CN107484254A - Available resources determine methods, devices and systems - Google Patents
Available resources determine methods, devices and systems Download PDFInfo
- Publication number
- CN107484254A CN107484254A CN201710840526.4A CN201710840526A CN107484254A CN 107484254 A CN107484254 A CN 107484254A CN 201710840526 A CN201710840526 A CN 201710840526A CN 107484254 A CN107484254 A CN 107484254A
- Authority
- CN
- China
- Prior art keywords
- resource
- pattern
- information
- available resources
- occupation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 38
- 230000005484 gravity Effects 0.000 claims abstract description 28
- 230000005540 biological transmission Effects 0.000 claims abstract description 27
- 238000001514 detection method Methods 0.000 claims abstract description 27
- 238000004891 communication Methods 0.000 abstract description 6
- 238000005516 engineering process Methods 0.000 description 6
- 230000006870 function Effects 0.000 description 6
- 230000000737 periodic effect Effects 0.000 description 5
- 230000008569 process Effects 0.000 description 5
- 238000004590 computer program Methods 0.000 description 3
- 238000010168 coupling process Methods 0.000 description 3
- 238000005859 coupling reaction Methods 0.000 description 3
- 238000012545 processing Methods 0.000 description 3
- 230000008878 coupling Effects 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 230000007774 longterm Effects 0.000 description 2
- 230000006855 networking Effects 0.000 description 2
- 239000007787 solid Substances 0.000 description 2
- 238000004422 calculation algorithm Methods 0.000 description 1
- 238000004364 calculation method Methods 0.000 description 1
- 230000001413 cellular effect Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 235000013399 edible fruits Nutrition 0.000 description 1
- 238000009472 formulation Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 230000003287 optical effect Effects 0.000 description 1
- 239000013307 optical fiber Substances 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 238000013468 resource allocation Methods 0.000 description 1
- 239000004065 semiconductor Substances 0.000 description 1
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/12—Wireless traffic scheduling
- H04W72/121—Wireless traffic scheduling for groups of terminals or users
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W28/00—Network traffic management; Network resource management
- H04W28/16—Central resource management; Negotiation of resources or communication parameters, e.g. negotiating bandwidth or QoS [Quality of Service]
- H04W28/26—Resource reservation
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/12—Wireless traffic scheduling
- H04W72/1221—Wireless traffic scheduling based on age of data to be sent
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/50—Allocation or scheduling criteria for wireless resources
- H04W72/53—Allocation or scheduling criteria for wireless resources based on regulatory allocation policies
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/50—Allocation or scheduling criteria for wireless resources
- H04W72/56—Allocation or scheduling criteria for wireless resources based on priority criteria
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Quality & Reliability (AREA)
- Mobile Radio Communication Systems (AREA)
Abstract
The embodiment of the present application provides a kind of available resources and determines methods, devices and systems, is related to the communications field, for solving it is determined that during available resources, the UE of pattern 3 and the UE resource occupation conflicts of pattern 4.The available resources determine method, including:First user equipment (UE) obtains the 2nd UE semi-persistent scheduling SPS resource occupation transmission cycle and resource gravity treatment counter information, wherein, the first UE is the UE of pattern 3,2nd UE is the UE of pattern 4, or the UE that the first UE is pattern 4, the 2nd UE are the UE of pattern 3;First UE detects the energy of the 2nd UE to determine the resource not taken in detection cycle by the 2nd UE;First UE determines the available resources of the first UE according to the SPS resource occupation transmission cycle, resource gravity treatment counter information and the resource not taken by the 2nd UE.The embodiment of the present application communicates applied to V2X.
Description
Technical field
The present invention relates to the communication technology, more particularly to a kind of available resources to determine methods, devices and systems.
Background technology
With the extensive use of mobile Internet, Internet of Things and wireless sensor technology, car networking, which turns into, realizes following intelligence
One of critical path of intelligent traffic and smart city.Along with Long Term Evolution (Long Term Evolution, LTE)-vehicle with
The research and formulation of extraneous (Vehicle to X, V2X) standard, the V2X technologies based on Cellular Networks turn into another of car networking
Study hotspot.
In user equipment (User Equipment, UE) scheduling of resource, LTE-V2X include pattern 3 (mode 3) and
Pattern 4 (mode 4) two spike-type cultivars scheduling method.The UE of pattern 3 is operated in by base station scheduling resource, is operated in the UE roots of pattern 4
According to occupation condition Autonomous Scheduling resource.One kind that one UE can be only in pattern 3 and pattern 4 at the same moment, and
And the resource pool of pattern 3 and pattern 4 is separate.
For the UE of pattern 3, although resource is distributed by base station, which resource base station is not aware that by pattern
4 UE takes.For the UE of pattern 4, it can not detect the resource periodically taken by the UE of pattern 3, it is possible to
The resource is not taken by the UE of pattern 3 during detection, but the resource is taken by the UE of pattern 3 in actual selection resource.Cause
This, when base station distributes resource or mode 4 UE for the UE of pattern 3 and independently selects resource, can produce resource occupation conflict
Situation.
The content of the invention
Embodiments herein provides a kind of available resources and determines methods, devices and systems, for solving it is determined that available
During resource, the UE of pattern 3 and the UE resource occupation conflicts of pattern 4.
