CN107470059A - A kind of hardware sheet material spray-painting plant - Google Patents
A kind of hardware sheet material spray-painting plant Download PDFInfo
- Publication number
- CN107470059A CN107470059A CN201710674355.2A CN201710674355A CN107470059A CN 107470059 A CN107470059 A CN 107470059A CN 201710674355 A CN201710674355 A CN 201710674355A CN 107470059 A CN107470059 A CN 107470059A
- Authority
- CN
- China
- Prior art keywords
- bolted connection
- sheet material
- plate
- casing
- hardware sheet
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B05—SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
- B05B—SPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
- B05B13/00—Machines or plants for applying liquids or other fluent materials to surfaces of objects or other work by spraying, not covered by groups B05B1/00 - B05B11/00
- B05B13/02—Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B05—SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
- B05B—SPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
- B05B13/00—Machines or plants for applying liquids or other fluent materials to surfaces of objects or other work by spraying, not covered by groups B05B1/00 - B05B11/00
- B05B13/02—Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work
- B05B13/0221—Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work characterised by the means for moving or conveying the objects or other work, e.g. conveyor belts
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B05—SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
- B05B—SPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
- B05B13/00—Machines or plants for applying liquids or other fluent materials to surfaces of objects or other work by spraying, not covered by groups B05B1/00 - B05B11/00
- B05B13/02—Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work
- B05B13/04—Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work the spray heads being moved during spraying operation
- B05B13/0405—Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work the spray heads being moved during spraying operation with reciprocating or oscillating spray heads
- B05B13/041—Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work the spray heads being moved during spraying operation with reciprocating or oscillating spray heads with spray heads reciprocating along a straight line
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B05—SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
- B05B—SPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
- B05B14/00—Arrangements for collecting, re-using or eliminating excess spraying material
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B05—SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
- B05B—SPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
- B05B9/00—Spraying apparatus for discharge of liquids or other fluent material, without essentially mixing with gas or vapour
- B05B9/03—Spraying apparatus for discharge of liquids or other fluent material, without essentially mixing with gas or vapour characterised by means for supplying liquid or other fluent material
- B05B9/04—Spraying apparatus for discharge of liquids or other fluent material, without essentially mixing with gas or vapour characterised by means for supplying liquid or other fluent material with pressurised or compressible container; with pump
- B05B9/0403—Spraying apparatus for discharge of liquids or other fluent material, without essentially mixing with gas or vapour characterised by means for supplying liquid or other fluent material with pressurised or compressible container; with pump with pumps for liquids or other fluent material
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B05—SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
- B05D—PROCESSES FOR APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
- B05D3/00—Pretreatment of surfaces to which liquids or other fluent materials are to be applied; After-treatment of applied coatings, e.g. intermediate treating of an applied coating preparatory to subsequent applications of liquids or other fluent materials
- B05D3/04—Pretreatment of surfaces to which liquids or other fluent materials are to be applied; After-treatment of applied coatings, e.g. intermediate treating of an applied coating preparatory to subsequent applications of liquids or other fluent materials by exposure to gases
- B05D3/0406—Pretreatment of surfaces to which liquids or other fluent materials are to be applied; After-treatment of applied coatings, e.g. intermediate treating of an applied coating preparatory to subsequent applications of liquids or other fluent materials by exposure to gases the gas being air
- B05D3/0413—Heating with air
Landscapes
- Details Or Accessories Of Spraying Plant Or Apparatus (AREA)
- Spray Control Apparatus (AREA)
Abstract
The present invention relates to a kind of spray-painting plant, more particularly to a kind of hardware sheet material spray-painting plant.The technical problem to be solved in the present invention is to provide it is a kind of it is time saving and energy saving, spray painting speed is fast, the paint that can be dropped is collected and saves paint, also has the hardware sheet material spray-painting plant to paint progress air-drying function.In order to solve the above-mentioned technical problem, the invention provides such a hardware sheet material spray-painting plant, bottom plate, collection frame, support plate, the first casing, hopper, paint pump, transverse slat etc. are included;Bottom plate crown center is provided with collection frame by bolted connection, and passing on left bolted mode at the top of bottom plate is provided with support plate, and support plate right flank bottom is provided with mobile device.The present invention can be carried out turning face to hardware sheet material and then hardware sheet material is comprehensively painted by rotating device, reach that time saving and energy saving, spray painting speed is fast, and the paint that can be dropped is collected and saves paint, also has the effect to painting progress air-drying function.
Description
Technical field
The present invention relates to a kind of spray-painting plant, more particularly to a kind of hardware sheet material spray-painting plant.
Background technology
Hardware:Traditional hardware, also referred to as " hardware ".Refer to five kinds of gold, silver, copper, iron, tin metals.Through artificial
The arts work such as knife, sword or metal device can be made.The hardware of modern society is more extensive, such as hardware & tools, hardware zero
Part, haberdashery and hardware, architectural hardware and security protection articles for use etc..Hardware product is not mostly final consumption product.
In the manufacture craft of hardware sheet material, final step can all be painted to hardware sheet material, and then make hardware sheet material
Preferably use, it is while more attractive, and when manually being painted to hardware sheet material, waste time and energy, speed of painting it is slow, painting
Cheng Zhong, the paint not being sprayed on hardware sheet material drop and cause to waste, therefore need a kind of time saving and energy saving, spray painting speed of research and development badly
It hurry up, the paint that can be dropped is collected and saves paint, also has the hardware sheet material spray-painting plant that air-drying function is carried out to paint.
The content of the invention
(1)Technical problems to be solved
The present invention is to overcome to hardware sheet material when manually painting, waste time and energy, speed of painting it is slow, in painting process,
The shortcomings that paint not being sprayed on hardware sheet material drops and causes to waste, the technical problem to be solved in the present invention is to provide one kind to save
Shi Shengli, spray painting speed are fast, and the paint that can be dropped is collected and saves paint, also have the hardware that air-drying function is carried out to paint
Sheet material spray-painting plant.
(2)Technical scheme
In order to solve the above-mentioned technical problem, the invention provides such a hardware sheet material spray-painting plant, include bottom plate, collect
Frame, support plate, the first casing, hopper, paint pump, transverse slat, fixed cover, the first shower nozzle, discharge nozzle, top plate, clamping device and shifting
Dynamic device, bottom plate crown center are provided with collection frame, passed on left at the top of bottom plate bolted by bolted connection
Mode is provided with support plate, and support plate right flank bottom is provided with mobile device, transverse slat, transverse slat are connected with the moving parts of mobile device
Top right side is provided with fixed cover by bolted connection, and support plate left surface bottom is provided with by bolted connection
First casing, the first casing top pass on left bolted mode and are provided with hopper, and hopper in the first casing with connecting
It is logical, paint pump is installed by bolted connection among the first casing inner bottom part, discharge nozzle, discharge nozzle are provided with fixed cover
Wherein one end is connected among the first casing top with paint pump, and the discharge nozzle other end is provided with by bolted connection
First shower nozzle, for the first shower nozzle with being connected in discharge nozzle, the first shower nozzle is located at collection frame upper left side, is bolted at the top of support plate
Mode top plate is installed, clamping device is provided among top plate bottom, clamping device is located at collection frame surface.
Preferably, clamping device includes cylinder, fixed plate, clamping bar and connecting rod, and top plate bottom left is bolted
Mode cylinder is installed, cylinder is in being vertically arranged, and symmetrical expression is installed by way of pin connection on the expansion link of cylinder
There is clamping bar, left and right sides clamping bar is cooperated, and clamping bar is located at directly over collection frame, and bottom is all connected by bolt at left and right sides of cylinder
The mode connect is provided with fixed plate, between left side fixed plate bottom left and left side clamping bar lateral surface by way of pin connection
Connecting rod is connected with, the mode connected between right side fixed plate bottom right and right side clamping bar lateral surface also by pin is connected with
Bar.
