CN107489396B - A kind of towed cementing method of small borehole bushing window sidetracking well - Google Patents

A kind of towed cementing method of small borehole bushing window sidetracking well Download PDF

Info

Publication number
CN107489396B
CN107489396B CN201710845719.9A CN201710845719A CN107489396B CN 107489396 B CN107489396 B CN 107489396B CN 201710845719 A CN201710845719 A CN 201710845719A CN 107489396 B CN107489396 B CN 107489396B
Authority
CN
China
Prior art keywords
short
well
circuit cycle
towed
drilling fluid
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710845719.9A
Other languages
Chinese (zh)
Other versions
CN107489396A (en
Inventor
张德荣
蒲阳凤
孔春岩
孙林平
吴思梦
杨之豪
岳华伟
谢武君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southwest Petroleum University
Original Assignee
Southwest Petroleum University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southwest Petroleum University filed Critical Southwest Petroleum University
Priority to CN201710845719.9A priority Critical patent/CN107489396B/en
Publication of CN107489396A publication Critical patent/CN107489396A/en
Application granted granted Critical
Publication of CN107489396B publication Critical patent/CN107489396B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/13Methods or devices for cementing, for plugging holes, crevices or the like
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B21/00Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B21/00Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
    • E21B21/08Controlling or monitoring pressure or flow of drilling fluid, e.g. automatic filling of boreholes, automatic control of bottom pressure
    • E21B21/085Underbalanced techniques, i.e. where borehole fluid pressure is below formation pressure
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/13Methods or devices for cementing, for plugging holes, crevices or the like
    • E21B33/14Methods or devices for cementing, for plugging holes, crevices or the like for cementing casings into boreholes

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Mechanical Engineering (AREA)
  • Piles And Underground Anchors (AREA)
  • Earth Drilling (AREA)

Abstract

The present invention relates to a kind of towed cementing methods of small borehole bushing window sidetracking well, belong to petroleum gas cementing technology field, technical solution is: intelligent short-circuit cycle pipe nipple is entered well with well cementation tubing string together;Former drilling fluid is injected, annular space is cleaned, is then implanted sequentially conventional very low-density drilling fluid (or clear water), insulating liquid, cement slurry and the former drilling fluid of specific quantity;Short-circuit cycle channel is opened, conventional very low-density drilling fluid (or clear water) is made to enter annular space, after conventional very low-density drilling fluid (or clear water) passes through completely, closes short-circuit cycle channel;Cement slurry is pressed into annular space using pressure difference, forms towed well cementation.The present invention has the advantages that by reducing annulus fluid density, the stagnation pressure reduction for being subject to shaft bottom prevents shaft bottom by pressure break, greatly improve the one-time success rate of small borehole bushing window sidetracking well well cementation, it ensure that cementing quality, reduce costs, avoid the pollution of oil-gas Layer.