To reach above-mentioned purpose, embodiments herein adopts the following technical scheme that:
First aspect, there is provided a kind of available resources determine method, and this method includes:
First user equipment (UE) obtains the 2nd UE semi-persistent scheduling SPS resource occupation transmission cycle and resource gravity treatment meter
Number device information, wherein, the first UE is the UE of pattern 3, and the 2nd UE is the UE of pattern 4, or, the first UE is mould
The UE of formula 4, the 2nd UE are the UE of pattern 3;
First UE detects the energy of the 2nd UE to determine the money not taken in detection cycle by the 2nd UE
Source;
First UE is according to the SPS resource occupation transmission cycle, resource gravity treatment counter information and not by described
The resource that two UE take, determine the available resources of the first UE.
Second aspect, there is provided a kind of first user equipment (UE), the first UE include:
Acquiring unit, based on the semi-persistent scheduling SPS resource occupation transmission cycle for obtaining the 2nd UE and resource gravity treatment
Number device information, wherein, the first UE is the UE of pattern 3, and the 2nd UE is the UE of pattern 4, or, the first UE is mould
The UE of formula 4, the 2nd UE are the UE of pattern 3;
Detection unit, for detecting the energy of the 2nd UE to determine in detection cycle what is do not taken by the 2nd UE
Resource;
Determining unit, for according to the SPS resource occupation transmission cycle, resource gravity treatment counter information and not described
The resource that 2nd UE takes, determine the available resources of the first UE.
The available resources that embodiments herein provides determine methods, devices and systems, and the first UE is obtained in detection cycle
2nd UE occupation condition, with reference to shared by the 2nd UE SPS resource occupation transmission cycles determine the 2nd UE periodic schedulings
Resource, the first UE available resources, which pair are further determined that with reference to the 2nd UE resource gravity treatment counter information
In the UE that the first UE is pattern 3, the 2nd UE is the UE of pattern 4, or, the first UE is the UE of pattern 4, and the 2nd UE is pattern 3
UE both of which is applicable, and is solved it is determined that during available resources, the UE of pattern 3 and the UE resource occupation conflicts of pattern 4.
Brief description of the drawings
, below will be to embodiment or existing in order to illustrate more clearly of the embodiment of the present application or technical scheme of the prior art
There is the required accompanying drawing used in technology description to be briefly described.
Fig. 1 is the structural representation for the communication system that embodiments herein provides;
Fig. 2 is the schematic flow sheet that a kind of available resources that embodiments herein provides determine method;
Fig. 3 is the schematic flow sheet that another available resources that embodiments herein provides determine method;
Fig. 4 is the schematic flow sheet that another available resources that embodiments herein provides determine method;
Fig. 5 is the schematic flow sheet that another available resources that embodiments herein provides determine method;
Fig. 6 is a kind of structural representation for the UE that embodiments herein provides.
Embodiment
Below in conjunction with the accompanying drawings, embodiments herein is described.
Shown in reference picture 1, the communication system that is provided for the embodiment of the present application, the system includes base station 11, at least one
First UE 12 and at least one 2nd UE 13.Wherein, the first UE 12 is the UE of pattern 3 (mode 3), and the 2nd UE 13 is mould
The UE of formula 4 (mode 4), or, the first UE 12 is the UE of pattern 4, and the 2nd UE 13 is the UE of pattern 3, and the embodiment of the present application is not
It is construed as limiting.
Embodiment 1,
Shown in reference picture 2, the embodiment of the present application provides a kind of available resources and determines method, applied to above-mentioned communication system
System, the method comprising the steps of S101-S103:
S101, the first UE obtain the 2nd UE semi-persistent scheduling (Semi-Persistent Scheduling, SPS) resource
Take transmission cycle and resource gravity treatment counter information.
Specifically, shown in reference picture 3, step S101 can include step S1011:
S1011, the first UE parse the 2nd UE physical shared control channel (Physical Sharing Control
Channel, PSCCH) obtain the letter of spatial channel information form (Space Channel Information, SCI Format) 1
Breath, wherein, the information of SCI Format 1 includes the 2nd UE SPS resource occupation transmission cycle and resource gravity treatment counter letter
Breath.
Specifically, it can be set in resource reservation (Resource reservation) domain of the information of SCI Format 1
SPS resource occupation transmission cycles;Resource gravity treatment counter information is set in the information of SCI Format 1, specifically, can make
Resource gravity treatment counter information is represented with the reservation bit of the information of SCI Format 1, or changes existing SCI Format 1
Form, increase special domain be used for represent resource gravity treatment counter information.
S102, the first UE detect the 2nd UE energy to determine in detection cycle the resource not taken by the 2nd UE.
First UE can determine second by way of detecting the 2nd UE reference signal energy and symbol gross energy
Whether UE takes corresponding resource.
Specifically, shown in reference picture 3, step S102 can include step S1021-S1023:
S1021, the first UE detect the 2nd UE reference signal ENERGY E in the resource in certain detection cyclefAnd symbol
Number gross energy Ec。
S1022, the first UE calculate energy measuring coefficientWherein,Ef,thresAnd Ec,thresFor energy measuring threshold value, μ is reference signal occupation proportion coefficient, ∪
Represent or operate.
