CN107480389A - A kind of intelligent alarm test emulation system and method towards scheduling station - Google Patents
A kind of intelligent alarm test emulation system and method towards scheduling station Download PDFInfo
- Publication number
- CN107480389A CN107480389A CN201710729941.2A CN201710729941A CN107480389A CN 107480389 A CN107480389 A CN 107480389A CN 201710729941 A CN201710729941 A CN 201710729941A CN 107480389 A CN107480389 A CN 107480389A
- Authority
- CN
- China
- Prior art keywords
- alarm
- intelligent
- module
- scheduling station
- inference
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0635—Risk analysis of enterprise or organisation activities
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0639—Performance analysis of employees; Performance analysis of enterprise or organisation operations
- G06Q10/06395—Quality analysis or management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/06—Electricity, gas or water supply
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2203/00—Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
- H02J2203/20—Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
Abstract
The embodiments of the invention provide a kind of intelligent alarm test emulation system and method towards scheduling station, solves the correctness to the intelligent alarm function of scheduling station, reliability lacks the effectively reliable technical problem for detecting instrument.Analogue system of the present invention includes data exporting, alarm signal generation, alarm intelligent inference, alarm evaluation analysis, boss station data five modules of communication, and data exporting module is responsible for importing and exporting for fault case data, inference rule and intelligent alarm result;Alarm signal generation module is by calling fault case storehouse to generate various alarm signals according to predefined signal sequence and type simulation;Predefined inference rule makes inferences and analyzes and generate the intelligent alarm result of standard alarm intelligent inference module in knowledge base by inference;Alarm evaluation analysis module is responsible for the standard intelligent alarm result that the intelligent alarm result of scheduling station generation generates with test emulation system being analyzed, and forms appraisal report.
Description
Technical field
The present invention relates to the present invention relates to power network intelligent alarm field, more particularly to a kind of intelligence announcement towards scheduling station
Alert test emulation system and method.
Background technology
With the increase of power network scale and the lifting of grid automation level, the information that dispatch automated system is gathered
Measure and develop to extra large quantized directions, cause monitoring difficulty of the dispatching and monitoring personnel to electric network information to sharply increase, management and running personnel
Operating pressure increasingly increase.Therefore, power grid enterprises propose to build the solution of intelligent alarm function in scheduling station.Intelligence
Alarm function realizes the intellectual analysis diagnosis of operation of power networks fault message by the way that magnanimity monitoring information is screened and handled,
So as to provide efficient, intuitively warning information and aid decision foundation for dispatching and monitoring, equipment operation maintenance personnel.Intelligent alarm is one
Item is to exigent new application technologies such as data processing, signal filtering, logic analyses, it is necessary to abundant fuse information stream and industry
The relevant knowledge of business stream carries out comprehensive analysis.
Intelligent alarm is realized in the application of power grid enterprises also in starting stage, the intelligent alarm of different manufacturers exploitation at present
Mode is varied, and rational analysis result is failed to report, reported by mistake there is also certain.And lack effectively reliable detection instrument on the market
Or detection means carries out validation test to correctness, the reliability of intelligent alarm function, its main difficulty is that field failure is accused
Alert signal is difficult to obtain or simulated, and the l-G simulation test environment of particularly complex fault and pressure test does not possess also.Therefore, adjust
There is certain uncontrollability and hysteresis quality in the defect elimination of degree main website intelligent alarm program, scheduling station system operation exists certain
Security risk.
The content of the invention
The embodiments of the invention provide a kind of intelligent alarm test emulation system and method towards scheduling station, solve
Correctness, reliability to the intelligent alarm function of scheduling station lack the technical problem of effectively reliable detection instrument.