Description

A kind of towed cementing method of small borehole bushing window sidetracking well
Technical field
The present invention relates to a kind of towed cementing methods of small borehole bushing window sidetracking well, belong to petroleum gas well cementation skill Art field.
Background technique
In the drilling engineering of petroleum industry, it is mountable that cementing technology is that the barefoot interval cementing sealing that will be drilled is formed The well of development equipment, cementing operation are that the cement slurry prepared is injected wellbore and casing after setting of casing in the wellbore being drilled Annular space, Hou Ning form firm cement sheath.Small borehole bushing window sidetracking well is the cased wellbores that casing damaged well section or more is utilized With original ground DP technology process again the offset well of oil reservoir of the drill change with a certain distance from casing damaged well section or adjustment well, it has The features such as small investment, quick, wellbore service life suitable with the new well service life.Slim Hole Sidetracking Technology is China middle and later periods oil field for solving Deformation well, accident well, deepened well and the important means for restoring production capacity on old block with Development volue.Due to small borehole bushing Annular clearance is small when window sidetracking well is cemented the well, flow resistance is big, and one side replacement efficiency is poor, easy channelling, serious reduces matter of cementing the well Amount, another aspect bottom pressure is larger, and excessive bottom pressure fractured well bottom often causes cement slurry to miss, and well cementation is caused to be lost It loses, it is subsequent to take perforation is crowded to block up to remedy, well cementation cost is considerably increased, while cement slurry intrusion payzone can pollute oil gas Layer reduces the rate of oil and gas recovery, so bottom pressure problems of too urgent need to resolve when small borehole bushing window sidetracking well is cemented the well.Mesh Before, small borehole bushing window sidetracking well well cementation circulation problems are solved frequently with low-density Antileakage Cement Slurry technology in casing and cementing, But low-density cement mortar price is high, substantially increases well cementation cost.Meanwhile the density of cement slurry is lower, the performance of Behavior of Hardened Cement Paste is got over Difference reduces cementing quality, cannot reach ideal well cementation effect.Therefore, towed cementing method can be effective from technique Solve the difficulties such as small borehole bushing window sidetracking well annular clearance is small, flow resistance is big, leakage, replacement efficiency difference caused by pump pressure height Topic.
Summary of the invention
It is an object of the invention to overcome the deficiencies of existing technologies, a kind of small borehole bushing window sidetracking well traction is provided Formula cementing method, with construction is simple, high reliablity is practical, can effectively solve the problem that small borehole bushing window sidetracking well The problems such as leakage, of poor quality, at high cost, pollution oil-gas Layer in well cementing operation.
The purpose of the present invention is achieved through the following technical solutions: a kind of towed well cementation of small borehole bushing window sidetracking well Method, it includes the following steps:
A, intelligent short-circuit cycle pipe nipple top connects drill string I, and lower part connects drill string II, enters well together with well cementation tubing string, and ensure Intelligent short-circuit cycle pipe nipple is at the 50m-100m of extension hanger upper end;
B, former drilling fluid, cleaning well cementation tubing string and annular space are recycled, guarantees that well cementation tubing string inner passage and annulus access are unimpeded It is without hindrance;
C, the conventional very low-density drilling fluid (or clear water) that specific quantity is injected into well cementation tubing string replaces former drilling fluid, pushes away Dynamic intelligence decoding glue core I moves downward, and when intelligently decoding glue core I reaches the specific position of intelligent short-circuit cycle pipe nipple, intelligence is short Road circulating sub receives decoding open signal I, and control short-circuit cycle channel is opened;
D, after the completion of the injection of conventional very low-density drilling fluid (or clear water), start successively to inject isolation into well cementation tubing string Liquid and cement slurry push intelligence decoding glue core II to move downward;
E, after the completion of cement slurry injection, former drilling fluid is injected into well cementation tubing string;
F, when intelligence decoding glue core II reaches the specific position of intelligent short-circuit cycle pipe nipple, intelligent short-circuit cycle pipe nipple is received Shutdown signal II is decoded, control short-circuit cycle channel is closed;
G, continue to inject former drilling fluid into well cementation tubing string, push cement slurry to enter annular space, until top cement plug bruising, stop Pump, Hou Ning.
The liquid for replacing former drilling fluid is conventional very low-density drilling fluid (or clear water), is injected conventional special low The amount of density drilling fluid (or clear water) can just be full of intelligent short-circuit cycle pipe nipple upper end annular space.
Well cementation tubing string inner passage and annular space are connected in the short-circuit cycle channel, make under intelligent short-circuit cycle pipe nipple (6a) The channel short circuit at end, guarantees that conventional very low-density drilling fluid (or clear water) can smoothly enter into the ring of intelligent short-circuit cycle pipe nipple or more It is empty.
