CN107480120A - A kind of gunter figure analysis method and device - Google Patents
A kind of gunter figure analysis method and device Download PDFInfo
- Publication number
- CN107480120A CN107480120A CN201710735838.9A CN201710735838A CN107480120A CN 107480120 A CN107480120 A CN 107480120A CN 201710735838 A CN201710735838 A CN 201710735838A CN 107480120 A CN107480120 A CN 107480120A
- Authority
- CN
- China
- Prior art keywords
- gantt chart
- information
- analyzed
- analysis
- gantt
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F40/00—Handling natural language data
- G06F40/10—Text processing
- G06F40/166—Editing, e.g. inserting or deleting
- G06F40/174—Form filling; Merging
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06T—IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- G06T11/00—2D [Two Dimensional] image generation
- G06T11/20—Drawing from basic elements, e.g. lines or circles
- G06T11/206—Drawing of charts or graphs
Abstract
The embodiment of the present application provides a kind of gunter figure analysis method and device, by determining Gantt chart to be analyzed;Gantt chart api interface is called to read the first information of the Gantt chart;The first information is handled, generation meets the second information of preset data form requirement;Analyze second information, obtain the mode of the analysis result of the Gantt chart, realize the analysis to Gantt chart, prior art is avoided because being embedded in for the VBA macrodoces analyzed Gantt chart in Microsoft Project instruments, the problem of caused VBA macrodoces (Gantt chart analytical technology) portable poor, poor expandability.
Description
Technical field
The present invention relates to data analysis technique field, and in particular to a kind of gunter figure analysis method and device.
Background technology
Gantt chart is also known as gunter drawing, bar graph, and it shows that project, progress are related to other times by bar graph
System progress internal relation situation about being in progress over time.
By the displaying directly perceived of Gantt chart, largely facilitate understanding of the user to development of projects.But only
Solution development of projects can not meet the needs of user, with the substantial increase of Gantt chart quantity, to the analytical technology of Gantt chart
Become more and more important.
Prior art is typically to be realized using the VBA macrodoces for being embedded in Microsoft Project instruments to Gantt chart
Analysis, still, because VBA macrodoces are embedded in Microsoft Project instruments, therefore, gunter map analysis often be present
The problem of technology portability is poor, poor expandability.
The content of the invention
In view of this, the embodiment of the present invention provides a kind of gunter figure analysis method and device, to improve gunter map analysis
On the basis of the portability of method, scalability, the analysis to Gantt chart is realized.
To achieve the above object, the embodiment of the present invention provides following technical scheme:
A kind of gunter figure analysis method, including:
Determine Gantt chart to be analyzed;
Gantt chart api interface is called to read the first information of the Gantt chart;
The first information is handled, generation meets the second information of preset data form requirement;
Second information is analyzed, obtains the analysis result of the Gantt chart.
Preferably, determination Gantt chart to be analyzed, including:
The selection operation at least one Gantt chart is responded, each Gantt chart selected by the selection operation is defined as
One Gantt chart to be analyzed;
Or
The Gantt chart being opened recently is defined as to Gantt chart to be analyzed.
Preferably, the first information for calling Gantt chart api interface to read the Gantt chart, including:
The Gantt chart api interface for calling Microsoft Project instruments to provide reads the task object of the Gantt chart
And the base attribute information of the Gantt chart, the first information described in the task object and base attribute information structure.
Preferably, described that the first information is handled, generation meets the second information of preset data form requirement,
Including:
Determine default data structure;
From the target information of the corresponding data structure of extraction in the task object in the first information;
Data format by the target information is the data format for meeting the data structure;
The target information after formatting is stored in the data structure, generates the second information.
Preferably, analysis second information, obtains the analysis result of the Gantt chart, including:
Check that rule is checked second information according to default, generate the inspection result of the Gantt chart;
Statistical analysis is carried out to second information using default statistical rules, and with reference to the basic category of the Gantt chart
Property information, generate the statistical result of the Gantt chart.
Preferably, described to check that rule indicates at least one check item, this method also includes:
The testing result is analyzed, obtains the analysis information of the inspection result;
Analysis information based on the inspection result, target check item is determined from least one check item.
