CN107463436A - Course control method, device, storage medium and electronic equipment - Google Patents

Course control method, device, storage medium and electronic equipment Download PDF

Info

Publication number
CN107463436A
CN107463436A CN201710643266.1A CN201710643266A CN107463436A CN 107463436 A CN107463436 A CN 107463436A CN 201710643266 A CN201710643266 A CN 201710643266A CN 107463436 A CN107463436 A CN 107463436A
Authority
CN
China
Prior art keywords
priority
background
list
electronic equipment
predetermined amplitude
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710643266.1A
Other languages
Chinese (zh)
Other versions
CN107463436B (en
Inventor
杜冰
张俊
林志泳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Oppo Mobile Telecommunications Corp Ltd
Original Assignee
Guangdong Oppo Mobile Telecommunications Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Oppo Mobile Telecommunications Corp Ltd filed Critical Guangdong Oppo Mobile Telecommunications Corp Ltd
Priority to CN201710643266.1A priority Critical patent/CN107463436B/en
Publication of CN107463436A publication Critical patent/CN107463436A/en
Priority to PCT/CN2018/094219 priority patent/WO2019024640A1/en
Application granted granted Critical
Publication of CN107463436B publication Critical patent/CN107463436B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F1/00Details not covered by groups G06F3/00 - G06F13/00 and G06F21/00
    • G06F1/26Power supply means, e.g. regulation thereof
    • G06F1/32Means for saving power
    • G06F1/3203Power management, i.e. event-based initiation of a power-saving mode
    • G06F1/3234Power saving characterised by the action undertaken
    • G06F1/3287Power saving characterised by the action undertaken by switching off individual functional units in the computer system
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F9/00Arrangements for program control, e.g. control units
    • G06F9/06Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
    • G06F9/46Multiprogramming arrangements
    • G06F9/48Program initiating; Program switching, e.g. by interrupt
    • G06F9/4806Task transfer initiation or dispatching
    • G06F9/4843Task transfer initiation or dispatching by program, e.g. task dispatcher, supervisor, operating system
    • G06F9/485Task life-cycle, e.g. stopping, restarting, resuming execution
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F9/00Arrangements for program control, e.g. control units
    • G06F9/06Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
    • G06F9/46Multiprogramming arrangements
    • G06F9/48Program initiating; Program switching, e.g. by interrupt
    • G06F9/4806Task transfer initiation or dispatching
    • G06F9/4843Task transfer initiation or dispatching by program, e.g. task dispatcher, supervisor, operating system
    • G06F9/4881Scheduling strategies for dispatcher, e.g. round robin, multi-level priority queues
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02DCLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
    • Y02D10/00Energy efficient computing, e.g. low power processors, power management or thermal management

Abstract

The invention discloses a kind of course control method, device, storage medium and electronic equipment, the course control method includes:Obtain Process flowchart instruction;The priority of the background process for obtaining the electronic equipment, foreground process, current location and each background process is instructed according to the Process flowchart;Target process list is determined according to the current location;The priority of the background process is adjusted according to the target process list and foreground process;According to the open and close of the two priority classes background process after adjustment.Above-mentioned course control method can combine current location and effective management and control is carried out to background process, and flexibility is high, and method is simple, advantageously reduces terminal power consumption amount.