Preferably, mobile device includes slide rail, sliding block, Electric Motor Wheel, driven pulley and bracing wire, and support plate right flank bottom passes through
Bolted mode is provided with slide rail, and for slide rail in being vertically arranged, slide rail is provided with the sliding block coordinated with it, and sliding block is slided with slide rail
Dynamic to coordinate, sliding block right flank middle part is connected with transverse slat left surface by bolted connection, and slide rail leading flank top passes through spiral shell
Tether the mode connect and Electric Motor Wheel is installed, slide rail leading flank bottom is provided with driven pulley, sliding block top by bolted connection
Bracing wire is connected with the left of portion, bracing wire tail end is around Electric Motor Wheel and driven pulley with being connected on the left of slider bottom.
Preferably, also include rotating device, rotating device include bearing block, rotating shaft, first gear, the first motor,
Second gear and installing plate, top plate bottom left are provided with bearing block by bolted connection, are provided with and turn in bearing block
Axle, bearing of the rotating shaft by way of interference connection and in bearing block are connected, and rotating shaft bottom is installed by bolted connection
There is installing plate, installing plate is connected with cylinder head by bolted connection among bottom, and rotating shaft bottom is bolted
Mode first gear is installed, top plate bottom left is provided with the first motor, the first motor position by bolted connection
On the left of the bearing block, for the first motor in being vertically arranged, the output shaft of the first motor is connected with second gear by shaft coupling, and second
Gear is located on the left of first gear, and second gear engages with first gear.
Preferably, also include air-dry apparatus, air-dry apparatus include the second casing, air pump, escape pipe, the second shower nozzle,
Heating wire and riser, top plate bottom right are provided with riser by bolted connection, and riser left surface bottom passes through bolt
The mode of connection is provided with the second casing, and air pump, air pump are provided with by bolted connection among the second casing inner bottom part
On be connected with escape pipe, escape pipe tail end is located on the right side of clamping bar through the second casing left lower, and escape pipe tail end passes through bolt
The mode of connection is provided with the second shower nozzle, the second shower nozzle with being connected in escape pipe, what the second casing inner top was bolted
Mode is provided with heating wire.
Preferably, the first travel switch and the second travel switch are also included, slide rail right flank bottom is connected by screw
Mode the first travel switch is installed, the first travel switch is located at below sliding block, and slide rail right flank top is connected by screw
Mode the second travel switch is installed, the second travel switch is located above sliding block, the second travel switch and the first travel switch
There is circuit to be connected with Electric Motor Wheel.
Preferably, the first block rubber and the second block rubber are also included, left side clamping bar tail end is by bolted connection
First block rubber is installed, right side clamping bar tail end is provided with the second block rubber by bolted connection, the first block rubber with
Second block rubber coordinates.
Preferably, also include reinforcement, reinforcement is connected between top plate bottom and riser left surface, reinforcement is in incline
Tiltedly set, reinforcement wherein one end is connected with top plate bottom right by bolted connection, and the reinforcement other end passes through spiral shell
The mode connect is tethered to be connected with riser left surface top.
Preferably, the material of bottom plate is Q235 steel.
Operation principle:Operating personnel will be painted and be poured into by hopper in the first casing first, then hardware sheet material is passed through
Clamping device is fixed, and makes the wherein one side of hardware sheet material on the right side of the first shower nozzle, you can starts paint pump, paint pump is by first
Paint in casing is pumped into discharge nozzle, and then the paint in discharge nozzle is sprayed by the first shower nozzle, and paint is sprayed to five golden plates
Material is painted, meanwhile, start mobile device, the moving parts band motion plate of mobile device moves up and down, and transverse slat moves up and down
Drive the first shower nozzle to move up and down, and then paint is more fully painted to hardware sheet material.And hardware sheet material is not bonded at
Paint fall in collection frame.After the completion of the wherein one side spray painting of hardware sheet material, paint pump and mobile device are closed, is passed through
Clamping device unclamps hardware sheet material, operating personnel can remove change that another side needs to paint on the right side of the first shower nozzle, then
Fixed by clamping device, by aforesaid operations, you can the side do not painted is painted.When hardware sheet material has all painted
Cheng Hou, mobile device and paint pump are closed, is unclamped hardware sheet material by clamping device, you can remove.And the oil in collection frame
Paint can be taken off reusing.
Because clamping device includes cylinder, fixed plate, clamping bar and connecting rod, the side that top plate bottom left is bolted
Formula is provided with cylinder, and cylinder is in being vertically arranged, and symmetrical expression is provided with folder by way of pin connection on the expansion link of cylinder
Bar, left and right sides clamping bar are cooperated, and clamping bar is located at directly over collection frame, and bottom is all bolted at left and right sides of cylinder
Mode is provided with fixed plate, is connected between left side fixed plate bottom left and left side clamping bar lateral surface by way of pin connection
There is connecting rod, the mode connected between right side fixed plate bottom right and right side clamping bar lateral surface also by pin is connected with connecting rod,
Operating personnel place hardware sheet material between two clamping bars first, and the expansion link for restarting cylinder moves up, and cylinder is stretched
Contracting bar, which moves up to coordinate with connecting rod, drives left and right sides clamping bar end mobile to centre, and then left and right sides clamping bar is by five golden plates
Material is fixed, and closes cylinder, you can hardware sheet material is painted.When hardware sheet material, which needs to change face, continues spray painting, start cylinder
Expansion link move down, you can hardware sheet material is removed and change face spray painting.And after the completion of the spray painting of hardware sheet material, it is again started up
The expansion link of cylinder moves down, you can removes hardware sheet material.
Because mobile device includes slide rail, sliding block, Electric Motor Wheel, driven pulley and bracing wire, support plate right flank bottom passes through spiral shell
Tether the mode connect and slide rail is installed, for slide rail in being vertically arranged, slide rail is provided with the sliding block coordinated with it, and sliding block slides with slide rail
Coordinate, sliding block right flank middle part is connected with transverse slat left surface by bolted connection, and slide rail leading flank top passes through bolt
The mode of connection is provided with Electric Motor Wheel, and slide rail leading flank bottom is provided with driven pulley, slider top by bolted connection
Left side is connected with bracing wire, and bracing wire tail end, with being connected on the left of slider bottom, sprays around Electric Motor Wheel and driven pulley when paint passes through first
When head ejection is painted to hardware sheet material, start Electric Motor Wheel positive and negative alternate and rotate, and then bracing wire band movable slider moves up and down, it is sliding
Block moves up and down band motion plate and moved up and down, and then drives the first shower nozzle to move up and down, and the first shower nozzle, which moves up and down, makes paint more
Comprehensively, uniformly hardware sheet material is painted.When hardware sheet material needs to change face or after the completion of spray painting, closing Electric Motor Wheel is
Can.