The intelligent short-circuit cycle pipe nipple carries out open and close and acts twice: triggering for the first time by intelligence decoding glue core I, intelligence The control system of energy short-circuit cycle pipe nipple receives identification decoding open signal I, control short-circuit cycle channel opening;Second by intelligence The triggering of glue core II can be decoded, the control system of intelligent short-circuit cycle pipe nipple receives identification decoding shutdown signal II, and control short circuit follows Ring channel is closed.
The center of the described intelligence decoding glue core I and intelligence decoding glue core II be it is hollow, pass through for liquid.
The short-circuit cycle channel is in close state when going into the well.
A kind of towed cementing method of small borehole bushing window sidetracking well utilizes the fluid column and ring in well cementation tubing string Cement slurry is pressed into annular space based on self-balancing principle, forms towed well cementation by the pressure difference formed between empty fluid column.
Compared with prior art, the beneficial effects of the present invention are: being replaced using conventional very low-density drilling fluid (or clear water) Former drilling fluid, due to gravity when well cementation, head of liquid is cemented the well in tubing string lower than head of liquid in well cementation tubing string in annular space Pressure difference is automatically formed between fluid column and annular space fluid column, to reach pressure balance, cement slurry is formed towed automatically into annular space Well cementation, the stagnation pressure reduction for being subject to shaft bottom effectively prevent shaft bottom by pressure break, guarantee cementing quality.The Small Well can effectively be overcome The problems such as leakage, replacement efficiency difference caused by eye casing window sidetracking well well cementation annular clearance is small, flow resistance is big, pump pressure is high, And then reaches and improve cementing quality, success rate of cementing the well and the target for reducing cost.
Detailed description of the invention
Fig. 1 is the status diagram for recycling former drilling fluid.
Fig. 2 is the status diagram for injecting conventional very low-density drilling fluid (or clear water).
Fig. 3 is the status diagram for injecting insulating liquid.
Fig. 4 is the status diagram for injecting cement slurry.
Fig. 5 is the status diagram of bottom plug rupture of membranes.
Fig. 6 is the status diagram of top cement plug bruising.
In figure: 1-top cement plug, 2-bottom plugs, 3-intelligence decoding glue cores II, 4-intelligence decoding glue cores I, 5-drill strings I, 6a-intelligence short-circuit cycle pipe nipple, 6b-short-circuit cycle channel, 7-drill strings II, 8-extension hangers, 9-casings, 10-rings Sky, 11-barefoot intervals, 12-float collars, 13-guide shoes, 14-former drilling fluids, 15-routine very low-density drilling fluids (or it is clear Water), 16-insulating liquids, 17-cement slurries.
Specific embodiment
In order to enable technical characteristic of the invention, purpose and beneficial effect to be more clearly understood, below with reference to embodiment The present invention will be further described in detail.But described only a part of the embodiments of the present invention, does not include whole implementations Example, should not be understood as the limitation to the scope of the present invention.
A kind of towed cementing method of small borehole bushing window sidetracking well, specific operating procedure is:
A, I 5 top of drill string connects cementing head, and I 5 lower part of drill string connects intelligent short-circuit cycle pipe nipple 6a, intelligent short-circuit cycle pipe nipple The lower part 6a connects drill string II 7, and II 7 lower part of drill string connects extension hanger 8,8 lower part female connector tubing string of extension hanger, and casing string includes set Pipe 9, float collar 12 and guide shoe 13, by casing string tripping in barefoot interval 11;
B, pitching builds the pressure, and packer realization is set;
C, continue to suppress, suppress logical ball seat, establish normal circulation;
D, former drilling fluid 14, cleaning well cementation tubing string and annular space 10 are recycled, guarantees that well cementation tubing string inner passage and annular space 10 are logical Road is unblocked;
E, the conventional very low-density drilling fluid (or clear water) 15 that specific quantity is injected into well cementation tubing string pushes intelligence decoding glue Core I 4 moves downward, and when intelligently decoding glue core I 4 reaches the specific position of intelligent short-circuit cycle pipe nipple 6a, intelligent short-circuit cycle is short It saves 6a and receives decoding open signal I, control short-circuit cycle channel 6b is opened;
F, after the completion of conventional 15 injection of very low-density drilling fluid (or clear water), start to inject specific quantity into well cementation tubing string Insulating liquid 16 and cement slurry 17 push intelligence decoding glue core II 3 to move downward;
G, when the specific position for intelligently decoding the intelligent short-circuit cycle pipe nipple 6a of the arrival of glue core II 3, intelligent short-circuit cycle pipe nipple 6a receives decoding shutdown signal II, and control short-circuit cycle channel 6b is closed;
H, it injects after the completion of cement slurry 17, former drilling fluid 14 is injected into well cementation tubing string and is recycled, 2 rupture of membranes of bottom plug, Annular space 10 between 17 sleeve pipe 9 of cement slurry and barefoot interval 11, cement slurry 17 replace former drilling fluid 14;
I, until 1 bruising of top cement plug, geostatic pressure rises certain value quickly, which has replaced Position, construction terminate;
J, termination of pumping, Hou Ning.
The great representativeness of above embodiments, have it is easy to operate, securely and reliably, can be realized stable well cementation effect, mention High cementing quality, has saved well cementation cost, can preferably realize cementing method of the present invention.

