CN107462509B - A gas permeability core clamping system suitable for multi-standard ultra-low permeability cores - Google Patents

A gas permeability core clamping system suitable for multi-standard ultra-low permeability cores Download PDF

Info

Publication number
CN107462509B
CN107462509B CN201710709606.6A CN201710709606A CN107462509B CN 107462509 B CN107462509 B CN 107462509B CN 201710709606 A CN201710709606 A CN 201710709606A CN 107462509 B CN107462509 B CN 107462509B
Authority
CN
China
Prior art keywords
pressure chamber
confining pressure
plug
sealing
chassis
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710709606.6A
Other languages
Chinese (zh)
Other versions
CN107462509A (en
Inventor
江文滨
林缅
曹高辉
姬莉莉
赵文龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Institute of Mechanics of CAS
Original Assignee
Institute of Mechanics of CAS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Institute of Mechanics of CAS filed Critical Institute of Mechanics of CAS
Priority to CN201710709606.6A priority Critical patent/CN107462509B/en
Publication of CN107462509A publication Critical patent/CN107462509A/en
Application granted granted Critical
Publication of CN107462509B publication Critical patent/CN107462509B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N15/00Investigating characteristics of particles; Investigating permeability, pore-volume or surface-area of porous materials
    • G01N15/08Investigating permeability, pore-volume, or surface area of porous materials
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N7/00Analysing materials by measuring the pressure or volume of a gas or vapour
    • G01N7/10Analysing materials by measuring the pressure or volume of a gas or vapour by allowing diffusion of components through a porous wall and measuring a pressure or volume difference

Landscapes

  • Chemical & Material Sciences (AREA)
  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Biochemistry (AREA)
  • General Health & Medical Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Immunology (AREA)
  • Pathology (AREA)
  • Dispersion Chemistry (AREA)
  • Sampling And Sample Adjustment (AREA)

Abstract

本发明提供了一种适用于多规格超低渗岩心的气测渗透率岩心夹持系统,包括一端开口的围压腔,和安装在围压腔内的渗透腔,渗透腔包括两端开口的筒形皮套和分别封闭皮套下游端的密封堵头,和活动封闭围压腔开口一端的底盘,以及一端与密封堵头上的出气道焊接连接另一端由底盘穿出的排气管。本发明可以保证测量大直径样品时尽可能减少漏点,同时,测量小直径样品时,通过O型圈和螺纹密封,装配方便的同时也能保证很好的密封效果。由此,实现两级或多级直径的配套使用,无需增加额外的堵头和体积,减少了堵头和排气管连接的重新拆装和安装,减少了测试和计算的变量,节省了时间,降低了气体泄漏的风险,而且气路体积始终保持不变,实验数据处理不容易出错。

The present invention provides a gas permeability core clamping system suitable for multi-standard ultra-low permeability cores, which includes a confining pressure chamber with one end open and a permeation chamber installed in the confining pressure chamber. The cylindrical holster and the sealing plug that respectively close the downstream end of the holster, the chassis at one end of the opening of the movable closed confining pressure chamber, and the exhaust pipe that is welded at one end to the air outlet on the sealing plug and the other end passes through the chassis. The invention can ensure that leakage points are reduced as much as possible when measuring large-diameter samples, and at the same time, when measuring small-diameter samples, the O-ring and screw thread are used for sealing, which is convenient for assembly and can also ensure a good sealing effect. As a result, two or more stages of diameters can be used together without adding additional plugs and volumes, reducing the need for re-disassembly and installation of plugs and exhaust pipe connections, reducing the variables of testing and calculations, and saving time , which reduces the risk of gas leakage, and the volume of the gas path remains unchanged, and the experimental data processing is not easy to make mistakes.

Description

一种适用于多规格超低渗岩心的气测渗透率岩心夹持系统A gas permeability core clamping system suitable for multi-standard ultra-low permeability cores

技术领域technical field

本发明涉及石油工程领域,特别涉及一种能够测量不同规格超低渗岩心的气测渗透率岩心夹持系统。The invention relates to the field of petroleum engineering, in particular to a gas permeability core clamping system capable of measuring ultra-low permeability cores of different specifications.