Because also including rotating device, rotating device includes bearing block, rotating shaft, first gear, the first motor, second
Gear and installing plate, top plate bottom left are provided with bearing block, rotating shaft are provided with bearing block by bolted connection, turn
Bearing of the axle by way of interference connection and in bearing block connects, and rotating shaft bottom is provided with installation by bolted connection
Plate, installing plate are connected with cylinder head by bolted connection among bottom, and rotating shaft bottom is by bolted connection
First gear is installed, top plate bottom left is provided with the first motor by bolted connection, and the first motor is located at bearing
Seat left side, for the first motor in being vertically arranged, the output shaft of the first motor is connected with second gear, second gear position by shaft coupling
On the left of the first gear, second gear engage with first gear, when hardware sheet material is wherein simultaneously after the completion of spray painting, you can startup the
One motor rotates, and the first motor, which rotates, drives second gear to rotate, and second gear, which rotates, drives first gear to rotate, first gear
Rotational band moves axis of rotation, and axis of rotation drives installing plate to rotate, and then drives installing plate to be rotated with lower component, when hardware sheet material
When that face do not painted is located at the first shower nozzle directly to the right, the first motor is closed, you can it is painted.In this way, without operation
Personnel, which remove hardware sheet material, to carry out changing face, convenient and swift.
Because also including air-dry apparatus, air-dry apparatus includes the second casing, air pump, escape pipe, the second shower nozzle, electric heating
Silk and riser, top plate bottom right are provided with riser by bolted connection, and riser left surface bottom is bolted
Mode the second casing is installed, air pump is installed by bolted connection among the second casing inner bottom part, connected on air pump
Escape pipe is connected to, escape pipe tail end is located on the right side of clamping bar through the second casing left lower, and escape pipe tail end is bolted
Mode the second shower nozzle is installed, the second shower nozzle in escape pipe with connecting, and the second casing inner top is by bolted connection
Heating wire is installed, after the completion of the spray painting of hardware sheet material, you can start heating wire, heating wire heats air, booster air pump, gas
Hot-air is pumped into escape pipe by pump, and then the hot-air in escape pipe is sprayed by the second shower nozzle, and hot-air is sprayed to hardware
Paint drying on sheet material, after the paint on hardware sheet material dries up, close heating wire and air pump, you can take hardware sheet material
Under.In this way, paint rate of drying on hardware sheet material can be made faster, and then improve operating efficiency.
Because also including the first travel switch and the second travel switch, side that slide rail right flank bottom is connected by screw
Formula is provided with the first travel switch, and the first travel switch is located at below sliding block, the side that slide rail right flank top is connected by screw
Formula is provided with the second travel switch, and the second travel switch is located above sliding block, the second travel switch and the first travel switch and electricity
Driving wheel has circuit connection, and when Electric Motor Wheel positive and negative alternate rotates, sliding block drives the first shower nozzle to move up and down by transverse slat, and then makes
Paint more fully paints to hardware sheet material, when sliding block moves down, sliding block and the first stroke switch contact, and Jin Er electricity
Driving wheel inverts, and sliding block moves up, and when sliding block, which moves up, to be contacted with the second travel switch, Electric Motor Wheel rotates forward, and then sliding block
Move down.Rotated in this way, starting Electric Motor Wheel positive and negative alternate without operating personnel, it is time saving and energy saving.
Because also including the first block rubber and the second block rubber, left side clamping bar tail end is installed by bolted connection
There is the first block rubber, right side clamping bar tail end is provided with the second block rubber, the first block rubber and second by bolted connection
Block rubber coordinates, when hardware sheet material is fixedly clamped by left and right sides clamping bar, the first block rubber and the second block rubber and five golden plates
Material is contacted, the first block rubber and the increase of the second block rubber and the frictional force of hardware sheet material, and then hardware sheet material is fixed more
It is firm, it is also less prone to scratch hardware sheet material.
Because also including reinforcement, reinforcement is connected between top plate bottom and riser left surface, reinforcement is inclined
Set, reinforcement wherein one end is connected with top plate bottom right by bolted connection, and the reinforcement other end passes through bolt
The mode of connection is connected with riser left surface top, and reinforcement can strengthen the bearing capacity of riser, makes riser more firm, and then work as
When air pump operates, it can operate air pump more steady, enter without influenceing to air-dry hardware sheet material.
Because the material of bottom plate is Q235 steel, the weight capacity of Q235 steel is strong, acidproof corrosion-resistant, adds the use of bottom plate
Life-span.
(3)Beneficial effect
The present invention can be carried out turning face to hardware sheet material and then hardware sheet material is comprehensively painted by rotating device, and be led to
Cross air-dry apparatus can to paint air-dry, without manually to paint air-dry, reached it is time saving and energy saving, spray painting speed it is fast,
The paint that can be dropped is collected and saves paint, also has the effect that air-drying function is carried out to paint.
Brief description of the drawings
Fig. 1 is the first main structure diagram of the present invention.
Fig. 2 is the first main structure diagram of mobile device of the present invention.
Fig. 3 is second of main structure diagram of the present invention.
Fig. 4 is the third main structure diagram of the present invention.
Fig. 5 is second of main structure diagram of mobile device of the present invention.
Fig. 6 is the 4th kind of main structure diagram of the present invention.
Mark in accompanying drawing for:1- bottom plates, 2- collection frames, 3- support plates, the casings of 4- first, 5- hoppers, 6- paint pumps, 7-
Transverse slat, 8- fixed covers, the shower nozzles of 9- first, 10- discharge nozzles, 11- top plates, 12- clamping devices, 121- cylinders, 122- fixed plates,
123- clamping bars, 124- connecting rods, 13- mobile devices, 131- slide rails, 132- sliding blocks, 133- Electric Motor Wheels, 134- driven pulleys, 135- are drawn
Line, 14- rotating devices, 141- bearing blocks, 142- rotating shafts, 143- first gears, the motors of 144- first, 145- second gears,
146- installing plates, 15- air-dry apparatus, the casings of 151- second, 152- air pumps, 153- escape pipes, the shower nozzles of 154- second, 155- electric heating
Silk, 156- risers, the travel switches of 16- first, the travel switches of 17- second, the block rubbers of 18- first, the block rubbers of 19- second, 20- add
Strengthening tendons.
Embodiment
The present invention is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1
A kind of hardware sheet material spray-painting plant, as shown in figures 1 to 6, include bottom plate 1, collection frame 2, support plate 3, the first casing 4, blanking
Bucket 5, paint pump 6, transverse slat 7, fixed cover 8, the first shower nozzle 9, discharge nozzle 10, top plate 11, clamping device 12 and mobile device 13, bottom
The crown center of plate 1 is provided with collection frame 2 by bolted connection, and the top left side of bottom plate 1 is pacified by bolted connection
Equipped with support plate 3, the right flank bottom of support plate 3 is provided with mobile device 13, and transverse slat 7 is connected with the moving parts of mobile device 13, horizontal
The top right side of plate 7 is provided with fixed cover 8 by bolted connection, and the left surface bottom of support plate 3 is by bolted connection
First casing 4 is installed, the top left side of the first casing 4 is provided with hopper 5, hopper 5 and by bolted connection
Connected in one casing 4, paint pump 6 is installed by bolted connection among the inner bottom part of the first casing 4, set in fixed cover 8
There is discharge nozzle 10, the wherein one end of discharge nozzle 10 is connected through the crown center of the first casing 4 with paint pump 6, the other end of discharge nozzle 10
First shower nozzle 9 is installed by bolted connection, the first shower nozzle 9 in discharge nozzle 10 with connecting, and the first shower nozzle 9 is positioned at collection
The upper left side of frame 2, the top of support plate 3 are provided with top plate 11, clamping device are provided among the bottom of top plate 11 by bolted connection
12, clamping device 12 is located at directly over collection frame 2.