Claims (7)

1. a kind of towed cementing method of small borehole bushing window sidetracking well, it is characterised in that it the following steps are included:
A: drill string I (5) top connects cementing head, and drill string I (5) lower part connects intelligent short-circuit cycle pipe nipple (6a), and intelligent short-circuit cycle is short Section lower part (6a) connects drill string II (7), and drill string II (7) lower part connects extension hanger (8), extension hanger (8) lower part female connector tubing string, Casing string includes casing (9), float collar (12) and guide shoe (13), by casing string tripping in barefoot interval (11), and guarantees intelligent short circuit Circulating sub (6a) is at extension hanger (8) upper end 50m-100m;
B: former drilling fluid (14), cleaning well cementation tubing string and annular space (10) are recycled, guarantees well cementation tubing string inner passage and annular space (10) Channel is unblocked;
C: injecting the conventional very low-density drilling fluid or clear water (15) of specific quantity into well cementation tubing string, pushes intelligence decoding glue core I (4) it moves downward, when intelligently decoding glue core I (4) reaches the specific position of intelligent short-circuit cycle pipe nipple (6a), intelligent short-circuit cycle Pipe nipple (6a) receives decoding open signal I, and control short-circuit cycle channel (6b) is opened;
D: after the completion of conventional very low-density drilling fluid or clear water (15) injection, start to be implanted sequentially specific quantity into well cementation tubing string Insulating liquid (16) and cement slurry (17), push intelligence decoding glue core II (3) move downward;
E: when intelligently decoding glue core II (3) reaches the specific position of intelligent short-circuit cycle pipe nipple (6a), intelligent short-circuit cycle pipe nipple (6a) receives decoding shutdown signal II, and control short-circuit cycle channel (6b) is closed;
F: after the completion of injection cement slurry (17), former drilling fluid (14) is injected into well cementation tubing string and is recycled, cement slurry is pushed (17) enter annular space (10);
G: after top cement plug (1) bruising, termination of pumping, Hou Ning.
2. a kind of towed cementing method of small borehole bushing window sidetracking well according to claim 1, it is characterised in that: use In the liquid for replacing former drilling fluid (14) be conventional very low-density drilling fluid or clear water (15), the conventional very low-density drilling well of injection The amount of liquid or clear water (15) can just be full of intelligent short-circuit cycle pipe nipple (6a) upper end annular space (10).
3. a kind of towed cementing method of small borehole bushing window sidetracking well according to claim 1, it is characterised in that: short Road circulation canal (6b) connects well cementation tubing string inner passage and annular space (10), makes the channel of intelligent short-circuit cycle pipe nipple (6a) lower end Short circuit.
4. a kind of towed cementing method of small borehole bushing window sidetracking well according to claim 1, it is characterised in that: Gu Intelligent short-circuit cycle pipe nipple (6a) progress open and close act twice during well, for the first time by intelligently decoding glue core I (4) triggering, intelligence The control system of energy short-circuit cycle pipe nipple (6a) receives identification decoding open signal I, control short-circuit cycle channel (6b) opening;The Secondary to be triggered by intelligently decoding glue core II (3), the control system of intelligent short-circuit cycle pipe nipple (6a), which receives identification decoding and closes, to be believed Number II, control short-circuit cycle channel (6b) is closed.
5. a kind of towed cementing method of small borehole bushing window sidetracking well according to claim 1, it is characterised in that: intelligence It is hollow that the center of glue core I (4) and intelligence decoding glue core II (3), which can be decoded,.
6. a kind of towed cementing method of small borehole bushing window sidetracking well according to claim 1, it is characterised in that: short Road circulation canal (6b) is in close state when going into the well.
7. a kind of towed cementing method of small borehole bushing window sidetracking well according to claim 1, it is characterised in that: benefit With the pressure difference between the fluid column and annular space (10) fluid column in well cementation tubing string, cement slurry (17) are pressed by ring based on self-balancing principle Empty (10), form towed well cementation.
CN201710845719.9A 2017-09-19 2017-09-19 A kind of towed cementing method of small borehole bushing window sidetracking well Active CN107489396B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710845719.9A CN107489396B (en) 2017-09-19 2017-09-19 A kind of towed cementing method of small borehole bushing window sidetracking well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710845719.9A CN107489396B (en) 2017-09-19 2017-09-19 A kind of towed cementing method of small borehole bushing window sidetracking well

