CN107472457B CN201710685857.5A CN201710685857A CN107472457B CN 107472457 B CN107472457 B CN 107472457B CN 201710685857 A CN201710685857 A CN 201710685857A CN 107472457 B CN107472457 B CN 107472457B
Authority
CN
China
Prior art keywords
hatchcover
platform
channel
ladder
ship
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710685857.5A
Other languages
Chinese (zh)
Other versions
CN107472457A (en
Inventor
孙海晓
黎峰
樊红元
沈立宁
晋文菊
沈威
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Merchant Ship Design and Research Institute of CSSC No 604 Research Institute
Original Assignee
Shanghai Merchant Ship Design and Research Institute of CSSC No 604 Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Merchant Ship Design and Research Institute of CSSC No 604 Research Institute filed Critical Shanghai Merchant Ship Design and Research Institute of CSSC No 604 Research Institute
Priority to CN201710685857.5A priority Critical patent/CN107472457B/en
Publication of CN107472457A publication Critical patent/CN107472457A/en
Application granted granted Critical
Publication of CN107472457B publication Critical patent/CN107472457B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B17/00Vessels parts, details, or accessories, not otherwise provided for
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B71/00Designing vessels; Predicting their performance

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Ladders (AREA)

Abstract

The present invention relates to technical field of ships, it is intended to solve the arrangement of first side tugboat device in the prior art, deck area occupied is more, structure is complicated for deck lower channel, and personnel channel is smaller, and construction is inconvenient, and the problem of higher cost, a kind of channel design, ship and motor are provided and hang out method.The channel design provided in the embodiment of the present invention comprising the channel limited by ship siding, for covering the hatchcover platform in channel, hatchcover platform side offers the through-hole for crewman's disengaging.Hatchcover platform is detachably connected by attachment device with ship siding.The top surface of hatchcover platform is arranged in erecting by overhang.Therefore channel design, ship and the motor provided in the embodiment of the present invention hangs out method and has been provided with saving deck space, but also structure channel design and construction are more simple, reduces the beneficial effect of shipyard cost.