Preferably, in addition to:
Determine destinations traffic address;
The analysis result of the Gantt chart is sent to the destinations traffic address.
A kind of Gantt chart analytical equipment, including:
Determining unit, for determining Gantt chart to be analyzed;
Call unit, for calling Gantt chart api interface to read the first information of the Gantt chart;
Processing unit, for handling the first information, generation meets the second letter of preset data form requirement
Breath;
Analytic unit, for analyzing second information, obtain the analysis result of the Gantt chart.
Preferably, the determining unit, is specifically used for:
The selection operation at least one Gantt chart is responded, each Gantt chart selected by the selection operation is defined as
One Gantt chart to be analyzed;
Or
The Gantt chart being opened recently is defined as to Gantt chart to be analyzed.
Preferably, the call unit, is specifically used for:
The Gantt chart api interface for calling Microsoft Project instruments to provide reads the task object of the Gantt chart
And the base attribute information of the Gantt chart, the first information described in the task object and base attribute information structure.
The embodiment of the present application provides a kind of gunter figure analysis method and device, by determining Gantt chart to be analyzed;Call
Gantt chart api interface reads the first information of the Gantt chart;The first information is handled, generation meets preset data
Second information of call format;Second information is analyzed, the mode of the analysis result of the Gantt chart is obtained, realizes to sweet
The analysis of special figure, prior art is avoided because the VBA macrodoces for being analyzed Gantt chart are embedded in Microsoft
In Project instruments, the problem of caused VBA macrodoces (Gantt chart analytical technology) portable poor, poor expandability.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing
There is the required accompanying drawing used in technology description to be briefly described, it should be apparent that, drawings in the following description are only this
The embodiment of invention, for those of ordinary skill in the art, on the premise of not paying creative work, can also basis
The accompanying drawing of offer obtains other accompanying drawings.
Fig. 1 is a kind of gunter figure analysis method flow chart that the embodiment of the present application provides;
Fig. 2 is that one kind that the embodiment of the present application provides is handled the first information, and generation meets preset data lattice
The method flow diagram of second information of formula requirement;
Fig. 3 is that one kind that the embodiment of the present application provides analyzes second information, obtains the analysis result of the Gantt chart
Method flow diagram;
Fig. 4 is another gunter figure analysis method flow chart that the embodiment of the present application provides;
Fig. 5 is another gunter figure analysis method flow chart that the embodiment of the present application provides;
Fig. 6 is a kind of structural representation for Gantt chart analytical equipment that the embodiment of the present application provides.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete
Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, rather than whole embodiments.It is based on
Embodiment in the present invention, those of ordinary skill in the art are obtained every other under the premise of creative work is not made
Embodiment, belong to the scope of protection of the invention.
Embodiment:
Fig. 1 is a kind of gunter figure analysis method flow chart that the embodiment of the present application provides.
As shown in figure 1, this method includes:
S101, determine Gantt chart to be analyzed;
Optionally, determination Gantt chart to be analyzed, including:The selection operation at least one Gantt chart is responded, will
Each Gantt chart selected by the selection operation is defined as a Gantt chart to be analyzed;It is or sweet by what is be opened recently
Special figure is defined as Gantt chart to be analyzed.
In the embodiment of the present application, it is preferred that by be opened recently Gantt chart, be defined as gunter to be analyzed
Figure;Or each Gantt chart in the multiple Gantt charts being opened recently is defined as a Gantt chart to be analyzed;Or
Person, user is to the selection operation of at least one Gantt chart for response, and each Gantt chart selected by the selection operation is defined as
One Gantt chart to be analyzed.
The above is only the preferred embodiment of the determination of the embodiment of the present application offer Gantt chart to be analyzed, is not limited herein
It is fixed.
S102, the first information for calling the Gantt chart api interface reading Gantt chart;
Optionally, the first information for calling Gantt chart api interface to read the Gantt chart, including:Call
The Gantt chart api interface that Microsoft Project instruments provide reads the task object of the Gantt chart and the gunter
The first information described in the base attribute information of figure, the task object and base attribute information structure.
Optionally, the Gantt chart api interface that the Microsoft Project instruments provide is Microsoft
The api interface related to Gantt chart that Project instruments provide.