Description

Course control method, device, storage medium and electronic equipment
Technical field
The present invention relates to field of computer technology, more particularly to a kind of course control method, device, storage medium and electricity Sub- equipment.
Background technology
At present, most terminal devices can run the operating system of multi-user's multi-process.For background program, to not With program carry out pull-up when, it will usually carry out pull-up according to certain priority, currently existing application program it is excellent First level is often fixed, and user can not also realize the adjustment of limited level in the case where not knowing, and often partial service enters Journey is bound together with application program, if the priority of application program is higher, service processes are even without operationally often Continued to run with because of binding together, expend the electricity of terminal.
The content of the invention
The embodiment of the present invention provides a kind of course control method, device, storage medium and electronic equipment, can effectively manage Control background process, reduce the waste of terminal power.
The embodiments of the invention provide a kind of course control method, applied to electronic equipment, including:
Obtain Process flowchart instruction;
According to Process flowchart instruction obtain the background process of the electronic equipment, foreground process, current location and The priority of each background process;
Target process list is determined according to the current location;
The priority of the background process is adjusted according to the target process list and foreground process;
The open and close of background process according to two priority classes after adjustment.
The embodiment of the present invention additionally provides a kind of progress control unit, applied to electronic equipment, including:
First acquisition module, for obtaining Process flowchart instruction;
Second acquisition module, for obtaining the background process of the electronic equipment, foreground according to Process flowchart instruction The priority of process, current location and each background process;
Determining module, for determining target process list according to the current location;
Adjusting module, for being carried out according to the target process list and foreground process to the priority of the background process Adjustment;
Control module, the open and close for the background process according to two priority classes after adjustment.
The embodiment of the present invention additionally provides a kind of storage medium, and a plurality of instruction, the finger are stored with the storage medium Order is suitable to be loaded by processor to perform any of the above-described course control method.
The embodiment of the present invention additionally provides a kind of electronic equipment, including processor and memory, the processor with it is described Memory is electrically connected with, and the memory is used for store instruction and data, and the processor is used to perform any of the above-described process Control method.
Course control method, device, storage medium and electronic equipment provided by the invention, are referred to by obtaining Process flowchart Order, and background process, foreground process, current location and each backstage for obtaining the electronic equipment are instructed according to the Process flowchart The priority of process, then, target process list is determined according to the current location, and enter according to the target process list and foreground Journey is adjusted to the priority of the background process, afterwards, according to the unlatching of the two priority classes background process and pass after adjustment Close, effective management and control is carried out to background process so as to combine current location, flexibility is high, and method is simple, advantageously reduces end Hold power consumption.
Brief description of the drawings
Below in conjunction with the accompanying drawings, by the way that the embodiment of the present invention is described in detail, technical scheme will be made And other beneficial effects are apparent.
Fig. 1 is the application scenarios schematic diagram of process control system provided in an embodiment of the present invention.
Fig. 2 is the schematic flow sheet of course control method provided in an embodiment of the present invention.
Fig. 3 is another schematic flow sheet of course control method provided in an embodiment of the present invention.
Fig. 4 is the storage schematic diagram of local data base provided in an embodiment of the present invention.
Fig. 5 is the structural representation of progress control unit provided in an embodiment of the present invention.
Fig. 6 is another structural representation of progress control unit provided in an embodiment of the present invention.
Fig. 7 is the structural representation of creation module provided in an embodiment of the present invention.
Fig. 8 is the structural representation of adjusting module provided in an embodiment of the present invention.
Fig. 9 is the structural representation of electronic equipment provided in an embodiment of the present invention.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, rather than whole embodiments.It is based on Embodiment in the present invention, the every other implementation that those skilled in the art are obtained under the premise of creative work is not made Example, belongs to the scope of protection of the invention.
The embodiment of the present invention provides a kind of course control method, device, storage medium, electronic equipment and system.
Referring to Fig. 1, Fig. 1 is the application scenario diagram of process control system, the process control system can include the present invention Any electronic equipment provided.
Wherein, electronic equipment can obtain Process flowchart instruction, and instructed according to the Process flowchart and obtain the electronic equipment Background process, foreground process, the priority of current location and each background process, then, determined according to the current location Target process list, and the priority of the background process is adjusted according to the target process list and foreground process, afterwards, According to the open and close of the two priority classes background process after adjustment.
For example when electric quantity for electronic equipment is relatively low or CPU usage is higher, Process flowchart instruction can be generated, now, Electronic equipment can be instructed according to the Process flowchart obtain foreground process Q, background process { H1, H2 ... Hn }, current location P1 and The priority of each background process, the priority can be that producer sets when electronic equipment dispatches from the factory, and afterwards, electronic equipment can So that target process list M1 is determined from local data base according to current location P1, can be stored in the local data base it is multiple enter Cheng Liebiao { M1, M2 ... Mn }, such as position P1 corresponding table M1, position P2 corresponding tables M2, etc., and according to foreground process Q and mesh Mark process list M1 can be adjusted to the priority of background process, afterwards, according to two priority classes { H1, H2 ... after adjustment Hn } open and close.
The present embodiment will be described from the angle of progress control unit, and the progress control unit can specifically be used as independent Entity realize that can also be integrated in electronic equipment, such as terminal to realize, the terminal can include mobile phone, flat board electricity Brain and personal computer etc..
As shown in Fig. 2 the course control method can apply to electronic equipment, its idiographic flow can be as follows:
S101, obtain Process flowchart instruction.
In the present embodiment, because the operation of process can influence the electricity, CPU usage and the speed of service of electronic equipment Deng, thus the Process flowchart instruction trigger condition can depending on electricity, CPU usage and the speed of service, such as, work as electricity Amount or the speed of service are less than certain value, or when CPU usage is higher than certain value, electronic equipment can trigger generation Process flowchart Instruction, it is of course also possible to when being that the number of processes run in electronic equipment exceedes certain value, triggering generation Process flowchart instruction.
S102, instructed according to the Process flowchart obtain the background process of the electronic equipment, foreground process, current location and The priority of each background process.
In the present embodiment, the priority can be set in advance according to the attribute information of each process, such as system The priority of process can be higher than the priority of nonsystematic process, and the priority of instant messaging process can be higher than shopping process Priority, etc..The current location can by GPS (Global PositioningSystem, global positioning system) position, The modes such as cellular data network is positioned or WiFi is positioned obtain, and it is attached that cellular data network positioning is based primarily upon electronic equipment Near base station location realizes that WiFi network positioning is based primarily upon the LAN title that electronic equipment is connected, namely SSID (Service Set Identifier, service set) is realized.
S103, target process list determined according to the current location.
In the present embodiment, can be stored in the target process list with some related processes of position, these processes can To be obtained by the history run to process in electronic equipment and place of operation statistical analysis, for example can first determine several The place that individual user often goes, then count and often remove the history run of process in place each, according to history run feelings Condition establishes this and often removes process list corresponding to place, wherein, it is each that often to go to place can be that user voluntarily sets according to own situation What fixed or electronic equipment directly went out according to place of operation induction and conclusion, afterwards, by the process list established and often Go to place to be associated storage, follow-up can according to corresponding to obtaining current location process list as target process list .