Embodiment 2
A kind of hardware sheet material spray-painting plant, as shown in figures 1 to 6, include bottom plate 1, collection frame 2, support plate 3, the first casing 4, blanking
Bucket 5, paint pump 6, transverse slat 7, fixed cover 8, the first shower nozzle 9, discharge nozzle 10, top plate 11, clamping device 12 and mobile device 13, bottom
The crown center of plate 1 is provided with collection frame 2 by bolted connection, and the top left side of bottom plate 1 is pacified by bolted connection
Equipped with support plate 3, the right flank bottom of support plate 3 is provided with mobile device 13, and transverse slat 7 is connected with the moving parts of mobile device 13, horizontal
The top right side of plate 7 is provided with fixed cover 8 by bolted connection, and the left surface bottom of support plate 3 is by bolted connection
First casing 4 is installed, the top left side of the first casing 4 is provided with hopper 5, hopper 5 and by bolted connection
Connected in one casing 4, paint pump 6 is installed by bolted connection among the inner bottom part of the first casing 4, set in fixed cover 8
There is discharge nozzle 10, the wherein one end of discharge nozzle 10 is connected through the crown center of the first casing 4 with paint pump 6, the other end of discharge nozzle 10
First shower nozzle 9 is installed by bolted connection, the first shower nozzle 9 in discharge nozzle 10 with connecting, and the first shower nozzle 9 is positioned at collection
The upper left side of frame 2, the top of support plate 3 are provided with top plate 11, clamping device are provided among the bottom of top plate 11 by bolted connection
12, clamping device 12 is located at directly over collection frame 2.
Clamping device 12 includes cylinder 121, fixed plate 122, clamping bar 123 and connecting rod 124, and the bottom left of top plate 11 passes through
Bolted mode is provided with cylinder 121, and cylinder 121 is in being vertically arranged, and symmetrical expression passes through pin on the expansion link of cylinder 121
The mode of nail connection is provided with clamping bar 123, and left and right sides clamping bar 123 cooperates, and clamping bar 123 is located at directly over collection frame 2, gas
The left and right sides bottom of cylinder 121 is all provided with fixed plate 122 by bolted connection, the bottom left of left side fixed plate 122 with
Be connected with connecting rod 124 by way of pin connection between the lateral surface of left side clamping bar 123, the bottom right of right side fixed plate 122 with
The mode connected between the lateral surface of right side clamping bar 123 also by pin is connected with connecting rod 124.
Embodiment 3
A kind of hardware sheet material spray-painting plant, as shown in figures 1 to 6, include bottom plate 1, collection frame 2, support plate 3, the first casing 4, blanking
Bucket 5, paint pump 6, transverse slat 7, fixed cover 8, the first shower nozzle 9, discharge nozzle 10, top plate 11, clamping device 12 and mobile device 13, bottom
The crown center of plate 1 is provided with collection frame 2 by bolted connection, and the top left side of bottom plate 1 is pacified by bolted connection
Equipped with support plate 3, the right flank bottom of support plate 3 is provided with mobile device 13, and transverse slat 7 is connected with the moving parts of mobile device 13, horizontal
The top right side of plate 7 is provided with fixed cover 8 by bolted connection, and the left surface bottom of support plate 3 is by bolted connection
First casing 4 is installed, the top left side of the first casing 4 is provided with hopper 5, hopper 5 and by bolted connection
Connected in one casing 4, paint pump 6 is installed by bolted connection among the inner bottom part of the first casing 4, set in fixed cover 8
There is discharge nozzle 10, the wherein one end of discharge nozzle 10 is connected through the crown center of the first casing 4 with paint pump 6, the other end of discharge nozzle 10
First shower nozzle 9 is installed by bolted connection, the first shower nozzle 9 in discharge nozzle 10 with connecting, and the first shower nozzle 9 is positioned at collection
The upper left side of frame 2, the top of support plate 3 are provided with top plate 11, clamping device are provided among the bottom of top plate 11 by bolted connection
12, clamping device 12 is located at directly over collection frame 2.
Clamping device 12 includes cylinder 121, fixed plate 122, clamping bar 123 and connecting rod 124, and the bottom left of top plate 11 passes through
Bolted mode is provided with cylinder 121, and cylinder 121 is in being vertically arranged, and symmetrical expression passes through pin on the expansion link of cylinder 121
The mode of nail connection is provided with clamping bar 123, and left and right sides clamping bar 123 cooperates, and clamping bar 123 is located at directly over collection frame 2, gas
The left and right sides bottom of cylinder 121 is all provided with fixed plate 122 by bolted connection, the bottom left of left side fixed plate 122 with
Be connected with connecting rod 124 by way of pin connection between the lateral surface of left side clamping bar 123, the bottom right of right side fixed plate 122 with
The mode connected between the lateral surface of right side clamping bar 123 also by pin is connected with connecting rod 124.
Mobile device 13 includes slide rail 131, sliding block 132, Electric Motor Wheel 133, driven pulley 134 and bracing wire 135, and support plate 3 is right
Side lower is provided with slide rail 131 by bolted connection, and in being vertically arranged, slide rail 131 is provided with matches somebody with somebody slide rail 131 with it
The sliding block 132 of conjunction, sliding block 132 are slidably matched with slide rail 131, the right flank middle part of sliding block 132 by bolted connection with horizontal stroke
The left surface of plate 7 connects, and the leading flank top of slide rail 131 is provided with Electric Motor Wheel 133, the front side of slide rail 131 by bolted connection
Face bottom is provided with driven pulley 134 by bolted connection, and the top left side of sliding block 132 is connected with bracing wire 135, bracing wire 135
Tail end is connected around Electric Motor Wheel 133 and driven pulley 134 with the bottom left of sliding block 132.
Embodiment 4
A kind of hardware sheet material spray-painting plant, as shown in figures 1 to 6, include bottom plate 1, collection frame 2, support plate 3, the first casing 4, blanking
Bucket 5, paint pump 6, transverse slat 7, fixed cover 8, the first shower nozzle 9, discharge nozzle 10, top plate 11, clamping device 12 and mobile device 13, bottom
The crown center of plate 1 is provided with collection frame 2 by bolted connection, and the top left side of bottom plate 1 is pacified by bolted connection
Equipped with support plate 3, the right flank bottom of support plate 3 is provided with mobile device 13, and transverse slat 7 is connected with the moving parts of mobile device 13, horizontal
The top right side of plate 7 is provided with fixed cover 8 by bolted connection, and the left surface bottom of support plate 3 is by bolted connection
First casing 4 is installed, the top left side of the first casing 4 is provided with hopper 5, hopper 5 and by bolted connection
Connected in one casing 4, paint pump 6 is installed by bolted connection among the inner bottom part of the first casing 4, set in fixed cover 8
There is discharge nozzle 10, the wherein one end of discharge nozzle 10 is connected through the crown center of the first casing 4 with paint pump 6, the other end of discharge nozzle 10
First shower nozzle 9 is installed by bolted connection, the first shower nozzle 9 in discharge nozzle 10 with connecting, and the first shower nozzle 9 is positioned at collection
The upper left side of frame 2, the top of support plate 3 are provided with top plate 11, clamping device are provided among the bottom of top plate 11 by bolted connection
12, clamping device 12 is located at directly over collection frame 2.