A kind of intelligent alarm test emulation system towards scheduling station provided in an embodiment of the present invention, including:Boss stands
Data communication module, data exporting module, alarm signal generation module, alarm intelligent inference module, alarm evaluation analysis
Module;
Boss station data communication module one end is connected with tested scheduling station, and the other end generates with the alarm signal
Module, the alarm evaluation analysis module, the data exporting module are connected;
Described alarm signal generation module one end and boss station data communication module, the alarm intelligent inference module
It is connected, the other end is connected with the data exporting module;
Described alarm intelligent inference module one end is connected with the alarm signal generation module, and the other end is believed with the alarm
Number generation module, the alarm evaluation analysis module, the data exporting module are connected;
The data that the boss stands between the data communication module transmission tested scheduling station and test emulation system;
Tentation data is imported the alarm signal generation module by the data exporting module, the alarm intelligence pushes away
Reason module, the alarm evaluation analysis module simultaneously export the alarm result of the tested scheduling station and the alarm intelligent inference
The standard alarm result of module;
The alarm signal generation module generates alarm signal and the alarm signal is sent into boss station data
Communication module and the alarm intelligent inference module;
The alarm signal that the alarm intelligent inference module receives the alarm signal generation module generation generates the mark
The standard alarm result is simultaneously sent to the data exporting module by quasi- alarm result;
The alarm evaluation analysis module receives the tested scheduling station of the data exporting module transmission
The standard alarm result of alarm result and the alarm intelligent inference module simultaneously generates evaluation analysis report.
Preferably, the alarm signal generation module includes fault case storehouse and fault simulation simulation program.
Preferably, the case source in the fault case storehouse includes the outside data imported and user's edit-modify has
Case and form new test cases.
Preferably, the fault simulation simulation program according to the data of electric network model and section file in the form of message to
The tested scheduling station sends telemetered signal, remote signals, protection signal, sequence of events recording signal.
Preferably, the alarm intelligent inference module is made up of inferenctial knowledge storehouse and inference machine.
Preferably, the inferenctial knowledge library storage inference rule and artificial self-defined extension to the inference rule and repair
Change.
Preferably, the inference machine monitors the alarm signal in real time, inference rule described in Auto-matching and to the intelligence
Energy alarm signal makes inferences analysis and generates the standard intelligent alarm result.
Preferably, the alarm evaluation analysis module is made up of intelligent alarm database and evaluation analysis unit;The intelligence
Can the standard intelligent alarm result of test emulation system generation, the tested scheduling station life described in record alert database storage management
Into intelligent alarm result, the evaluation analysis report;The evaluation analysis unit contrast tested scheduling station generation
The alarm result and the standard alarm result of test emulation system generation form the evaluation analysis report.
As can be seen from the above technical solutions, the embodiment of the present invention has advantages below:Complex fault is overcome to be difficult to simulate
Problem;Acceptance Test means are provided for scheduling station intelligent alarm program;Lift the practical level of power network intelligent alarm.
A kind of intelligent alarm test emulation method towards scheduling station provided in the embodiment of the present invention, including:
S1:By obtaining tested scheduling station electric network model and profile data setting fault case and being broken by setting data
The transmission sequence of face and fault alarm signal establishes fault simulation simulated program, by setting inference rule and believing special alarm
Number and alarm demand be added to inferenctial knowledge storehouse establish alarm intelligent inference program;
S2:Real time data and alarm signal are sent to the tested scheduling station by the fault simulation simulated program
With the alarm intelligent inference program;
S3:By contrasting intelligent alarm result and the alarm intelligent inference program life that the tested scheduling station generates
Into standard intelligent alarm result obtain appraisal report.
Preferably, fault case is set and by setting number by obtaining tested scheduling station electric network model and profile data
Fault simulation simulated program is established according to the transmission sequence of section and fault alarm signal;By setting inference rule and by special announcement
The data that alert signal and alarm demand are added to the setting fault case that inferenctial knowledge storehouse is established in alarm intelligent inference program are set
The mode of putting includes:
Manually set single remote measurement amount;Manually set single remote signalling amount;Artificial setting sequence of events recording;Artificial set amount
The abnormal situation of mass metering code simulation measuring quality code;Artificial setting remote measurement random quantity specifies remote measurement amount up-and-down boundary simulation plant-station
The actual conditions of remote measurement amount during system operation;Manually set the feelings that continuously displacement analog remote signaling node is shaken on same remote signalling point
Condition;Artificial setting is more than can continuously or discontinuously conjugating and setting the order of transmission for being more than 1 remote signalling point for 1 remote signalling point
Relation is sent with time interval simulated accident trip condition lower switch and protection signal;Concurrently set and be more than 1 remote measurement amount;Simultaneously
Setting is more than 1 remote signalling amount;Automatic imitation it is single or more than 1 measurement change.
As can be seen from the above technical solutions, the embodiment of the present invention is solved to the intelligent alarm function of scheduling station just
True property, reliability lack the technical problem of effectively reliable detection means, have advantages below:Support artificial setting fault warning
Signal, the simulation for failure and special, complex fault have flexibility and convenience.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing
There is the required accompanying drawing used in technology description to be briefly described, it should be apparent that, drawings in the following description are only this
Some embodiments of invention, for those of ordinary skill in the art, without having to pay creative labor, may be used also
To obtain other accompanying drawings according to these accompanying drawings.