Certainly, it is contemplated that in actual use, user haunt is typically a regional extent, and simultaneously non-precision Place, thus establish can be regional extent and process list corresponding relation, now, above-mentioned steps are " according to the current location Determine target process list " it can specifically include:
Determine the preset position area belonging to the current location;
Process list corresponding to the preset position area determined is obtained, as target process list.
In the present embodiment, the preset position area can be user's sets itself or electronic equipment according to going through History place of operation is summarized, and it can include family, office or subway etc..It is easily understood that the process list should Set in advance, that is, before above-mentioned steps S103, the course control method can also include:
Number of run, the fortune of operation process and the operation process in 1-1, acquisition historical period in the electronic equipment Row duration and place of operation.
1-2, according to the place of operation operation process is divided, obtain at least one operation process group.
In the present embodiment, the historical period can be manually set, such as one month in the past or half a year.The place of operation is main Refer to operation process operationally, the location of the electronic equipment.The operation process group includes at least one operation process, and it can To be user in the used all operation processes of same preset position area, now, above-mentioned steps 1-2 can specifically include: Operation process corresponding to the place of operation in same preset position area will be belonged to and be classified as one group.Certainly, the operation process group is also Can be user in the used all operation processes in same place of operation.
1-3, the process list according to corresponding to creating the number of run and operation duration that process is run in the operation process group.
For example, above-mentioned steps 1-3 can specifically include:
Running frequency of the corresponding operation process in the historical period is calculated according to the number of run and operation duration;
The operation process in the operation process group is ranked up according to the running frequency;
The process list according to corresponding to creating the operation process group after sequence.
In the present embodiment, the operation in operation process group can be entered from high to low or from low to high according to running frequency Journey is ranked up, afterwards can be directly using the operation process group after sequence as process list.Certainly, it is contemplated that the process list It is mainly used in screening background process, if the quantity of process is excessive in process list, screening purpose may not be reached, therefore The higher a number of operation process of running frequency can be chosen, or chooses the process wound that running frequency is more than certain frequency Build process list.
S104, according to the target process list and foreground process the priority of the background process is adjusted.
For example, above-mentioned steps S104 can specifically include:
2-1, obtain association process corresponding to the foreground process.
In the present embodiment, the association process refers to the process associated with foreground process, and it can set in advance, For example can be association process associated with each other by the process definition for belonging to same application.
2-2, acquisition and the association process identical background process, as the first process;Obtain in the target process list Comprising background process, as the second process.
It should be noted that because foreground process is the process that user is used, after its importance is usually above other Platform process, and the first process is the background process relevant with foreground process, thus the importance of first process it is different and other Background process, at the same time, because second process is the background process in target process list, and the target process list It is relevant with current location, therefore the importance of second process is also different from other background process.
2-3, according to first process and the second process the priority of the background process is adjusted.
For example, above-mentioned steps 2-3 can specifically include:
Judge to whether there is identical background process in first process and the second process;
If in the presence of heightening the priority of the identical background process with the first predetermined amplitude;
If being not present, the priority of first process is heightened with the second predetermined amplitude, this is heightened with the 3rd predetermined amplitude The priority of second process, first predetermined amplitude are more than the second predetermined amplitude, and second predetermined amplitude is more than the 3rd default width Degree.
In the present embodiment, first predetermined amplitude, the second predetermined amplitude and the 3rd predetermined amplitude need user to set in advance It is good, for example it can be 4 grades, 3 grades and 2 grades etc. successively.It is relative in view of first process or the second process In user significance level apparently higher than other background process, therefore when in the presence of overlap the first process (or second process) when, can On the basis of existing priority, to lift the priority of the first process (or second process) of the coincidence with amplitude peak, and For misaligned the first process and the second process, it lifts amplitude can be with more relatively low, certainly, the lifting of the first process The lifting amplitude of amplitude and the second process requires without obvious height to each other, can be with actual demand depending on.
In addition, above-mentioned steps 2-3 can also include:
The background process in addition to first process and the second process is obtained, as the 3rd process;
The priority of the 3rd process is reduced with the 4th predetermined amplitude.
In the present embodiment, for neither the first process and be not the background process of the second process, its significance level should It is minimum, at this point it is possible to its existing priority is not adjusted, or, it is existing excellent its can also to be reduced with the 4th predetermined amplitude First level, the size and the first predetermined amplitude of the 4th predetermined amplitude, do not have between the second predetermined amplitude and the 3rd predetermined amplitude Positive connection, it can set in advance.
S105, the open and close according to the two priority classes background process after adjustment.
For example, above-mentioned steps S105 can specifically include:
Obtain be located at after preset position adjustment after background process corresponding to priority, or obtain less than predetermined level tune Background process corresponding to priority after whole, as target process;
Close the target process.
In the present embodiment, the default position can according to the actual requirements depending on, for example can be 3 or 4, the predetermined level can be with Depending on the priority level divided altogether according to electronic equipment, for example when division has ten priority levels altogether, this is default Grade can be the third level.Specifically, because the higher process of priority is more important to user, therefore working as needs to enter background process During row cleaning, it can pay the utmost attention to close the relatively low process of priority, these processes can be priority less than a certain degree of Process or relatively low a number of process.Certainly, can be with for the backstage progress without shutoff operation The higher part of priority maintains active state, and another part freezed, or all maintains active state, specifically can be with Depending on according to the actual requirements.
From the foregoing, the course control method that the present embodiment provides, applied to electronic equipment, by obtaining Process flowchart Instruction, and instructed according to the Process flowchart obtain the background process of the electronic equipment, foreground process, current location and it is each after The priority of platform process, then, target process list is determined according to the current location, and according to the target process list and foreground Process is adjusted to the priority of the background process, afterwards, according to the unlatching of the two priority classes background process after adjustment with Close, effective management and control is carried out to background process so as to combine current location, flexibility is high, and method is simple, advantageously reduces Terminal power consumption amount.
In the present embodiment, will be described in detail so that the progress control unit specifically integrates in the electronic device as an example.
Fig. 3 is referred to, a kind of course control method, idiographic flow can be as follows:
S201, electronic equipment obtain the fortune of the operation process and the operation process in historical period in the electronic equipment Places number, operation duration and place of operation.
For example, the historical period can be one month or two months etc. be manually set.The place of operation can pass through GPS The modes such as positioning, cellular data network positioning or WiFi positioning obtain.Generally, in the historical period, electronic equipment can be remembered Record the operation information of each process in it, including number of run, operation duration and place of operation etc..
S202, electronic equipment will belong to operation process corresponding to the place of operation in same preset position area and be classified as one Group, obtain at least one operation process group.
For example, the preset position area can be that electronic equipment is summarized according to place of operation, for example will can count The place of operation that number is more, stay time is longer is defined as common site, then using the common site as the center of circle, specified numerical value A border circular areas is determined for radius, using the border circular areas as preset position area, generally, the preset position area can wrap Include family, office and some Condoms often gone etc..
S203, electronic equipment calculate corresponding operation process in the historical period according to the number of run and operation duration Running frequency, and the operation process in the operation process group is ranked up according to the running frequency.