背景技术Background technique

岩石渗透率是储层物性研究、地层损害评价、油气藏开发设计的重要参数和指标。页岩气藏储层渗透率非常低,是影响最终采收率的重要因素。采用液测或者稳态测试的方法测量渗透率为毫达西以下(1md=9.87×10-16m2)样品的耗时过长且信号弱精度难以保证。因此,一般多采用瞬态气测方法进行测定,Rock permeability is an important parameter and index for reservoir physical property research, formation damage evaluation, and oil and gas reservoir development design. The permeability of shale gas reservoirs is very low, which is an important factor affecting the ultimate recovery. It takes too long to measure samples with permeability below millidarcy (1md=9.87×10 -16 m 2 ) by means of liquid measurement or steady state measurement, and the signal is weak and the accuracy is difficult to guarantee. Therefore, the transient gas measurement method is generally used for measurement.

测量设备采用两端封堵的方式,对内部的待测岩心进行测量,该测量设备采用两端小腔体设计,各个部件之间采用可拆卸安装的结构,一旦气路中任何一个地方存在微小的漏点,则可能造成压力的显著变化,影响最终的测量结果。The measuring equipment adopts the method of sealing both ends to measure the core to be tested inside. The measuring equipment adopts the design of small chambers at both ends, and the structure of detachable installation is adopted between the various parts. Once there is a small If there is a leak point, it may cause a significant change in pressure and affect the final measurement result.

现有的测量设备连接点较多,在更换不同尺寸不同长度的岩心时,都需要拆卸测量设备相应的连接点,再进行配套安装,频繁的拆卸可能导致密封配件更快失效或密封性能下降,如两端堵头的更换,排气管的更换等,这些行为都容易造成接着损坏或内部压力泄漏。Existing measurement equipment has many connection points. When replacing rock cores of different sizes and lengths, it is necessary to disassemble the corresponding connection points of the measurement equipment and then perform supporting installation. Frequent disassembly may lead to faster failure of sealing parts or deterioration of sealing performance. Such as the replacement of the plugs at both ends, the replacement of the exhaust pipe, etc., these actions are likely to cause subsequent damage or internal pressure leakage.

发明内容Contents of the invention

本发明的目的是要提供一种适用于不同直径、不同长度超低渗岩心且尽量减少可拆卸结构的气测渗透率岩心夹持系统。The object of the present invention is to provide a gas permeability core clamping system suitable for ultra-low permeability cores of different diameters and lengths and minimizing detachable structures.

特别地,本发明提供一种适用于多规格超低渗岩心的气测渗透率岩心夹持系统,包括:In particular, the present invention provides a gas permeability core clamping system suitable for multi-standard ultra-low permeability cores, including:

围压腔,为一端开口的圆形腔体,在未开口端上设置有排气孔;The confining pressure chamber is a circular cavity with one end open, and an exhaust hole is arranged on the unopened end;

渗透腔,安装在所述围压腔的内部,包括两端开口的筒形皮套,和分别封闭皮套下游端的密封堵头,在所述密封堵头上设置有沿轴向贯穿的出气道;The permeation chamber is installed inside the confining pressure chamber, including a cylindrical leather sheath with two ends open, and sealing plugs respectively closing the downstream ends of the leather sheath, and an air outlet channel penetrating in the axial direction is arranged on the sealing plugs ;

底盘,活动封闭所述围压腔的开口一端,设置有向所述围压腔内注水的进水口、和向一侧突出以封闭所述皮套上游端的固定堵头,在固定堵头处设置有沿轴向贯穿的进气道;Chassis, which movably closes the opening end of the confining pressure chamber, is provided with a water inlet for injecting water into the confining pressure chamber, and a fixed plug protruding to one side to close the upstream end of the leather sheath, and is provided at the fixed plug There is an air inlet through the axial direction;

排气管,一端与所述密封堵头上的出气道焊接连接,另一端由所述底盘穿出,在所述底盘上设置有供所述排气管伸出的通孔,在所述通孔朝向所述围压腔内部的一侧依次安装有不锈钢垫圈、O形圈和压板,所述压板通过螺栓与所述底盘固定。An exhaust pipe, one end is welded to the air outlet on the sealing plug, and the other end passes through the chassis, and a through hole for the exhaust pipe to protrude is arranged on the chassis. A stainless steel washer, an O-ring and a pressure plate are sequentially installed on the side of the hole facing the inside of the confining pressure chamber, and the pressure plate is fixed to the chassis by bolts.

