CN107476323A - The construction method of the automatic base pit dewatering of water level control - Google Patents

The construction method of the automatic base pit dewatering of water level control Download PDF

Info

Publication number
CN107476323A
CN107476323A CN201710863168.9A CN201710863168A CN107476323A CN 107476323 A CN107476323 A CN 107476323A CN 201710863168 A CN201710863168 A CN 201710863168A CN 107476323 A CN107476323 A CN 107476323A
Authority
CN
China
Prior art keywords
water
floating
water pump
ball
water level
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710863168.9A
Other languages
Chinese (zh)
Inventor
孟繁奇
刘洋
王纯岩
刘鹏飞
张学佳
邱远桂
雷贤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Original Assignee
China MCC20 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN201710863168.9A priority Critical patent/CN107476323A/en
Publication of CN107476323A publication Critical patent/CN107476323A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/10Restraining of underground water by lowering level of ground water

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Hydrology & Water Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Control Of Non-Positive-Displacement Pumps (AREA)

Abstract

The invention provides a kind of construction method of the automatic base pit dewatering of water level control, this method comprises the following steps:Water pump and floating-ball level switch are connected;Water pump is put to the bottom of drainpipe, also, floating-ball level switch is placed in the dewatering well that construction is completed in advance, wherein, drainpipe is located in dewatering well;Water pump after series connection and floating-ball level switch are connected with power supply, so that water pump, floating-ball level switch and power supply form loop.It can be seen that, in the present invention, pass through the water pump and floating-ball level switch of series connection, it can realize that water pump is closed when the water level in dewatering well is less than turn on pump limit for height water level, when water level rises to turn on pump limit for height water level, water pump is opened, when water level is down to termination of pumping limit for height water level, water pump is closed, and then realizes and precipitation is automatically controlled, and is improved precipitation efficiency, is saved electric power resource;Precipitation is automatically controlled simultaneously as can realize, decreases certain artificial input.