In the embodiment of the present application, it is preferred that a kind of gunter figure analysis method that the embodiment of the present application provides, it is determined that treating
After the Gantt chart of analysis, pass through the Gantt chart api interface for calling Microsoft Project instruments to provide, you can read and treat point
The base attribute information of the task object of the Gantt chart of analysis and the Gantt chart.
Optionally, the progress of at least one task in Gantt chart directory entry, and the base attribute information of project, lead to
The Gantt chart api interface for calling Microsoft Project instruments to provide is crossed, the task object (institute of the Gantt chart can be read
State the mission bit stream that task object indicates each task that the Gantt chart includes), and the base attribute information of the Gantt chart
(the base attribute information of the Gantt chart includes the base attribute information of the project of Gantt chart instruction).
In the embodiment of the present application, it is preferred that the base attribute information of the project of the Gantt chart instruction includes:The item
The purpose project cycle, the director etc. of the project.
It is only the preferred of the base attribute information of the project for the Gantt chart instruction that the embodiment of the present application provides above
Mode, inventor can arbitrarily set the particular content of base attribute information according to the demand of oneself, not limit herein.
S103, the first information is handled, generation meets the second information of preset data form requirement;
S104, analysis second information, obtain the analysis result of the Gantt chart.
For the ease of a kind of understanding of the gunter figure analysis method provided the embodiment of the present application, now to the embodiment of the present application
" handling the first information, generation meets preset data form requirement in a kind of gunter figure analysis method provided
The second information " method describes in detail.
Fig. 2 is that one kind that the embodiment of the present application provides is handled the first information, and generation meets preset data lattice
The method flow diagram of second information of formula requirement.
As shown in Fig. 2 this method includes:
S201, determine default data structure;
Optionally, the default data structure includes default tables of data, and the tables of data has table structure, the table
Structure indicates at least one task, and indicates attribute corresponding to each task at least one task.
S202, the target information from the corresponding data structure of extraction in the task object in the first information;
S203, it is the data format for meeting the data structure by the data format of the target information;
S204, the target information after formatting is stored in the data structure, the second information of generation.
Optionally, the task object indicates the mission bit stream for each task that the Gantt chart includes;For the number
For each task that the table structure having according to table indicates, it is performed both by " from the task letter of the task of task object instruction
The property value of attribute (is taken out from the task object in the first information in breath, corresponding to the task of the extraction table structure instruction
The all properties value for the correspondence data structure got, as described target information), and by the data format lattice of the property value
Formula, which turns to, meets that the data format of the property value (that is, is by the data format of the attribute:Meet to belong to corresponding to the attribute
The data format requirement of property value filling position), the property value is filled into the tables of data position corresponding with the attribute
(that is, the property value being filled to property value filling position corresponding to the attribute) " process, and then generate the second information.
For the ease of a kind of understanding of the gunter figure analysis method provided the embodiment of the present application, now to the embodiment of the present application
" analysis second information, obtain the analysis result of the Gantt chart " method in a kind of gunter figure analysis method provided is entered
Row is discussed in detail.
Fig. 3 is that one kind that the embodiment of the present application provides analyzes second information, obtains the analysis result of the Gantt chart
Method flow diagram.
As shown in figure 3, this method includes:
S301, according to it is default check rule second information is checked, generate the inspection knot of the Gantt chart
Fruit;
In the embodiment of the present application, it is preferred that the inspection rule includes:1st, task resource is chosen whether as effective enterprise
Industry provides;2nd, whether task Back ground Information fills in (work distribution person, resource type, resource name, job category, man-hour, Mission Day
Go through, batch, product, the affiliated stage);3rd, resource type and resource name check;4th, saddlebag refinement checks in one month;
5th, whether milestone is set, and whether workload is 0;6th, engineering activity stage progress is closed rule and checked;7th, management activity and engineering are lived
Dynamic circuit connector rule check;8th, baseline issue active checking;9th, product selection Correctness checking;10th, job category inspection.
Optionally, the every bit in the 1-10 points that above-mentioned detected rule includes is regarded as a check item, the inspection
Looking into rule may include that (that is, detected rule may include in above-mentioned ten check items for any point in above-mentioned 1-10 points or multiple spot
It is any one or more);Also, it is only the preferred embodiment for the inspection rule that the embodiment of the present application provides above, inventor is also
The particular content for checking rule can be arbitrarily set according to the demand of oneself, do not limited herein.