Publications (2)

Publication Number Publication Date
CN107489396A CN107489396A (en) 2017-12-19
CN107489396B true CN107489396B (en) 2019-07-19

Family

ID=60651739

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710845719.9A Active CN107489396B (en) 2017-09-19 2017-09-19 A kind of towed cementing method of small borehole bushing window sidetracking well

Country Status (1)

Country Link
CN (1) CN107489396B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111706259A (en) * 2020-07-14 2020-09-25 中国石油集团渤海钻探工程有限公司 Method for solving casing deformation by sidetracking old well paste-salt section reaming unfixed well

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108979583B (en) * 2018-07-12 2020-11-17 福州宇卓科技有限公司 Sidetracking well layering and segmenting cementing device and using method
CN109403916A (en) * 2018-12-05 2019-03-01 田振林 A kind of thermally conductive well shaft fixing technology of geothermal well
CN114109309A (en) * 2020-08-28 2022-03-01 中国石油化工股份有限公司 Underground infinite-stage fracturing sliding sleeve
CN112943161B (en) * 2021-01-14 2022-11-04 中国石油天然气股份有限公司 Side drilling is exempted from to hang and can be lost hand well cementation well completion device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5301760A (en) * 1992-09-10 1994-04-12 Natural Reserves Group, Inc. Completing horizontal drain holes from a vertical well
CN1621658A (en) * 2003-11-28 2005-06-01 大港油田集团有限责任公司 Well cementing technology by center tube replacing elutriation method
CN1632278A (en) * 2003-12-24 2005-06-29 大港油田集团有限责任公司 Big tail pipe side drilling well cementing technology
CN103362473A (en) * 2012-10-24 2013-10-23 中国石油化工股份有限公司 Graded variable density well cementation technology
CN104963653A (en) * 2015-07-24 2015-10-07 中石化华东石油工程有限公司 Cementing technology for 5.5-cun sleeve windowed side drilled slim hole
CN106223917A (en) * 2016-08-01 2016-12-14 中国石油集团川庆钻探工程有限公司工程技术研究院 A kind of side tracked slim hole layered fracturing pipe string and method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5301760A (en) * 1992-09-10 1994-04-12 Natural Reserves Group, Inc. Completing horizontal drain holes from a vertical well
US5301760C1 (en) * 1992-09-10 2002-06-11 Natural Reserve Group Inc Completing horizontal drain holes from a vertical well
CN1621658A (en) * 2003-11-28 2005-06-01 大港油田集团有限责任公司 Well cementing technology by center tube replacing elutriation method
CN1632278A (en) * 2003-12-24 2005-06-29 大港油田集团有限责任公司 Big tail pipe side drilling well cementing technology
CN103362473A (en) * 2012-10-24 2013-10-23 中国石油化工股份有限公司 Graded variable density well cementation technology
CN104963653A (en) * 2015-07-24 2015-10-07 中石化华东石油工程有限公司 Cementing technology for 5.5-cun sleeve windowed side drilled slim hole
CN106223917A (en) * 2016-08-01 2016-12-14 中国石油集团川庆钻探工程有限公司工程技术研究院 A kind of side tracked slim hole layered fracturing pipe string and method