在本发明的一个实施方式中,在所述围压腔内安装有恒温循环管,所述恒温循环管由所述围压腔相对所述底盘一端插入所述围压腔内,以螺旋形均匀分布后再由所述围压腔的插入端伸出。In one embodiment of the present invention, a constant temperature circulation pipe is installed in the confining pressure chamber, and the constant temperature circulation pipe is inserted into the confining pressure chamber from the end of the confining pressure chamber opposite to the chassis, spirally and evenly After distribution, it protrudes from the insertion end of the confining pressure chamber.

在本发明的一个实施方式中,在所述固定堵头和所述密封堵头相对的一面分别设置有带内螺纹的凹槽,所述凹槽用于安装封堵不同直径待测岩心的活动堵头,所述活动堵头通过螺纹安装在所述凹槽内,且在所述活动堵头上设置有与所述进气道和所述出气道连通的气孔。In one embodiment of the present invention, grooves with internal threads are respectively provided on the opposite sides of the fixed plug and the sealing plug, and the grooves are used to install and block the movable cores of different diameters to be tested. A plug, the movable plug is installed in the groove through threads, and an air hole communicating with the air inlet and the outlet is arranged on the movable plug.

在本发明的一个实施方式中,所述活动堵头的直径小于所述密封堵头和所述固定堵头的直径,且所述密封堵头和所述固定堵头的直径与最大直径的待测岩心直径对应。In one embodiment of the present invention, the diameter of the movable plug is smaller than the diameters of the sealing plug and the fixed plug, and the diameters of the sealing plug and the fixed plug are to be equal to the maximum diameter. Corresponding to the measured core diameter.

在本发明的一个实施方式中,还包括用于填充所述凹槽的堵块,所述堵块通过螺纹拧在所述凹槽内,所述堵块包括设置有与所述进气道或出气道连通气孔的连通堵块,和实心的封堵堵块。In one embodiment of the present invention, it also includes a blocking block for filling the groove, the blocking block is screwed into the groove through threads, and the blocking block includes a The communicating blocking block that the air outlet communicates with the stomata, and the solid blocking blocking block.

在本发明的一个实施方式中,在所述固定堵头和所述密封堵头与所述活动堵头的接触面上,以及所述底盘与所述围压腔接触的接触面上,分别设置有密封槽,在所述密封槽内安装有密封条。In one embodiment of the present invention, on the contact surfaces of the fixed plug, the sealing plug and the movable plug, and the contact surface between the chassis and the confining pressure chamber, respectively set There is a sealing groove, and a sealing strip is installed in the sealing groove.

在本发明的一个实施方式中,所述待测岩心的直径为1.0~1.5英寸。In one embodiment of the present invention, the diameter of the rock core to be tested is 1.0-1.5 inches.

在本发明的一个实施方式中,在所述皮套与所述固定堵头和所述密封堵头接触的外部,设置有提高紧固效果的的卡箍。In one embodiment of the present invention, a clip to improve the fastening effect is provided on the outside of the leather sheath in contact with the fixed plug and the sealing plug.

在本发明的一个实施方式中,在所述底盘上安装有检测所述围压腔内水温的温度传感器,和检测所述围压腔内部压力的围压传感器。In one embodiment of the present invention, a temperature sensor for detecting the water temperature in the confining pressure chamber and a confining pressure sensor for detecting the internal pressure of the confining pressure chamber are installed on the chassis.