S302, using default statistical rules statistical analysis is carried out to second information, and with reference to the Gantt chart
Base attribute information, generate the statistical result of the Gantt chart.
In the embodiment of the present application, it is preferred that the statistical rules includes:1st, according to project level way to manage, in batches,
Product accounting is own, outsourcing service provider's workload information;2nd, outsourcing service provider's workload collect statistics;3rd, management class activity is united in batches
Meter;4th, milestone counts;5th, the cycle for counting an engineering phase in batches is set.
Optionally, the every bit in the 1-5 points that above-mentioned statistical rules includes is regarded as a statistical items, the statistics
Rule may include that (that is, statistical rules may include any in above-mentioned five statistical items for any point in above-mentioned 1-5 points or multiple spot
It is one or more);Also, it is only the preferred embodiment for the statistical rules that the embodiment of the present application provides above, inventor can basis
The demand of oneself arbitrarily sets the particular content of statistical rules, does not limit herein.
Fig. 4 is another gunter figure analysis method flow chart that the embodiment of the present application provides.
As shown in figure 4, this method includes:
S401, determine Gantt chart to be analyzed;
S402, the first information for calling the Gantt chart api interface reading Gantt chart;
S403, the first information is handled, generation meets the second information of preset data form requirement;
S404, according to it is default check rule second information is checked, generate the inspection knot of the Gantt chart
Fruit;
S405, using default statistical rules statistical analysis is carried out to second information, and with reference to the Gantt chart
Base attribute information, generate the statistical result of the Gantt chart;
S406, the testing result is analyzed, obtain the analysis information of the inspection result;
Optionally, check that rule instruction has at least one check item, by analyzing inspection result, can obtain described
The analysis information of inspection result, the analysis information of the inspection result include at least one detection for checking rule instruction
In error number corresponding to each check item (wherein, error number corresponding to detection includes believing second based on the detection
Cease and checked, the underproof number of obtained testing result).
S407, the analysis information based on the inspection result, from least one check item for checking rule instruction
Determine target check item.
Optionally, at least one detection that the detected rule indicates is entered according to the order of error number from high to low
Row sequence, it is regular really that the most forward N number of inspection rule that sorts is defined as target check item/N number of inspection by sequence most rearward
It is set to target check item.
Optionally, by determining target check item, in order to which user is from least one check item for checking rule instruction
Pending check item (target check item) is determined, in order to which user modifies to target check item, and will be amended
Target check item replaces the target check item at least one check item for checking rule instruction, follow-up to the to carry out
The inspection of two information.
Fig. 5 is another gunter figure analysis method flow chart that the embodiment of the present application provides.
As shown in figure 5, this method includes:
S501, determine Gantt chart to be analyzed;
S502, the first information for calling the Gantt chart api interface reading Gantt chart;
S503, the first information is handled, generation meets the second information of preset data form requirement;
S504, analysis second information, obtain the analysis result of the Gantt chart;
Optionally, the step that the implementation procedure for the step S501-S504 that the embodiment of the present application provides provides with above-described embodiment
Rapid S101-S104 implementation procedure is identical, and the implementation procedure about step S501-S504 refers to the step of above-described embodiment offer
Rapid S101-S104 implementation procedure, will not be described here.
S505, determine destinations traffic address;
Optionally, the destinations traffic address is that cell-phone number, mailbox, WeChat ID, QQ number etc. can be used for the logical of receive information
Believe address.More than be only the embodiment of the present application provide destinations traffic address preferred embodiment, inventor can according to oneself
Demand arbitrarily sets the particular content of destinations traffic address, does not limit herein.
Optionally, the mailing address that user inputs is defined as destinations traffic address, or, default mailing address is true
It is set to destinations traffic address.
S506, the analysis result to the destinations traffic address transmission Gantt chart.
Optionally, can be in the form of short message by the analysis of the Gantt chart when destinations traffic address is cell-phone number
As a result send to the destinations traffic address;, can be with mail he by the Gantt chart when destinations traffic address is mailbox
Analysis result send to the destinations traffic address;When the destinations traffic address is WeChat ID or QQ number, it can disappear immediately
The form of breath sends the analysis result of the Gantt chart to the destinations traffic address.
