CN107470860A - A kind of building technology of offshore boosting station lower component - Google Patents

A kind of building technology of offshore boosting station lower component Download PDF

Info

Publication number
CN107470860A
CN107470860A CN201710580887.XA CN201710580887A CN107470860A CN 107470860 A CN107470860 A CN 107470860A CN 201710580887 A CN201710580887 A CN 201710580887A CN 107470860 A CN107470860 A CN 107470860A
Authority
CN
China
Prior art keywords
singletree
steel
hound
welding
pipe pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710580887.XA
Other languages
Chinese (zh)
Other versions
CN107470860B (en
Inventor
朱军
胡静波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nantong Taisheng Blue Island Offshore Co Ltd
Original Assignee
Nantong Lan Dao Ocean Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nantong Lan Dao Ocean Engineering Co Ltd filed Critical Nantong Lan Dao Ocean Engineering Co Ltd
Priority to CN201710580887.XA priority Critical patent/CN107470860B/en
Publication of CN107470860A publication Critical patent/CN107470860A/en
Priority to PCT/CN2017/119682 priority patent/WO2019015260A1/en
Application granted granted Critical
Publication of CN107470860B publication Critical patent/CN107470860B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P15/00Making specific metal objects by operations not covered by a single other subclass or a group in this subclass
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03DWIND MOTORS
    • F03D13/00Assembly, mounting or commissioning of wind motors; Arrangements specially adapted for transporting wind motor components
    • F03D13/20Arrangements for mounting or supporting wind motors; Masts or towers for wind motors
    • F03D13/25Arrangements for mounting or supporting wind motors; Masts or towers for wind motors specially adapted for offshore installation

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Butt Welding And Welding Of Specific Article (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a kind of building technology of offshore boosting station lower component, its step are as follows:(1)Steel plate presses jacking figure blanking;(2)Line, beveling and cutting;(3)Make steel-pipe pile, singletree and hound;(4)Close up welded steel pipe pile, singletree, hound.The present invention closes up welding by vertical again after each segmentation first horizontal construction, building technology orderliness is orderly, efficiency of construction is greatly improved, ensure that the support steadiness that bottom is set up, so as to ensure that the longtime running of offshore boosting station is safeguarded, and steel-pipe pile includes vertical portion and intilted rake, the supportive of lower component is substantially increased, is not susceptible to tilt, it is high to edge rolling and split requirement, using high, few without arc light, flue dust using submerged-arc welding, welding quality stable, welding productivity;Rationally reserved welding surplus, ensures welding quality and welding precision, substantially increases the supportive of lower component, certain stability is brought to whole offshore boosting station.