Clamping device 12 includes cylinder 121, fixed plate 122, clamping bar 123 and connecting rod 124, and the bottom left of top plate 11 passes through
Bolted mode is provided with cylinder 121, and cylinder 121 is in being vertically arranged, and symmetrical expression passes through pin on the expansion link of cylinder 121
The mode of nail connection is provided with clamping bar 123, and left and right sides clamping bar 123 cooperates, and clamping bar 123 is located at directly over collection frame 2, gas
The left and right sides bottom of cylinder 121 is all provided with fixed plate 122 by bolted connection, the bottom left of left side fixed plate 122 with
Be connected with connecting rod 124 by way of pin connection between the lateral surface of left side clamping bar 123, the bottom right of right side fixed plate 122 with
The mode connected between the lateral surface of right side clamping bar 123 also by pin is connected with connecting rod 124.
Mobile device 13 includes slide rail 131, sliding block 132, Electric Motor Wheel 133, driven pulley 134 and bracing wire 135, and support plate 3 is right
Side lower is provided with slide rail 131 by bolted connection, and in being vertically arranged, slide rail 131 is provided with matches somebody with somebody slide rail 131 with it
The sliding block 132 of conjunction, sliding block 132 are slidably matched with slide rail 131, the right flank middle part of sliding block 132 by bolted connection with horizontal stroke
The left surface of plate 7 connects, and the leading flank top of slide rail 131 is provided with Electric Motor Wheel 133, the front side of slide rail 131 by bolted connection
Face bottom is provided with driven pulley 134 by bolted connection, and the top left side of sliding block 132 is connected with bracing wire 135, bracing wire 135
Tail end is connected around Electric Motor Wheel 133 and driven pulley 134 with the bottom left of sliding block 132.
Also include rotating device 14, rotating device 14 includes bearing block 141, rotating shaft 142, first gear 143, first
Motor 144, second gear 145 and installing plate 146, the bottom left of top plate 11 are provided with bearing block by bolted connection
141, rotating shaft 142 is installed, rotating shaft 142 is connected by way of interference connection with the bearing in bearing block 141 in bearing block 141
Connect, the bottom of rotating shaft 142 is provided with installing plate 146 by bolted connection, and installing plate 146 is bolted among bottom
The top of mode and cylinder 121 be connected, the bottom of rotating shaft 142 is provided with first gear 143, top plate 11 by bolted connection
Bottom left is provided with the first motor 144 by bolted connection, and the first motor 144 is located on the left of bearing block 141, and first
For motor 144 in being vertically arranged, the output shaft of the first motor 144 is connected with second gear 145, second gear 145 by shaft coupling
Positioned at the left side of first gear 143, second gear 145 engages with first gear 143.
Also include air-dry apparatus 15, air-dry apparatus 15 includes the second casing 151, air pump 152, escape pipe 153, second
Shower nozzle 154, heating wire 155 and riser 156, the bottom right of top plate 11 are provided with riser 156, riser by bolted connection
156 left surface bottoms are provided with the second casing 151 by bolted connection, pass through spiral shell among the inner bottom part of the second casing 151
Tether the mode connect and air pump 152 is installed, escape pipe 153 is connected with air pump 152, the tail end of escape pipe 153 runs through the second casing
151 left lowers are located at the right side of clamping bar 123, and the tail end of escape pipe 153 is provided with the second shower nozzle 154 by bolted connection,
For second shower nozzle 154 with being connected in escape pipe 153, the inner top of the second casing 151 is provided with heating wire by bolted connection
155。
Also include the first travel switch 16 and the second travel switch 17, the right flank bottom of slide rail 131 is connected by screw
Mode the first travel switch 16 is installed, the first travel switch 16 is located at the lower section of sliding block 132, and the right flank top of slide rail 131 leads to
The mode for crossing mode connects for screw is provided with the second travel switch 17, and the second travel switch 17 is located at the top of sliding block 132, and the second stroke is opened
The travel switch 16 of pass 17 and first has circuit to be connected with Electric Motor Wheel 133.
Also include the first block rubber 18 and the second block rubber 19, the tail end of left side clamping bar 123 is by bolted connection
First block rubber 18 is installed, the tail end of right side clamping bar 123 is provided with the second block rubber 19, the first rubber by bolted connection
Blob of viscose 18 coordinates with the second block rubber 19.
Also include reinforcement 20, reinforcement 20, reinforcement 20 are connected between the bottom of top plate 11 and the left surface of riser 156
It is inclined to set, the wherein one end of reinforcement 20 is connected with the bottom right of top plate 11 by bolted connection, and reinforcement 20 is another
One end is connected with the left surface top of riser 156 by bolted connection.
The material of bottom plate 1 is Q235 steel.
Operation principle:Operating personnel will be painted and be poured into by hopper 5 in the first casing 4 first, then hardware sheet material is led to
Cross clamping device 12 to fix, make the wherein one side of hardware sheet material positioned at the right side of the first shower nozzle 9, you can start paint pump 6, paint pump
6 are pumped into the paint in the first casing 4 in discharge nozzle 10, and then the paint in discharge nozzle 10 is sprayed by the first shower nozzle 9, paint
Ejection is painted to hardware sheet material, meanwhile, start mobile device 13, the moving parts band motion plate of mobile device 13 is about 7
Mobile, transverse slat 7, which moves up and down, drives the first shower nozzle 9 to move up and down, and then paint is more fully sprayed to hardware sheet material
Paint.And the paint for not being bonded at hardware sheet material is fallen in collection frame 2.After the completion of the wherein one side spray painting of hardware sheet material, close
Paint pump 6 and mobile device 13, hardware sheet material is unclamped by clamping device 12, operating personnel, which can remove, changes another side needs
Spray painting is located at the right side of the first shower nozzle 9, then is fixed by clamping device 12, by aforesaid operations, you can to the side do not painted
Painted.After the completion of hardware sheet material all spray painting, mobile device 13 and paint pump 6 are closed, by clamping device 12 by five
Golden plate material unclamps, you can removes.And the paint in collection frame 2 can be taken off reusing.
Because clamping device 12 includes cylinder 121, fixed plate 122, clamping bar 123 and connecting rod 124, the bottom left of top plate 11
Cylinder 121 is installed by bolted connection, cylinder 121 is in being vertically arranged, and symmetrical expression is logical on the expansion link of cylinder 121
Cross pin connection mode clamping bar 123 is installed, left and right sides clamping bar 123 cooperates, clamping bar 123 be located at collection frame 2 just on
Side, the left and right sides bottom of cylinder 121 are all provided with fixed plate 122 by bolted connection, and the bottom of left side fixed plate 122 is left
Between side and the lateral surface of left side clamping bar 123 connecting rod 124, the bottom, right of right side fixed plate 122 are connected with by way of pin connection
The mode connected between side and the lateral surface of right side clamping bar 123 also by pin is connected with connecting rod 124, and operating personnel first are by hardware
Sheet material is placed between two clamping bars 123, and the expansion link for restarting cylinder 121 moves up, and the expansion link of cylinder 121 is to moving up
It is dynamic coordinate with connecting rod 124 drive the left and right sides end of clamping bar 123 mobile to centre, and then left and right sides clamping bar 123 is by five golden plates
Material is fixed, and closes cylinder 121, you can hardware sheet material is painted.When hardware sheet material, which needs to change face, continues spray painting, start gas
The expansion link of cylinder 121 moves down, you can removes hardware sheet material and carries out changing face spray painting.And after the completion of the spray painting of hardware sheet material, then
The secondary expansion link for starting cylinder 121 moves down, you can removes hardware sheet material.