Optionally, the type of the analysis result of the Gantt chart sent to the destinations traffic address meets target analysis
Result type.
In the embodiment of the present application, it is preferred that the analysis result type that user inputs is defined as target analysis result class
Type, or, the analysis result type pre-set is defined as target analysis result type.
Optionally, target analysis result type is the types such as Gantt chart, curve map, form.That is, step S505 is obtained into institute
The analysis result for stating Gantt chart is converted into the information of target analysis result type, and the described information being converted into is led to the target
Believe that address is sent.
The embodiment of the present application provides a kind of gunter figure analysis method and device, by determining Gantt chart to be analyzed;Call
Gantt chart api interface reads the first information of the Gantt chart;The first information is handled, generation meets preset data
Second information of call format;Second information is analyzed, the mode of the analysis result of the Gantt chart is obtained, realizes to sweet
The analysis of special figure, prior art is avoided because the VBA macrodoces for being analyzed Gantt chart are embedded in Microsoft
In Project instruments, the problem of caused VBA macrodoces (Gantt chart analytical technology) portable poor, poor expandability.
VBA macrodoce test modes are contrasted, a kind of gunter figure analysis method that the embodiment of the present application provides is to pass through independence
What instrument was realized, therefore autgmentability is stronger, function is also more powerful, and maintainable and portability is greatly better than VBA grand generations
Code, polytype analysis result way of output can be achieved;In security, program deployment, renewal, popularization practical, standalone tool
Advantage is also had more than VBA macrodoce.By providing User Interface, its operation is simpler, convenient.In outside support side
Face, professional programming language easily can obtain more technical supports by multiple channel.
Fig. 6 is a kind of structural representation for Gantt chart analytical equipment that the embodiment of the present application provides.
As shown in fig. 6, the device includes:
Determining unit 61, for determining Gantt chart to be analyzed;
Call unit 62, for calling Gantt chart api interface to read the first information of the Gantt chart;
Processing unit 63, for handling the first information, generation meets the second of preset data form requirement
Information;
Analytic unit 64, for analyzing second information, obtain the analysis result of the Gantt chart.
Optionally, the determining unit, is specifically used for:The selection operation at least one Gantt chart is responded, by the choosing
Select the selected each Gantt chart of operation and be defined as a Gantt chart to be analyzed;It is or the Gantt chart being opened recently is true
It is set to Gantt chart to be analyzed.
Optionally, the call unit, is specifically used for:The Gantt chart API for calling Microsoft Project instruments to provide
Interface reads the task object of the Gantt chart and the base attribute information of the Gantt chart, the task object and basic category
Property first information described in information structure.
The embodiment of the present application provides a kind of detailed construction of processing unit 63, optionally, the processing unit 63, including:
Determination subelement, for determining default data structure;
Extracting unit, for the target from the corresponding data structure of extraction in the task object in the first information
Information;
Formatting unit, for being the data for meeting the data structure by the data format of the target information
Form;
First generation unit, for the target information after formatting to be stored in into the data structure, the letter of generation second
Breath.
The embodiment of the present application provides a kind of detailed construction of analytic unit 64, optionally, the analytic unit 64, including:
Second generation unit, for checking that rule is checked second information according to default, generation is described sweet
The inspection result of special figure;
Second generation unit, for carrying out statistical analysis to second information using default statistical rules, and combine
The base attribute information of the Gantt chart, generate the statistical result of the Gantt chart.
Optionally, it is described to check that rule indicates at least one check item.Further, one kind that the embodiment of the present application provides
Also include target check item determining unit in Gantt chart analytical equipment, be used for:The testing result is analyzed, obtained described
The analysis information of inspection result;Analysis information based on the inspection result, target is determined from least one check item
Check item.
Further, also include transmitting element in a kind of Gantt chart analytical equipment that the embodiment of the present application provides, be used for:Really
Set the goal mailing address;The analysis result of the Gantt chart is sent to the destinations traffic address.