Description

A kind of building technology of offshore boosting station lower component
Technical field
The invention belongs to marine transportation manufacturing field, and in particular to a kind of building technology of offshore boosting station lower component.
Background technology
With the huge consumption of fossil energy and the serious pollution of environment, it is each that regenerative resource receives the world more and more The concern of state, wind energy turns into most one of new energy of competitiveness, and compared to land wind-powered electricity generation, offshore wind farm is not only not take up soil money Source, and energy abundance, stable, utilization rate height of contributing, it has also become the new direction of world's Wind Power Development.At present, China is built If the most offshore 10-30km of coastal waters wind-powered electricity generation, project planning capacity is 200-300kw, by more 3mw-6mw offshore wind turbines groups Generate electricity, power transmission is concentrated to offshore boosting station via submarine cable current collection link, then the main transformer boosting through offshore boosting station is sent To transformer station on the bank complete electric power send out, therefore, offshore boosting station turn into offshore wind farm generate electricity send out most important link it One.
Lower component plays the effect of supportive to whole offshore boosting station, thus the edge rolling to lower component, cutting, The requirement welded, make and closed up is very strict, when traditional offshore boosting station lower component is built, has the disadvantage that: Because structure is larger when lower component is built, lower component monoblock type construction difficulty is bigger, takes time and effort simultaneously, and step is complicated In disorder and low to edge rolling and split requirement during construction, welding is unstable, poor welding quality, largely reducing lower component Precision and supportive are connected, certain unstability is brought to whole offshore boosting station.
The content of the invention
In view of the above-mentioned deficiencies in the prior art, it is an object of the present invention to now provide, a kind of processing step orderliness is orderly, and manufacture is smart Degree is high, improves efficiency of construction, improves the building technology of the offshore boosting station lower component of stability.
In order to solve the above technical problems, the technical solution adopted by the present invention is:A kind of offshore boosting station lower component is built Make technique, lower component is one to be vertically arranged and its lower end extends to the jacket of the following supporting course of sea bed, and jacket includes more Individual steel-pipe pile, steel-pipe pile include vertical portion and rake, and the lower end of the rake and the upper end of vertical portion connect, tilted simultaneously The upper end in portion, which slopes inwardly, to be set, and the rake of multiple steel-pipe piles is corresponding in turn to setting, while the upper end position in adjacent inclined portion Between, the first singletree, the second singletree, the 3rd singletree are respectively equipped between medium position, between lower end position, it is adjacent to incline Two hounds arranged in a crossed manner are provided between inclined portion, the center of hound is connected with the center of the second singletree, multiple inclinations A platform is provided between the upper end in portion, the platform is placed in the top position of the first singletree, while the outer ring of the platform is set respectively There is fence, the rake upper end of any steel-pipe pile is provided with the vertically arranged cat ladder of a book;
A kind of building technology of offshore boosting station lower component, first be respectively segmented after horizontal construction again it is vertical close up welding, its step It is as follows:(1)Steel plate presses jacking figure blanking;(2)Line, beveling and cutting;(3)Make steel-pipe pile, singletree and hound;(4) Close up welded steel pipe pile, singletree, hound.
Further, it is comprised the following steps that:
(1)Steel plate presses jacking figure blanking:According to jacking figure blanking, cutting drawing and cutting instruction repertorie are carefully checked before cutting, is kept away Exempt from miscut, to be made a record in cutting process, every block of steel plate of cutting will check steel plate furnace lot number, make a record, in addition Every piece of part of well cutting will have corresponding mark, not repeat to cut, and the sheet material and clout of well cutting will reasonable heaps in batches Put;