A kind of one reality of the intelligent alarm test emulation system towards scheduling station provided in Fig. 1 embodiment of the present invention
Apply the structural representation of example;
A kind of one reality of the intelligent alarm test emulation system towards scheduling station provided in Fig. 2 embodiment of the present invention
Apply the test emulation system and scheduling station connection diagram of example;
Fig. 3 is one of a kind of intelligent alarm test emulation method towards scheduling station provided in the embodiment of the present invention
The schematic flow sheet of the test emulation method of embodiment.
Embodiment
The embodiments of the invention provide a kind of intelligent alarm test emulation system towards scheduling station, for solving to exchange
Spend the correctness of the intelligent alarm function of main website, reliability lacks the effectively reliable technical problem for detecting instrument.
To enable goal of the invention, feature, the advantage of the present invention more obvious and understandable, below in conjunction with the present invention
Accompanying drawing in embodiment, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that disclosed below
Embodiment be only part of the embodiment of the present invention, and not all embodiment.Based on the embodiment in the present invention, this area
All other embodiment that those of ordinary skill is obtained under the premise of creative work is not made, belongs to protection of the present invention
Scope.
A kind of referring to Fig. 1, intelligent alarm test emulation system towards scheduling station provided in the embodiment of the present invention
One embodiment include boss stand data communication module, data exporting module, alarm signal generation module, alarm intelligence
Reasoning module, alarm evaluation analysis module.
Boss station data communication module one end is connected with tested scheduling station, and the other end generates with the alarm signal
Module, the alarm evaluation analysis module, the data exporting module are connected;
Described alarm signal generation module one end and boss station data communication module, the alarm intelligent inference module
It is connected, the other end is connected with the data exporting module;
Described alarm intelligent inference module one end is connected with the alarm signal generation module, and the other end is believed with the alarm
Number generation module, the alarm evaluation analysis module, the data exporting module are connected;
The data that the boss stands between the data communication module transmission tested scheduling station and test emulation system;
Tentation data is imported the alarm signal generation module by the data exporting module, the alarm intelligence pushes away
Reason module, the alarm evaluation analysis module simultaneously export the alarm result of the tested scheduling station and the alarm intelligent inference
The standard alarm result of module;
The alarm signal generation module generates alarm signal and the alarm signal is sent into boss station data
Communication module and the alarm intelligent inference module;
The alarm signal that the alarm intelligent inference module receives the alarm signal generation module generation generates the mark
The standard alarm result is simultaneously sent to the data exporting module by quasi- alarm result;
The alarm evaluation analysis module receives the tested scheduling station of the data exporting module transmission
The standard alarm result of alarm result and the alarm intelligent inference module simultaneously generates evaluation analysis report.
Further, the alarm signal generation module includes fault case storehouse and fault simulation simulation program.
Further, the case source in the fault case storehouse has included the outside data imported and user's edit-modify
There is case and form new test cases.
Further, the fault simulation simulation program according to the data of electric network model and section file in the form of message
Telemetered signal, remote signals, protection signal, sequence of events recording signal are sent to the tested scheduling station.
Further, the alarm intelligent inference module is made up of inferenctial knowledge storehouse and inference machine.
Further, the inferenctial knowledge library storage inference rule and the artificial self-defined extension to the inference rule and
Modification.
Further, the inference machine monitors the alarm signal in real time, inference rule described in Auto-matching and to described
Intelligent alarm signal makes inferences analysis and generates the standard intelligent alarm result.
Further, the alarm evaluation analysis module is made up of intelligent alarm database and evaluation analysis unit;It is described
Intelligent alarm database purchase manages the standard intelligent alarm result of the test emulation system generation, the tested scheduling station
The intelligent alarm result of generation, evaluation analysis report;The evaluation analysis unit contrast tested scheduling station generation
The alarm result and the standard alarm result of test emulation system generation form evaluation analysis report.
The data that data exporting module is responsible for importing and exporting mainly include fault case data, inference rule, intelligence
Alarm result.Wherein, fault case data include electric network model and section file;Inference rule includes single inference rule and pass
Join inference rule;Intelligent alarm result includes standard intelligent alarm result and the scheduling station life of test emulation system itself generation
Into intelligent alarm result.