The embodiment of the present application provides a kind of Gantt chart analytical equipment, by determining Gantt chart to be analyzed;Call Gantt chart
Api interface reads the first information of the Gantt chart;The first information is handled, generation meets that preset data form will
The second information asked;Second information is analyzed, the mode of the analysis result of the Gantt chart is obtained, realizes to Gantt chart
Analysis, prior art is avoided because the VBA macrodoces for being analyzed Gantt chart are embedded in Microsoft Project works
In tool, the problem of caused VBA macrodoces (Gantt chart analytical technology) portable poor, poor expandability.
Each embodiment is described by the way of progressive in this specification, what each embodiment stressed be and other
The difference of embodiment, between each embodiment identical similar portion mutually referring to.For device disclosed in embodiment
For, because it is corresponded to the method disclosed in Example, so description is fairly simple, related part is said referring to method part
It is bright.
Professional further appreciates that, with reference to the unit of each example of the embodiments described herein description
And algorithm steps, can be realized with electronic hardware, computer software or the combination of the two, in order to clearly demonstrate hardware and
The interchangeability of software, the composition and step of each example are generally described according to function in the above description.These
Function is performed with hardware or software mode actually, application-specific and design constraint depending on technical scheme.Specialty
Technical staff can realize described function using distinct methods to each specific application, but this realization should not
Think beyond the scope of this invention.
Directly it can be held with reference to the step of method or algorithm that the embodiments described herein describes with hardware, processor
Capable software module, or the two combination are implemented.Software module can be placed in random access memory (RAM), internal memory, read-only deposit
Reservoir (ROM), electrically programmable ROM, electrically erasable ROM, register, hard disk, moveable magnetic disc, CD-ROM or technology
In any other form of storage medium well known in field.
The foregoing description of the disclosed embodiments, professional and technical personnel in the field are enable to realize or using the present invention.
A variety of modifications to these embodiments will be apparent for those skilled in the art, as defined herein
General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, it is of the invention
The embodiments shown herein is not intended to be limited to, and is to fit to and principles disclosed herein and features of novelty phase one
The most wide scope caused.
Claims (10)
- A kind of 1. gunter figure analysis method, it is characterised in that including:Determine Gantt chart to be analyzed;Gantt chart api interface is called to read the first information of the Gantt chart;The first information is handled, generation meets the second information of preset data form requirement;Second information is analyzed, obtains the analysis result of the Gantt chart.
- 2. according to the method for claim 1, it is characterised in that determination Gantt chart to be analyzed, including:The selection operation at least one Gantt chart is responded, each Gantt chart selected by the selection operation is defined as one Gantt chart to be analyzed;OrThe Gantt chart being opened recently is defined as to Gantt chart to be analyzed.
- 3. according to the method for claim 1, it is characterised in that the calling Gantt chart api interface reads the Gantt chart The first information, including:The Gantt chart api interface for calling Microsoft Project instruments to provide read the Gantt chart task object and The first information described in the base attribute information of the Gantt chart, the task object and base attribute information structure.
- 4. according to the method for claim 3, it is characterised in that described that the first information is handled, generation meets Second information of preset data form requirement, including:Determine default data structure;From the target information of the corresponding data structure of extraction in the task object in the first information;Data format by the target information is the data format for meeting the data structure;The target information after formatting is stored in the data structure, generates the second information.
- 5. according to the method for claim 1, it is characterised in that analysis second information, obtain the Gantt chart Analysis result, including:Check that rule is checked second information according to default, generate the inspection result of the Gantt chart;Statistical analysis is carried out to second information using default statistical rules, and is believed with reference to the base attribute of the Gantt chart Breath, generate the statistical result of the Gantt chart.
- 6. according to the method for claim 5, it is characterised in that described to check that rule indicates at least one check item, the party Method also includes:The testing result is analyzed, obtains the analysis information of the inspection result;Analysis information based on the inspection result, target check item is determined from least one check item.
- 7. according to the method described in claim 1-6 any one, it is characterised in that also include:Determine destinations traffic address;The analysis result of the Gantt chart is sent to the destinations traffic address.
- A kind of 8. Gantt chart analytical equipment, it is characterised in that including:Determining unit, for determining Gantt chart to be analyzed;Call unit, for calling Gantt chart api interface to read the first information of the Gantt chart;Processing unit, for handling the first information, generation meets the second information of preset data form requirement;Analytic unit, for analyzing second information, obtain the analysis result of the Gantt chart.
