CN107489429A - Prefabricated maintenance pipe fitting method - Google Patents

Prefabricated maintenance pipe fitting method Download PDF

Info

Publication number
CN107489429A
CN107489429A CN201710776343.0A CN201710776343A CN107489429A CN 107489429 A CN107489429 A CN 107489429A CN 201710776343 A CN201710776343 A CN 201710776343A CN 107489429 A CN107489429 A CN 107489429A
Authority
CN
China
Prior art keywords
prefabricated components
prefabricated
pipe fitting
fitting method
maintenance pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710776343.0A
Other languages
Chinese (zh)
Other versions
CN107489429B (en
Inventor
王俊
胡质
刘经国
刘宇
宋海洋
陈柯宇
李鼐垚
张洪
汤井伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Second Harbor Engineering Co
CCCC Fourth Harbor Engineering Co Ltd
China Communications 2nd Navigational Bureau 2nd Engineering Co Ltd
No 2 Engineering Co of CCCC Fourth Harbor Engineering Co Ltd
Original Assignee
CCCC Second Harbor Engineering Co
CCCC Fourth Harbor Engineering Co Ltd
China Communications 2nd Navigational Bureau 2nd Engineering Co Ltd
No 2 Engineering Co of CCCC Fourth Harbor Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Second Harbor Engineering Co, CCCC Fourth Harbor Engineering Co Ltd, China Communications 2nd Navigational Bureau 2nd Engineering Co Ltd, No 2 Engineering Co of CCCC Fourth Harbor Engineering Co Ltd filed Critical CCCC Second Harbor Engineering Co
Priority to CN201710776343.0A priority Critical patent/CN107489429B/en
Publication of CN107489429A publication Critical patent/CN107489429A/en
Application granted granted Critical
Publication of CN107489429B publication Critical patent/CN107489429B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/14Layout of tunnels or galleries; Constructional features of tunnels or galleries, not otherwise provided for, e.g. portals, day-light attenuation at tunnel openings
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F17/00Methods or devices for use in mines or tunnels, not covered elsewhere

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Environmental & Geological Engineering (AREA)
  • Road Signs Or Road Markings (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention discloses a kind of prefabricated maintenance pipe fitting method, comprises the following steps A, the installation place of each prefabricated components is correspondingly arranged vertical adjustment part on ground;B, one prefabricated component of handling are placed on corresponding vertical adjustment part;C, the height that vertical adjustment part changes the prefabricated components set thereon is adjusted, meets control line requirement;D, the previous prefabricated components of prefabricated components alignment are promoted;E, after the setting for completing all prefabricated components, the slip casting under all prefabricated components, all prefabricated components and ground are connected.With the prefabricated maintenance pipe fitting method of the present invention, first all prefabricated components are adjusted with vertical adjustment part be located at identical height, each prefabricated components are adjusted again flushes previous prefabricated components, it is easy to adjust controllable, quick and convenient, last slip casting connection ground and all prefabricated components, all prefabricated components positions are constant, installation accuracy is not influenceed, this method step is simple, convenient and practical.