Description

The construction method of the automatic base pit dewatering of water level control
Technical field
The present invention relates to civil engineering technical field, in particular to a kind of applying for the automatic base pit dewatering of water level control Work method.
Background technology
At present, foundation ditch pipe well points dewatering construction scene is more is directly accessed three-level case using diving pump drainage, power supply.Water pump Unlatching and closing need to through in measurement well after water level again by professional electrician by switching manual control, more waste time and energy.For The engineering that circuit is longer, scope is larger is difficult to effective supervision, not timely turn on pump draining, shadow when water level is higher in well easily occurs Dewatering effect is rung, and does not close pump when water is drained in well in time and causes draining pump to dally scaling loss, wastes the situation of electric power resource.
The content of the invention
In consideration of it, the present invention proposes a kind of construction method of the automatic base pit dewatering of water level control, it is intended to solves row at present The problem of dewatering effect caused by artificial monitoring is needed during water is poor, waste of resource.
The present invention proposes a kind of construction method of the automatic base pit dewatering of water level control, and this method comprises the following steps:Will Water pump and floating-ball level switch series connection;Water pump is put to the bottom of drainpipe, also, floating-ball level switch is placed in advance construction In the dewatering well of completion, wherein, drainpipe is located in dewatering well;Water pump after series connection and floating-ball level switch are connected with power supply Connect, so that water pump, floating-ball level switch and power supply form loop.
Further, in the construction method of the automatic base pit dewatering of above-mentioned water level control, water pump or floating-ball level switch are led to Cross master switch with power supply to be connected with can cut-offfing, so that water pump, floating-ball level switch and power supply, which are formed, can cut-off earth-return;In shape Into after can cut-off earth-return, master switch is closed.
Further, in the construction method of the automatic base pit dewatering of above-mentioned water level control, opened when the water level in dewatering well is less than During pump limit for height water level, floating-ball level switch is flat bubble through the water column on so that floating-ball level switch disconnects, and then close water pump.
Further, in the construction method of the automatic base pit dewatering of above-mentioned water level control, when water level rises to turn on pump limit for height water level When, floating-ball level switch is erected in water, so that floating-ball level switch is connected, and then opens water pump.
Further, in the construction method of the automatic base pit dewatering of above-mentioned water level control, when water level is down to turn on pump limit for height water level During below and positioned at termination of pumping limit above high water mark, floating-ball level switch is flat bubble through the water column on, floating-ball level switch remains up shape State, so that water pump is kept it turned on.
Further, in the construction method of the automatic base pit dewatering of above-mentioned water level control, when water level is down to termination of pumping limit for height water level When, floating-ball level switch is hung on the water surface vertically, so that floating-ball level switch disconnects, and then closes water pump.
Further, in the construction method of the automatic base pit dewatering of above-mentioned water level control, put by water pump to the bottom of drainpipe Before portion, hand switch and floating-ball level switch are in parallel.
Further, it is above-mentioned to put water pump to drainpipe in the construction method of the automatic base pit dewatering of above-mentioned water level control The process of bottom includes:Lifting rope is installed on water pump;The switching line of floating-ball level switch is fixed on lifting rope;Water pump is hung To the bottom of drainpipe;Lifting rope is fixed on to the well head of dewatering well.
Further, in the construction method of the automatic base pit dewatering of above-mentioned water level control, the length of switching line is according to water drain Position control range is reserved.
Further, in the construction method of the automatic base pit dewatering of above-mentioned water level control, after above-mentioned closure master switch also Including:After the completion for the treatment of precipitation work, water pump and floating-ball level switch are removed.
As can be seen that in the present invention, pass through the water pump and floating-ball level switch of series connection, it is possible to achieve when the water in dewatering well Water pump is closed when position is less than turn on pump limit for height water level, and when water level rises to turn on pump limit for height water level, water pump is opened, when water level is down to termination of pumping Water pump is closed during limit for height water level, and then realizes and precipitation is automatically controlled, and avoids artificial level monitoring and water level in well easily occurs When higher not timely turn on pump draining the problem of, so as to improve precipitation efficiency;It it also avoid not closing pump when water is drained in well in time The problem of causing draining pump idle running scaling loss, so as to save electric power resource;Simultaneously as the automatic control to precipitation can be realized System, decreases certain artificial input.
Brief description of the drawings
By reading the detailed description of hereafter preferred embodiment, it is various other the advantages of and benefit it is common for this area Technical staff will be clear understanding.Accompanying drawing is only used for showing the purpose of preferred embodiment, and is not considered as to the present invention Limitation.And in whole accompanying drawing, identical part is denoted by the same reference numerals.In the accompanying drawings:
Fig. 1 is the flow chart of the construction method of the automatic base pit dewatering of water level control provided in an embodiment of the present invention;
Fig. 2 is water pump, Floating Ball Liquid Level in the construction method of the automatic base pit dewatering of water level control provided in an embodiment of the present invention Switch and power supply form the circuit diagram in loop;
Fig. 3 is in the construction method of the automatic base pit dewatering of water level control provided in an embodiment of the present invention, when in dewatering well When water level is less than turn on pump limit for height water level, the position view of floating-ball level switch;
Fig. 4 is in the construction method of the automatic base pit dewatering of water level control provided in an embodiment of the present invention, when water level rises to out During pump limit for height water level, the position view of floating-ball level switch;
Fig. 5 is in the construction method of the automatic base pit dewatering of water level control provided in an embodiment of the present invention, when water level is down to out During below pump limit for height water level and positioned at termination of pumping limit above high water mark, the position view of floating-ball level switch;
Fig. 6 is in the construction method of the automatic base pit dewatering of water level control provided in an embodiment of the present invention, is down to and stops when water level During pump limit for height water level, the position view of floating-ball level switch;
Fig. 7 is in the construction method of the automatic base pit dewatering of water level control provided in an embodiment of the present invention, and water pump is put to row The flow chart of the bottom of water pipe;
Fig. 8 is the another flow chart of the construction method of the automatic base pit dewatering of water level control provided in an embodiment of the present invention.
Embodiment