- 9. device according to claim 8, it is characterised in that the determining unit, be specifically used for:The selection operation at least one Gantt chart is responded, each Gantt chart selected by the selection operation is defined as one Gantt chart to be analyzed;OrThe Gantt chart being opened recently is defined as to Gantt chart to be analyzed.
- 10. device according to claim 8, it is characterised in that the call unit, be specifically used for:The Gantt chart api interface for calling Microsoft Project instruments to provide read the Gantt chart task object and The first information described in the base attribute information of the Gantt chart, the task object and base attribute information structure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710735838.9A CN107480120A (en) | 2017-08-24 | 2017-08-24 | A kind of gunter figure analysis method and device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710735838.9A CN107480120A (en) | 2017-08-24 | 2017-08-24 | A kind of gunter figure analysis method and device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107480120A true CN107480120A (en) | 2017-12-15 |
Family
ID=60602558
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710735838.9A Pending CN107480120A (en) | 2017-08-24 | 2017-08-24 | A kind of gunter figure analysis method and device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107480120A (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2010218048A (en) * | 2009-03-13 | 2010-09-30 | Nec Corp | Information processor, gantt chart data restructuring method, and program |
CN102591961A (en) * | 2011-12-30 | 2012-07-18 | 甘肃电力科学研究院 | Method and system for making data charts |
CN102906697A (en) * | 2010-06-03 | 2013-01-30 | 国际商业机器公司 | Method and system of adapting data model to user interface component |
JP2015049710A (en) * | 2013-09-02 | 2015-03-16 | 株式会社日立システムズ | Project management device, program, and management method |
-
2017
- 2017-08-24 CN CN201710735838.9A patent/CN107480120A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2010218048A (en) * | 2009-03-13 | 2010-09-30 | Nec Corp | Information processor, gantt chart data restructuring method, and program |
CN102906697A (en) * | 2010-06-03 | 2013-01-30 | 国际商业机器公司 | Method and system of adapting data model to user interface component |
CN102591961A (en) * | 2011-12-30 | 2012-07-18 | 甘肃电力科学研究院 | Method and system for making data charts |
JP2015049710A (en) * | 2013-09-02 | 2015-03-16 | 株式会社日立システムズ | Project management device, program, and management method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US11416676B2 (en) | Using text messages to interact with spreadsheets | |
US8306971B2 (en) | Methods and systems of automatically geocoding a dataset for visual analysis | |
CN105260534B (en) | Regression test case maintaining method and system for ultra-large chip checking | |
US8364663B2 (en) | Tokenized javascript indexing system | |
CN104346075B (en) | Carry out the method and client of sectional drawing processing | |
US10896411B2 (en) | Methods and systems for communicating expense management information | |
CN108572918A (en) | Performance test methods, device, computer equipment and storage medium | |
US10169461B2 (en) | Analysis of data utilization | |
CN102546668A (en) | Method, device and system for counting unique visitors | |
CN106681921A (en) | Method and device for achieving data parameterization | |
CN111694561A (en) | Interface management method, device, equipment and storage medium | |
CN109408502A (en) | A kind of data standard processing method, device and its storage medium | |
CN111159040A (en) | Test data generation method, device, equipment and storage medium | |
CN107480120A (en) | A kind of gunter figure analysis method and device | |
CN115408358B (en) | Network disk online file management method and device, network disk and storage medium | |
CN112925774B (en) | Method and device for cleaning address data, storage medium and computer equipment | |
CN105893462A (en) | User network behavior analysis method and device | |
CN109039855A (en) | A kind of message treatment method and device | |
CN107168876A (en) | A kind of method and device of static code detection | |
CN113850067B (en) | Information collection method and device based on online editing, network disk and storage medium | |
CN116860909B (en) | Data storage method, system and storage medium based on biochemical knowledge graph | |
CN109241208A (en) | Address location, address monitoring, information processing method and device | |
CN113312132B (en) | Mail sending method, device, equipment and storage medium | |
CN111126737B (en) | Cross-scene cross analysis method and device, electronic equipment and storage medium | |
JP2018073191A (en) | Project management item evaluation system and project management item evaluation method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20171215 |