Description

Prefabricated maintenance pipe fitting method
Technical field
The present invention relates to engineering field, more particularly to a kind of prefabricated maintenance pipe fitting method.
Background technology
The maintaining roadway of existing tunnel both sides is mostly prefabricated components, and usually using the installation such as slurry processes is sat, it is first on ground to sit slurry processes One layer of certain thickness mortar of making on base, then prefabricated components row is built on screed, this method is directly in bonding agent (sand Slurry) on connect prefabricated components, it is necessary to prefabricated components position, not easy operation control once be mixed up, if prefabricated components are put into mortar Depth exceedes control line, it is also necessary to extract prefabricated components and reset, it is time-consuming, at the same mortar initial set shrink can influence it is pre- The installation accuracy of component processed.
The content of the invention
It is an object of the invention to overcome the existing prefabricated maintaining roadway in the presence of prior art to be installed using slurry processes are sat, One layer of certain thickness mortar of making on ground, then prefabricated components row is built on screed, this method is directly in bonding agent Prefabricated components are connected on (mortar), it is necessary to prefabricated components position, not easy operation control once be mixed up, if prefabricated components are put into mortar Depth exceed control line, it is also necessary to extract prefabricated components and reset, it is time-consuming, while mortar initial set shrink can influence A kind of above-mentioned deficiency of the installation accuracy of prefabricated components, there is provided prefabricated maintenance pipe fitting method.
In order to realize foregoing invention purpose, the invention provides following technical scheme:
A kind of prefabricated maintenance pipe fitting method, comprises the following steps:
A, the installation place of each prefabricated components is correspondingly arranged vertical adjustment part on ground;
B, one prefabricated component of handling are placed on the corresponding vertical adjustment part;
C, the height that the vertical adjustment part changes the prefabricated components set thereon is adjusted, meets that control line will Ask;
D, the previous prefabricated components of the prefabricated components alignment are promoted;
E, after the setting for completing all prefabricated components, slip casting, grout cures and company under all prefabricated components Connect all prefabricated components and ground.
Using prefabricated maintenance pipe fitting method of the present invention, first adjusted with the vertical adjustment part all described pre- Component processed is located at identical height, then adjusts each prefabricated components and flush the previous prefabricated components, easy to adjust controllable, soon Speed is convenient, and last slip casting connects the ground and all prefabricated components, and all prefabricated components positions are constant, do not influence Installation accuracy, this method step is simple, convenient and practical.
Preferably, the control line in the step C is vertical curve datum line, the positioning of the vertical curve datum line, According to the Absolutely orientation of design vertical curve.
Preferably, the step D comprises the following steps:
D1, the side for promoting the prefabricated components, make the side parallel to horizontal datum, described according to phase in tunnel In dividing position and the actual center line of road is fitted, the horizontal datum is formulated according to the actual center line;
D2, the end face for promoting the prefabricated components, make the end face of the previous prefabricated components of the end face.
Preferably, in the step D1, vertical adjustment part described in reaction frame barb is set, thousand are set on the reaction frame Side described in the pushing tow of jin top, adjust the lateral attitude of the prefabricated components.
Preferably, in the step D1, side described in jack pushing tow is set by the use of tunnel inner road step as counter-force point Face, adjust the lateral attitude of the prefabricated components.
Preferably, in the step D2, vertical adjustment part described in reaction frame barb is set, thousand are set on the reaction frame End face described in the pushing tow of jin top, adjust the axial location of the prefabricated components.
Preferably, before the step A is performed, in vertical curve datum line described in tunnel sidewalls setting-out, in tunnel road Horizontal datum described in edge setting-out, and by the actual center line lead to road edge.
Preferably, before the step B is performed, to the top surface setting-out component position line of each prefabricated components.
Preferably, there is installation seam, the installation seam is 1- between two end faces of the two neighboring prefabricated components 5mm。
Preferably, in the immersed tube tunnel of seabed, adjacent tube coupling joint has tube coupling joint ballasting concrete expansion joint, the pipe There is prefabricated components expansion joint, institute between two end faces of two prefabricated components set at section joint ballasting concrete expansion joint Prefabricated components expansion joint position is stated to overlap with the tube coupling joint ballasting concrete expansion joint position.
Preferably, every 20-100m spacing on the ground performs the step B-E.
Preferably, each vertical adjustment part includes at least three threaded support pipes, each threaded support pipe Bolt is fitted with, all threaded support pipes are embedded in the ground in advance, and each prefabricated components of handling are placed on correspondingly The bolt on, rotate each bolt to adjust the height of the corresponding relatively described ground of prefabricated components.
Preferably, after performing the step A, included with the presetting each vertical adjustment part of horizon rule all described Bolt.
Preferably, each prefabricated components are hollow structural members.
Preferably, each prefabricated components are C45 steel reinforced concrete precast construction parts.
In summary, by adopting the above-described technical solution, the beneficial effects of the invention are as follows:
With prefabricated maintenance pipe fitting method of the present invention, first adjusted with the vertical adjustment part all described pre- Component processed is located at identical height, then adjusts each prefabricated components and flush the previous prefabricated components, easy to adjust controllable, soon Speed is convenient, and last slip casting connects the ground and all prefabricated components, and all prefabricated components positions are constant, do not influence Installation accuracy, this method step is simple, convenient and practical.