Description

A kind of channel design, ship and motor hang out method
Technical field
The present invention relates to technical field of ships, in particular to a kind of channel design, ship and the motor side of hanging out Method.
Background technique
Many ships are equipped with first side tugboat device, for the arrangement of first side tugboat, not only to consider lifting up into for motor It hangs out, it is also contemplated that the disengaging of crewman.Currently, ship head side tugboat need to arrange that a sufficiently large channel carries out first side and pushes away motor Hang out the work such as maintenance, need specially to be arranged in place a channel also in addition for the disengaging of crewman's daily maintenance, lead to Vertical ladder is equipped in road to climb for crewman.Two little hatch doors are arranged in channel top.
Current this arrangement, deck area occupied is more, and structure is complicated for deck lower channel, and especially personnel channel is smaller, applies Work is inconvenient, and two little hatch doors bring higher cost to shipyard.
Summary of the invention
The present invention is intended to provide a kind of channel design, to solve the arrangement of first side tugboat device in the prior art, deck Area occupied is more, and structure is complicated for deck lower channel, and personnel channel is smaller, and construction is inconvenient, and the problem of higher cost.
Another object of the present invention is to provide a kind of ships with above-mentioned channel design.
Third object of the present invention is to provide a kind of motor for applying to above-mentioned ship and hangs out method.
The embodiment of the present invention is achieved in that
A kind of channel design comprising the channel limited by ship siding, for covering the hatchcover platform in channel, hatchcover is flat Platform side offers the through-hole for crewman's disengaging.The attachment device of detachably connected hatchcover platform and ship siding.Connection The top surface of hatchcover platform is arranged in the erecting by overhang of hatchcover platform, erecting by overhang.
The channel design provided in the embodiment of the present invention comprising the channel limited by ship siding, it is logical for covering The hatchcover platform in road, hatchcover platform side offer the through-hole for crewman's disengaging.Hatchcover platform passes through with ship siding to be connect Device is detachably connected.The top surface of hatchcover platform is arranged in erecting by overhang.The channel design provided in the embodiment of the present invention, Crewman channel is cancelled, motor channel is also used as crewman channel, motor channel and crewman channel are combined into one, not only saved Deck space reduces shipyard cost but also structure channel design and construction are more simple.
In one embodiment of the invention:
Above-mentioned hatchcover platform is made of steel plate welding.
In one embodiment of the invention:
Above-mentioned hatchcover platform base is additionally provided with reinforcing rib.
In one embodiment of the invention:
Above-mentioned attachment device is set as screw bolt, and hatchcover platform is connect with ship siding by screw bolt.
In one embodiment of the invention:
Above-mentioned erecting by overhang includes the orderliness that hatchcover platform top surface is arranged in.
In one embodiment of the invention:
Above-mentioned channel design includes two hatchcover platforms, and two hatchcover platforms are staggered along the length direction in channel; The through-hole of two hatchcover platforms is located at the same side of ship siding.
In one embodiment of the invention:
Above-mentioned channel design further includes that the first ladder, the second ladder and the third connecting through through-hole with ship siding are climbed Ladder.Upper deck of the first ladder one end close to ship, through-hole of the other end close to first hatchcover platform.Second ladder and first Ladder is staggered side by side, and close to the first ladder, the other end extends to the through hole of second hatchcover platform for second ladder one end. Third ladder is located on the extended line of the first ladder, and one end is close to the second ladder, and the other end is along marine electrical motors channel to far from the The direction of one hatchcover platform extends.
In one embodiment of the invention:
Above-mentioned second ladder is provided with the first extension close to one end of the first ladder;Third ladder is close to the second ladder One end is provided with the second extension.
A kind of ship, ship include hull and above-mentioned channel design;The first of hull is arranged in the top of channel design At plate;Channel design to hull interior from extending at the deck of hull.
A kind of motor hangs out method, and motor hangs out approach application in above-mentioned ship;Motor hangs out method
Hatchcover platform is dismantled, and hatchcover platform is hung out from channel;
Motor in ship is hung out by channel.
The beneficial effect of the embodiment of the present invention is:
The channel design provided in the embodiment of the present invention comprising the channel limited by ship siding, it is logical for covering The hatchcover platform in road, hatchcover platform side offer the through-hole for crewman's disengaging.Hatchcover platform passes through with ship siding to be connect Device is detachably connected.The top surface of hatchcover platform is arranged in erecting by overhang.The channel design provided in the embodiment of the present invention, Crewman channel is cancelled, motor channel is also used as crewman channel, motor channel and crewman channel are combined into one, not only saved Deck space reduces shipyard cost but also structure channel design and construction are more simple.
The ship provided in the embodiment of the present invention also has saving first due to including above-mentioned channel design Plate space reduces the beneficial effect of shipyard cost but also structure channel design and construction are more simple.
The motor provided in the embodiment of the present invention hangs out method, since motor hangs out approach application in above-mentioned ship, Therefore the motor hangs out method and also has saving deck space, but also structure channel design and construction are more simple, reduces The beneficial effect of shipyard cost.
Detailed description of the invention
In order to illustrate the technical solution of the embodiments of the present invention more clearly, below will be to needed in the embodiment attached Figure is briefly described, it should be understood that the following drawings illustrates only certain embodiments of the present invention, therefore is not construed as pair The restriction of range for those of ordinary skill in the art without creative efforts, can also be according to this A little attached drawings obtain other relevant attached drawings.