(2)Line, beveling and cutting:The line of jacket stull pipe and down tube is very crucial, and important line must pass through electricity Brain cutting instruction repertorie produces, and is powder marking in cutting stock, and content includes cylinder inside and outside the support tube of bevel cut Line is examined in longitudinal direction etc. point up and down of intersection and detected size, and determines test point and cut point, to all inspection lines and pass Key point, it is required to be marked with ocean punching;Welding groove, diagonal brace are correctly cut according to the details in jacking figure and construction drawing Pipe intersection and its groove hand cut again after cylinder splicing;
(3)Make steel-pipe pile, singletree and hound:The drawing provided first according to design department is checked and is familiar with each piece The machined parameters of sheet material, the processing dimension of each block of plate is controlled after processing, sheet material edge rolling direction both ends are respectively added with 100mm processing Surplus;Secondly, suitable attitude is rotated according to steel-pipe pile, singletree, the diameter of hound, wall thickness, then rolled, Roll to be positioned on veneer reeling machine and disposably complete;Again, the weld seam between steel-pipe pile, singletree and hound is welded Connect, after the completion of welding, check the circularity of steel-pipe pile, singletree and hound;
(4)Close up welded steel pipe pile, singletree, hound:Have good positioning after steel-pipe pile, lift singletree and hound respectively, Spot welding singletree and hound after lifting in place;The middle part surplus of hound is cut, and passes through circumferential weld with singletree medium position Spot welding positions;Lincoln weld is used when welded steel pipe pile and singletree, first welding bead is cleaned out before welding, it is first right during welding Welded on the inside of cylinder, then outside carbon plane back chipping, capping, during positioning, the twice longitudinal plate in adjacent cylinder, which is sewed on down, to be staggered 90 °, the weld seam that lateral loops are stitched to rare more than 50mm is overlapping, and the strengthening of welded seam in beginning and end region must not exceed 3mm.
Beneficial effects of the present invention are as follows:
1st, welding is closed up by vertical again after each segmentation first horizontal construction when the present invention builds lower component, building technology orderliness has Sequence, greatly improves efficiency of construction, and the jacket of lower component passes through steel-pipe pile, the first singletree, the second singletree, the 3rd stull The setting of bar and hound, the support steadiness that bottom is set up is ensure that, so as to ensure that the longtime running of offshore boosting station is tieed up Shield, and steel-pipe pile includes vertical portion and intilted rake, substantially increases the supportive of lower component, is not susceptible to Tilt.
2nd, steel plate is included when lower component is built by the blanking of jacking figure, line beveling and cutting, making steel-pipe pile and singletree And hound, close up the step such as welded steel pipe pile and singletree one-level hound, and it is high to edge rolling and split requirement, using adopting It is high, few without arc light, flue dust with submerged-arc welding, welding quality stable, welding productivity;Rationally reserved welding surplus, ensures welding matter Amount and welding precision, substantially increase the supportive of lower component, certain stability are brought to whole offshore boosting station.
Brief description of the drawings
Fig. 1 is a kind of structural representation of the lower component of the building technology of offshore boosting station lower component of the present invention.
Embodiment
Embodiments of the present invention are illustrated by particular specific embodiment below, those skilled in the art can be by this explanation Content disclosed by book understands other advantages and effect of the present invention easily.
As shown in Fig. 1, a kind of building technology of offshore boosting station lower component, the lower component is vertically arranged for one And its lower end extends to the jacket of the following supporting course of sea bed, the jacket includes multiple steel-pipe piles, and the steel-pipe pile includes Vertical portion and rake, the lower end of the rake and the upper end of vertical portion are connected, while the upper end inward slant of rake is set Put, the rake of the multiple steel-pipe pile is corresponding in turn to setting, while between the upper end position in adjacent inclined portion, medium position it Between, be respectively equipped with the first singletree, the second singletree, the 3rd singletree between lower end position, be provided with and hand between adjacent inclined portion Pitch two hounds set, the center of hound is connected with the center of the second singletree, the upper end of the multiple rake it Between be provided with a platform, the platform is placed in the top position of the first singletree, while the outer ring of the platform is respectively equipped with fence, any The rake upper end of steel-pipe pile is provided with the vertically arranged cat ladder of a book;