Because mobile device 13 includes slide rail 131, sliding block 132, Electric Motor Wheel 133, driven pulley 134 and bracing wire 135, support plate
3 right flank bottoms are provided with slide rail 131 by bolted connection, slide rail 131 in being vertically arranged, slide rail 131 be provided with
Its sliding block 132 coordinated, sliding block 132 are slidably matched with slide rail 131, and the right flank middle part of sliding block 132 is by bolted connection
It is connected with the left surface of transverse slat 7, the leading flank top of slide rail 131 is provided with Electric Motor Wheel 133, slide rail 131 by bolted connection
Leading flank bottom is provided with driven pulley 134 by bolted connection, and the top left side of sliding block 132 is connected with bracing wire 135, bracing wire
135 tail ends are connected around Electric Motor Wheel 133 and driven pulley 134 with the bottom left of sliding block 132, when paint is sprayed by the first shower nozzle 9
When being painted to hardware sheet material, start Electric Motor Wheel 133 positive and negative alternate and rotate, and then bracing wire 135 on movable slider 132 with moving down
Dynamic, sliding block 132 moves up and down band motion plate 7 and moved up and down, and then drives the first shower nozzle 9 to move up and down, and is moved down on the first shower nozzle 9
It is dynamic paint more comprehensively, is uniformly painted to hardware sheet material.When hardware sheet material needs to change face or after the completion of spray painting, close
Electric Motor Wheel 133.
Because also including rotating device 14, rotating device 14 include bearing block 141, rotating shaft 142, first gear 143,
First motor 144, second gear 145 and installing plate 146, the bottom left of top plate 11 are provided with bearing by bolted connection
Seat 141, rotating shaft 142 is provided with bearing block 141, and rotating shaft 142 is connected by way of interference connection with the bearing in bearing block 141
Connect, the bottom of rotating shaft 142 is provided with installing plate 146 by bolted connection, and installing plate 146 is bolted among bottom
The top of mode and cylinder 121 be connected, the bottom of rotating shaft 142 is provided with first gear 143, top plate 11 by bolted connection
Bottom left is provided with the first motor 144 by bolted connection, and the first motor 144 is located on the left of bearing block 141, and first
For motor 144 in being vertically arranged, the output shaft of the first motor 144 is connected with second gear 145, second gear 145 by shaft coupling
Positioned at the left side of first gear 143, second gear 145 is engaged with first gear 143, and when hardware sheet material, wherein simultaneously spray painting is completed
Afterwards, you can start the first motor 144 and rotate, the first motor 144, which rotates, drives second gear 145 to rotate, and second gear 145 rotates
First gear 143 is driven to rotate, the rotational band turn axle 142 of first gear 143 rotates, and rotating shaft 142, which rotates, drives 146 turns of installing plate
It is dynamic, and then drive installing plate 146 to be rotated with lower component, when that face that hardware sheet material does not paint is located at the first 9 directly to the right of shower nozzle,
Close the first motor 144, you can it is painted.Carry out changing face in this way, removing hardware sheet material without operating personnel, it is convenient
Fast.
Because also including air-dry apparatus 15, air-dry apparatus 15 include the second casing 151, air pump 152, escape pipe 153,
Second shower nozzle 154, heating wire 155 and riser 156, the bottom right of top plate 11 are provided with riser 156 by bolted connection,
The left surface bottom of riser 156 is provided with the second casing 151 by bolted connection, leads among the inner bottom part of the second casing 151
Cross bolted mode and air pump 152 is installed, escape pipe 153 is connected with air pump 152, the tail end of escape pipe 153 runs through second
The left lower of casing 151 is located at the right side of clamping bar 123, and the tail end of escape pipe 153 is provided with the second shower nozzle by bolted connection
154, for the second shower nozzle 154 with being connected in escape pipe 153, the inner top of the second casing 151 is provided with electricity by bolted connection
Heated filament 155, after the completion of the spray painting of hardware sheet material, you can start heating wire 155, heating wire 155 heats air, booster air pump
152, hot-air is pumped into escape pipe 153 by air pump 152, and then the hot-air in escape pipe 153 is sprayed by the second shower nozzle 154
Go out, hot-air sprays to be dried up to the paint on hardware sheet material, after the paint on hardware sheet material dries up, closes the He of heating wire 155
Air pump 152, you can remove hardware sheet material.In this way, paint rate of drying on hardware sheet material can be made faster, and then improve work
Efficiency.
Because also including the first travel switch 16 and the second travel switch 17, the right flank bottom of slide rail 131 passes through screw
The mode of connection is provided with the first travel switch 16, and the first travel switch 16 is located at below sliding block 132, on the right flank of slide rail 131
The mode that portion is connected by screw is provided with the second travel switch 17, and the second travel switch 17 is located at the top of sliding block 132, the second row
The travel switches 16 of Cheng Kaiguan 17 and first have circuit to be connected with Electric Motor Wheel 133, when the positive and negative alternate of Electric Motor Wheel 133 rotates, sliding block
132 drive the first shower nozzle 9 to move up and down by transverse slat 7, and then paint is more fully painted to hardware sheet material, work as sliding block
132 when moving down, and sliding block 132 contacts with the first travel switch 16, and then Electric Motor Wheel 133 inverts, and sliding block 132 moves up,
When sliding block 132, which moves up, to be contacted with the second travel switch 17, Electric Motor Wheel 133 rotates forward, and then sliding block 132 moves down.Such as
This, started the positive and negative alternate of Electric Motor Wheel 133 without operating personnel and rotated, time saving and energy saving.
Because also including the first block rubber 18 and the second block rubber 19, the tail end of left side clamping bar 123 is bolted
Mode is provided with the first block rubber 18, and the tail end of right side clamping bar 123 is provided with the second block rubber 19 by bolted connection, the
One block rubber 18 coordinates with the second block rubber 19, when hardware sheet material is fixedly clamped by left and right sides clamping bar 123, the first block rubber
18 and second block rubber 19 and hardware web contact, the first block rubber 18 increases with the second block rubber 19 and the friction of hardware sheet material
Power, and then more consolidated what hardware sheet material was fixed, it is also less prone to scratch hardware sheet material.
Because also including reinforcement 20, reinforcement 20 is connected between the bottom of top plate 11 and the left surface of riser 156, is strengthened
Muscle 20 is inclined to set, and the wherein one end of reinforcement 20 is connected with the bottom right of top plate 11 by bolted connection, reinforcement
20 other ends are connected with the left surface top of riser 156 by bolted connection, and reinforcement 20 can strengthen the load-bearing of riser 156
Power, make riser 156 more firm, and then when air pump 152 operates, can operate air pump 152 more steady, enter without influenceing
Hardware sheet material is air-dried.
Because the material of bottom plate 1 is Q235 steel, the weight capacity of Q235 steel is strong, acidproof corrosion-resistant, adds making for bottom plate 1
Use the life-span.
Embodiment described above only expresses the preferred embodiment of the present invention, and its description is more specific and detailed, but simultaneously
Therefore the limitation to the scope of the claims of the present invention can not be interpreted as.It should be pointed out that for one of ordinary skill in the art
For, without departing from the inventive concept of the premise, some deformations can also be made, improves and substitutes, these belong to this hair
Bright protection domain.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.