For example, the operation process in operation process group can be carried out from high to low or from low to high according to running frequency Sequence.The running frequency actually reflects the use preference of user, and the application that different places user gets used to may differ Sample, so as to which the process of operation is also different, for example user is in subway, using duration it is longer can be that the palm is read, wechat is read Etc. application process;User stay at home network environment under, usage time it is longer can be the application processes such as wechat, microblogging;With Family in office, usage time it is longer can be nail nail, the application process of office software such as Email, etc..
S204, the electronic equipment process list according to corresponding to creating the operation process group after sequence.
For example, the higher a number of operation process of running frequency can be chosen, or chooses running frequency and is more than one Determine the operation process creation process list of frequency, afterwards, establish these process lists and the incidence relation of preset position area, and By incidence relation storage in the local database.
S205, electronic equipment obtain Process flowchart instruction.
For example, electronic equipment can be less than certain value in electricity or the speed of service, or CPU usage is higher than certain value, Or number of processes is when exceeding certain value, triggering generation Process flowchart instruction.
S206, electronic equipment instruct according to the Process flowchart obtains the background process of the electronic equipment, foreground process, current Position and the priority of each background process.
In the present embodiment, the priority can be set in advance according to the attribute information of each process, such as system The priority of process can be higher than the priority of nonsystematic process, and the priority of instant messaging process can be higher than shopping process Priority, etc..
S207, electronic equipment determine the preset position area belonging to the current location, and obtain the predeterminated position of determination Process list corresponding to region, as target process list.
For example, Fig. 4 is referred to, process list { M1, M2 ... Mn } can be stored with local data base, and be associated with depositing The preset position area of storage can include { office, family ... subway }, and wherein M1 can include the applications such as nail nail, Email and enter Journey, M2 can include the application processes such as wechat, microblogging, the application process such as M3 can be read including the palm, wechat reading, if current location Belong to family, then the target process list got is M2, if current location belongs to office, the target process got arranges Table is M1.
S208, electronic equipment obtain association process corresponding to the foreground process, and after acquisition and the association process identical Platform process, as the first process, the background process included in the target process list is obtained, as the second process.
S209, electronic equipment judge to whether there is identical background process in first process and the second process, if so, then The priority of the identical background process is heightened with the first predetermined amplitude, if it is not, then performing following step S210.
For example, it is contemplated that first process or the second process are entered from the background relative to the significance level of user apparently higher than other Journey, therefore when in the presence of the first process (or second process) overlapped, it can be carried on the basis of existing priority with amplitude peak The priority of the first process (or second process) of the coincidence is risen, namely first predetermined amplitude can be maximum regulation width Degree, such as 4 grades.
S210, electronic equipment obtain the background process in addition to first process and the second process, as the 3rd process, and The priority of first process is heightened with the second predetermined amplitude, the priority of second process is heightened with the 3rd predetermined amplitude, with 4th predetermined amplitude reduces the priority of the 3rd process.
For example, second predetermined amplitude, the 3rd predetermined amplitude and the 4th predetermined amplitude can successively decrease successively, for example be followed successively by 3 grades, 2 grades and 1 grade.
S211, electronic equipment obtain be located at after preset position adjustment after background process corresponding to priority, or obtain it is low The background process corresponding to priority after the adjustment of predetermined level, as target process, and closes the target process.
For example, the default position can be 3 or 4.The predetermined level can be the third level, and now, total priority can be drawn It is divided into ten grades, higher grade, and representative is more important to user.When needing to clear up background process, can pay the utmost attention to Close the relatively low process of priority, these processes can be priority less than a certain degree of process or relatively low A number of process.
From the foregoing, the course control method that the present embodiment provides, wherein electronic equipment can be obtained in historical period Number of run, operation duration and the place of operation of operation process and the operation process in the electronic equipment, and will belong to same Operation process is classified as one group corresponding to place of operation in one preset position area, obtains at least one operation process group, then, Running frequency of the corresponding operation process in the historical period is calculated according to the number of run and operation duration, and according to the operation Frequency is ranked up to the operation process in the operation process group, then, according to corresponding to creating the operation process group after sequence Process list, so as to store the incidence relation of each preset position area and process list in the local database, side Method is simple, afterwards, when electronic equipment gets Process flowchart instruction, the acquisition electronics can be instructed to set according to the Process flowchart Standby background process, foreground process, the priority of current location and each background process, it is then determined the current location institute The preset position area of category, and process list corresponding to the preset position area of determination is obtained, as target process list, connect , obtain association process corresponding to the foreground process, and acquisition and the association process identical background process, enter as first Journey, the background process included in the target process list is obtained, as the second process, next, it is determined that first process and second It whether there is identical background process in process, if so, then heightening the preferential of the identical background process with the first predetermined amplitude Level, if it is not, the background process in addition to first process and the second process is then obtained, as the 3rd process, and it is default with second Amplitude heightens the priority of first process, and the priority of second process is heightened with the 3rd predetermined amplitude, with the 4th default width Degree reduces the priority of the 3rd process, afterwards, obtains background process corresponding to priority after the adjustment that position is preset after being located at, or Person obtains background process corresponding to priority after the adjustment less than predetermined level, as target process, and closes the target process, Effective management and control is carried out to background process so as to combine current location, flexibility is high, and method is simple, advantageously reduces terminal consumption Electricity.
Method according to described by above-described embodiment, the present embodiment will further be retouched from the angle of progress control unit State, the progress control unit can integrate in the electronic device.
Referring to Fig. 5, progress control unit provided in an embodiment of the present invention has been described in detail in Fig. 5, applied to electronic equipment, It can include:First acquisition module 10, the second acquisition module 20, determining module 30, adjusting module 40 and control module 50, its In:
(1) first acquisition module 10
First acquisition module 10, for obtaining Process flowchart instruction.
In the present embodiment, because the operation of process can influence the electricity, CPU usage and the speed of service of electronic equipment Deng, thus the Process flowchart instruction trigger condition can depending on electricity, CPU usage and the speed of service, such as, work as electricity Amount or the speed of service are less than certain value, or when CPU usage is higher than certain value, electronic equipment can trigger generation Process flowchart Instruction, it is of course also possible to when being that the number of processes run in electronic equipment exceedes certain value, triggering generation Process flowchart instruction.
(2) second acquisition modules 20
Second acquisition module 20, for instructing the background process for obtaining the electronic equipment, foreground to enter according to the Process flowchart The priority of journey, current location and each background process.
In the present embodiment, the priority can be set in advance according to the attribute information of each process, such as system The priority of process can be higher than the priority of nonsystematic process, and the priority of instant messaging process can be higher than shopping process Priority, etc..The current location can by GPS (Global PositioningSystem, global positioning system) position, The modes such as cellular data network is positioned or WiFi is positioned obtain, and it is attached that cellular data network positioning is based primarily upon electronic equipment Near base station location realizes that WiFi network positioning is based primarily upon the LAN title that electronic equipment is connected, namely SSID (Service Set Identifier, service set) is realized.
(3) determining module 30
Determining module 30, for determining target process list according to the current location.