A kind of building technology of offshore boosting station lower component, first be respectively segmented after horizontal construction again it is vertical close up welding, its step It is as follows:(1)Steel plate presses jacking figure blanking;(2)Line, beveling and cutting;(3)Make steel-pipe pile, singletree and hound;(4) Close up welded steel pipe pile, singletree, hound.
It is comprised the following steps that:
(1)Steel plate presses jacking figure blanking:According to jacking figure blanking, cutting drawing and cutting instruction repertorie are carefully checked before cutting, is kept away Exempt from miscut, to be made a record in cutting process, every block of steel plate of cutting will check steel plate furnace lot number, make a record, in addition Every piece of part of well cutting will have corresponding mark, not repeat to cut, and the sheet material and clout of well cutting will reasonable heaps in batches Put;
(2)Line, beveling and cutting:The line of jacket stull pipe and down tube is very crucial, and important line must pass through electricity Brain cutting instruction repertorie produces, and is powder marking in cutting stock, and content includes cylinder inside and outside the support tube of bevel cut Line is examined in longitudinal direction etc. point up and down of intersection and detected size, and determines test point and cut point, to all inspection lines and pass Key point, it is required to be marked with ocean punching;Welding groove, diagonal brace are correctly cut according to the details in jacking figure and construction drawing Pipe intersection and its groove hand cut again after cylinder splicing;
(3)Make steel-pipe pile, singletree and hound:The drawing provided first according to design department is checked and is familiar with each piece The machined parameters of sheet material, the processing dimension of each block of plate is controlled after processing, sheet material edge rolling direction both ends are respectively added with 100mm processing Surplus;Secondly, suitable attitude is rotated according to steel-pipe pile, singletree, the diameter of hound, wall thickness, then rolled, Roll to be positioned on veneer reeling machine and disposably complete;Again, the weld seam between steel-pipe pile, singletree and hound is welded Connect, after the completion of welding, check the circularity of steel-pipe pile, singletree and hound;
(4)Close up welded steel pipe pile, singletree, hound:Have good positioning after steel-pipe pile, lift singletree and hound respectively, Spot welding singletree and hound after lifting in place;The middle part surplus of hound is cut, and passes through circumferential weld with singletree medium position Spot welding positions;Lincoln weld is used when welded steel pipe pile and singletree, first welding bead is cleaned out before welding, it is first right during welding Welded on the inside of cylinder, then outside carbon plane back chipping, capping, during positioning, the twice longitudinal plate in adjacent cylinder, which is sewed on down, to be staggered 90 °, the weld seam that lateral loops are stitched to rare more than 50mm is overlapping, and the strengthening of welded seam in beginning and end region must not exceed 3mm.
Close up welding, building technology orderliness by vertical again after each segmentation first horizontal construction when the present invention builds lower component In order, efficiency of construction is greatly improved, the jacket of lower component passes through steel-pipe pile, the first singletree, the second singletree, the 3rd horizontal stroke The setting of strut and hound, the support steadiness that bottom is set up is ensure that, so as to ensure the longtime running of offshore boosting station Safeguard, and steel-pipe pile includes vertical portion and intilted rake, substantially increases the supportive of lower component, is not easy to send out It is raw to tilt.
Include when lower component is built steel plate by the blanking of jacking figure, line beveling and cutting, make steel-pipe pile and singletree with And hound, close up the step such as welded steel pipe pile and singletree one-level hound, and it is high to edge rolling and split requirement, using use Submerged-arc welding, welding quality stable, welding productivity are high, few without arc light, flue dust;Rationally reserved welding surplus, ensures welding quality And welding precision, the supportive of lower component is substantially increased, certain stability is brought to whole offshore boosting station.
Above-described embodiment is presently preferred embodiments of the present invention, is not the limitation to technical solution of the present invention, as long as The technical scheme that can be realized on the basis of above-described embodiment without creative work, it is regarded as falling into patent of the present invention Rights protection scope in.