Above-mentioned formula represents:WhenIn all values when being 0, then P=0, whenIn when to have a value be 1, then P=1.
S1023, the first UE selection P=0 resource are as the resource not taken by the 2nd UE.
First UE judges whether Current resource is taken by the 2nd UE, if P according to the 2nd UE energy measuring probability coefficent P
=1, then it represents that resource is occupied, if P=0, judges that resource is not taken by the 2nd UE.
S103, the first UE are according to the 2nd UE SPS resource occupation transmission cycle, resource gravity treatment counter information and detection week
The resource not taken in phase by the 2nd UE, determine the first UE available resources.
The occupancy resource obtained in step S1023 is the resource taken in detection cycle by the 2nd UE, it is contemplated that second
UE is possible to periodic scheduling, therefore also needs to combine SPS resource occupation transmission cycle to exclude by the 2nd UE periodic scheduling
Shared resource, to avoid resource occupation conflict.
In addition, in order to avoid the 2nd UE takes resource for a long time and causes the wasting of resources, it is necessary to which the first UE is with reference to the 2nd UE's
Resource gravity treatment counter information, to further determine that the first UE available resources.When resource gravity treatment counter is completed to count, say
The bright part resource is discharged by the 2nd UE, and now the first UE can resume the part resource, to improve resource utilization
It will be understood by those skilled in the art that the first UE unavailable resource, i.e. quilt can also be determined through the above way
The resource that 2nd UE takes, its technique effect are identical with aforesaid way.
It should be noted that as the UE that the first UE is pattern 4, when the 2nd UE is the UE of pattern 3, the first UE can be according to the
One UE available resources carry out Autonomous Scheduling resource.As the UE that the first UE is pattern 3, when the 2nd UE is the UE of pattern 4, the first UE can
So that the first UE available resources are sent into base station, by base station come scheduling resource.
The available resources that the embodiment of the present application provides determine method, and the resource that the first UE obtains the 2nd UE in detection cycle accounts for
With situation, the resource with reference to shared by the 2nd UE SPS resource occupation transmission cycles determine the 2nd UE periodic schedulings, with reference to
Two UE resource gravity treatment counter information further determines that the first UE available resources, and which is pattern 3 for the first UE
UE, the 2nd UE be pattern 4 UE, or, the first UE be pattern 4 UE, the 2nd UE be pattern 3 UE both of which fit
With solving it is determined that during available resources, the UE of pattern 3 and the UE resource occupation conflicts of pattern 4.
Optionally, the 2nd UE resource occupation precedence information and pattern information is also included in the information of SCI Format 1,
Resource occupation precedence information is used for the priority for indicating the 2nd UE distribution resources, and pattern information is used to indicate that the 2nd UE is pattern
The 4 UE or UE of pattern 3.
Specifically, 1 bit in the information reservation bits of SCI Format 1 can be used to represent UE pattern, such as with 0 table
Show pattern 3, with 1 intermediate scheme 4, or, with 1 intermediate scheme 3, with 0 intermediate scheme 4.
Further alternative, shown in reference picture 4, when the first UE is the UE of pattern 3, this method also includes step
S104 and S105:
S104, the first UE determine the UE that the 2nd UE is pattern 4 according to the 2nd UE pattern information.
The available resources of 2nd UE resource occupation precedence information and the first UE are sent to base station by S105, the first UE.
The step is used for base station and distributes resource according to the two information for the first UE of pattern 3.
Embodiment 2,
Exemplified by UE using the first UE as pattern 3, the 2nd UE are the UE of pattern 4, the embodiment of the present application provides another kind can
With resource determining method, shown in reference picture 5, this method includes:
S201, base station notify that the first UE is detected.
Base station can notify that all or part of first UE, the first UE are the UE of pattern 3.
S202, the first UE parse the information of SCI Format 1 in the 2nd UE PSCCH, obtain the 2nd UE pattern letter
Breath, resource occupation precedence information, SPS resource occupation transmission cycle and resource gravity treatment counter information, and according to the 2nd UE
Pattern information determine the 2nd UE be pattern 4 UE, then perform step S203, otherwise re-execute S202.
S203, the first UE detect the 2nd UE energy to determine in detection cycle the resource not taken by the 2nd UE.
The step is identical with S102, will not be repeated here.
S204, the first UE are according to the 2nd UE SPS resource occupation transmission cycle, resource gravity treatment counter information and detection week
The resource not taken in phase by the 2nd UE, determine the first UE available resources.
The step is identical with S103, will not be repeated here.
The available resources of 2nd UE resource occupation precedence information and the first UE are sent to base station by S205, the first UE.
The step is identical with S105, will not be repeated here.
S206, base station are distributed according to the 2nd UE resource occupation precedence information and the first UE available resources for the first UE
Resource.
Base station is with reference to the first UE available resources (excluding the resource taken by the 2nd UE) and the 2nd UE resource
Take precedence information and suitable resource allocation is selected from candidate resource to the first UE.