In the present embodiment, can be stored in the target process list with some related processes of position, these processes can To be obtained by the history run to process in electronic equipment and place of operation statistical analysis, for example can first determine several The place that individual user often goes, then count and often remove the history run of process in place each, according to history run feelings Condition establishes this and often removes process list corresponding to place, wherein, it is each that often to go to place can be that user voluntarily sets according to own situation What fixed or electronic equipment directly went out according to place of operation induction and conclusion, afterwards, by the process list established and often Go to place to be associated storage, follow-up can according to corresponding to obtaining current location process list as target process list .
Certainly, it is contemplated that in actual use, user haunt is typically a regional extent, and simultaneously non-precision Place, thus establish can be regional extent and process list corresponding relation, now, above-mentioned determining module 30 can specifically be used In:
Determine the preset position area belonging to the current location;
Process list corresponding to the preset position area determined is obtained, as target process list.
In the present embodiment, the preset position area can be user's sets itself or electronic equipment according to going through History place of operation is summarized, and it can include family, office or subway etc..It is easily understood that the process list should Set in advance, that is, referring to Fig. 6 and Fig. 7, the progress control unit can also include creating mould 60, the establishment mould Block 60 can specifically include the 3rd acquisition submodule 61, division submodule 62 and create submodule 63, wherein:
3rd acquisition submodule 61, for the determining module 30 according to the current location determine target process list it Before, number of run, operation duration and the fortune of operation process and the operation process in acquisition historical period in the electronic equipment Row place;
Submodule 62 is divided, for being divided according to the place of operation to the operation process, obtains at least one operation Process group;
In the present embodiment, the historical period can be manually set, such as one month in the past or half a year.The place of operation is main Refer to operation process operationally, the location of the electronic equipment.The operation process group includes at least one operation process, and it can To be user in the used all operation processes of same preset position area, now, the division submodule 62 can specifically be used In:Operation process corresponding to the place of operation in same preset position area will be belonged to and be classified as one group.Certainly, the operation process group It can also be user in the used all operation processes in same place of operation.
Submodule 63 is created, for according to the number of run and operation duration establishment pair that process is run in the operation process group The process list answered.
For example, the establishment submodule 63 specifically can be used for:
Running frequency of the corresponding operation process in the historical period is calculated according to the number of run and operation duration;
The operation process in the operation process group is ranked up according to the running frequency;
The process list according to corresponding to creating the operation process group after sequence.
In the present embodiment, creating submodule 63 can be according to running frequency from high to low or from low to high to running process Operation process in group is ranked up, afterwards can be directly using the operation process group after sequence as process list.Certainly, consider It is mainly used in screening background process to the process list, if the quantity of process is excessive in process list, may reaches not To screening purpose, therefore the higher a number of operation process of running frequency can be chosen by creating submodule 63, or choose fortune Line frequency is more than the process creation process list of certain frequency.
(4) adjusting module 40
Adjusting module 40, for being adjusted according to the target process list and foreground process to the priority of the background process It is whole.
For example, referring to Fig. 8, the adjusting module 40 can specifically include first and obtain submodule 41, the second acquisition submodule 42 and adjustment submodule 43, wherein:
First obtains submodule 41, for obtaining association process corresponding to the foreground process.
In the present embodiment, the association process refers to the process associated with foreground process, and it can set in advance, For example can be association process associated with each other by the process definition for belonging to same application.
Second acquisition submodule 42, for acquisition and the association process identical background process, as the first process;Obtain The background process included in the target process list, as the second process.
It should be noted that because foreground process is the process that user is used, after its importance is usually above other Platform process, and the first process is the background process relevant with foreground process, thus the importance of first process it is different and other Background process, at the same time, because second process is the background process in target process list, and the target process list It is relevant with current location, therefore the importance of second process is also different from other background process.
Submodule 43 is adjusted, for being adjusted according to first process and the second process to the priority of the background process It is whole.
For example, the adjustment submodule 43 specifically can be used for:
Judge to whether there is identical background process in first process and the second process;
If in the presence of heightening the priority of the identical background process with the first predetermined amplitude;
If being not present, the priority of first process is heightened with the second predetermined amplitude, this is heightened with the 3rd predetermined amplitude The priority of second process, first predetermined amplitude are more than the second predetermined amplitude, and second predetermined amplitude is more than the 3rd default width Degree.
In the present embodiment, first predetermined amplitude, the second predetermined amplitude and the 3rd predetermined amplitude need user to set in advance It is good, for example it can be 4 grades, 3 grades and 2 grades etc. successively.It is relative in view of first process or the second process In user significance level apparently higher than other background process, therefore when in the presence of overlap the first process (or second process) when, adjust Whole submodule 43 on the basis of existing priority, can lift the first process (or second process) of the coincidence with amplitude peak Priority, and for misaligned the first process and the second process, its lifted amplitude can with more relatively low, certainly, the The lifting amplitude of one process and the lifting amplitude of the second process require without obvious height to each other, can with actual demand and It is fixed.
In addition, the adjustment submodule 43 can be also used for:
The background process in addition to first process and the second process is obtained, as the 3rd process;
The priority of the 3rd process is reduced with the 4th predetermined amplitude.
In the present embodiment, for neither the first process and be not the background process of the second process, its significance level should Minimum, now, its existing priority can not be adjusted for adjustment submodule 43, or, can also be with the 4th predetermined amplitude Its existing priority is reduced, the size of the 4th predetermined amplitude and the first predetermined amplitude, the second predetermined amplitude and the 3rd are default There is no positive connection between amplitude, it can set in advance.
(5) control module 50
Control module 50, for the open and close according to the two priority classes background process after adjustment.
For example, the control module 50 specifically can be used for:
Obtain be located at after preset position adjustment after background process corresponding to priority, or obtain less than predetermined level tune Background process corresponding to priority after whole, as target process;
Close the target process.
In the present embodiment, the default position can according to the actual requirements depending on, for example can be 3 or 4, the predetermined level can be with Depending on the priority level divided altogether according to electronic equipment, for example when division has ten priority levels altogether, this is default Grade can be the third level.Specifically, because the higher process of priority is more important to user, therefore working as needs to enter background process During row cleaning, it can pay the utmost attention to close the relatively low process of priority, these processes can be priority less than a certain degree of Process or relatively low a number of process.Certainly, can be with for the backstage progress without shutoff operation The higher part of priority maintains active state, and another part freezed, or all maintains active state, specifically can be with Depending on according to the actual requirements.
It when it is implemented, above unit can be realized as independent entity, can also be combined, be made Realized for same or several entities, the specific implementation of above unit can be found in embodiment of the method above, herein not Repeat again.
From the foregoing, the progress control unit that the present embodiment provides, applied to electronic equipment, passes through the first acquisition module 10 obtain Process flowcharts instruction, the second acquisition module 20 according to the Process flowchart instruct obtain the electronic equipment background process, The priority of foreground process, current location and each background process, it is then determined module 30 determines mesh according to the current location Process list is marked, adjusting module 40 is adjusted according to the target process list and foreground process to the priority of the background process Whole, afterwards, control module 50 is current so as to combine according to the open and close of the two priority classes background process after adjustment Place carries out effective management and control to background process, and flexibility is high, and method is simple, advantageously reduces terminal power consumption amount.