Fig. 1 is the overall structure diagram of the channel design that provides under the first visual angle in the embodiment of the present invention;
Fig. 2 is overall structure diagram of the channel design that provides of trip under the second visual angle in the embodiment of the present invention;
Fig. 3 is the structural schematic diagram of the hatchcover platform for the channel design that trip provides in the embodiment of the present invention;
Fig. 4 is the partial sectional view of the attachment device of the channel design provided in the embodiment of the present invention;
Fig. 5 is the partial sectional view of the erecting by overhang of the channel design provided in the embodiment of the present invention.
Icon: 10- channel design;The channel 100-;The first ladder of 110-;The second ladder of 120-;The first extension of 122-; 130- third ladder;The second extension of 132-;200- hatchcover platform;210- through-hole;300- attachment device;400- erecting by overhang.
Specific embodiment
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with the embodiment of the present invention In attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is A part of the embodiment of the present invention, instead of all the embodiments.The present invention being usually described and illustrated herein in the accompanying drawings is implemented The component of example can be arranged and be designed with a variety of different configurations.
Therefore, the detailed description of the embodiment of the present invention provided in the accompanying drawings is not intended to limit below claimed The scope of the present invention, but be merely representative of selected embodiment of the invention.Based on the embodiments of the present invention, this field is common Technical staff's every other embodiment obtained without making creative work belongs to the model that the present invention protects It encloses.
It should also be noted that similar label and letter indicate similar terms in following attached drawing, therefore, once a certain Xiang Yi It is defined in a attached drawing, does not then need that it is further defined and explained in subsequent attached drawing.
In the description of the embodiment of the present invention, it should be noted that if there is the finger such as term " on ", "lower", "inner", "outside" The orientation or positional relationship shown is to be based on the orientation or positional relationship shown in the drawings or when invention product use usually puts The orientation or positional relationship put, is merely for convenience of description of the present invention and simplification of the description, rather than the dress of indication or suggestion meaning It sets or element must have a particular orientation, be constructed and operated in a specific orientation, therefore should not be understood as to limit of the invention System.If being only used for distinguishing description in addition, occurring term " first ", " second " etc. in description of the invention, and should not be understood as referring to Show or imply relative importance.
In the description of the embodiment of the present invention, it is also necessary to which explanation is unless specifically defined or limited otherwise, if occurring Term " setting ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integrally Connection;It can be mechanical connection, can be directly connected, two elements can also be can be indirectly connected through an intermediary Internal connection.For the ordinary skill in the art, it can understand above-mentioned term in the present invention with concrete condition Concrete meaning.
Embodiment 1
Fig. 1 is the overall structure diagram of the channel design 10 that provides under the first visual angle in the embodiment of the present invention;Fig. 2 is Overall structure diagram of the channel design 10 that trip provides in the embodiment of the present invention under the second visual angle.It please refers to Fig. 1 and combines Fig. 2, the present embodiment provides a kind of channel designs 10 comprising the channel 100 limited by ship siding, for covering channel 100 Hatchcover platform 200,200 side of hatchcover platform offer for crewman disengaging through-hole 210.Detachably connected hatchcover platform 200 with the attachment device 300 of ship siding.The erecting by overhang 400 of hatchcover platform 200 is connected, erecting by overhang 400 is arranged in hatchcover The top surface of platform 200.
Fig. 3 is the structural schematic diagram of the hatchcover platform 200 for the channel design 10 that trip provides in the embodiment of the present invention.It please refers to Fig. 3, optionally, in the present embodiment, hatchcover platform 200 is made of steel plate welding.
In the present embodiment, 200 bottom surface of hatchcover platform is additionally provided with reinforcing rib (not shown).In hatchcover platform 200 Reinforcing rib is arranged in bottom surface.The stability of hatchcover platform 200 can be effectively improved.
It should be noted that in the present embodiment, reinforcing rib is arranged in 200 bottom surface of hatchcover platform.Hatchcover can be effectively improved The stability of platform 200.It should be understood that can also be not provided with reinforcing according to the demand of user in other specific embodiments Muscle.
Fig. 4 is the partial sectional view of the attachment device 300 of the channel design 10 provided in the embodiment of the present invention.Please refer to figure 4, optionally, in the present embodiment, attachment device 300 is set as screw bolt, and hatchcover platform 200 and ship siding pass through screw thread It is bolted.
Fig. 5 is the partial sectional view of the erecting by overhang 400 of the channel design 10 provided in the embodiment of the present invention.Please refer to figure 5, in the present embodiment, erecting by overhang 400 includes the orderliness that 200 top surface of hatchcover platform is arranged in.It sets erecting by overhang 400 to Orderliness, convenient for hanging out use for hatchcover platform 200.
It should be noted that in the present embodiment, orderliness is set by erecting by overhang 400, convenient for hanging for hatchcover platform 200 It uses out.It should be understood that can also according to the demand of user be set erecting by overhang 400 in other specific embodiments Other structures.
In the present embodiment, channel design 10 includes two hatchcover platforms 200, and two hatchcover platforms 200 are along channel 100 Length direction be staggered;The through-hole 210 of two hatchcover platforms 200 is located at the same side of ship siding.According to channel 100 Two hatchcover platforms 200 are arranged in depth, and two hatchcover platforms 200 are staggered along the length direction in channel 100, convenient for closing The walking path of reason setting crewman.The through-hole 210 of two hatchcover platforms 200 is located to the same side of ship siding, it can be effectively Two through-holes 210 for crewman's disengaging are made to convert walking path convenient for crewman to close.