The available resources that the embodiment of the present application provides determine method, and the UE of pattern 3 obtains the UE's of detection cycle internal schema 4
Occupation condition, the UE of binding pattern 4 SPS resource occupation transmission cycles are determined shared by the UE periodic schedulings of pattern 4
Resource, the UE of binding pattern 4 resource gravity treatment counter information further determines that the UE of pattern 3 available resources, solves
It is determined that during available resources, the UE of pattern 3 and the UE resource occupation conflicts of pattern 4.
Embodiment 3,
The embodiment of the present application provides the first UE 12 of one kind, including:Acquiring unit 1201, detection unit 1202, determine list
Member 1203, transmitting element 1204.
Acquiring unit 1201, for obtaining the 2nd UE semi-persistent scheduling SPS resource occupation transmission cycle and resource weight
Counter information is selected, wherein, the first UE is the UE of pattern 3, and the 2nd UE is the UE of pattern 4, or, the first UE
For the UE of pattern 4, the 2nd UE is the UE of pattern 3.
Detection unit 1202, for detecting the energy of the 2nd UE to determine not accounted for by the 2nd UE in detection cycle
Resource.
Determining unit 1203, for according to the SPS resource occupation transmission cycle, resource gravity treatment counter information and not by
The resource that 2nd UE takes, determine the available resources of the first UE.
In a kind of possible embodiment, acquiring unit 1201 is specifically used for:The physics for parsing the 2nd UE is shared
Control channel PSCCH obtains the information of spatial channel information form SCI Format 1, wherein, in the information of SCI Format 1
SPS resource occupation transmission cycle and resource gravity treatment counter information including the 2nd UE.
In a kind of possible embodiment, also the resource including the 2nd UE accounts in the information of SCI Format 1
With precedence information and pattern information, wherein, the resource occupation precedence information is used to indicate the 2nd UE distribution resource
Priority, the pattern information be used for indicate the 2nd UE be pattern 4 UE or pattern 3 UE.
In a kind of possible embodiment, when the first UE is the UE of pattern 3, the determining unit 1203, also
For determining UEs of the 2nd UE for pattern 4 according to the pattern information;The transmitting element 1204 is used for described second
UE resource occupation precedence information and the available resources are sent to base station.
In a kind of possible embodiment, the detection unit 1202 is specifically used for:Money in certain detection cycle
The reference signal ENERGY E of the 2nd UE is detected on sourcefAnd symbol gross energy Ec;Calculate energy measuring coefficientWherein,Ef,thresAnd Ec,thresFor energy
Detection threshold value is measured, μ is reference signal occupation proportion coefficient, and ∪ is represented or operation;Select P=0 resource be used as described in not by
The resource that 2nd UE takes.
Because the first UE in the embodiment of the present application can apply to the above method, therefore, it can be obtained technology effect
Fruit also refers to above method embodiment, and the embodiment of the present application will not be repeated here.
It should be noted that acquiring unit 1201, detection unit 1202, determining unit 1203 can be the place individually set up
Device is managed, can also be integrated in some processor of controller and realize, in addition it is also possible to be stored in the form of program code
In the memory of controller, called by some processor of controller and perform the function of above each unit.Described here
Processor can be a central processing unit (Central Processing Unit, CPU), or specific integrated circuit
(Application Specific Integrated Circuit, ASIC), or be arranged to implement the embodiment of the present application
One or more integrated circuits.
It should be understood that in the various embodiments of the application, the size of the sequence number of above-mentioned each process is not meant to perform suitable
The priority of sequence, the execution sequence of each process should be determined with its function and internal logic, without the implementation of reply the embodiment of the present application
Process forms any restriction.
Those of ordinary skill in the art are it is to be appreciated that the list of each example described with reference to the embodiments described herein
Member and algorithm steps, it can be realized with the combination of electronic hardware or computer software and electronic hardware.These functions are actually
Performed with hardware or software mode, application-specific and design constraint depending on technical scheme.Professional and technical personnel
Described function can be realized using distinct methods to each specific application, but this realization is it is not considered that exceed
Scope of the present application.
It is apparent to those skilled in the art that for convenience and simplicity of description, the system of foregoing description,
The specific work process of device and unit, the corresponding process in preceding method embodiment is may be referred to, will not be repeated here.
In several embodiments provided herein, it should be understood that disclosed system, apparatus and method, can be with
Realize by another way.For example, apparatus embodiments described above are only schematical, for example, the unit
Division, only a kind of division of logic function, can there is other dividing mode, such as multiple units or component when actually realizing
Another system can be combined or be desirably integrated into, or some features can be ignored, or do not perform.It is another, it is shown or
The mutual coupling discussed or direct-coupling or communication connection can be the indirect couplings by some interfaces, equipment or unit
Close or communicate to connect, can be electrical, mechanical or other forms.
The unit illustrated as separating component can be or may not be physically separate, show as unit
The part shown can be or may not be physical location, you can with positioned at a place, or can also be distributed to multiple
On NE.Some or all of unit therein can be selected to realize the mesh of this embodiment scheme according to the actual needs
's.
In addition, each functional unit in each embodiment of the application can be integrated in a processing unit, can also
That unit is individually physically present, can also two or more units it is integrated in a unit.