Brief description of the drawings
Fig. 1 is prefabricated maintaining roadway scheme of installation of the present invention;
Fig. 2 is that vertical curve datum line and horizontal datum set schematic diagram;
Fig. 3 is to pour the structural representation after mortar;
Fig. 4 is the structural representation of vertical adjustment part;
Fig. 5 is the flat schematic diagram of coarse adjustment of vertical adjustment part;
Fig. 6 is the schematic diagram that prefabricated components are arranged on vertical adjustment part;
Fig. 7 is installation seam, prefabricated components expansion joint and the position view at tube coupling joint ballasting concrete expansion joint.
Marked in figure:01- grounds, 02- vertical curve datum lines, 03- horizontal datums, 1- prefabricated components, 11- sides, 12- End face, 13- top surfaces, 14- installation seams, 15- prefabricated components expansion joint, 16- tube coupling joint ballasting concretes expansion joint, 2- vertical adjustments portion Part, 21- threaded support pipes, 22- bolts, 3- horizon rules, 4- mortars, 5- fillers.
Embodiment
With reference to test example and embodiment, the present invention is described in further detail.But this should not be understood Following embodiment is only limitted to for the scope of the above-mentioned theme of the present invention, it is all that this is belonged to based on the technology that present invention is realized The scope of invention.
Embodiment
As shown in figs. 1-7, a kind of prefabricated maintenance pipe fitting method of the present invention, comprises the following steps:
A, the installation place of each prefabricated components 1 is correspondingly arranged vertical adjustment part 2 on ground 01;
B, the prefabricated components 1 of handling one are placed on the corresponding vertical adjustment part 2;
C, the height that the vertical adjustment part 2 changes the prefabricated components 1 set thereon is adjusted, meets that control line will Ask;
D, the prefabricated components 1 are promoted to align the previous prefabricated components 1;
E, after the setting for completing all prefabricated components 1, in all 1 time slip castings of prefabricated components, grout cures are simultaneously Connect all prefabricated components 1 and ground 01.
As a preferred scheme of the present embodiment, the step D comprises the following steps:
D1, the side 11 for promoting the prefabricated components 1, make the side 11 parallel to horizontal datum 03, it is described according to During relative position is divided in tunnel and the actual center line of road is fitted, the horizontal datum 03 is formulated according to the actual center line;
D2, the end face 12 for promoting the prefabricated components 1, make the end face 12 flush the end of the previous prefabricated components 1 Face 12.
Wherein, in the step D1, side described in jack pushing tow is set by the use of tunnel inner road step as counter-force point 11, adjust the lateral attitude of the prefabricated components 1, in the step D2, vertical adjustment part 2 described in reaction frame barb is set, End face 12 described in jack pushing tow is set on the reaction frame, adjust the axial location of the prefabricated components 1.
The control line in the step C is vertical curve datum line 02, the positioning of the vertical curve datum line 02, according to Design the Absolutely orientation of vertical curve.Before the step A is performed, in vertical curve datum line described in tunnel sidewalls setting-out 02, in horizontal datum 03 described in tunnel road edge setting-out, and by the actual center line lead to road edge.Performing institute Before stating step B, to the setting-out component position line of top surface 13 of each prefabricated components 1.Each prefabricated components 1 are C45 Steel reinforced concrete prefabricated hollow structural member.
As a preferred scheme of the present embodiment, as shown in fig. 7, in the immersed tube tunnel of seabed, adjacent tube coupling joint With tube coupling joint ballasting concrete expansion joint 16, two prefabricated components being set at the tube coupling joint ballasting concrete expansion joint 16 There is prefabricated components expansion joint 15, the position of prefabricated components expansion joint 15 and the tube coupling joint between 1 two end faces 12 The position of ballasting concrete expansion joint 16 overlaps.As shown in fig. 7, each 1 long 1497mm of prefabricated components, the two neighboring prefabricated structure There is installation seam 14, the installation seam 14 is 3mm, and every 30m spacing on the ground 01 is held between two end faces 12 of part 1 The row step B-E, and 20 prefabricated components 1 of regulation are set in every 30m distances, mortar 4 is then poured, treats the mortar After 4 solidifications, filler 5 is set between the prefabricated components 1 and side wall, then carries out the installation of next distance segment, the mortar 4 Grade is C15.
As seen in figs. 5-6, each vertical adjustment part 2 includes four threaded support pipes 21, each screw thread branch Stay tube 21 is fitted with bolt 22, and all threaded support pipes 21 are embedded in the ground 01, each prefabricated structure of handling in advance Part 1 is placed on the corresponding bolt 22, and it is relatively described to adjust the corresponding prefabricated components 1 to rotate each bolt 22 The height of ground 01;In use, wherein three bolts 22 are put down with the coarse adjustment of horizon rule 3, by another described bolt 22 compared with this Three bolts 22 are turned down, after handling sets the prefabricated components 1 to be put on three bolts 22, three spiral shells of accurate adjustment Bolt 22 makes the height of prefabricated components 1 meet control line requirement, and it is described prefabricated that another described bolt 22 finally is heightened into contact The stress of component 1.
With prefabricated maintenance pipe fitting method of the present invention, first adjusted with the vertical adjustment part 2 all described Prefabricated components 1 are located at identical height, then adjust each prefabricated components 1 and flush the previous prefabricated components 1, it is easy to adjust can Control, quick and convenient, last slip casting connects the ground 01 and all prefabricated components 1, and all positions of prefabricated components 1 are not Become, do not influence installation accuracy, this method step is simple, convenient and practical.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all essences in the present invention All any modification, equivalent and improvement made within refreshing and principle etc., should be included in the scope of the protection.