Claims (2)

  1. A kind of 1. building technology of offshore boosting station lower component, it is characterised in that:The lower component be one be vertically arranged and Its lower end extends to the jacket of the following supporting course of sea bed, and the jacket includes multiple steel-pipe piles, and the steel-pipe pile includes perpendicular Straight portion and rake, the lower end of the rake and the upper end of vertical portion are connected, while the upper end inward slant of rake is set, The rake of the multiple steel-pipe pile is corresponding in turn to setting, at the same between the upper end position in adjacent inclined portion, between medium position, The first singletree, the second singletree, the 3rd singletree are respectively equipped between lower end position, adjacent inclined is set between portion provided with intersection Two hounds put, the center of hound are connected with the center of the second singletree, set between the upper end of the multiple rake There is a platform, the platform is placed in the top position of the first singletree, while the outer ring of the platform is respectively equipped with fence, any steel pipe The rake upper end of stake is provided with the vertically arranged cat ladder of a book;
    A kind of building technology of offshore boosting station lower component, first be respectively segmented after horizontal construction again it is vertical close up welding, its step It is as follows:(1)Steel plate presses jacking figure blanking;(2)Line, beveling and cutting;(3)Make steel-pipe pile, singletree and hound;(4) Close up welded steel pipe pile, singletree, hound.
  2. A kind of 2. building technology of offshore boosting station lower component according to claim 1, it is characterised in that:Its specific steps It is as follows:
    (1)Steel plate presses jacking figure blanking:According to jacking figure blanking, cutting drawing and cutting instruction repertorie are carefully checked before cutting, is kept away Exempt from miscut, to be made a record in cutting process, every block of steel plate of cutting will check steel plate furnace lot number, make a record, in addition Every piece of part of well cutting will have corresponding mark, not repeat to cut, and the sheet material and clout of well cutting will reasonable heaps in batches Put;
    (2)Line, beveling and cutting:The line of jacket stull pipe and down tube is very crucial, and important line must pass through electricity Brain cutting instruction repertorie produces, and is powder marking in cutting stock, and content includes cylinder inside and outside the support tube of bevel cut Line is examined in longitudinal direction etc. point up and down of intersection and detected size, and determines test point and cut point, to all inspection lines and pass Key point, it is required to be marked with ocean punching;Welding groove, diagonal brace are correctly cut according to the details in jacking figure and construction drawing Pipe intersection and its groove hand cut again after cylinder splicing;
    (3)Make steel-pipe pile, singletree and hound:The drawing provided first according to design department is checked and is familiar with each piece The machined parameters of sheet material, the processing dimension of each block of plate is controlled after processing, sheet material edge rolling direction both ends are respectively added with 100mm processing Surplus;Secondly, suitable attitude is rotated according to steel-pipe pile, singletree, the diameter of hound, wall thickness, then rolled, Roll to be positioned on veneer reeling machine and disposably complete;Again, the weld seam between steel-pipe pile, singletree and hound is welded Connect, after the completion of welding, check the circularity of steel-pipe pile, singletree and hound;
    (4)Close up welded steel pipe pile, singletree, hound:Have good positioning after steel-pipe pile, lift singletree and hound respectively, Spot welding singletree and hound after lifting in place;The middle part surplus of hound is cut, and passes through circumferential weld with singletree medium position Spot welding positions;Lincoln weld is used when welded steel pipe pile and singletree, first welding bead is cleaned out before welding, it is first right during welding Welded on the inside of cylinder, then outside carbon plane back chipping, capping, during positioning, the twice longitudinal plate in adjacent cylinder, which is sewed on down, to be staggered 90 °, the weld seam that lateral loops are stitched to rare more than 50mm is overlapping, and the strengthening of welded seam in beginning and end region must not exceed 3mm.
CN201710580887.XA 2017-07-17 2017-07-17 A kind of building technology of offshore boosting station lower component Active CN107470860B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201710580887.XA CN107470860B (en) 2017-07-17 2017-07-17 A kind of building technology of offshore boosting station lower component
PCT/CN2017/119682 WO2019015260A1 (en) 2017-07-17 2017-12-29 Construction process of lower assembly of offshore voltage booster substation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710580887.XA CN107470860B (en) 2017-07-17 2017-07-17 A kind of building technology of offshore boosting station lower component

Publications (2)

Publication Number Publication Date
CN107470860A true CN107470860A (en) 2017-12-15
CN107470860B CN107470860B (en) 2019-05-21

Family

ID=60596666

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710580887.XA Active CN107470860B (en) 2017-07-17 2017-07-17 A kind of building technology of offshore boosting station lower component

Country Status (2)

Country Link
CN (1) CN107470860B (en)
WO (1) WO2019015260A1 (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108487212A (en) * 2018-03-13 2018-09-04 海洋石油工程股份有限公司 Jacket skirt pile sleeve combines sheet of hoisting
CN109137867A (en) * 2018-10-11 2019-01-04 江苏长风海洋装备制造有限公司 One kind, which is made and lies on one's side for large jacket side, builds transportation technology
WO2019015260A1 (en) * 2017-07-17 2019-01-24 南通蓝岛海洋工程有限公司 Construction process of lower assembly of offshore voltage booster substation
CN110790122A (en) * 2019-11-15 2020-02-14 南通泰胜蓝岛海洋工程有限公司 Main lifting lug for booster station project and construction process of main lifting lug
CN111015103A (en) * 2019-12-13 2020-04-17 南通泰胜蓝岛海洋工程有限公司 Folding process and positioning tool for offshore booster station
CN111604643A (en) * 2020-05-08 2020-09-01 友联船厂(蛇口)有限公司 Manufacturing and mounting process of crane upright column for ship and ocean engineering
CN112872729A (en) * 2021-01-14 2021-06-01 中铁工程设计咨询集团有限公司 Manufacturing method and assembling method of straddle type single-rail steel-concrete combined track beam stable surface component
CN114704436A (en) * 2022-06-06 2022-07-05 华电曹妃甸重工装备有限公司 Offshore wind power jacket construction system and method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3825076A (en) * 1973-02-09 1974-07-23 Brown & Root Pile mounted drilling rig and method
CN202492833U (en) * 2012-03-30 2012-10-17 广东省电力设计研究院 Double-platform offshore booster station
CN103556649A (en) * 2013-11-08 2014-02-05 广东明阳风电产业集团有限公司 Jacket leveling mechanism of offshore wind turbine generator system
CN103624488A (en) * 2013-11-15 2014-03-12 南通润邦重机有限公司 Technology for manufacturing pile leg of self-elevating offshore wind power work platform
CN105019419A (en) * 2015-06-29 2015-11-04 中国能源建设集团广东省电力设计研究院有限公司 Guide pipe frame, guide pipe frame foundation platform and guide pipe frame construction method
CN205894049U (en) * 2016-07-29 2017-01-18 中国电建集团华东勘测设计研究院有限公司 A first pitching pile formula jacket structure for marine booster station
CN206298888U (en) * 2016-11-30 2017-07-04 中国电建集团华东勘测设计研究院有限公司 For the pin shoe jacket structure of offshore boosting station

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107470860B (en) * 2017-07-17 2019-05-21 南通蓝岛海洋工程有限公司 A kind of building technology of offshore boosting station lower component

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3825076A (en) * 1973-02-09 1974-07-23 Brown & Root Pile mounted drilling rig and method
CN202492833U (en) * 2012-03-30 2012-10-17 广东省电力设计研究院 Double-platform offshore booster station
CN103556649A (en) * 2013-11-08 2014-02-05 广东明阳风电产业集团有限公司 Jacket leveling mechanism of offshore wind turbine generator system
CN103624488A (en) * 2013-11-15 2014-03-12 南通润邦重机有限公司 Technology for manufacturing pile leg of self-elevating offshore wind power work platform
CN105019419A (en) * 2015-06-29 2015-11-04 中国能源建设集团广东省电力设计研究院有限公司 Guide pipe frame, guide pipe frame foundation platform and guide pipe frame construction method
CN205894049U (en) * 2016-07-29 2017-01-18 中国电建集团华东勘测设计研究院有限公司 A first pitching pile formula jacket structure for marine booster station
CN206298888U (en) * 2016-11-30 2017-07-04 中国电建集团华东勘测设计研究院有限公司 For the pin shoe jacket structure of offshore boosting station