In the above-described embodiments, can come wholly or partly by software, hardware, firmware or its any combination real
It is existing.When being realized using software program, can realize in the form of a computer program product whole or in part.The computer
Program product includes one or more computer instructions.On computers load and perform computer program instructions when, all or
Partly produce according to the flow or function described in the embodiment of the present application.The computer can be all-purpose computer, special meter
Calculation machine, computer network or other programmable devices.The computer instruction can be stored in computer-readable recording medium
In, or the transmission from a computer-readable recording medium to another computer-readable recording medium, for example, the computer
Instruction can pass through wired (such as coaxial cable, optical fiber, number from a web-site, computer, server or data center
Word user line (Digital Subscriber Line, DSL)) or wireless (such as infrared, wireless, microwave etc.) mode to another
Individual web-site, computer, server or data center are transmitted.The computer-readable recording medium can be computer
Any usable medium that can be accessed is either comprising numbers such as one or more servers that medium can be used to integrate, data centers
According to storage device.The usable medium can be magnetic medium (for example, floppy disk, hard disk, tape), optical medium (for example, DVD),
Or semiconductor medium (such as solid state hard disc (Solid State Disk, SSD)) etc..
Described above, the only embodiment of the application, but the protection domain of the application is not limited thereto is any
Those familiar with the art can readily occur in change or replacement in the technical scope that the application discloses, and should all contain
Cover within the protection domain of the application.Therefore, the protection domain of the application should be based on the protection scope of the described claims.
Claims (10)
1. a kind of available resources determine method, it is characterised in that including:
First user equipment (UE) obtains the 2nd UE semi-persistent scheduling SPS resource occupation transmission cycle and resource gravity treatment counter
Information, wherein, the first UE is the UE of pattern 3, and the 2nd UE is the UE of pattern 4, or, the first UE is pattern 4
UE, the 2nd UE be pattern 3 UE;
First UE detects the energy of the 2nd UE to determine the resource not taken in detection cycle by the 2nd UE;
First UE is according to the SPS resource occupation transmission cycle, resource gravity treatment counter information and not by the 2nd UE
The resource of occupancy, determine the available resources of the first UE.
2. according to the method for claim 1, it is characterised in that first user equipment (UE) obtains the semi-static of the 2nd UE
SPS resource occupation transmission cycle and resource gravity treatment counter information are dispatched, including:
The physical shared control channel PSCCH that first UE parses the 2nd UE obtains spatial channel information form SCI
The information of Format 1, wherein, the information of SCI Format 1 include the SPS resource occupation transmission cycle of the 2nd UE with
And resource gravity treatment counter information.
3. according to the method for claim 2, it is characterised in that also include described second in the information of SCI Format 1
UE resource occupation precedence information and pattern information, wherein, the resource occupation precedence information is used to indicate described second
UE distributes the priority of resource, and the pattern information is used to indicate the 2nd UE for the UE of the pattern 4 or UE of pattern 3.
4. according to the method for claim 3, it is characterised in that when the first UE is the UE of pattern 3, methods described is also
Including:
First UE determines the UE that the 2nd UE is pattern 4 according to the pattern information;
The resource occupation precedence information of 2nd UE and the available resources are sent to base station by the first UE.
5. according to the method described in claim any one of 1-4, it is characterised in that the first UE detects the energy of the 2nd UE
Measure to determine the resource not taken by the 2nd UE, including:
First UE detects the reference signal ENERGY E of the 2nd UE in the resource in certain detection cyclefAnd symbol is total
ENERGY Ec;
First UE calculates energy measuring coefficientWherein,Ef,thresAnd Ec,thresFor energy measuring threshold value, μ is reference signal occupation proportion coefficient, ∪
Represent or operate;
The resource of the first UE selections P=0 is as the resource not taken by the 2nd UE.
A kind of 6. first user equipment (UE), it is characterised in that including:
Acquiring unit, for obtaining the 2nd UE semi-persistent scheduling SPS resource occupation transmission cycle and resource gravity treatment counter
Information, wherein, the first UE is the UE of pattern 3, and the 2nd UE is the UE of pattern 4, or, the first UE is pattern 4
UE, the 2nd UE be pattern 3 UE;
Detection unit, for detecting the energy of the 2nd UE to determine in detection cycle the money not taken by the 2nd UE
Source;
Determining unit, for according to the SPS resource occupation transmission cycle, resource gravity treatment counter information and not by described second
The resource that UE takes, determine the available resources of the first UE.
7. the first UE according to claim 6, it is characterised in that the acquiring unit is specifically used for:
The physical shared control channel PSCCH for parsing the 2nd UE obtains spatial channel information form SCI Format 1 and believed
Breath, wherein, the information of SCI Format 1 includes SPS resource occupation transmission cycle and the resource gravity treatment of the 2nd UE
Counter information.
8. the first UE according to claim 7, it is characterised in that also include described the in the SCI Format1 information
Two UE resource occupation precedence information and pattern information, wherein, the resource occupation precedence information is used to indicate described the
Two UE distribute the priority of resource, and the pattern information is used to indicate the 2nd UE for the UE of the pattern 4 or UE of pattern 3.