Alarm signal generation module includes fault case storehouse and fault simulation simulation program.Case in fault case storehouse is come
Source includes the outside data imported and the existing case of user's edit-modify and forms two kinds of forms of new test cases.Fault simulation
Simulation program be responsible for according to the model specified and profile data in the form of message toward main website send remote measurement, remote signalling, protection act,
The signals such as SOE.
Alarm intelligent inference module is made up of inferenctial knowledge storehouse and inference machine.It is responsible for the storage of inference rule in inferenctial knowledge storehouse
Management and artificial self-defined extension and modification.For inference machine by monitoring alarm signal in real time, Auto-matching inference rule carries out intelligence
Rational analysis can be alerted, and then generates the intelligent alarm result of standard.
Alarm evaluation analysis module is made up of intelligent alarm database and evaluation analysis function.Intelligent alarm database is used for
The standard intelligent alarm result of storage management test emulation system generation, the intelligent alarm result of scheduling station generation, Yi Jiping
Valency analysis report.Evaluation analysis function is responsible for the mark by the intelligent alarm result of scheduling station generation and test emulation system generation
Quasi intelligent alarm result is analyzed, and forms evaluation analysis report.
Boss stand data communication module be responsible for according to specified communication protocol realize scheduling station and test emulation system it
Between data communication.
Structural representation according to Fig. 1, from the point of view of Software Architecture Design angle, system can be divided into interface layer, application
Three layer, communication layers levels.Interface layer includes data exporting module, provides and connects for the data interaction of the system and external system
Oral business.Application layer includes alarm signal generation, alarm intelligent inference, alarm three modules of evaluation analysis, constructs from alarm
Produce, analyze, the complete application chain of evaluation.Communication layers include boss station data communication module, for providing stipulations parsing, net
Network communication service.
Referring to Fig. 2, the present invention can be deployed in desktop computer, notebook towards the intelligent alarm test emulation system of scheduling station
On the computers such as computer, test emulation system only needs degree of exchanging main station system can be achieved by interchanger to be attached.Scheduling
Main station system generally requires accesses same interchanger by front end processor, intelligent alarm server, ensures front end processor, intelligent alarm service
Device, test emulation system are in same LAN., only need to IP be set in test emulation system in terms of configuration is connected
Location and port can establish scheduling station and emulate the interface channel between substation.Test emulation system can fictionalize multiple emulation
Substation, each substation that emulates are correspondingly arranged a unique port numbers.In communication process, test emulation system is as service
End, scheduling station system is as client.Real time data and alarm signal of test emulation system simulation generation etc. pass through message
Form is sent initially to main station system front end processor, after front end processor completes the work such as stipulations parsing, Message processing, then by after processing
Ripe data forwarding is finally completed the analysis application of alarm data to intelligent alarm server by intelligent alarm server.
The above is that a kind of intelligent alarm test emulation system towards scheduling station is described in detail, below will be right
A kind of implementation process of intelligent alarm test emulation method towards scheduling station is described in detail, referring to Fig. 3, this hair
A kind of intelligent alarm test emulation method one embodiment towards scheduling station provided in bright embodiment, including step:
S1:By obtaining tested scheduling station electric network model and profile data setting fault case and being broken by setting data
The transmission sequence of face and fault alarm signal establishes fault simulation simulated program, by setting inference rule and believing special alarm
Number and alarm demand be added to inferenctial knowledge storehouse establish alarm intelligent inference program;
Electric network model and profile data used by the tested scheduling station system of importing.If test emulation system failure case
Example has preserved electric network model and profile data used by tested scheduling station system in storehouse, i.e., to same set of main station system or adopts
When being tested with the main station system of identical electric network model, it may not be necessary to import electric network model again, profile data can as needed again
Secondary importing, or used from the existing profile data in fault case storehouse., also can be under the occasion of some networking detections
Fault case storehouse export electric network model gives tested scheduling station system, and import electric network model by system under test (SUT) uses as test.
This pattern freely imported and exported imparts the great flexibility of test and selectivity.
Fault case is set, defines the transmission sequence of data section and fault alarm signal.The step groundwork be from
Which data section is selected to be sent as real time data in case library, and the transmission sequence to fault alarm signal is configured,
What fault-signal of which moment transmission, this is completely by artificial self-defined.Time interval that data are sent, cycle-index etc.