Claims (10)

1. a kind of prefabricated maintenance pipe fitting method, it is characterised in that comprise the following steps:
A, the installation place of each prefabricated components (1) is correspondingly arranged vertical adjustment part (2) on ground (01);
B, the prefabricated components (1) of handling one are placed on the corresponding vertical adjustment part (2);
C, the height that the vertical adjustment part (2) changes the prefabricated components (1) set thereon is adjusted, meets that control line will Ask;
D, the previous prefabricated components (1) of prefabricated components (1) alignment are promoted;
E, after the setting for completing all prefabricated components (1), the slip casting under all prefabricated components (1), grout cures are simultaneously Connect all prefabricated components (1) and ground (01).
2. prefabricated maintenance pipe fitting method according to claim 1, it is characterised in that the control in the step C Line is vertical curve datum line (02).
3. prefabricated maintenance pipe fitting method according to claim 2, it is characterised in that the step D comprises the following steps:
D1, the side (11) for promoting the prefabricated components (1), make the side (11) parallel to horizontal datum (03);
D2, the end face (12) for promoting the prefabricated components (1), make the end face (12) flush the previous prefabricated components (1) End face (12).
4. prefabricated maintenance pipe fitting method according to claim 3, it is characterised in that before the step A is performed, Vertical curve datum line (02) described in tunnel sidewalls setting-out, in horizontal datum (03) described in tunnel road edge setting-out.
5. prefabricated maintenance pipe fitting method according to claim 1, it is characterised in that right before the step B is performed Top surface (13) setting-out component position line of each prefabricated components (1).
6. prefabricated maintenance pipe fitting method according to claim 1, it is characterised in that the two neighboring prefabricated components (1) there is installation seam (14), the installation seam (14) is 1-5mm between two end faces (12).
7. prefabricated maintenance pipe fitting method according to claim 1, it is characterised in that adjacent in the immersed tube tunnel of seabed Tube coupling joint has a tube coupling joint ballasting concrete expansion joint (16), tube coupling joint ballasting concrete expansion joint (16) place set two There are prefabricated components expansion joint (15) between two end faces (12) of the individual prefabricated components (1), the prefabricated components expansion joint (15) position overlaps with tube coupling joint ballasting concrete expansion joint (16) position.
8. prefabricated maintenance pipe fitting method according to claim 1, it is characterised in that every on the ground (01) 20-100m spacing performs the step B-E.
9. the prefabricated maintenance pipe fitting method according to claim any one of 1-8, it is characterised in that each vertical tune Section part (2) includes at least three threaded support pipes (21), and each threaded support pipe (21) is fitted with bolt (22), owns The threaded support pipe (21) is embedded in the ground (01) in advance, and each prefabricated components (1) of handling are placed on corresponding institute State on bolt (22), rotate each bolt (22) to adjust the corresponding relatively described ground (01) of prefabricated components (1) Highly.
10. prefabricated maintenance pipe fitting method according to claim 9, it is characterised in that after performing the step A, use water All bolts (22) that the presetting each vertical adjustment part (2) of leveling ruler (3) includes.
CN201710776343.0A 2017-08-31 2017-08-31 Prefabricated maintenance pipe fitting method Expired - Fee Related CN107489429B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710776343.0A CN107489429B (en) 2017-08-31 2017-08-31 Prefabricated maintenance pipe fitting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710776343.0A CN107489429B (en) 2017-08-31 2017-08-31 Prefabricated maintenance pipe fitting method

Publications (2)