9. the first UE according to claim 8, it is characterised in that the first UE also includes transmitting element, when described
When one UE is the UE of pattern 3,
The determining unit, it is additionally operable to determine UEs of the 2nd UE for pattern 4 according to the pattern information;
The transmitting element is used to the resource occupation precedence information of the 2nd UE and the available resources being sent to base station.
10. according to the first UE described in claim any one of 6-9, it is characterised in that the detection unit is specifically used for:
The reference signal ENERGY E of the 2nd UE is detected in resource in certain detection cyclefAnd symbol gross energy Ec;
Calculate energy measuring coefficientWherein,Ef,thresAnd Ec,thresFor energy measuring threshold value, μ is reference signal occupation proportion coefficient, ∪
Represent or operate;
P=0 resource is selected as the resource not taken by the 2nd UE.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710840526.4A CN107484254B (en) | 2017-09-15 | 2017-09-15 | Available resource determination method, device and system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710840526.4A CN107484254B (en) | 2017-09-15 | 2017-09-15 | Available resource determination method, device and system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107484254A true CN107484254A (en) | 2017-12-15 |
CN107484254B CN107484254B (en) | 2021-05-25 |
Family
ID=60584936
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710840526.4A Active CN107484254B (en) | 2017-09-15 | 2017-09-15 | Available resource determination method, device and system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107484254B (en) |
Cited By (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108924789A (en) * | 2018-06-21 | 2018-11-30 | 中国联合网络通信集团有限公司 | Car networking communication pattern selection method and device |
CN109644436A (en) * | 2018-03-20 | 2019-04-16 | Oppo广东移动通信有限公司 | The method and terminal device of resource-sharing |
WO2019148376A1 (en) * | 2018-01-31 | 2019-08-08 | Lenovo (Beijing) Limited | Method and apparatus for resource collision avoidance on sidelink |
CN110167072A (en) * | 2018-02-12 | 2019-08-23 | 华为技术有限公司 | Resource selection method and terminal equipment |
CN110248412A (en) * | 2018-03-07 | 2019-09-17 | 华为技术有限公司 | Transmission method, equipment and the system of preemption information |
CN110381586A (en) * | 2018-04-13 | 2019-10-25 | 华为技术有限公司 | Resource allocation methods, apparatus and system |
CN110392360A (en) * | 2018-04-17 | 2019-10-29 | 普天信息技术有限公司 | A kind of available resources report method and device |
CN110830950A (en) * | 2018-08-07 | 2020-02-21 | 普天信息技术有限公司 | Mode configuration and switching method of vehicle-mounted terminal |
CN111148258A (en) * | 2018-11-02 | 2020-05-12 | 中国信息通信研究院 | Dynamic authorization-free uplink scheduling method, and terminal device, network device and system applying same |
CN111432376A (en) * | 2020-06-11 | 2020-07-17 | 之江实验室 | Cooperative V2X wireless resource allocation and scheduling method |
CN111919483A (en) * | 2018-04-03 | 2020-11-10 | 高通股份有限公司 | Hybrid operating mode for internet of vehicles communication |
WO2020233189A1 (en) * | 2019-05-20 | 2020-11-26 | Guangdong Oppo Mobile Telecommunications Corp., Ltd. | User equipment and method for resource selection of same |
CN112153705A (en) * | 2019-06-29 | 2020-12-29 | 华为技术有限公司 | Communication method and device |
CN112714414A (en) * | 2020-04-29 | 2021-04-27 | 宸芯科技有限公司 | Resource selection scheme determination method, device, terminal and storage medium |
CN112788670A (en) * | 2019-11-07 | 2021-05-11 | 北京三星通信技术研究有限公司 | Resource allocation method and equipment |
WO2021142698A1 (en) * | 2020-01-16 | 2021-07-22 | Qualcomm Incorporated | Transmitter resource conflict avoidance in c-v2x |
WO2021155556A1 (en) * | 2020-02-07 | 2021-08-12 | Oppo广东移动通信有限公司 | Resource selection method and device, terminal, and medium |
WO2022006741A1 (en) * | 2020-07-07 | 2022-01-13 | Qualcomm Incorporated | Slot identification for semi-persistent scheduling (sps) and configured grant transmissions |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104185281A (en) * | 2013-05-22 | 2014-12-03 | 电信科学技术研究院 | Resource allocation and resource use methods and devices in D2D communication |
CN104640145A (en) * | 2013-11-13 | 2015-05-20 | 普天信息技术有限公司 | Method and system for solving time-frequency resource conflicts |
CN105101430A (en) * | 2014-05-08 | 2015-11-25 | 中兴通讯股份有限公司 | Configuration, distribution method, and apparatus of D2D resource |
CN105307107A (en) * | 2015-10-31 | 2016-02-03 | 深圳市金立通信设备有限公司 | Resource block occupation determining method and terminal |
CN105451211A (en) * | 2014-09-25 | 2016-03-30 | 中兴通讯股份有限公司 | Method and device of device-to-device communication |