本发明的围压腔仅一端开口,同时排气管的管径统一并采用焊接固定,可以减少现有测量设备存在的潜在漏点多而导致内部压力显著变化的问题,提高测量精度和更换测试对象时的效率。The confining pressure chamber of the present invention is only open at one end, and at the same time, the pipe diameter of the exhaust pipe is unified and fixed by welding, which can reduce the problem of significant changes in internal pressure caused by many potential leaks existing in existing measuring equipment, and improve measurement accuracy and replacement testing. target efficiency.

本发明可以保证测量大直径样品时尽可能减少漏点,同时,测量小直径样品时,通过O型圈和螺纹密封,装配方便的同时也能保证很好的密封效果。由此,实现两级或多级直径的配套使用,无需增加额外的堵头和体积,减少了堵头和排气管连接的重新拆装和安装,减少了测试和计算的变量,节省了时间,降低了气体泄漏的风险,而且气路体积始终保持不变,实验数据处理不容易出错。The invention can ensure that leakage points are reduced as much as possible when measuring large-diameter samples, and at the same time, when measuring small-diameter samples, the O-ring and screw thread are used for sealing, which is convenient for assembly and can also ensure a good sealing effect. As a result, two-stage or multi-stage diameters can be used together without adding additional plugs and volumes, reducing the need for re-disassembly and installation of plugs and exhaust pipe connections, reducing the variables of testing and calculation, and saving time , which reduces the risk of gas leakage, and the volume of the gas path remains unchanged, and the experimental data processing is not easy to make mistakes.

附图说明Description of drawings

图1是根据本发明一个实施例的气测渗透率岩心夹持系统结构示意图。Fig. 1 is a schematic structural diagram of a gas permeability core clamping system according to an embodiment of the present invention.

具体实施方式Detailed ways

如图1所示,本发明一个实施例提供一种适用于多规格超低渗岩心的气测渗透率岩心夹持系统,该气测渗透率岩心夹持系统一般性地包括围压腔10、渗透腔20、底盘30和排气管40。As shown in Figure 1, an embodiment of the present invention provides a gas-permeability core clamping system suitable for multi-standard ultra-low permeability cores. The gas-permeability core clamping system generally includes a confining pressure chamber 10, Permeate chamber 20 , chassis 30 and exhaust pipe 40 .

该围压腔10为一端开口的圆形腔体,以用于安装渗透腔20,在未开口端上设置有排气孔11。The confining pressure chamber 10 is a circular cavity with one end open for installation of the permeation chamber 20 , and an exhaust hole 11 is arranged on the unopened end.

该底盘30活动封闭在围压腔10的开口一端,以使围压腔10形成一个密闭的环境,在底盘30上设置有向围压腔10内注水的进水口31。底盘30可以通过螺栓一类固定件与围压腔10固定。此外,可以在底盘30与围压腔10接触的接触面上,设置环形的密封槽32,然后在密封槽32内安装密封条33,以提高底盘30与围压腔10之间的密封效果。The chassis 30 is movably closed at the opening end of the confining pressure chamber 10 so that the confining pressure chamber 10 forms an airtight environment. The chassis 30 is provided with a water inlet 31 for injecting water into the confining pressure chamber 10 . The chassis 30 may be fixed to the confining pressure chamber 10 by bolts or other fixings. In addition, an annular sealing groove 32 can be provided on the contact surface between the chassis 30 and the confining pressure chamber 10 , and then a sealing strip 33 can be installed in the sealing groove 32 to improve the sealing effect between the chassis 30 and the confining pressure chamber 10 .

该渗透腔20安装在围压腔10的内部,与围压腔10的内侧壁有一定的间隔,包括两端开口以圆周夹持待测岩心50的筒形皮套21,和封闭皮套21上游端的固定堵头22、封闭下游端的密封堵头23,在固定堵头22和密封堵头23上分别设置有沿轴向贯穿的进气道221和出气道231,该进气道221和出气道231用于连通渗透腔20和围压腔10。本实施方式中,固定堵头22与底盘30为一体设置,由底盘30的一侧凸出形成,以减少可拆卸连接点。The permeation chamber 20 is installed in the inside of the confining pressure chamber 10, and has a certain distance from the inner side wall of the confining pressure chamber 10. It includes a cylindrical leather sheath 21 with two openings at both ends to clamp the rock core 50 to be tested, and a closed leather sheath 21. The fixed plug 22 at the upstream end and the sealing plug 23 that closes the downstream end are respectively provided with an inlet passage 221 and an air outlet passage 231 penetrating in the axial direction on the fixed plug 22 and the sealing plug 23. The inlet passage 221 and the outlet passage The channel 231 is used to connect the permeate chamber 20 and the confining pressure chamber 10 . In this embodiment, the fixed plug 22 is integrated with the chassis 30 and formed by protruding from one side of the chassis 30 to reduce detachable connection points.