The exemplary embodiment of the disclosure is more fully described below with reference to accompanying drawings.Although the disclosure is shown in accompanying drawing Exemplary embodiment, it being understood, however, that may be realized in various forms the disclosure without should be by embodiments set forth here Limited.On the contrary, these embodiments are provided to facilitate a more thoroughly understanding of the present invention, and can be by the scope of the present disclosure Completely it is communicated to those skilled in the art.It should be noted that in the case where not conflicting, embodiment in the present invention and Feature in embodiment can be mutually combined.Describe the present invention in detail below with reference to the accompanying drawings and in conjunction with the embodiments.
Referring to Fig. 1, Fig. 1 is the flow of the construction method of the automatic base pit dewatering of water level control provided in an embodiment of the present invention Figure.As illustrated, this method comprises the following steps:
Step S110, water pump and floating-ball level switch are connected.
Specifically, water pump 1 and floating-ball level switch 2 are in series by staff, while can be opened manually with parallel connection Close 3 and be used as emergency button, joint uses underwater operation water joint.
Step S120, water pump is put to the bottom of drainpipe, also, floating-ball level switch is placed in what construction in advance was completed In dewatering well, wherein, drainpipe is located in dewatering well.
Specifically, drainpipe 5 is provided with dewatering well 4, dewatering well 4 is to construct what is completed previously according to construction drawing. Water pump 1 is put to the bottom of drainpipe 5, also, floating-ball level switch 2 is placed in dewatering well 4.
Step S130, the water pump after series connection and floating-ball level switch are connected with power supply, so that water pump, Floating Ball Liquid Level are opened Close and power supply forms loop.
Specifically, join Fig. 2, water pump 1 is connected with the negative pole of power supply 6, by floating-ball level switch 2 and power supply 6 Positive pole is connected, so that water pump 1, floating-ball level switch 2 and power supply 6 form loop.
Referring to Fig. 3, formed after loop, when the water level C in dewatering well 4 is less than turn on pump limit for height water level A, Floating Ball Liquid Level is opened Close 2 it is flat bubble through the water column on, now floating-ball level switch 2 is disconnected, and water pump 1 is closed;Referring to Fig. 4, when water level C rises to turn on pump limit for height water During the A of position, floating-ball level switch 2 is erected in water, and now floating-ball level switch 2 is connected, and water pump 1 is opened, i.e., water pump 1 starts to draw water Work, water are discharged into ground D gutter 7 by drainpipe 5;Referring to Fig. 5, when water level C be down to below turn on pump limit for height water level A and During positioned at more than termination of pumping limit for height water level B, floating-ball level switch 2 is flat bubble through the water column on, now floating-ball level switch 2 remains up shape State, water pump 1 are kept it turned on;Referring to Fig. 6, when water level C is down to termination of pumping limit for height water level B, floating-ball level switch 2 hang vertically in On the water surface, now floating-ball level switch 2 is disconnected, and water pump 1 is closed, i.e. water pump 1 stops pumping work.Said process is repeated, until Precipitation work is completed.It should be noted that turn on pump limit for height water level A is located at below the absolute altitude E of foundation ditch bottom.
As can be seen that in the present embodiment, pass through the water pump and floating-ball level switch of series connection, it is possible to achieve when in dewatering well Water pump is closed when water level is less than turn on pump limit for height water level, and when water level rises to turn on pump limit for height water level, water pump is opened, and is down to and is stopped when water level Water pump is closed during pump limit for height water level, and then realizes and precipitation is automatically controlled, and avoids artificial level monitoring and water in well easily occurs Position it is higher when not timely turn on pump draining the problem of, so as to improve precipitation efficiency;It it also avoid not closing in time when water is drained in well Pump causes the problem of draining pump idle running scaling loss, so as to save electric power resource;Simultaneously as the automatic control to precipitation can be realized System, decreases certain artificial input.
In above-described embodiment, water pump 1 or floating-ball level switch 2 can be connected in which can cut-off by master switch 8 with power supply 6 Connect, so that water pump 1, floating-ball level switch 2 and power supply 6, which are formed, can cut-off earth-return, so that the more easily connection of control loop With disconnection.After formation can cut-off earth-return, master switch 8 is closed.
Referring to Fig. 7, in one embodiment of the invention, the process that water pump is put to the bottom of drainpipe can be wrapped Include:
Step S710, lifting rope is installed on water pump.
Step S720, the switching line of floating-ball level switch is fixed on lifting rope.
Specifically, the switching line 10 of floating-ball level switch 2 is fixed on lifting rope 9 using buckle, the length of switching line 10 Degree can be reserved according to discharge level control range.
Step S730, water pump is hung to the bottom of drainpipe.
Step S740, lifting rope is fixed on to the well head of dewatering well.
In the present embodiment, the length of the switching line of the floating-ball level switch by reserving certain length, it is possible to achieve to row The control of water level scope, and then realize the function of automatic precipitation in the range of certain height of water level in dewatering well.
Referring to Fig. 8, Fig. 8 is the another stream of the construction method of the automatic base pit dewatering of water level control provided in an embodiment of the present invention Cheng Tu.As illustrated, this method comprises the following steps:
Step S810, water pump and floating-ball level switch are connected.
Step S820, water pump is put to the bottom of drainpipe, also, floating-ball level switch is placed in what construction in advance was completed In dewatering well, wherein, drainpipe is located in dewatering well.
Step S830, the water pump after series connection and floating-ball level switch are connected with power supply, so that water pump, Floating Ball Liquid Level are opened Close and power supply forms loop.
Step S840, after the completion for the treatment of precipitation work, water pump and floating-ball level switch are removed.
Specifically, when it is implemented, according to different geological conditions, 6~10 days startup water pumps 1 before excavation of foundation pit, directly To after precipitation work completion and backfilling to foundation ditch, water pump 1 is removed.
In the present embodiment, after the completion for the treatment of precipitation work, water pump and floating-ball level switch are removed, to be reused, Resource is saved.
To sum up, it can be seen that in the present embodiment, pass through the water pump and floating-ball level switch of series connection, it is possible to achieve work as precipitation Water pump is closed when water level in well is less than turn on pump limit for height water level, and when water level rises to turn on pump limit for height water level, water pump is opened, and works as water level Water pump is closed when being down to termination of pumping limit for height water level, and then realizes and precipitation is automatically controlled, and avoids artificial level monitoring and easily occurs When water level is higher in well not timely turn on pump draining the problem of, so as to improve precipitation efficiency;It it also avoid when water is drained in well not The problem of pump causes draining pump idle running scaling loss is closed in time, so as to save electric power resource;Simultaneously as it can realize to precipitation Automatically control, decrease certain artificial input.
Obviously, those skilled in the art can carry out the essence of various changes and modification without departing from the present invention to the present invention God and scope.So, if these modifications and variations of the present invention belong to the scope of the claims in the present invention and its equivalent technologies Within, then the present invention is also intended to comprising including these changes and modification.