It can be configured.It is the key link for ensureing test effect and difficulty of test that fault case, which is set, in order to improve the present invention's
The ability of being applicable, the present invention provide several data set-up mode, specifically included:Manually set single remote measurement amount;Artificial setting is single
Individual remote signalling amount;Artificial setting sequence of events recording (SOE);Artificial setting measuring quality code:Measuring quality code exception can be simulated
Situation;Artificial setting remote measurement random quantity:Some remote measurement amount up-and-down boundaries can be specified, its value constantly changes within this range,
The actual conditions of remote measurement amount when being run for simulation plant-station system;Artificial setting telesignalling dithering:It is continuous n times on same remote signalling point
Displacement, for simulate RTU remote signalling node shake situation;Artificial setting emergency stop valve trip:The displacement of n different remote signalling points,
Can be continuously also discontinuous, while their order of transmission and time interval can be manually set, it is mainly used in emergency stop valve trip feelings
Condition lower switch and protection signal send the simulation of relation;Batch setting remote measurement amount;Batch setting remote signalling amount;Automatic imitation is set:
The measurement change of the single, batch or whole selected by automatic imitation is supported, the data variation cycle can be set.Remote measurement amount is according to setting
The change or distant according to certain rule (sine curve) change, remote signalling mechanical periodicity in the way of setting at random of fixed scope
Letter displacement should send SOE signals automatically.
Confirmation inference rule is enabled, inferenctial knowledge storehouse is added to special alarm signal and alarm demand.In general, push away
Reason rule includes single inference rule and related reasoning rule.Single inference rule is the announcement defined for same alarm object
Police regulations are then.Related reasoning rule is the alarm regulation defined for different alarm objects, such as main transformer fault reasoning, is utilized
The warning information of main transformer protection action message and each side switch, reasoning main transformer failure.Conventional inference rule is usually solid in advance
Change to inferenctial knowledge storehouse, then need manually to be added to inferenctial knowledge storehouse for special alarm signal and alarm demand, such as
Whether this kind of failures such as spring unstored energy, energy storage motor operation time-out make inferences and can be arranged as required to.
Startup separator analogue simulation program, real time data and related alarm signal are sent toward main website.For convenience to scheduling
The different passages of main station system carry out simulation test, and when sending data, user can the communication rule such as unrestricted choice IEC101, IEC104
About tested.
S2:Real time data and alarm signal are sent to the tested scheduling station by the fault simulation simulated program
With the alarm intelligent inference program;
While real time data and alarm signal are sent to tested scheduling station by the fault simulation simulated program,
Start alarm intelligent inference program, intelligent inference analysis is synchronously carried out according to predefined inference rule, forms the intelligence of standard
Alarm result.
S3:By contrasting intelligent alarm result and the alarm intelligent inference program life that the tested scheduling station generates
Into standard intelligent alarm result obtain appraisal report.
The intelligent alarm result of the intelligent alarm result of scheduling station and test emulation system is analyzed, formed
Appraisal report.Appraisal report is mainly made up of three parts content, and Part I is differences description, i.e., to foregoing two kinds alarm knots
The difference of fruit is described, including fails to report alarm item, false alarms item, and wherein false alarms item includes alerting incorrect, repetition
The situations such as alarm;Part II is Variant statistical, including alarm accuracy, alarm rate of failing to report, alarm rate of false alarm;Part III is
Original alarm result, will both alarm result enumerated displaying item by item respectively.
It is apparent to those skilled in the art that for convenience and simplicity of description, the system of foregoing description,
The specific work process of device and unit, the corresponding process in preceding method embodiment is may be referred to, will not be repeated here.
Described above, the above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although with reference to before
Embodiment is stated the present invention is described in detail, it will be understood by those within the art that:It still can be to preceding
State the technical scheme described in each embodiment to modify, or equivalent substitution is carried out to which part technical characteristic;And these
Modification is replaced, and the essence of appropriate technical solution is departed from the spirit and scope of various embodiments of the present invention technical scheme.