It should be noted that in the present embodiment, two hatchcover platforms 200, and two cabins are arranged according to the depth in channel 100 Lid platform 200 is staggered along the length direction in channel 100, convenient for the walking path of crewman is rationally arranged.It should be understood that Here the quantity of hatchcover platform 200 is not limited, in other specific embodiments, can also according to the demand of user, Three, four etc. are set by the quantity of hatchcover platform 200.
It should also be noted that, in the present embodiment, the through-hole 210 of two hatchcover platforms 200 is located at ship siding The same side can effectively make two through-holes 210 for crewman's disengaging convert walking path convenient for crewman to close.It can manage Solution, it, can also according to the demand of user, by two hatchcover platforms 200 using other positions in other specific embodiments Relationship setting.
In the present embodiment, channel design 10 further include the first ladder 110 being connect with ship siding through through-hole 210, Second ladder 120 and third ladder 130.First ladder, 110 one end is close to the upper deck of ship, and the other end is close to first cabin The through-hole 210 of lid platform 200.Second ladder 120 is staggered side by side with the first ladder 110, and 120 one end of the second ladder is close to One ladder 110, the other end extend at the through-hole 210 of second hatchcover platform 200.Third ladder 130 is located at the first ladder 110 Extended line on, close to the second ladder 120, the other end prolongs along channel 100 to the direction far from first hatchcover platform 200 for one end It stretches.Crewman can be by the first ladder 110 at first hatchcover platform 200, and changes to the climbing downwards of the second ladder 120 to the At two hatchcover platforms 200, third ladder 130 is recycled, side tugboat room is finally reached, it is possible to understand that, it is specific real at other It applies in example, if side tugboat channel is deeper, multiple tracks hatchcover platform 200 can be continuously set according to height.
It should be noted that in the present embodiment, setting through the first ladder 110 of through-hole 210, the second ladder 120 with And third ladder 130, it is convenient for crewman's access way 100.It should be understood that in other specific embodiments, can also according to Other devices for being convenient for crewman's access way 100 are arranged in the demand at family.
In the present embodiment, the second ladder 120 is provided with the first extension 122 close to one end of the first ladder 110;Third Ladder 130 is provided with the second extension 132 close to one end of the second ladder 120.The first extension 122 and second is arranged to extend Section 132, convenient for after two hatchcover platforms 200 hang out channel 100, crewman can be by the first extension 122 in the first ladder 110 and second change between ladder 120, are changed between the second ladder 120 and third ladder 130 by the second extension 132.
It should be noted that in the present embodiment, the first extension 122 and the second extension 132 is arranged, convenient at two After hatchcover platform 200 hangs out channel 100, crewman can be by the first extension 122 in the first ladder 110 and the second ladder 120 Between change to, changed between the second ladder 120 and third ladder 130 by the second extension 132.It should be understood that at it In his specific embodiment, the first extension 122 and the second extension 132 can also be not provided with according to the demand of user.
The channel design 10 provided in the embodiment of the present invention comprising the channel 100 limited by ship siding, for covering The hatchcover platform 200 in lid channel 100,200 side of hatchcover platform offer the through-hole 210 for crewman's disengaging.Hatchcover platform 200 It is detachably connected by attachment device 300 with ship siding.The top surface of hatchcover platform 200 is arranged in erecting by overhang 400.This hair The channel design 10 provided in bright embodiment, crewman channel is cancelled, and motor channel is also used as crewman channel, motor is led to Road and crewman channel are combined into one, and not only save deck space, but also the design of channel design 10 and construction are more simple, are reduced Shipyard cost.
A kind of ship is also provided in the embodiment of the present invention, ship includes hull and above-mentioned channel design 10;Channel The top of structure 10 is arranged at the deck of hull;Channel design 10 to hull interior from extending at the deck of hull.
The ship provided in the embodiment of the present invention also has saving due to including above-mentioned channel design 10 Deck space reduces the beneficial effect of shipyard cost but also the design of channel design 10 and construction are more simple.
A kind of motor is also provided in the embodiment of the present invention and hangs out method, motor hangs out approach application in above-mentioned ship; Motor hangs out method
Hatchcover platform 200 is dismantled, and hatchcover platform 200 is hung out from channel 100;
Motor in ship is hung out by channel 100.
In the present embodiment, it is as follows to hang out method specific implementation step for motor:
The attachment device 300 of first hatchcover platform 200 is come loose first, is filled using the fixed hanging of hatchcover platform 200 400 are set to hang out hatchcover platform 200;
Crewman can be changed to by the first extension 122 of the second ladder 120, be carried out to second hatchcover platform 200 Operation, second hatchcover platform 200 is hung out;
After similarly hanging out all hatchcover platforms 200 in channel 100, motor is hung out out of channel 100.
It should be noted that can be incited somebody to action due to being provided with the through-hole 210 for crewman's disengaging on hatchcover platform 200 Hatchcover platform 200 is smoothly hung out.After all hatchcover platforms 200 are hung out, this channel 100 can push away motor as side and hang out Channel 100.After motor is hung out, crewman can be changed to by the first extension 122 and the second extension 132, most Zhongdao Up to upper deck position.
The motor provided in the embodiment of the present invention hangs out method, since motor hangs out approach application in above-mentioned ship, Therefore the motor hangs out method and also has saving deck space, but also the design of channel design 10 and construction are more simple, drop The beneficial effect of low shipyard cost.
The foregoing is only a preferred embodiment of the present invention, is not intended to restrict the invention, for the skill of this field For art personnel, the invention may be variously modified and varied.All within the spirits and principles of the present invention, made any to repair Change, equivalent replacement, improvement etc., should all be included in the protection scope of the present invention.