In addition, the embodiment of the present invention additionally provides a kind of storage medium, wherein, a plurality of finger is stored with the storage medium Order, the instruction are suitable to be loaded as processor to perform the course control method described by any of the above-described embodiment.
In addition, the embodiment of the present invention additionally provides a kind of electronic equipment, the electronic equipment can be smart mobile phone, flat board electricity The equipment such as brain.Shown in Fig. 9, electronic equipment 700 includes processor 701, memory 702, display screen 703 and control circuit 704. Wherein, processor 701 is electrically connected with memory 702, display screen 703, control circuit 704 respectively.
Processor 701 is the control centre of electronic equipment 700, utilizes various interfaces and the whole electronic equipment of connection Various pieces, by the application program of operation or load store in memory 702, and call and be stored in memory 702 Data, the various functions and processing data of electronic equipment are performed, so as to carry out integral monitoring to electronic equipment.
In the present embodiment, processor 701 in electronic equipment 700 can according to the steps, by one or one with On application program process corresponding to instruction be loaded into memory 702, and be stored in memory by processor 701 to run Application program in 702, so as to realize various functions:
Obtain Process flowchart instruction;
Instructed according to the Process flowchart and obtain the background process of the electronic equipment, foreground process, current location and each The priority of background process;
Target process list is determined according to the current location;
The priority of the background process is adjusted according to the target process list and foreground process;
According to the open and close of the two priority classes background process after adjustment.
In certain embodiments, the priority of the background process is carried out according to the target process list and foreground process During adjustment, the processor is used to perform following steps:
Obtain association process corresponding to the foreground process;
Acquisition and the association process identical background process, as the first process;
The background process included in the target process list is obtained, as the second process;
The priority of the background process is adjusted according to first process and the second process.
In certain embodiments, the priority of the background process is adjusted according to first process and the second process When, the processor is used to perform following steps:
Judge to whether there is identical background process in first process and the second process;
If in the presence of heightening the priority of the identical background process with the first predetermined amplitude;
If being not present, the priority of first process is heightened with the second predetermined amplitude, this is heightened with the 3rd predetermined amplitude The priority of second process, first predetermined amplitude are more than the second predetermined amplitude, and second predetermined amplitude is more than the 3rd default width Degree.
In certain embodiments, the priority of the background process is adjusted according to first process and the second process When, the processor is additionally operable to perform following steps:
The background process in addition to first process and the second process is obtained, as the 3rd process;
The priority of the 3rd process is reduced with the 4th predetermined amplitude.
In certain embodiments, before target process list is determined according to the current location, the processor is additionally operable to hold Row following steps:
When obtaining number of run, the operation of the operation process and the operation process in historical period in the electronic equipment Long and place of operation;
The operation process is divided according to the place of operation, obtains at least one operation process group;
According to process list corresponding to number of run and operation duration establishment that process is run in the operation process group.
In certain embodiments, according to the number of run and operation duration establishment pair that process is run in the operation process group During the process list answered, the processor is used to perform following steps:
Running frequency of the corresponding operation process in the historical period is calculated according to the number of run and operation duration;
The operation process in the operation process group is ranked up according to the running frequency;
The process list according to corresponding to creating the operation process group after sequence.
In certain embodiments, when being divided according to the place of operation to the operation process, the processor is used to hold Row following steps:
Operation process corresponding to the place of operation in same preset position area will be belonged to and be classified as one group;
This determines target process list according to the current location, including:Determine the predeterminated position area belonging to the current location Domain;Process list corresponding to the preset position area determined is obtained, as target process list.
Memory 702 can be used for storage application program and data.Including in the application program that memory 702 stores can be The instruction performed in processor.Application program can form various functions module.Processor 701 is stored in memory by operation 702 application program, so as to perform various function application and data processing.
Display screen 703 can be used for display by the information of user's input or be supplied to the information of user and the various figures of terminal Shape user interface, these graphical user interface can be made up of image, text, icon, video and its any combination.
Control circuit 704 is electrically connected with display screen 703, for the display information of control display screen 703.
In certain embodiments, as shown in figure 9, electronic equipment 700 also includes:Radio circuit 705, input block 706, sound Frequency circuit 707, sensor 708 and power supply 709.Wherein, processor 701 respectively with radio circuit 705, input block 706, sound Frequency circuit 707, sensor 708 and power supply 709 are electrically connected with.
Radio circuit 705 is used for transceiving radio frequency signal, to be built by radio communication and the network equipment or other electronic equipments Vertical wireless telecommunications, the receiving and transmitting signal between the network equipment or other electronic equipments.
Input block 706 can be used for numeral, character information or the user's characteristic information (such as fingerprint) for receiving input, and Keyboard, mouse, action bars, optics or the trace ball signal relevant with user's setting and function control is produced to input.Wherein, Input block 706 can include fingerprint recognition module.
Voicefrequency circuit 707 can provide the COBBAIF between user and terminal by loudspeaker, microphone.
Electronic equipment 700 can also include at least one sensor 708, for example, optical sensor, motion sensor and its His sensor.Specifically, optical sensor may include ambient light sensor and proximity transducer, wherein, ambient light sensor can root The brightness of display panel is adjusted according to the light and shade of ambient light, proximity transducer can close display when terminal is moved in one's ear Panel and/or backlight.As one kind of motion sensor, gravity accelerometer can detect in all directions (generally three Axle) acceleration size, size and the direction of gravity are can detect that when static, available for identification mobile phone posture application (such as Horizontal/vertical screen switching, dependent game, magnetometer pose calibrating), Vibration identification correlation function (such as pedometer, tap) etc.;As for The other sensors such as gyroscope that terminal can also configure, barometer, hygrometer, thermometer, infrared ray sensor, it is no longer superfluous herein State.
The all parts that power supply 709 is used for electron equipment 700 are powered.In certain embodiments, power supply 709 can pass through Power-supply management system and processor 701 are logically contiguous, so as to realize management charging, electric discharge, Yi Jigong by power-supply management system The functions such as consumption management.
Although not shown in Fig. 9, electronic equipment 700 can also include camera, bluetooth module etc., will not be repeated here.
Electronic equipment provided in an embodiment of the present invention, instructed by obtaining Process flowchart, and instructed according to the Process flowchart The priority of the background process of the electronic equipment, foreground process, current location and each background process is obtained, then, according to The current location determines target process list, and the priority according to the target process list and foreground process to the background process It is adjusted, afterwards, according to the open and close of the two priority classes background process after adjustment, so as to reference to current location Effective management and control is carried out to background process, flexibility is high, and method is simple, advantageously reduces terminal power consumption amount.
It should be noted that one of ordinary skill in the art will appreciate that whole in the various methods of above-described embodiment or Part steps are by program the hardware of correlation can be instructed to complete, and the program can be stored in a computer-readable storage In medium, storage medium can include:Read-only storage (ROM, Read Only Memory), random access memory (RAM, Random Access Memory), disk or CD etc..
In summary, although the present invention is disclosed above with preferred embodiment, above preferred embodiment simultaneously is not used to limit The system present invention, one of ordinary skill in the art, without departing from the spirit and scope of the present invention, it can make various changes and profit Decorations, therefore protection scope of the present invention is defined by the scope that claim defines.