Claims (10)
- A kind of 1. intelligent alarm test emulation system towards scheduling station, it is characterised in that including:Boss station data communication mould Block, data exporting module, alarm signal generation module, alarm intelligent inference module, alarm evaluation analysis module;Boss station data communication module one end is connected with tested scheduling station, the other end and alarm signal generation mould Block, the alarm evaluation analysis module, the data exporting module are connected;Described alarm signal generation module one end and boss station data communication module, the alarm intelligent inference module phase Even, the other end is connected with the data exporting module;Described alarm intelligent inference module one end is connected with the alarm signal generation module, and the other end is given birth to the alarm signal It is connected into module, the alarm evaluation analysis module, the data exporting module;The data that the boss stands between the data communication module transmission tested scheduling station and test emulation system;Tentation data is imported the alarm signal generation module, the alarm intelligent inference mould by the data exporting module Block, the alarm evaluation analysis module simultaneously export the alarm result of the tested scheduling station and the alarm intelligent inference module Standard alarm result;The alarm signal generation module generates alarm signal and the alarm signal is sent into the boss station data communication Module and the alarm intelligent inference module;The alarm signal that the alarm intelligent inference module receives the alarm signal generation module generation generates the standard announcement The standard alarm result is simultaneously sent to the data exporting module by alert result;The alarm evaluation analysis module receives the alarm of the tested scheduling station of the data exporting module transmission As a result with it is described alarm intelligent inference module standard alarm result and generate evaluation analysis report.
- 2. the intelligent alarm test emulation system according to claim 1 towards scheduling station, it is characterised in that the announcement Alert signal generation module includes fault case storehouse and fault simulation simulation program.
- 3. the intelligent alarm test emulation system according to claim 2 towards scheduling station, it is characterised in that the event Case source in barrier case library includes the outside data imported and the existing case of user's edit-modify and forms new test case Example.
- 4. the intelligent alarm test emulation system according to claim 2 towards scheduling station, it is characterised in that the event Hinder analogue simulation program to be sent to the tested scheduling station in the form of message according to the data of electric network model and section file Telemetered signal, remote signals, protection signal, sequence of events recording signal.
- 5. the intelligent alarm test emulation system according to claim 1 towards scheduling station, it is characterised in that the announcement Alert intelligent inference module is made up of inferenctial knowledge storehouse and inference machine.
- 6. the intelligent alarm test emulation system according to claim 5 towards scheduling station, it is characterised in that described to push away Manage knowledge library storage inference rule and artificial self-defined extension and modification to the inference rule.
- 7. the intelligent alarm test emulation system towards scheduling station stated according to claim 5, it is characterised in that the reasoning Machine monitors the alarm signal in real time, and inference rule described in Auto-matching simultaneously makes inferences analysis life to the intelligent alarm signal Into the standard intelligent alarm result.
- 8. the intelligent alarm test emulation system according to claim 1 towards scheduling station, it is characterised in that the announcement Alert evaluation analysis module is made up of intelligent alarm database and evaluation analysis unit;The intelligent alarm database purchase manages institute State the standard intelligent alarm result of test emulation system generation, the intelligent alarm result of tested scheduling station generation, described Evaluation analysis is reported;The alarm result of the evaluation analysis unit contrast tested scheduling station generation and the test The standard alarm result of analogue system generation forms the evaluation analysis report.
- A kind of 9. intelligent alarm test emulation method towards scheduling station, it is characterised in that including:S1:By obtain tested scheduling station electric network model and profile data set fault case and by set data section and The transmission sequence of fault alarm signal establishes fault simulation simulated program, by set inference rule and by special alarm signal and Alarm demand is added to inferenctial knowledge storehouse and establishes alarm intelligent inference program;S2:Real time data and alarm signal are sent to the tested scheduling station and institute by the fault simulation simulated program State alarm intelligent inference program;S3:By contrasting intelligent alarm result that the tested scheduling station generates and the alarm intelligent inference Program Generating Standard intelligent alarm result obtains appraisal report.