Claims (10)

1. a kind of construction method of the automatic base pit dewatering of water level control, it is characterised in that comprise the following steps:
Water pump and floating-ball level switch are connected;
The water pump is put to the bottom of drainpipe, also, the floating-ball level switch is placed in the precipitation that construction is completed in advance In well, wherein, the drainpipe is located in the dewatering well;
The water pump after series connection and the floating-ball level switch are connected with power supply, so that the water pump, the ball float liquid Bit switch and the power supply form loop.
2. the construction method of the automatic base pit dewatering of water level control according to claim 1, it is characterised in that
The water pump or the floating-ball level switch are connected in which can cut-off by master switch with power supply, so that the water pump, The floating-ball level switch and the power supply, which are formed, can cut-off earth-return;
After formation can cut-off earth-return, the master switch is closed.
3. the construction method of the automatic base pit dewatering of water level control according to claim 1 or 2, it is characterised in that
When the water level in the dewatering well is less than turn on pump limit for height water level, the floating-ball level switch is flat bubble through the water column on so that The floating-ball level switch disconnects, and then closes the water pump.
4. the construction method of the automatic base pit dewatering of water level control according to claim 3, it is characterised in that
When the water level rises to the turn on pump limit for height water level, the floating-ball level switch is erected in water, so that the ball float Liquid-level switch is connected, and then opens the water pump.
5. the construction method of the automatic base pit dewatering of water level control according to claim 4, it is characterised in that
When the water level is down to below the turn on pump limit for height water level and limits above high water mark positioned at termination of pumping, the Floating Ball Liquid Level is opened On Guan Ping bubbles through the water column, the floating-ball level switch remains turned on, so that the water pump is kept it turned on.
6. the construction method of the automatic base pit dewatering of water level control according to claim 5, it is characterised in that
When the water level is down to the termination of pumping limit for height water level, the floating-ball level switch is hung on the water surface vertically, so that described Floating-ball level switch disconnects, and then closes the water pump.
7. the construction method of the automatic base pit dewatering of water level control according to claim 1 or 2, it is characterised in that
Put by the water pump to before the bottom of the drainpipe, hand switch and the floating-ball level switch are in parallel.
8. the construction method of the automatic base pit dewatering of water level control according to claim 1 or 2, it is characterised in that above-mentioned to incite somebody to action The process that the water pump is put to the bottom of drainpipe includes:
Lifting rope is installed on the water pump;
The switching line of the floating-ball level switch is fixed on the lifting rope;
The water pump is hung to the bottom of the drainpipe;
The lifting rope is fixed on to the well head of the dewatering well.
9. the construction method of the automatic base pit dewatering of water level control according to claim 8, it is characterised in that
The length of the switching line is reserved according to discharge level control range.
10. the construction method of the automatic base pit dewatering of water level control according to claim 2, it is characterised in that closed above-mentioned Close the master switch also includes afterwards:
After the completion for the treatment of precipitation work, the water pump and the floating-ball level switch are removed.
CN201710863168.9A 2017-09-22 2017-09-22 The construction method of the automatic base pit dewatering of water level control Pending CN107476323A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710863168.9A CN107476323A (en) 2017-09-22 2017-09-22 The construction method of the automatic base pit dewatering of water level control