Publication Number Publication Date
CN107489429A true CN107489429A (en) 2017-12-19
CN107489429B CN107489429B (en) 2019-06-07

Family

ID=60646091

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710776343.0A Expired - Fee Related CN107489429B (en) 2017-08-31 2017-08-31 Prefabricated maintenance pipe fitting method

Country Status (1)

Country Link
CN (1) CN107489429B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3102673A1 (en) * 1981-01-28 1982-09-02 Ed. Züblin AG, 7000 Stuttgart Lath-like light-screen element for the partial covering of country traffic routes
DE3117110A1 (en) * 1981-04-30 1982-11-18 Ulrich Dr.Ing. e.h. Dr.Ing. 8000 München Finsterwalder Tunnel, in particular a rock tunnel, with high overburden, and method of constructing it
CN2575934Y (en) * 2002-08-02 2003-09-24 川湖工厂股份有限公司 Heat energy recovery plate
CN107059918A (en) * 2017-01-13 2017-08-18 沈阳建筑大学 Get down the highway to Double Multi-Arch, pipe gallery and sponge City complex
CN107100078A (en) * 2017-05-19 2017-08-29 中国五冶集团有限公司 A kind of packaged type bridges Precast Pier Columns component installation method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3102673A1 (en) * 1981-01-28 1982-09-02 Ed. Züblin AG, 7000 Stuttgart Lath-like light-screen element for the partial covering of country traffic routes
DE3117110A1 (en) * 1981-04-30 1982-11-18 Ulrich Dr.Ing. e.h. Dr.Ing. 8000 München Finsterwalder Tunnel, in particular a rock tunnel, with high overburden, and method of constructing it
CN2575934Y (en) * 2002-08-02 2003-09-24 川湖工厂股份有限公司 Heat energy recovery plate
CN107059918A (en) * 2017-01-13 2017-08-18 沈阳建筑大学 Get down the highway to Double Multi-Arch, pipe gallery and sponge City complex
CN107100078A (en) * 2017-05-19 2017-08-29 中国五冶集团有限公司 A kind of packaged type bridges Precast Pier Columns component installation method

Also Published As

Publication number Publication date
CN107489429B (en) 2019-06-07

Similar Documents

Publication Publication Date Title
CN104695557B (en) Steel structure building construction method for one-step pre-burying of foundation bolts
CN100476142C (en) Construction method for combined V-shape steel pipe concrete pile
CN110005435B (en) Construction process for primary support of tunnel body
CN104790676A (en) Rapid leveling and alignment device and method for installation of prefabricated wallboards
CN205205857U (en) Integral concrete utility tunnel of prefabricated assembly
CN104405123A (en) Mold subassembly for casting thin-wall rectangular small-section reinforced concrete hollow column in situ and construction method thereof
CN105714966A (en) Inverted laminated slab provided with elevation adjustment devices and construction method
CN110424455A (en) The underground confined space is without fertile slot structure side wall big steel form plate system and construction method
CN111535208A (en) Construction process of foam concrete and steel corrugated pipe composite culvert
CN102733406B (en) Railway construction method of solid concrete roadbed in large-size industrial plant
CN104831832B (en) Assembly of shear wall structure and its installation method
CN206973068U (en) A kind of through-flooring is pre-buried to use the pre-buried adapter of flexible interface adjusting center
CN105089276B (en) A kind of construction method of the large area concrete plate of application floor elevation control instrument
CN105244835A (en) L-shaped concrete cable trench prefabricated component and production technology
CN107489429A (en) Prefabricated maintenance pipe fitting method
CN109129849B (en) Prefabricated beam wedge block and embedded bolt mounting die and construction method thereof
CN108951883B (en) High-precision embedded part installation method for nuclear power station
CN103276645A (en) Precast pile, beam and slab renovation technology for diseases of existing line tunnel base
CN109853803A (en) Assembled integral floor and fabrication and installation method
CN108978713A (en) A kind of prefabrication elevator shaft foundation pit and its installation method
CN212200401U (en) Static pressure pipe pile
CN108625262B (en) Stud and construction method for fine adjustment of lifting height of pavement formwork of stud
CN107701198B (en) A kind of slip casting fixing means of prefabricated components
CN208792366U (en) A kind of prefabrication elevator shaft foundation pit
CN209556123U (en) A kind of dedicated auxiliary fixing device in cast-in-place concrete node

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190607

Termination date: 20200831

CF01 Termination of patent right due to non-payment of annual fee