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
国内外小井眼固井技术研究现状;张凯等;《钻采工艺》;20150331;第38卷(第2期);29-30
小井眼开窗侧钻井固井工艺技术;蒋海涛等;《石油钻采工艺》;20030430;第25卷(第2期);50-53
开窗侧钻小井眼、小间隙井;张文泽等;《化学工程师》;20161231(第9期);23-26

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111706259A (en) * 2020-07-14 2020-09-25 中国石油集团渤海钻探工程有限公司 Method for solving casing deformation by sidetracking old well paste-salt section reaming unfixed well

Also Published As

Publication number Publication date
CN107489396A (en) 2017-12-19

Similar Documents

Publication Publication Date Title
CN107489396B (en) A kind of towed cementing method of small borehole bushing window sidetracking well
US11898414B2 (en) Method for filling oil-gas well of fractured oil-gas reservoir with isolation particles to reduce water and increase oil production
CN201705219U (en) Lateral drilling gravel pack completion string
CN105756650B (en) It is a kind of that the outer method altered and realize horizontal well fracturing is managed using mixing diverting agent closure
CN103061684A (en) Open-hole horizontal well sectional multi-cluster uniform acidizing tubular column and acidizing method thereof
CN110424912A (en) Method, the row's of returning service unit and the completion structure of tubing string replacement filling layer are not changed
CN205936557U (en) Water injection oil production pipe
CN104695895A (en) Plugging method integrating channel blocking and leakage plugging
CN103452531B (en) Oil pipe under underbalance, no killing well gaslift, turn the method for taking out, examining pump and maintenance oil pipe
CN201738822U (en) String for upper horizontal well cementation and lower screen pipe gravel pack completion
CN105178910A (en) Water-plugging process tubing string and method of horizontal wells
CN115247543A (en) Method for accurately injecting steam in fixed-point segmented water shutoff and dislocation mode of heavy oil reservoir horizontal well
CN103470221B (en) Method made by the connection that pump was taken out and examined to oil pipe under underbalance, no killing well gaslift, axle
CN108625841A (en) A kind of refracturing method that the sealing of horizontal well annular space is made with pitching sliding sleeve connection
CN107780904A (en) A kind of water flood recovery tubing string
CN108049816A (en) The narrow pressure window well four of deep water opens time Casing Program Design Method
CN205477525U (en) Horizontal well floats case tubular column
CN103711473A (en) Double-circulation relay type method for drilling and completing coal seam composite well
CN104563872B (en) Blockage resisting self-filling-type float collar
CN110067528A (en) A kind of injecting cement in oil well method and single current cementing tool
CN114562199B (en) Cement leaking stoppage bores stopper integrated underground device
AU2021104224A4 (en) Sectional Cementing Technology for Deep Trona Drilling and Mining
CN104100228B (en) Reversal valve is adopted in a kind of synchronization point
RU2644360C1 (en) Installation method of cement bridge in well
CN105178905A (en) Process tubing string and method for integrated setting and channeling testing of bridge plugs of horizontal wells

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Zhang Derong

Inventor after: Zhao Lu

Inventor after: Pu Yangfeng

Inventor after: Kong Chunyan

Inventor after: Sun Linping

Inventor after: Wu Simeng

Inventor after: Yang Zhihao

Inventor after: Yue Huawei

Inventor after: Xie Wujun

Inventor before: Zhang Derong

Inventor before: Pu Yangfeng

Inventor before: Kong Chunyan

Inventor before: Sun Linping

Inventor before: Wu Simeng

Inventor before: Yang Zhihao

Inventor before: Yue Huawei

Inventor before: Xie Wujun