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710863168.9A CN107476323A (en) 2017-09-22 2017-09-22 The construction method of the automatic base pit dewatering of water level control

Publications (1)

Publication Number Publication Date
CN107476323A true CN107476323A (en) 2017-12-15

Family

ID=60586267

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710863168.9A Pending CN107476323A (en) 2017-09-22 2017-09-22 The construction method of the automatic base pit dewatering of water level control

Country Status (1)

Country Link
CN (1) CN107476323A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109144118A (en) * 2018-09-30 2019-01-04 上海宝冶集团有限公司 The automation control method of dewatering well power supply
CN110700296A (en) * 2019-09-27 2020-01-17 中国十七冶集团有限公司 Foundation pit dewatering system with high water level and weak permeability soil and implementation method
CN112252346A (en) * 2020-09-11 2021-01-22 北京市市政二建设工程有限责任公司 Construction method of dewatering well

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007239286A (en) * 2006-03-08 2007-09-20 Kajima Corp Construction method for lowering underground water level
CN103674184A (en) * 2012-09-14 2014-03-26 鸿富锦精密工业(武汉)有限公司 Water level detection device
CN203594588U (en) * 2013-10-23 2014-05-14 中建三局建设工程股份有限公司 Automatic drainage system in foundation pit
CN205000350U (en) * 2015-08-31 2016-01-27 鞍钢房产建设有限公司 Closed automatic precipitation device
CN206470618U (en) * 2017-02-28 2017-09-05 韩富杰 Dewatering well water level control, alarming device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007239286A (en) * 2006-03-08 2007-09-20 Kajima Corp Construction method for lowering underground water level
CN103674184A (en) * 2012-09-14 2014-03-26 鸿富锦精密工业(武汉)有限公司 Water level detection device
CN203594588U (en) * 2013-10-23 2014-05-14 中建三局建设工程股份有限公司 Automatic drainage system in foundation pit
CN205000350U (en) * 2015-08-31 2016-01-27 鞍钢房产建设有限公司 Closed automatic precipitation device
CN206470618U (en) * 2017-02-28 2017-09-05 韩富杰 Dewatering well water level control, alarming device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109144118A (en) * 2018-09-30 2019-01-04 上海宝冶集团有限公司 The automation control method of dewatering well power supply
CN110700296A (en) * 2019-09-27 2020-01-17 中国十七冶集团有限公司 Foundation pit dewatering system with high water level and weak permeability soil and implementation method
CN112252346A (en) * 2020-09-11 2021-01-22 北京市市政二建设工程有限责任公司 Construction method of dewatering well

Similar Documents

Publication Publication Date Title
CN203947484U (en) A kind of drainage of foundation pit and circulating water utilization system
CN107476323A (en) The construction method of the automatic base pit dewatering of water level control
CN106320353B (en) A kind of construction method of basement construction Yield rainfall relation device
CN102635402A (en) Siphon drainage method for tunnel wall water seepage disposal by using dipping borehole
CN204811321U (en) Solar energy siphon suction pipe pump
CN108560693A (en) Side slope siphon drainge system starter and method
CN109707444A (en) A kind of automatic starting formula tunnel drainage system
CN106677198A (en) Well plugging method under dynamic water level state
CN103774680A (en) Directional diversion drainage method and device for large area water seepage of deep base pit slope supporting body
CN106223351B (en) Self priming pump reduces local groundwater level construction method
CN104018548A (en) Vertical deep-layer rainwater regulation, storage and collection system
CN108589695B (en) A kind of automatic starting formula has both the side slope siphon drainge system and method for flow monitoring function
CN205895309U (en) Prevention of seepage water system for pitshaft driving
CN210482455U (en) Pump station diversion and drainage combined overpass culvert gate
CN209053075U (en) A kind of drainage arrangement for land control
CN208831025U (en) A kind of hydrous fluids underground chamber concrete construction anti-seepage device
CN109555090B (en) Ecological flow discharge facility for pumped storage power station and implementation method
CN206581978U (en) A kind of tunnel water handling integrated system
CN208106478U (en) A kind of coal mine gas extraction automatic water drainage device
CN208073549U (en) A kind of mobile tunnel construction relay pump drainage water installations
CN215211042U (en) Device for carrying out concrete maintenance and recharge by utilizing underground water
CN215594077U (en) Cable trench and tunnel backflow-preventing drainage structure
CN111945676B (en) Water tank, gate opening and closing device and control method of gate opening and closing device
CN213329082U (en) Small-aperture pumping device
CN213448586U (en) Strong permeable stratum deep buried underground structure anti-floating pressure relief device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20171215