Claims (9)

1. a kind of channel design characterized by comprising
The channel limited by ship siding,
For covering the hatchcover platform in the channel, hatchcover platform side offers the through-hole for crewman's disengaging;
The attachment device of detachably connected the hatchcover platform and the ship siding;
The erecting by overhang of the hatchcover platform is connected, the top surface of the hatchcover platform is arranged in the erecting by overhang;
The channel design includes two hatchcover platforms, and two hatchcover platforms are handed over along the length direction in the channel Mistake setting;The through-hole of two hatchcover platforms is located at the same side of the ship siding.
2. channel design according to claim 1, it is characterised in that:
The hatchcover platform is made of steel plate welding.
3. channel design according to claim 1, it is characterised in that:
The hatchcover platform base is additionally provided with reinforcing rib.
4. channel design according to claim 1, it is characterised in that:
The attachment device is set as screw bolt, and the hatchcover platform is connected with the ship siding by the screw bolt It connects.
5. channel design according to claim 1, it is characterised in that:
The erecting by overhang includes the orderliness that hatchcover platform top surface is arranged in.
6. channel design according to claim 1, it is characterised in that:
The channel design further includes the first ladder being connect with the ship siding through the through-hole, the second ladder and the Three ladders;
Upper deck of first ladder one end close to ship, through-hole of the other end close to first hatchcover platform;
Second ladder is staggered side by side with first ladder, second ladder one end close to first ladder, The other end extends to the through hole of second hatchcover platform;
The third ladder is located on the extended line of first ladder, and one end is close to the second ladder, and the other end is along the channel Extend to the direction far from first hatchcover platform.
7. channel design according to claim 6, it is characterised in that:
Second ladder is provided with the first extension close to one end of first ladder;The third ladder is close to described One end of two ladders is provided with the second extension.
8. a kind of ship, it is characterised in that:
The ship includes channel design described in hull and claim 1 to 7 any one;The top of the channel design It is arranged at the deck of the hull;The channel design to the hull interior from extending at the deck of the hull.
9. a kind of motor hangs out method, it is characterised in that:
The motor hangs out approach application in ship according to any one of claims 8;The motor hangs out method
The hatchcover platform is dismantled, and the hatchcover platform is hung out from the channel;
Motor in the ship is hung out by the channel.
CN201710685857.5A 2017-08-11 2017-08-11 A kind of channel design, ship and motor hang out method Active CN107472457B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710685857.5A CN107472457B (en) 2017-08-11 2017-08-11 A kind of channel design, ship and motor hang out method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710685857.5A CN107472457B (en) 2017-08-11 2017-08-11 A kind of channel design, ship and motor hang out method