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019015260A1 (en) * 2017-07-17 2019-01-24 南通蓝岛海洋工程有限公司 Construction process of lower assembly of offshore voltage booster substation
CN108487212A (en) * 2018-03-13 2018-09-04 海洋石油工程股份有限公司 Jacket skirt pile sleeve combines sheet of hoisting
CN109137867A (en) * 2018-10-11 2019-01-04 江苏长风海洋装备制造有限公司 One kind, which is made and lies on one's side for large jacket side, builds transportation technology
CN110790122A (en) * 2019-11-15 2020-02-14 南通泰胜蓝岛海洋工程有限公司 Main lifting lug for booster station project and construction process of main lifting lug
CN111015103A (en) * 2019-12-13 2020-04-17 南通泰胜蓝岛海洋工程有限公司 Folding process and positioning tool for offshore booster station
CN111015103B (en) * 2019-12-13 2021-11-26 南通泰胜蓝岛海洋工程有限公司 Folding process and positioning tool for offshore booster station
CN111604643A (en) * 2020-05-08 2020-09-01 友联船厂(蛇口)有限公司 Manufacturing and mounting process of crane upright column for ship and ocean engineering
CN111604643B (en) * 2020-05-08 2021-06-15 友联船厂(蛇口)有限公司 Manufacturing and mounting process of crane upright column for ship and ocean engineering
CN112872729A (en) * 2021-01-14 2021-06-01 中铁工程设计咨询集团有限公司 Manufacturing method and assembling method of straddle type single-rail steel-concrete combined track beam stable surface component
CN114704436A (en) * 2022-06-06 2022-07-05 华电曹妃甸重工装备有限公司 Offshore wind power jacket construction system and method

Also Published As

Publication number Publication date
CN107470860B (en) 2019-05-21
WO2019015260A1 (en) 2019-01-24

Similar Documents

Publication Publication Date Title
CN107470860A (en) A kind of building technology of offshore boosting station lower component
CN202155668U (en) Multifunctional welding machine frame for welding soldering seam outside barrel body of wind power generation tower barrel
CN107401175B (en) A kind of method of construction of the upper guide pipe support of six pile leaders frame
CN105643048A (en) Manufacturing technology for long large-diameter LSAW (longitudinal submerged arc welding) pile pipe for ocean platform
CN201385181Y (en) Fillet weld dedicated welding bracket for manufacturing wind generating set tower
CN110576939A (en) Construction method for large conical cylinder segments
CN102848056A (en) Field welding method for wall boards of steel lining of nuclear power plant
CN203944985U (en) A kind of special plasma welding machine that welds cylindrical shell seam crossing
CN201913423U (en) Multifunctional standard section overturning tool
CN218597884U (en) Tower section of thick bamboo seam supports reinforcing apparatus
CN212552532U (en) Wind power tower cylinder terminal surface butt welding device convenient to alignment
CN208083108U (en) Alignment tool and round member alignment tool
CN204673137U (en) A kind of tower cylinder welding hoistable platform
CN204735829U (en) Separator head circumferential weld weldment work station
CN204018979U (en) A kind of device of being convenient to weld the outer circumferential weld of foundation ring lower flange
CN114012372A (en) Construction method of super-large-diameter single-pile composite cylinder
CN203062067U (en) Base ring angle weld joint welding positioner of wind power generation tower drum
CN217193202U (en) Portal formula welded platform device that can walk and go up and down
CN206435905U (en) A kind of floating tool for grid plate weld with positioning function
CN206984058U (en) A kind of construction MPV
CN217024620U (en) Foil coil feeding device
CN206567659U (en) A kind of portable circle-cutting machine for being applied to circular thick plates cutting
CN203304754U (en) Automatic submerged arc welding device for tank
CN205950071U (en) Welding set suitable for circular welding seam orbit of large -scale gasifier
CN206445383U (en) The underframe of wind-power tower foundation ring weld holder

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 226200 No. 1, Blue Island Road, marine industrial park, Qidong, Nantong, Jiangsu

Patentee after: Nantong Taisheng blue island ocean engineering Co., Ltd

Address before: 226200 Jiangsu city of Nantong Province town Qidong City Lan Yin Road No. 1

Patentee before: Nantong Lan Dao ocean engineering Co., Ltd

CP03 Change of name, title or address