US20160234812A1 (en) * | 2012-12-03 | 2016-08-11 | Lg Electronics Inc. | Method and apparatus for encoding transport block |
CN106301534A (en) * | 2011-03-24 | 2017-01-04 | Lg电子株式会社 | For sending/receive method and the device thereof of signal |
CN106550318A (en) * | 2015-09-21 | 2017-03-29 | 海能达通信股份有限公司 | A kind of processing method and terminal in the conflict of direct mode operation lower channel |
US20170215119A1 (en) * | 2016-01-22 | 2017-07-27 | Kt Corporation | Methods for controlling mobility of user equipment for performing v2x communication and apparatuses for performing the same |
CN107079434A (en) * | 2014-09-25 | 2017-08-18 | 株式会社Ntt都科摩 | User's set and resource selection method |
CN107079323A (en) * | 2014-11-20 | 2017-08-18 | 松下电器(美国)知识产权公司 | Authorize and the improved channel status information reports on unauthorized carrier wave |
-
2017
- 2017-09-15 CN CN201710840526.4A patent/CN107484254B/en active Active
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106301534A (en) * | 2011-03-24 | 2017-01-04 | Lg电子株式会社 | For sending/receive method and the device thereof of signal |
US20160234812A1 (en) * | 2012-12-03 | 2016-08-11 | Lg Electronics Inc. | Method and apparatus for encoding transport block |
CN104185281A (en) * | 2013-05-22 | 2014-12-03 | 电信科学技术研究院 | Resource allocation and resource use methods and devices in D2D communication |
CN104640145A (en) * | 2013-11-13 | 2015-05-20 | 普天信息技术有限公司 | Method and system for solving time-frequency resource conflicts |
CN105101430A (en) * | 2014-05-08 | 2015-11-25 | 中兴通讯股份有限公司 | Configuration, distribution method, and apparatus of D2D resource |
CN105451211A (en) * | 2014-09-25 | 2016-03-30 | 中兴通讯股份有限公司 | Method and device of device-to-device communication |
CN107079434A (en) * | 2014-09-25 | 2017-08-18 | 株式会社Ntt都科摩 | User's set and resource selection method |
CN107079323A (en) * | 2014-11-20 | 2017-08-18 | 松下电器(美国)知识产权公司 | Authorize and the improved channel status information reports on unauthorized carrier wave |
CN106550318A (en) * | 2015-09-21 | 2017-03-29 | 海能达通信股份有限公司 | A kind of processing method and terminal in the conflict of direct mode operation lower channel |
CN105307107A (en) * | 2015-10-31 | 2016-02-03 | 深圳市金立通信设备有限公司 | Resource block occupation determining method and terminal |
US20170215119A1 (en) * | 2016-01-22 | 2017-07-27 | Kt Corporation | Methods for controlling mobility of user equipment for performing v2x communication and apparatuses for performing the same |
Non-Patent Citations (3)
Title |
---|
LG ELECTRONICS INC.: ""Radio resource pool sharing between UEs using mode 3 and UEs using mode 4"", 《3GPP TSG-RAN2#99 R2-1709133》 * |
NTT DOCOMO, INC.: ""Resource pool sharing between UEs using mode 3 and UEs using mode 4"", 《3GPP TSG RAN WG1 MEETING #89 R1-1708427》 * |
NTT DOCOMO: ""Discussion on Resource Allocation Enhancement for PC5 based V2V Communications"", 《3GPP TSG RAN WG1 MEETING #83 R1-157438》 * |
Cited By (31)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2019148376A1 (en) * | 2018-01-31 | 2019-08-08 | Lenovo (Beijing) Limited | Method and apparatus for resource collision avoidance on sidelink |
US11412486B2 (en) | 2018-01-31 | 2022-08-09 | Lenovo (Beijing) Limited | Method and apparatus for resource collision avoidance on sidelink |
CN111670595A (en) * | 2018-01-31 | 2020-09-15 | 联想(北京)有限公司 | Method and device for avoiding resource conflict on side link |
US11979855B2 (en) | 2018-02-12 | 2024-05-07 | Huawei Technologies Co., Ltd. | Resource selection method and terminal device |
CN110167072B (en) * | 2018-02-12 | 2022-05-13 | 华为技术有限公司 | Resource selection method and terminal equipment |
CN110167072A (en) * | 2018-02-12 | 2019-08-23 | 华为技术有限公司 | Resource selection method and terminal equipment |
CN110248412A (en) * | 2018-03-07 | 2019-09-17 | 华为技术有限公司 | Transmission method, equipment and the system of preemption information |
CN110248412B (en) * | 2018-03-07 | 2021-12-31 | 华为技术有限公司 | Transmission method, equipment and system for preemption information |
CN109644436B (en) * | 2018-03-20 | 2020-04-21 | Oppo广东移动通信有限公司 | Resource sharing method and terminal equipment |
WO2019178749A1 (en) * | 2018-03-20 | 2019-09-26 | Oppo广东移动通信有限公司 | Resource sharing method and terminal device |
CN109644436A (en) * | 2018-03-20 | 2019-04-16 | Oppo广东移动通信有限公司 | The method and terminal device of resource-sharing |
CN111919483B (en) * | 2018-04-03 | 2024-05-28 | 高通股份有限公司 | Hybrid operation mode for internet of vehicles communication |
CN111919483A (en) * | 2018-04-03 | 2020-11-10 | 高通股份有限公司 | Hybrid operating mode for internet of vehicles communication |
CN110381586A (en) * | 2018-04-13 | 2019-10-25 | 华为技术有限公司 | Resource allocation methods, apparatus and system |
CN110392360A (en) * | 2018-04-17 | 2019-10-29 | 普天信息技术有限公司 | A kind of available resources report method and device |