Publications (2)

Publication Number Publication Date
CN107472457A CN107472457A (en) 2017-12-15
CN107472457B true CN107472457B (en) 2019-08-13

Family

ID=60600150

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710685857.5A Active CN107472457B (en) 2017-08-11 2017-08-11 A kind of channel design, ship and motor hang out method

Country Status (1)

Country Link
CN (1) CN107472457B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109110052B (en) * 2018-08-30 2020-12-01 广船国际有限公司 Manufacturing and mounting method of ship inspection channel

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2000051884A1 (en) * 1999-03-03 2000-09-08 Global Marine Inc. High retraction marine thruster
CN203111460U (en) * 2013-01-29 2013-08-07 大连中远船务工程有限公司 Generator module multifunctional channel for floating production storage and offloading vessel
KR20140049192A (en) * 2012-10-16 2014-04-25 현대중공업 주식회사 Headlight device of drill ship
CN106143795A (en) * 2015-04-08 2016-11-23 江南造船(集团)有限责任公司 The dismounting of a kind of marine generator group and turnover cabin technique
CN206068081U (en) * 2016-08-03 2017-04-05 上海船舶研究设计院 A kind of lifesaving Wheelchair Accessible on rescue ship

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2000051884A1 (en) * 1999-03-03 2000-09-08 Global Marine Inc. High retraction marine thruster
KR20140049192A (en) * 2012-10-16 2014-04-25 현대중공업 주식회사 Headlight device of drill ship
CN203111460U (en) * 2013-01-29 2013-08-07 大连中远船务工程有限公司 Generator module multifunctional channel for floating production storage and offloading vessel
CN106143795A (en) * 2015-04-08 2016-11-23 江南造船(集团)有限责任公司 The dismounting of a kind of marine generator group and turnover cabin technique
CN206068081U (en) * 2016-08-03 2017-04-05 上海船舶研究设计院 A kind of lifesaving Wheelchair Accessible on rescue ship

Also Published As

Publication number Publication date
CN107472457A (en) 2017-12-15

Similar Documents

Publication Publication Date Title
EP0815004A1 (en) Lashing bridge for a containership
CN107472457B (en) A kind of channel design, ship and motor hang out method
CN111098982A (en) Lashing bridge structure of large container ship
CN206278232U (en) Gangway ladder component and ship
CN206826867U (en) Ship deck activity safety protection network
KR101592922B1 (en) Electrical telescopic system for accommodation ladder
CN207617929U (en) A kind of telescopic steel ladder device
CN205977074U (en) Scalable insulating ladder
CN205327341U (en) Marine horizontal manhole protective cover
CN206900602U (en) A kind of device for reducing semisubmersible platform wave and climbing
CN210761185U (en) Retractable inclined ladder for ship
CN107380355A (en) Container ship cargo hold passage
CN208453216U (en) A kind of sea net cage platform is gone up on the stage device
CN207773389U (en) A kind of removable rope ladder and use its ship
CN201109483Y (en) Easy safety barrier pole
CN206634161U (en) A kind of hanging ladder peculiar to vessel
CN208248439U (en) A kind of compartment and boarding bridge of boarding bridge
CN204778217U (en) Safe type fire elevator convenient to flee fast
CN205973686U (en) Marine lift
CN209600739U (en) A kind of ship moon pool operating platform
KR20030089053A (en) Stair to go on board a ship to disembark
CN204279874U (en) Hatch coaming anchor fitting
CN215889893U (en) Oil-immersed transformer ladder
CN210526786U (en) Marine bow boarding ladder and ship
CN214729501U (en) Marine fan platform safety board ladder of stepping on

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant