and is not less than 2m.
2. aileron type blocking dam according to claim 1, it is characterised in that: be arranged at the dam abutment of aileron type blocking dam anti- It protects cone (4), the buried depth of protection cone (4) is consistent with the buried depth of dam body, and the radius at the cone bottom of cone (4) is protected to be not less than 5.0m, cone slope ratio are 1:0.75;Dam abutment both ends enter soil layer not less than 2.0m, and the above soil body of dam abutment is handled by 1:1 slope.
3. according to aileron type blocking dam of any of claims 1 or 2, it is characterised in that: the dam foundation and dam body of aileron type blocking dam are equal It is built up using C25 cyclopean concrete, dam body backwater side 50cm width and overflow port excessively stream part surface 50cm at overflow port Thickness do Wear-resistant Treatment, i.e., surface is built up using C30 pea gravel concreten.
CN201710850163.2A 2017-09-20 2017-09-20 Aileron type blocking dam Expired - Fee Related CN107503327B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710850163.2A CN107503327B (en) 2017-09-20 2017-09-20 Aileron type blocking dam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710850163.2A CN107503327B (en) 2017-09-20 2017-09-20 Aileron type blocking dam

Publications (2)

Publication Number Publication Date
CN107503327A CN107503327A (en) 2017-12-22
CN107503327B true CN107503327B (en) 2019-04-30

Family

ID=60697886

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710850163.2A Expired - Fee Related CN107503327B (en) 2017-09-20 2017-09-20 Aileron type blocking dam

Country Status (1)

Country Link
CN (1) CN107503327B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108360465B (en) * 2018-01-14 2023-07-25 浙江大学 Wedge-shaped debris flow diversion blocking device and construction method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000290969A (en) * 1999-04-07 2000-10-17 Yachiyo Engineering Co Ltd Countermeasure structure for debris flow and construction method therefor
CN203755243U (en) * 2014-03-19 2014-08-06 长沙有色冶金设计研究院有限公司 Protection structure of bridgehead conical slopes
CN205171469U (en) * 2015-09-07 2016-04-20 四川省华地建设工程有限责任公司 Mud -rock flow flow blocking dam scour protection dissipation structure
CN105926544A (en) * 2016-06-24 2016-09-07 中国电建集团华东勘测设计研究院有限公司 Economical debris flow blocking dam structure and construction method thereof

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000290969A (en) * 1999-04-07 2000-10-17 Yachiyo Engineering Co Ltd Countermeasure structure for debris flow and construction method therefor
CN203755243U (en) * 2014-03-19 2014-08-06 长沙有色冶金设计研究院有限公司 Protection structure of bridgehead conical slopes
CN205171469U (en) * 2015-09-07 2016-04-20 四川省华地建设工程有限责任公司 Mud -rock flow flow blocking dam scour protection dissipation structure
CN105926544A (en) * 2016-06-24 2016-09-07 中国电建集团华东勘测设计研究院有限公司 Economical debris flow blocking dam structure and construction method thereof

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
"冲击荷载作用下泥石流拦挡坝变形破坏机制";余政;《中国优秀硕士学位论文全文数据库 基础科学辑》;20170315;第56-58页 *
"基于ANSYS/LS-DYNA的新型带支撑泥石流拦挡坝抗冲击性能研究";王秀丽等;《防灾减灾工程学报》;20141215;第34卷(第6期);第664页第2段及第670页 *

Also Published As

Publication number Publication date
CN107503327A (en) 2017-12-22

Similar Documents

Publication Publication Date Title
WO2014201742A1 (en) Debris flow drainage trough planning and designing method and application thereof
CN202369969U (en) Variable cross-section gravity type debris flow debris dam
CN103306242A (en) Debris flow control dam for adjusting peak discharge as well as design method and application thereof
CN107503327B (en) Aileron type blocking dam
CN101701454B (en) Artificial structure body used for scouring prevention of mud-rock flow and weir dam and application thereof
CN110145007A (en) The drainage system of Dumping Sites
CN103195024A (en) Debris flow diversion dam capable of automatically distributing drainage quantity and silt stopping quantity and design method of debris flow diversion dam
CN112144488A (en) Multi-curved arch water-permeable stepped energy dissipation secondary dam capable of preventing river channel undercut from being damaged
CN105926542B (en) A kind of design method of asymmetric debris flow drainage groove and application
CN208039303U (en) A kind of Construction of Civil Engineering retaining wall
CN207193911U (en) A kind of stage beam pattern debris flow drainage groove
CN203452049U (en) Debris flow control dam for adjusting peak discharge
CN206902664U (en) A kind of hydraulic engineering ecological protection slope based on multilayer proofing structure
CN105421305A (en) Pile plate plane and vertical face intersecting combination auxiliary energy dissipater
KR101170789B1 (en) Complex debris barrier of eco-friendly
CN212026132U (en) Hydraulic engineering protection buffering slope
CN109356097B (en) A drainage tunnel import structure for ditch water treatment
CN205046656U (en) Slow down and erode drop well
CN203878542U (en) W-shaped ecological gabion submerged dam
CN208055980U (en) A kind of permeable erosion control wall construction of hydraulic engineering
CN107806065A (en) A kind of stage beam pattern debris flow drainage groove and its application
CN210086181U (en) Sediment dam structure is blocked to formula of permeating water
CN203808025U (en) Intercepting ditch structure for steeper terrain
CN203144971U (en) Debris flow drainage structure combining open channel and box culvert
CN206928260U (en) A kind of reservoir dam structure with flood discharge desilting function

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200930

Address after: 030000 160 Heping South Road, wanBerlin District, Taiyuan, Shanxi

Patentee after: Shanxi Geological Engineering Survey Institute

Address before: 030024 West Street, Taiyuan, Shanxi, No. 79, No.

Patentee before: Taiyuan University of Technology

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190430

Termination date: 20210920