Claims (9)
1. a kind of hardware sheet material spray-painting plant, it is characterised in that include bottom plate(1), collection frame(2), support plate(3), the first case
Body(4), hopper(5), paint pump(6), transverse slat(7), fixed cover(8), the first shower nozzle(9), discharge nozzle(10), top plate(11)、
Clamping device(12)And mobile device(13), bottom plate(1)Crown center is provided with collection frame by bolted connection(2),
Bottom plate(1)Top left side is provided with support plate by bolted connection(3), support plate(3)Right flank bottom is provided with mobile device
(13), mobile device(13)Moving parts on be connected with transverse slat(7), transverse slat(7)Top right side is by bolted connection
Fixed cover is installed(8), support plate(3)Left surface bottom is provided with the first casing by bolted connection(4), the first casing
(4)Top left side is provided with hopper by bolted connection(5), hopper(5)With the first casing(4)Interior connection, the
One casing(4)Paint pump is installed by bolted connection among inner bottom part(6), fixed cover(8)It is interior to be provided with discharge nozzle
(10), discharge nozzle(10)Wherein the first casing is run through in one end(4)Crown center and paint pump(6)Connection, discharge nozzle(10)It is another
End is provided with the first shower nozzle by bolted connection(9), the first shower nozzle(9)With discharge nozzle(10)Interior connection, the first shower nozzle
(9)Positioned at collection frame(2)Upper left side, support plate(3)Top is provided with top plate by bolted connection(11), top plate(11)Bottom
Clamping device is provided among portion(12), clamping device(12)Positioned at collection frame(2)Surface.
A kind of 2. hardware sheet material spray-painting plant according to claim 1, it is characterised in that clamping device(12)Include gas
Cylinder(121), fixed plate(122), clamping bar(123)And connecting rod(124), top plate(11)Bottom left is pacified by bolted connection
Equipped with cylinder(121), cylinder(121)In being vertically arranged, cylinder(121)Expansion link on symmetrical expression by pin connect side
Formula is provided with clamping bar(123), left and right sides clamping bar(123)Cooperate, clamping bar(123)Positioned at collection frame(2)Surface, cylinder
(121)Left and right sides bottom is all provided with fixed plate by bolted connection(122), left side fixed plate(122)Bottom is left
Side and left side clamping bar(123)Between lateral surface connecting rod is connected with by way of pin connection(124), right side fixed plate(122)
Bottom right and right side clamping bar(123)The mode connected between lateral surface also by pin is connected with connecting rod(124).
A kind of 3. hardware sheet material spray-painting plant according to claim 2, it is characterised in that mobile device(13)Include cunning
Rail(131), sliding block(132), Electric Motor Wheel(133), driven pulley(134)And bracing wire(135), support plate(3)Right flank bottom passes through spiral shell
Tether the mode connect and slide rail is installed(131), slide rail(131)In being vertically arranged, slide rail(131)It is provided with the sliding block coordinated with it
(132), sliding block(132)With slide rail(131)It is slidably matched, sliding block(132)Right flank middle part by bolted connection with horizontal stroke
Plate(7)Left surface connects, slide rail(131)Leading flank top is provided with Electric Motor Wheel by bolted connection(133), slide rail
(131)Leading flank bottom is provided with driven pulley by bolted connection(134), sliding block(132)Top left side is connected with drawing
Line(135), bracing wire(135)Tail end bypasses Electric Motor Wheel(133)And driven pulley(134)With sliding block(132)Bottom left connects.
4. a kind of hardware sheet material spray-painting plant according to claim 3, it is characterised in that also include rotating device
(14), rotating device(14)Include bearing block(141), rotating shaft(142), first gear(143), the first motor(144), second
Gear(145)And installing plate(146), top plate(11)Bottom left is provided with bearing block by bolted connection(141), axle
Bearing(141)Rotating shaft is inside installed(142), rotating shaft(142)Interference connection by way of and bearing block(141)Interior bearing connects
Connect, rotating shaft(142)Bottom is provided with installing plate by bolted connection(146), installing plate(146)Pass through spiral shell among bottom
Tether the mode connect and cylinder(121)Top connects, rotating shaft(142)Bottom is provided with first gear by bolted connection
(143), top plate(11)Bottom left is provided with the first motor by bolted connection(144), the first motor(144)It is located at
Bearing block(141)Left side, the first motor(144)In being vertically arranged, the first motor(144)Output shaft be connected with by shaft coupling
Second gear(145), second gear(145)Positioned at first gear(143)Left side, second gear(145)With first gear(143)
Engagement.
5. a kind of hardware sheet material spray-painting plant according to claim 4, it is characterised in that also include air-dry apparatus
(15), air-dry apparatus(15)Include the second casing(151), air pump(152), escape pipe(153), the second shower nozzle(154), electric heating
Silk(155)And riser(156), top plate(11)Bottom right is provided with riser by bolted connection(156), riser
(156)Left surface bottom is provided with the second casing by bolted connection(151), the second casing(151)Among inner bottom part
Air pump is installed by bolted connection(152), air pump(152)On be connected with escape pipe(153), escape pipe(153)Tail
The second casing is run through at end(151)Left lower is located at clamping bar(123)Right side, escape pipe(153)The side that tail end is bolted
Formula is provided with the second shower nozzle(154), the second shower nozzle(154)With escape pipe(153)Interior connection, the second casing(151)Inner top leads to
Cross bolted mode and heating wire is installed(155).
6. a kind of hardware sheet material spray-painting plant according to claim 5, it is characterised in that also include the first travel switch
(16)With the second travel switch(17), slide rail(131)The mode that right flank bottom is connected by screw is provided with the first stroke and opened
Close(16), the first travel switch(16)Positioned at sliding block(132)Lower section, slide rail(131)The side that right flank top is connected by screw
Formula is provided with the second travel switch(17), the second travel switch(17)Positioned at sliding block(132)Top, the second travel switch(17)With
First travel switch(16)With Electric Motor Wheel(133)There is circuit connection.
7. a kind of hardware sheet material spray-painting plant according to claim 6, it is characterised in that also include the first block rubber
(18)With the second block rubber(19), left side clamping bar(123)Tail end is provided with the first block rubber by bolted connection(18),
Right side clamping bar(123)Tail end is provided with the second block rubber by bolted connection(19), the first block rubber(18)With second
Block rubber(19)Coordinate.
8. a kind of hardware sheet material spray-painting plant according to claim 7, it is characterised in that also include reinforcement(20),
Top plate(11)Bottom and riser(156)Reinforcement is connected between left surface(20), reinforcement(20)It is inclined to set, reinforcement
(20)Wherein one end by bolted connection with top plate(11)Bottom right connects, reinforcement(20)The other end passes through bolt
The mode and riser of connection(156)Left surface top connects.
A kind of 9. hardware sheet material spray-painting plant according to claim 8, it is characterised in that bottom plate(1)Material be Q235
Steel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710674355.2A CN107470059A (en) | 2017-08-09 | 2017-08-09 | A kind of hardware sheet material spray-painting plant |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710674355.2A CN107470059A (en) | 2017-08-09 | 2017-08-09 | A kind of hardware sheet material spray-painting plant |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107470059A true CN107470059A (en) | 2017-12-15 |
Family
ID=60598935
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710674355.2A Pending CN107470059A (en) | 2017-08-09 | 2017-08-09 | A kind of hardware sheet material spray-painting plant |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107470059A (en) |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107694788A (en) * | 2017-09-27 | 2018-02-16 | 吴浪 | A kind of auxiliary connection socket plug mould antirust spraying device |
CN107931002A (en) * | 2017-12-25 | 2018-04-20 | 陈鸿基 | One kind building plank mopping device |
CN108273675A (en) * | 2018-01-22 | 2018-07-13 | 冯云鹏 | A kind of rotary paint spraying apparatus of steel |
CN108480087A (en) * | 2018-02-05 | 2018-09-04 | 浙江欧导自动化设备有限公司 | A kind of motor housing spray-painting plant that spray range is controllable |
CN109127223A (en) * | 2018-09-21 | 2019-01-04 | 湖州欧宝木业有限公司 | A kind of woodwork side wall glue-spraying mechanism |
CN109225717A (en) * | 2018-08-10 | 2019-01-18 | 杜鑫 | A kind of spray-painting plant that stroke is controllable |
CN110170407A (en) * | 2019-06-28 | 2019-08-27 | 东阳客语环保科技有限公司 | A kind of aluminium shape surface filming equipment |
CN111993049A (en) * | 2020-09-15 | 2020-11-27 | 李树平 | Automatic production line for torsion spring built-in yarn guide plate |
CN112354721A (en) * | 2020-09-17 | 2021-02-12 | 安徽省含山县皖中减速机械有限公司 | High-efficient spraying device of anti-rust paint for speed reducer |
CN112474109A (en) * | 2020-11-02 | 2021-03-12 | 张冬冬 | Dalle coating spraying device |
CN112517274A (en) * | 2020-11-25 | 2021-03-19 | 路运雷 | Painting device of PDC drill bit |
CN113019743A (en) * | 2021-03-29 | 2021-06-25 | 中犇检测认证有限公司 | Viaduct guardrail reflective paint spraying device |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2013138972A (en) * | 2011-12-28 | 2013-07-18 | Leap Co Ltd | Spray coater |
CN106076703A (en) * | 2016-08-29 | 2016-11-09 | 浙江天阳钢管有限公司 | The quick spray-painting plant in a kind of iron pipe surface |
CN106140539A (en) * | 2016-08-26 | 2016-11-23 | 温州市海龙五金制品有限公司 | A kind of five metals makes of the high uniformly spray-painting plant of alloy steel products |
CN106140518A (en) * | 2016-08-16 | 2016-11-23 | 温州市洋源五金厂 | A kind of quick spray-painting plant of five metals plate surface |
CN106322601A (en) * | 2016-08-31 | 2017-01-11 | 安徽瑞宏信息科技有限公司 | Intelligent temperature control device for computer room |
CN205887293U (en) * | 2016-08-16 | 2017-01-18 | 温州市洋源五金厂 | Quick paint spraying apparatus of five gold plate materials |
CN206122034U (en) * | 2016-06-22 | 2017-04-26 | 无锡市东特机械科技有限公司 | Baking finish device for hardware |
CN107008601A (en) * | 2017-06-06 | 2017-08-04 | 张传波 | A kind of hardware & tools processing quick paint spraying apparatus of part |
-
2017
- 2017-08-09 CN CN201710674355.2A patent/CN107470059A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2013138972A (en) * | 2011-12-28 | 2013-07-18 | Leap Co Ltd | Spray coater |
CN206122034U (en) * | 2016-06-22 | 2017-04-26 | 无锡市东特机械科技有限公司 | Baking finish device for hardware |
CN106140518A (en) * | 2016-08-16 | 2016-11-23 | 温州市洋源五金厂 | A kind of quick spray-painting plant of five metals plate surface |
CN205887293U (en) * | 2016-08-16 | 2017-01-18 | 温州市洋源五金厂 | Quick paint spraying apparatus of five gold plate materials |
CN106140539A (en) * | 2016-08-26 | 2016-11-23 | 温州市海龙五金制品有限公司 | A kind of five metals makes of the high uniformly spray-painting plant of alloy steel products |
CN106076703A (en) * | 2016-08-29 | 2016-11-09 | 浙江天阳钢管有限公司 | The quick spray-painting plant in a kind of iron pipe surface |
CN106322601A (en) * | 2016-08-31 | 2017-01-11 | 安徽瑞宏信息科技有限公司 | Intelligent temperature control device for computer room |
CN107008601A (en) * | 2017-06-06 | 2017-08-04 | 张传波 | A kind of hardware & tools processing quick paint spraying apparatus of part |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107694788B (en) * | 2017-09-27 | 2019-08-16 | 邱民杰 | A kind of auxiliary connection socket plug mold antirust spraying device |
CN107694788A (en) * | 2017-09-27 | 2018-02-16 | 吴浪 | A kind of auxiliary connection socket plug mould antirust spraying device |
CN107931002A (en) * | 2017-12-25 | 2018-04-20 | 陈鸿基 | One kind building plank mopping device |
CN108273675A (en) * | 2018-01-22 | 2018-07-13 | 冯云鹏 | A kind of rotary paint spraying apparatus of steel |
CN108480087A (en) * | 2018-02-05 | 2018-09-04 | 浙江欧导自动化设备有限公司 | A kind of motor housing spray-painting plant that spray range is controllable |
CN109225717A (en) * | 2018-08-10 | 2019-01-18 | 杜鑫 | A kind of spray-painting plant that stroke is controllable |
CN109127223A (en) * | 2018-09-21 | 2019-01-04 | 湖州欧宝木业有限公司 | A kind of woodwork side wall glue-spraying mechanism |
CN110170407A (en) * | 2019-06-28 | 2019-08-27 | 东阳客语环保科技有限公司 | A kind of aluminium shape surface filming equipment |
CN111993049A (en) * | 2020-09-15 | 2020-11-27 | 李树平 | Automatic production line for torsion spring built-in yarn guide plate |
CN112354721A (en) * | 2020-09-17 | 2021-02-12 | 安徽省含山县皖中减速机械有限公司 | High-efficient spraying device of anti-rust paint for speed reducer |
CN112474109A (en) * | 2020-11-02 | 2021-03-12 | 张冬冬 | Dalle coating spraying device |
CN112517274A (en) * | 2020-11-25 | 2021-03-19 | 路运雷 | Painting device of PDC drill bit |
CN113019743A (en) * | 2021-03-29 | 2021-06-25 | 中犇检测认证有限公司 | Viaduct guardrail reflective paint spraying device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107470059A (en) | A kind of hardware sheet material spray-painting plant | |
CN206637950U (en) | A kind of energy-saving drying equipment | |
CN107127094A (en) | A kind of municipal works guardrail spray-painting plant | |
CN103008274B (en) | Cylinder part cleaning machine | |
CN107322336A (en) | A kind of handware perforating device | |
CN107905508A (en) | A kind of finishing paint spraying equipment | |
CN205631461U (en) | Aluminium scrap pipe compaction device | |
CN102527685A (en) | Step brushing and cleaning machine for cylinder barrels | |
CN107095635A (en) | Cleaning device at the top of a kind of household electrical appliance refrigerator | |
CN107095326A (en) | A kind of cleaning machinery for being used to clean peanut | |
CN206483597U (en) | A kind of plastic-spraying equipment | |
CN206300507U (en) | A kind of device for utilizing waste of industrial furnace | |
CN202683393U (en) | Product rotating device of spray paint assembly line | |
CN107130108A (en) | It is a kind of to facilitate cleaning-type rare-earth feed liquid deoiling device | |
CN208322893U (en) | Inboard wall of cylinder liner polishing cleaning device | |
CN110238762A (en) | A kind of environmentally protective sand-blasting machine of production hair side | |
CN107024082A (en) | Penholder air-dry apparatus is used in a kind of writing brush production | |
CN102120219A (en) | High-pressure jet flow cleaning technique test device | |
CN203540972U (en) | Valve cleaning machine | |
CN107552490A (en) | A kind of electric power cabinet dust removal machine | |
CN111085480A (en) | Carbon fiber automobile engine hood processing integrated device | |
CN206683340U (en) | A kind of writing brush is manufactured with penholder air-drying box | |
CN211515291U (en) | Carbon fiber automobile engine hood processing integrated device | |
CN202984157U (en) | Oil cylinder part washer | |
CN207385771U (en) | A kind of casting paint spraying apparatus |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20171215 |