Claims (16)

  1. A kind of 1. course control method, applied to electronic equipment, it is characterised in that including:
    Obtain Process flowchart instruction;
    The background process of the electronic equipment, foreground process, current location and each are obtained according to Process flowchart instruction The priority of background process;
    Target process list is determined according to the current location;
    The priority of the background process is adjusted according to the target process list and foreground process;
    The open and close of background process according to two priority classes after adjustment.
  2. 2. course control method according to claim 1, it is characterised in that it is described according to the target process list and before Platform process is adjusted to the priority of the background process, including:
    Obtain association process corresponding to the foreground process;
    Acquisition and the association process identical background process, as the first process;
    The background process included in the target process list is obtained, as the second process;
    The priority of the background process is adjusted according to first process and the second process.
  3. 3. course control method according to claim 2, it is characterised in that described to be entered according to first process and second Journey is adjusted to the priority of the background process, including:
    Judge to whether there is identical background process in first process and the second process;
    If in the presence of heightening the priority of the identical background process with the first predetermined amplitude;
    If being not present, the priority of first process is heightened with the second predetermined amplitude, is heightened with the 3rd predetermined amplitude described The priority of second process, first predetermined amplitude are more than the second predetermined amplitude, and it is pre- that second predetermined amplitude is more than the 3rd If amplitude.
  4. 4. course control method according to claim 3, it is characterised in that described to be entered according to first process and second Journey is adjusted to the priority of the background process, in addition to:
    The background process in addition to first process and the second process is obtained, as the 3rd process;
    The priority of the 3rd process is reduced with the 4th predetermined amplitude.
  5. 5. according to the course control method described in any one in claim 1-4, it is characterised in that according to the present bit Put before determining target process list, in addition to:
    When obtaining number of run, the operation of the operation process and the operation process in historical period in the electronic equipment Long and place of operation;
    The operation process is divided according to the place of operation, obtains at least one operation process group;
    According to process list corresponding to number of run and operation duration establishment that process is run in the operation process group.
  6. 6. course control method according to claim 5, it is characterised in that described to be run according in the operation process group Process list corresponding to number of run and the operation duration establishment of process, including:
    Running frequency of the corresponding operation process in the historical period is calculated according to the number of run and operation duration;
    The operation process in the operation process group is ranked up according to the running frequency;
    The process list according to corresponding to creating the operation process group after sequence.
  7. 7. course control method according to claim 5, it is characterised in that it is described according to the place of operation to the fortune Traveling Cheng Jinhang is divided, including:
    Operation process corresponding to the place of operation in same preset position area will be belonged to and be classified as one group;
    It is described that target process list is determined according to the current location, including:Determine the predeterminated position belonging to the current location Region;Process list corresponding to the preset position area determined is obtained, as target process list.
  8. A kind of 8. progress control unit, applied to electronic equipment, it is characterised in that including:
    First acquisition module, for obtaining Process flowchart instruction;
    Second acquisition module, for obtained according to the Process flowchart instruction background process of the electronic equipment, foreground process, Current location and the priority of each background process;
    Determining module, for determining target process list according to the current location;
    Adjusting module, for being adjusted according to the target process list and foreground process to the priority of the background process It is whole;
    Control module, the open and close for the background process according to two priority classes after adjustment.
  9. 9. progress control unit according to claim 8, it is characterised in that the adjusting module specifically includes:
    First acquisition submodule, for obtaining association process corresponding to the foreground process;
    Second acquisition submodule, for acquisition and the association process identical background process, as the first process;Described in acquisition The background process included in target process list, as the second process;
    Submodule is adjusted, for being adjusted according to first process and the second process to the priority of the background process.
  10. 10. progress control unit according to claim 9, it is characterised in that the adjustment submodule is specifically used for:
    Judge to whether there is identical background process in first process and the second process;
    If in the presence of heightening the priority of the identical background process with the first predetermined amplitude;
    If being not present, the priority of first process is heightened with the second predetermined amplitude, is heightened with the 3rd predetermined amplitude described The priority of second process, first predetermined amplitude are more than the second predetermined amplitude, and it is pre- that second predetermined amplitude is more than the 3rd If amplitude.
  11. 11. progress control unit according to claim 10, it is characterised in that the adjustment submodule is additionally operable to:
    The background process in addition to first process and the second process is obtained, as the 3rd process;
    The priority of the 3rd process is reduced with the 4th predetermined amplitude.
  12. 12. according to the progress control unit described in any one in claim 8-11, it is characterised in that also include creating mould Block, the creation module specifically include:
    3rd acquisition submodule, for before the determining module determines target process list according to the current location, obtaining Take number of run, operation duration and the fortune of the operation process and the operation process in historical period in the electronic equipment Row place;
    Divide submodule, for being divided according to the place of operation to the operation process, obtain it is at least one run into Journey group;
    Submodule is created, for according to corresponding to number of run and the operation duration establishment that process is run in the operation process group Process list.
  13. 13. progress control unit according to claim 12, it is characterised in that the establishment submodule is specifically used for:
    Running frequency of the corresponding operation process in the historical period is calculated according to the number of run and operation duration;
    The operation process in the operation process group is ranked up according to the running frequency;
    The process list according to corresponding to creating the operation process group after sequence.
  14. 14. progress control unit according to claim 12, it is characterised in that the division submodule is specifically used for:
    Operation process corresponding to the place of operation in same preset position area will be belonged to and be classified as one group;
    The determining module is specifically used for:Determine the preset position area belonging to the current location;Obtain the described pre- of determination If process list corresponding to the band of position, as target process list.
  15. A kind of 15. storage medium, it is characterised in that be stored with a plurality of instruction in the storage medium, the instruction be suitable to by Manage course control method of the device loading any one of with perform claim requirement 1 to 7.
  16. 16. a kind of electronic equipment, it is characterised in that including processor and memory, the processor and the memory are electrical Connection, the memory are used for store instruction and data, and the processor is used to call the store instruction will with perform claim Seek the course control method any one of 1 to 7.
CN201710643266.1A 2017-07-31 2017-07-31 process control method, device, storage medium and electronic equipment Active CN107463436B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201710643266.1A CN107463436B (en) 2017-07-31 2017-07-31 process control method, device, storage medium and electronic equipment
PCT/CN2018/094219 WO2019024640A1 (en) 2017-07-31 2018-07-03 Process control method, apparatus, storage medium, and electronic device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710643266.1A CN107463436B (en) 2017-07-31 2017-07-31 process control method, device, storage medium and electronic equipment

Publications (2)

Publication Number Publication Date
CN107463436A true CN107463436A (en) 2017-12-12
CN107463436B CN107463436B (en) 2019-12-10

Family

ID=60548195

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710643266.1A Active CN107463436B (en) 2017-07-31 2017-07-31 process control method, device, storage medium and electronic equipment

Country Status (2)

Country Link
CN (1) CN107463436B (en)
WO (1) WO2019024640A1 (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109117256A (en) * 2018-07-12 2019-01-01 维沃移动通信有限公司 A kind of management method and terminal of background application
WO2019024640A1 (en) * 2017-07-31 2019-02-07 Oppo广东移动通信有限公司 Process control method, apparatus, storage medium, and electronic device
CN109324883A (en) * 2018-08-29 2019-02-12 烽火通信科技股份有限公司 The EMS memory management process and system of intelligent terminal
CN109445567A (en) * 2018-09-30 2019-03-08 联想(北京)有限公司 Information processing method and electronic equipment
WO2019128588A1 (en) * 2017-12-29 2019-07-04 Oppo广东移动通信有限公司 Process processing method and apparatus, electronic device, computer readable storage medium
CN110032321A (en) * 2018-01-12 2019-07-19 广东欧珀移动通信有限公司 Applied program processing method and device, electronic equipment, computer readable storage medium
CN111651261A (en) * 2020-07-07 2020-09-11 Oppo(重庆)智能科技有限公司 Process management method and device, terminal equipment and computer readable storage medium
CN117149362A (en) * 2023-04-06 2023-12-01 荣耀终端有限公司 Process control method and related device

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102479108A (en) * 2010-11-26 2012-05-30 中国科学院声学研究所 Terminal resource management system for multi-application process embedded system and method
CN103838630A (en) * 2014-03-03 2014-06-04 联想(北京)有限公司 Information processing method, system and electronic equipment

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2010094295A1 (en) * 2009-02-17 2010-08-26 Siemens Aktiengesellschaft Method and apparatus for adapting the processor utilization in an automation system
CN102622290A (en) * 2012-03-07 2012-08-01 苏州阔地网络科技有限公司 Process monitoring method and system
CN104991816A (en) * 2015-06-25 2015-10-21 浪潮(北京)电子信息产业有限公司 Process scheduling method and apparatus
CN107463436B (en) * 2017-07-31 2019-12-10 Oppo广东移动通信有限公司 process control method, device, storage medium and electronic equipment

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102479108A (en) * 2010-11-26 2012-05-30 中国科学院声学研究所 Terminal resource management system for multi-application process embedded system and method
CN103838630A (en) * 2014-03-03 2014-06-04 联想(北京)有限公司 Information processing method, system and electronic equipment

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019024640A1 (en) * 2017-07-31 2019-02-07 Oppo广东移动通信有限公司 Process control method, apparatus, storage medium, and electronic device
WO2019128588A1 (en) * 2017-12-29 2019-07-04 Oppo广东移动通信有限公司 Process processing method and apparatus, electronic device, computer readable storage medium
CN109992397A (en) * 2017-12-29 2019-07-09 广东欧珀移动通信有限公司 Process handling method and device, electronic equipment, computer readable storage medium
CN110032321A (en) * 2018-01-12 2019-07-19 广东欧珀移动通信有限公司 Applied program processing method and device, electronic equipment, computer readable storage medium
CN110032321B (en) * 2018-01-12 2024-02-20 Oppo广东移动通信有限公司 Application processing method and device, electronic equipment and computer readable storage medium
CN109117256A (en) * 2018-07-12 2019-01-01 维沃移动通信有限公司 A kind of management method and terminal of background application
CN109324883A (en) * 2018-08-29 2019-02-12 烽火通信科技股份有限公司 The EMS memory management process and system of intelligent terminal
CN109445567A (en) * 2018-09-30 2019-03-08 联想(北京)有限公司 Information processing method and electronic equipment
CN109445567B (en) * 2018-09-30 2021-11-16 联想(北京)有限公司 Information processing method and electronic device
CN111651261A (en) * 2020-07-07 2020-09-11 Oppo(重庆)智能科技有限公司 Process management method and device, terminal equipment and computer readable storage medium
CN117149362A (en) * 2023-04-06 2023-12-01 荣耀终端有限公司 Process control method and related device

Also Published As

Publication number Publication date
WO2019024640A1 (en) 2019-02-07
CN107463436B (en) 2019-12-10

Similar Documents

Publication Publication Date Title
CN107463436A (en) Course control method, device, storage medium and electronic equipment
CN105005457B (en) Geographical location methods of exhibiting and device
CN106332307B (en) Method for accessing application program to network and mobile terminal
CN104243671B (en) Volume adjusting method, device and electronic equipment
CN106776036A (en) A kind of resource allocation methods and device
CN109992398A (en) Method for managing resource, device, mobile terminal and computer readable storage medium
CN104158506A (en) Method, device and terminal for adjusting volume
CN104427083A (en) Volume adjusting method and device
CN104301504A (en) Message viewing method and device and mobile terminal
CN104660820A (en) Implementation method of management mode of mobile terminal and mobile terminal
CN105094809A (en) Combined picture layout modification method and device and terminal equipment
CN106373531A (en) Method for adjusting displaying brightness and electronic equipment
CN106453896A (en) Method, apparatus and system for adjusting display brightness of terminal
CN105224556A (en) Waterfall stream interface display packing and device
CN104954159A (en) Network information statistics method and device
CN104837042A (en) Digital multimedia data encoding method and apparatus
CN106255036A (en) A kind of eSIM changing method and terminal unit
CN106331359A (en) Speech signal acquisition method and apparatus and terminal
CN106293738A (en) The update method of a kind of facial expression image and device
CN107302591A (en) Method of data synchronization, device, storage medium and electronic equipment
CN108322897A (en) Cutting ferrule meal combined method and device
CN110032439A (en) Method for managing resource, device, mobile terminal and computer readable storage medium
CN110046032A (en) Applied program processing method and device, electronic equipment, computer readable storage medium
CN106452644A (en) Playing control method and device, and terminal
CN103631592A (en) Configuration method, calling method, device and equipment for displaying resources

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 523860 No. 18, Wu Sha Beach Road, Changan Town, Dongguan, Guangdong

Applicant after: OPPO Guangdong Mobile Communications Co., Ltd.

Address before: 523860 No. 18, Wu Sha Beach Road, Changan Town, Dongguan, Guangdong

Applicant before: Guangdong OPPO Mobile Communications Co., Ltd.

GR01 Patent grant
GR01 Patent grant