CN108924789A (en) * | 2018-06-21 | 2018-11-30 | 中国联合网络通信集团有限公司 | Car networking communication pattern selection method and device |
CN110830950A (en) * | 2018-08-07 | 2020-02-21 | 普天信息技术有限公司 | Mode configuration and switching method of vehicle-mounted terminal |
CN110830950B (en) * | 2018-08-07 | 2022-12-30 | 普天信息技术有限公司 | Mode configuration and switching method of vehicle-mounted terminal |
CN111148258B (en) * | 2018-11-02 | 2021-12-10 | 中国信息通信研究院 | Dynamic authorization-free uplink scheduling method, and terminal device, network device and system applying same |
CN111148258A (en) * | 2018-11-02 | 2020-05-12 | 中国信息通信研究院 | Dynamic authorization-free uplink scheduling method, and terminal device, network device and system applying same |
WO2020233189A1 (en) * | 2019-05-20 | 2020-11-26 | Guangdong Oppo Mobile Telecommunications Corp., Ltd. | User equipment and method for resource selection of same |
WO2021000679A1 (en) * | 2019-06-29 | 2021-01-07 | 华为技术有限公司 | Communication method and device |
CN112153705A (en) * | 2019-06-29 | 2020-12-29 | 华为技术有限公司 | Communication method and device |
CN112153705B (en) * | 2019-06-29 | 2024-04-09 | 华为技术有限公司 | Communication method and device |
CN112788670A (en) * | 2019-11-07 | 2021-05-11 | 北京三星通信技术研究有限公司 | Resource allocation method and equipment |
WO2021142698A1 (en) * | 2020-01-16 | 2021-07-22 | Qualcomm Incorporated | Transmitter resource conflict avoidance in c-v2x |
WO2021155556A1 (en) * | 2020-02-07 | 2021-08-12 | Oppo广东移动通信有限公司 | Resource selection method and device, terminal, and medium |
CN112714414A (en) * | 2020-04-29 | 2021-04-27 | 宸芯科技有限公司 | Resource selection scheme determination method, device, terminal and storage medium |
CN112714414B (en) * | 2020-04-29 | 2022-05-03 | 宸芯科技有限公司 | Resource selection scheme determination method, device, terminal and storage medium |
CN111432376A (en) * | 2020-06-11 | 2020-07-17 | 之江实验室 | Cooperative V2X wireless resource allocation and scheduling method |
WO2022006741A1 (en) * | 2020-07-07 | 2022-01-13 | Qualcomm Incorporated | Slot identification for semi-persistent scheduling (sps) and configured grant transmissions |
Also Published As
Publication number | Publication date |
---|---|
CN107484254B (en) | 2021-05-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107484254A (en) | Available resources determine methods, devices and systems | |
US11121957B2 (en) | Dynamic quality of service in edge cloud architectures | |
US11711267B2 (en) | 5G network slicing with distributed ledger traceability and resource utilization inferencing | |
US20220124560A1 (en) | Resilient radio resource provisioning for network slicing | |
KR101752820B1 (en) | Control channel detection method and user equipment | |
BR112020009840B1 (en) | USER EQUIPMENT OPERATABLE FOR MULTIPLE SUBCARRIER SPACING VALUES, METHOD PERFORMED BY A USER EQUIPMENT, NETWORK NODE OPERATABLE FOR MULTIPLE SUBCARRIER SPACING VALUES AND METHOD PERFORMED BY A NETWORK NODE | |
JP6716698B2 (en) | Control information format processing method, base station, and user equipment | |
WO2015141337A1 (en) | Reception packet distribution method, queue selector, packet processing device, and recording medium | |
JP2017511644A5 (en) | ||
JP2014511646A (en) | Grouped inter-machine communication | |
CN110166194A (en) | A kind of pilot signal generation method and device | |
CN109076522A (en) | To wireless device granting resources | |
KR102326830B1 (en) | Methods, devices and devices for determining transport block size | |
US10334602B2 (en) | Communications between connected devices | |
CN110536315A (en) | Determine method, apparatus, communication equipment and the storage medium of CSI report processing time | |
US10505697B2 (en) | Facilitating a mobile device specific physical downlink shared channel resource element mapping indicator | |
WO2019137162A1 (en) | Information indicating and determining method and apparatus, and computer storage medium | |
CN104704751B (en) | Update the technology of radio communication channel estimation | |
US20160066346A1 (en) | Method and apparatus to achieve collision-free random access | |
TW201707477A (en) | Method and network node for dynamic resource allocation for control channels | |
US11171837B2 (en) | Methods and systems for management of shared network slice instance (NSI) in a wireless network | |
CN104009937A (en) | Enhanced-transmission-selection configuration information transmission method and device | |
CN114599010A (en) | Positioning method and device on secondary link SL and terminal | |
CN107006005B (en) | Method and module for processing channels in radio spectrum | |
CN108282306A (en) | A kind of candidate control channel resource determines method and device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |