CN107464024B - 基于覆冰形状试验的架空输电线路舞动预测方法及系统 - Google Patents
基于覆冰形状试验的架空输电线路舞动预测方法及系统 Download PDFInfo
- Publication number
- CN107464024B CN107464024B CN201710707442.3A CN201710707442A CN107464024B CN 107464024 B CN107464024 B CN 107464024B CN 201710707442 A CN201710707442 A CN 201710707442A CN 107464024 B CN107464024 B CN 107464024B
- Authority
- CN
- China
- Prior art keywords
- icing
- unevenness
- ice coating
- galloping
- transmission line
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 230000005540 biological transmission Effects 0.000 title claims abstract description 47
- 238000012360 testing method Methods 0.000 title claims abstract description 29
- 238000000034 method Methods 0.000 title claims abstract description 24
- 239000011248 coating agent Substances 0.000 claims abstract description 50
- 238000000576 coating method Methods 0.000 claims abstract description 50
- 238000012545 processing Methods 0.000 claims description 23
- 238000001514 detection method Methods 0.000 abstract description 2
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 2
- 239000004020 conductor Substances 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000008859 change Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
- 230000004044 response Effects 0.000 description 1
- 238000000547 structure data Methods 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A90/00—Technologies having an indirect contribution to adaptation to climate change
- Y02A90/10—Information and communication technologies [ICT] supporting adaptation to climate change, e.g. for weather forecasting or climate simulation
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Health & Medical Sciences (AREA)
- Marketing (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Tourism & Hospitality (AREA)
- Quality & Reliability (AREA)
- Development Economics (AREA)
- Game Theory and Decision Science (AREA)
- Operations Research (AREA)
- Entrepreneurship & Innovation (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)
- Suspension Of Electric Lines Or Cables (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
Claims (8)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710707442.3A CN107464024B (zh) | 2017-08-17 | 2017-08-17 | 基于覆冰形状试验的架空输电线路舞动预测方法及系统 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710707442.3A CN107464024B (zh) | 2017-08-17 | 2017-08-17 | 基于覆冰形状试验的架空输电线路舞动预测方法及系统 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107464024A CN107464024A (zh) | 2017-12-12 |
CN107464024B true CN107464024B (zh) | 2021-01-15 |
Family
ID=60549957
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710707442.3A Active CN107464024B (zh) | 2017-08-17 | 2017-08-17 | 基于覆冰形状试验的架空输电线路舞动预测方法及系统 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107464024B (zh) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113536568B (zh) * | 2021-07-15 | 2022-06-24 | 国网湖南省电力有限公司 | 基于输电线路舞动关键影响因素的舞动预测方法及系统 |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101794977B (zh) * | 2010-03-18 | 2013-05-01 | 华北电力大学 | 长距离输电线路的融冰方法 |
CN102261901B (zh) * | 2011-04-27 | 2012-11-14 | 中国电力工程顾问集团西南电力设计院 | 一种利用水汽压模型预测输电线路冰厚的方法 |
CN105095670B (zh) * | 2015-08-21 | 2017-03-22 | 国家电网公司 | 基于连续雨凇的输电线路覆冰厚度增长率分布图绘制方法 |
CN106203839B (zh) * | 2016-07-13 | 2018-04-03 | 国网湖南省电力公司 | 输电线路舞动影响关键因素辨识方法及系统 |
CN106503751A (zh) * | 2016-11-10 | 2017-03-15 | 国网河南省电力公司电力科学研究院 | 一种基于svm分类器的输电线路易舞气象条件预报方法 |
CN106682776B (zh) * | 2016-12-27 | 2018-04-17 | 国网湖南省电力公司 | 架空输电线路舞动精细化预测预警方法及系统 |
CN107436162B (zh) * | 2017-07-31 | 2019-07-12 | 国网湖南省电力有限公司 | 一种电网线路舞动发生预测方法和系统 |
-
2017
- 2017-08-17 CN CN201710707442.3A patent/CN107464024B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN107464024A (zh) | 2017-12-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107169645B (zh) | 一种计及暴雨灾害影响的输电线路故障概率在线评估方法 | |
CN113324489B (zh) | 一种基于导线弧垂变化精确测量的等值覆冰厚度监测方法 | |
EP3238311B1 (en) | Method and system for determining the thermal power line rating | |
CN106225843A (zh) | 一种基于小型雷达的输电线路广域覆冰监测预警方法 | |
EP3164637B1 (en) | Monitoring the structural health of columns | |
WO2019225064A1 (ja) | 気象予測装置、気象予測方法、並びに風力発電出力推定装置 | |
CN107389014B (zh) | 一种输电线路覆冰厚度预测方法 | |
CN106570780B (zh) | 基于灰色关联理论的输电线路舞动预警方法 | |
CN105117538A (zh) | 一种输电通道舞动预警方法 | |
KR101353387B1 (ko) | 변위센서를 이용한 통신 구조물 안전상태 감시 시스템 | |
WO2020170829A1 (ja) | 推定方法 | |
CN107464024B (zh) | 基于覆冰形状试验的架空输电线路舞动预测方法及系统 | |
CN105571642A (zh) | 一种电力系统输电线路覆冰高精度监测方法 | |
CN112291360B (zh) | 一种广告牌监测系统及监测方法 | |
CN112990678B (zh) | 基于多源数据融合的覆冰预警判定方法 | |
Roldsgaard et al. | Preliminary probabilistic prediction of ice/snow accretion on stay cables based on meteorological variables | |
CN104573192A (zh) | 一种架空线路耐张塔等值覆冰厚度的在线监测方法 | |
CN114812698B (zh) | 防雷监测方法、装置、可读存储介质及电子设备 | |
KR0130198B1 (ko) | 다기능형 번개 경보기 | |
CN110649505B (zh) | 输电线路覆冰的立体式监测方法及装置 | |
CN109342908B (zh) | 一种基于观察绝缘子的覆冰预警方法 | |
CN110442897B (zh) | 一种输电线塔倒塔情况分析方法 | |
CN112670893A (zh) | 基于高度订正的线路覆冰实况计算方法及系统 | |
Jones et al. | The development of a US climatology of extreme ice loads | |
CN112464536A (zh) | 输电线路覆冰故障预测的方法、装置、计算机设备和介质 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information | ||
CB02 | Change of applicant information |
Address after: 410000 Shaoshan North Road, Yuhua District, Hunan, No. 388, No. Applicant after: State Grid Hunan Electric Power Co., Ltd. Applicant after: National network Hunan Electric Power Co., Ltd. disaster prevention and Reduction Center Applicant after: Hunan Xiangdian Electric Power Text & Research Co., Ltd. Applicant after: State Grid Corporation of China Address before: 410000 Shaoshan North Road, Yuhua District, Hunan, No. 388, No. Applicant before: State Grid Hunan Electric Power Company Applicant before: State Grid Hunan Electric Power Company prevents and reduces natural disasters center Applicant before: Hunan Xiangdian Electric Power Text & Research Co., Ltd. Applicant before: State Grid Corporation of China |
|
GR01 | Patent grant | ||
GR01 | Patent grant |