- 10. a kind of intelligent alarm test emulation method towards scheduling station as claimed in claim 9, it is characterised in that logical Cross the tested scheduling station electric network model of acquisition and profile data sets fault case and by setting data section and fault warning The transmission sequence of signal establishes fault simulation simulated program, by setting inference rule and by special alarm signal and alarm demand Being added to the data set-up mode for the setting fault case that inferenctial knowledge storehouse is established in alarm intelligent inference program includes:Manually set single remote measurement amount;Manually set single remote signalling amount;Artificial setting sequence of events recording;Artificial setting measures matter Measure the abnormal situation of code simulation measuring quality code;Artificial setting remote measurement random quantity specifies remote measurement amount up-and-down boundary simulation plant-station system The actual conditions of remote measurement amount during operation;Manually set the situation that continuously displacement analog remote signaling node is shaken on same remote signalling point; Artificial setting be more than 1 remote signalling point can continuously or discontinuously conjugate and set the order of transmission for being more than 1 remote signalling point and Time interval simulated accident trip condition lower switch and protection signal send relation;Concurrently set and be more than 1 remote measurement amount;Set simultaneously Surely it is more than 1 remote signalling amount;Automatic imitation it is single or more than 1 measurement change.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710729941.2A CN107480389A (en) | 2017-08-23 | 2017-08-23 | A kind of intelligent alarm test emulation system and method towards scheduling station |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710729941.2A CN107480389A (en) | 2017-08-23 | 2017-08-23 | A kind of intelligent alarm test emulation system and method towards scheduling station |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107480389A true CN107480389A (en) | 2017-12-15 |
Family
ID=60601235
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710729941.2A Pending CN107480389A (en) | 2017-08-23 | 2017-08-23 | A kind of intelligent alarm test emulation system and method towards scheduling station |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107480389A (en) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108647196A (en) * | 2018-04-16 | 2018-10-12 | 北京航空航天大学 | The artificial intelligence generation method and device of table in digital aircraft simulation report |
CN108830495A (en) * | 2018-06-22 | 2018-11-16 | 广东电网有限责任公司 | Unusual service condition test method and device |
CN108873735A (en) * | 2018-06-29 | 2018-11-23 | 许继集团有限公司 | A kind of distribution main station system component simulation testing device and method |
CN109299528A (en) * | 2018-09-11 | 2019-02-01 | 北京航空航天大学 | A kind of digital aircraft emulation data artificial intelligence statistical analysis technique and device |
CN111291245A (en) * | 2020-02-17 | 2020-06-16 | 广东电网有限责任公司电力科学研究院 | Case online generation system and method applied to PAS and computer equipment |
CN111416439A (en) * | 2020-03-26 | 2020-07-14 | 广东电网有限责任公司 | Panoramic data integration and intelligent warning system for transformer substation |
CN112037084A (en) * | 2020-07-24 | 2020-12-04 | 贵州电网有限责任公司 | Method and system for testing fault processing, testing and analyzing of power distribution main station |
CN113013992A (en) * | 2021-04-16 | 2021-06-22 | 广东电网有限责任公司 | Method and device for monitoring functions of information-protecting master station |
CN113553236A (en) * | 2021-07-20 | 2021-10-26 | 深圳阿帕云计算有限公司 | Centralized automatic management system and method for physical machines in data center |
CN113743764A (en) * | 2021-08-26 | 2021-12-03 | 贵州电网有限责任公司 | Spare power automatic switching action judgment method for dispatching master station |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20120022849A1 (en) * | 2009-03-25 | 2012-01-26 | Udmtek Co., Ltd. | Plc symbol structure for a plc code for automatically generating an input/output model, and simulation apparatus and simulation method for testing the plc code using same |
CN105262212A (en) * | 2015-09-29 | 2016-01-20 | 国网安徽省电力公司 | Relay protection equipment data acquisition method based on main/standby channels |
CN105321039A (en) * | 2015-09-24 | 2016-02-10 | 国家电网公司 | Disconnector online monitoring data management system and method |
CN106655490A (en) * | 2016-10-19 | 2017-05-10 | 国网浙江省电力公司温州供电公司 | A fault recording data fusion system based on multiple substations |
-
2017
- 2017-08-23 CN CN201710729941.2A patent/CN107480389A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20120022849A1 (en) * | 2009-03-25 | 2012-01-26 | Udmtek Co., Ltd. | Plc symbol structure for a plc code for automatically generating an input/output model, and simulation apparatus and simulation method for testing the plc code using same |
CN105321039A (en) * | 2015-09-24 | 2016-02-10 | 国家电网公司 | Disconnector online monitoring data management system and method |
CN105262212A (en) * | 2015-09-29 | 2016-01-20 | 国网安徽省电力公司 | Relay protection equipment data acquisition method based on main/standby channels |
CN106655490A (en) * | 2016-10-19 | 2017-05-10 | 国网浙江省电力公司温州供电公司 | A fault recording data fusion system based on multiple substations |
Cited By (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108647196A (en) * | 2018-04-16 | 2018-10-12 | 北京航空航天大学 | The artificial intelligence generation method and device of table in digital aircraft simulation report |
CN108647196B (en) * | 2018-04-16 | 2022-10-25 | 北京航空航天大学 | Artificial intelligence generation method and device for table in digital aircraft simulation report |
CN108830495A (en) * | 2018-06-22 | 2018-11-16 | 广东电网有限责任公司 | Unusual service condition test method and device |
CN108873735B (en) * | 2018-06-29 | 2021-11-19 | 许继集团有限公司 | Power distribution main station system component simulation test device and method |
CN108873735A (en) * | 2018-06-29 | 2018-11-23 | 许继集团有限公司 | A kind of distribution main station system component simulation testing device and method |
CN109299528A (en) * | 2018-09-11 | 2019-02-01 | 北京航空航天大学 | A kind of digital aircraft emulation data artificial intelligence statistical analysis technique and device |
CN111291245A (en) * | 2020-02-17 | 2020-06-16 | 广东电网有限责任公司电力科学研究院 | Case online generation system and method applied to PAS and computer equipment |
CN111416439A (en) * | 2020-03-26 | 2020-07-14 | 广东电网有限责任公司 | Panoramic data integration and intelligent warning system for transformer substation |
CN111416439B (en) * | 2020-03-26 | 2022-02-18 | 广东电网有限责任公司 | Panoramic data integration and intelligent warning system for transformer substation |
CN112037084A (en) * | 2020-07-24 | 2020-12-04 | 贵州电网有限责任公司 | Method and system for testing fault processing, testing and analyzing of power distribution main station |
CN113013992A (en) * | 2021-04-16 | 2021-06-22 | 广东电网有限责任公司 | Method and device for monitoring functions of information-protecting master station |
CN113553236A (en) * | 2021-07-20 | 2021-10-26 | 深圳阿帕云计算有限公司 | Centralized automatic management system and method for physical machines in data center |
CN113553236B (en) * | 2021-07-20 | 2022-03-01 | 深圳阿帕云计算有限公司 | Centralized automatic management system and method for physical machines in data center |
CN113743764A (en) * | 2021-08-26 | 2021-12-03 | 贵州电网有限责任公司 | Spare power automatic switching action judgment method for dispatching master station |
CN113743764B (en) * | 2021-08-26 | 2024-04-05 | 贵州电网有限责任公司 | Method for judging spare power automatic switching action of scheduling master station |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107480389A (en) | A kind of intelligent alarm test emulation system and method towards scheduling station | |
CN105242164B (en) | A kind of automatic checkout system and its method in intelligent substation secondary void loop | |
CN109240126B (en) | Distributed application service monitoring system and method with analog operation function | |
CN111478818A (en) | Telecontrol checking method based on SCD file and RCD file | |
CN106789412A (en) | Method, the apparatus and system of monitoring information collection main website performance | |
CN105262210A (en) | System and method for analysis and early warning of substation network security | |
CN108802517B (en) | Testing method and system for in-place protection device | |
CN108107851A (en) | A kind of production line intelligent remote pacifies lamp control system | |
CN107390628B (en) | Distribution status monitoring and method for early warning and system | |
CN109286538A (en) | Communication protocol conformance test method and terminal device | |
CN103532738B (en) | The defining method of a kind of port connection relationship and device | |
CN106556765A (en) | The method of testing and RTDS emulators of distributed distribution automation system | |
CN109634816A (en) | Application management method and terminal device | |
CN103412520A (en) | Centralized monitoring system for energy of various kinds and monitoring method thereof | |
CN109783260A (en) | Intelligent IT whole process O&M method, apparatus, equipment and readable storage medium storing program for executing | |
CN103545917A (en) | Scheduling-automation sub-station simulation system | |
CN110989547A (en) | Detection method and system for intelligent substation one-key sequence control system | |
CN106506237B (en) | A kind of Fault Locating Method and device of substation communication network | |
KR102402653B1 (en) | AI-based SCADA system and operating method thereof | |
CN111123009A (en) | Intelligent substation avalanche testing method and system based on SCD file and terminal equipment | |
CN100544476C (en) | The gprs service intelligence control method | |
CN112543123B (en) | Safety protection and early warning system of industrial automatic control system | |
CN109412902A (en) | A kind of intelligent monitoring method of power dispatch data network system, storage equipment, terminal and system | |
CN114172271B (en) | Intelligent alarm test method, system and equipment for online monitoring control function of master station | |
CN101414737A (en) | Control method and system for track traffic electric power data acquisition and surveillance |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20171215 |