该排气管40由一根独立的管子构成,其一端位于围压腔10内并与密封堵头23上的出气道231焊接连接,另一端经过弯折后由围压腔10内穿出底盘30。排气管40采用整段完整管线直接连到外部阀门的方式,中间不进行拼接、变径等处理。上述结构能够减少因待测岩心50高度不同而进行管线组合或拼接时所带来的泄漏点增加和体积增加问题。The exhaust pipe 40 is composed of an independent pipe, one end of which is located in the confining pressure chamber 10 and welded to the air outlet channel 231 on the sealing plug 23, and the other end is bent and passes through the chassis from the confining pressure chamber 10 30. The exhaust pipe 40 is directly connected to the external valve by the whole section of the complete pipeline, without splicing, diameter reduction and other treatments in the middle. The above-mentioned structure can reduce the problems of increased leakage points and increased volume caused by the combination or splicing of pipelines due to the different heights of the rock cores 50 to be tested.

为方便排气管40的调整,可以在底盘30上设置供排气管40由围压腔10内伸出的通孔34,在通孔34朝向围压腔10内部的一侧依次安装支撑环41、O形圈42和压板43,压板43通过螺栓与底盘30固定。当排气管40需要根据测试岩心50的高度调整固定位置时,可以拧松螺栓,使排气管40相对通孔34滑动。当调节到位后,再拧紧螺栓,利用压板43对O形圈42的挤压将排气管40密封固定在通孔34处。本实施方式可以在螺栓和底盘30的拧紧力作用下,通过压板43和支撑环41压紧O型圈42,填满底盘30和排气管40之间的孔隙,以免造成围压水体的泄露和围压下降或无法保持。In order to facilitate the adjustment of the exhaust pipe 40, a through hole 34 through which the supply and exhaust pipe 40 protrudes from the confining pressure chamber 10 can be provided on the chassis 30, and support rings are sequentially installed on the side of the through hole 34 facing the inside of the confining pressure chamber 10 41. O-ring 42 and pressure plate 43, the pressure plate 43 is fixed to the chassis 30 by bolts. When the fixed position of the exhaust pipe 40 needs to be adjusted according to the height of the test core 50 , the bolts can be loosened so that the exhaust pipe 40 can slide relative to the through hole 34 . After the adjustment is in place, the bolts are tightened again, and the exhaust pipe 40 is sealed and fixed at the through hole 34 by pressing the O-ring 42 with the pressure plate 43 . In this embodiment, under the tightening force of the bolts and the chassis 30, the O-ring 42 can be pressed by the pressure plate 43 and the support ring 41 to fill the gap between the chassis 30 and the exhaust pipe 40, so as to avoid leakage of the confined water body And the confining pressure drops or cannot be maintained.

由于排气管40与密封堵头23上的出气道231是采用焊接固定,因此在调节时,排气管40可随密封堵头23同步移动,进而减少连接结构,降低泄漏可能。Since the exhaust pipe 40 and the air outlet channel 231 on the sealing plug 23 are fixed by welding, the exhaust pipe 40 can move synchronously with the sealing plug 23 during adjustment, thereby reducing the connection structure and reducing the possibility of leakage.

在实验时,将待测岩心50插入皮套21内,用密封堵头23封闭皮套21的下游端,再由围压腔10的开口端放入围压腔10内,利用底盘30将围压腔10的开口端密封,同时使固定堵头22插入皮套21的上游端,然后根据待测岩心50的高度调整排气管40穿出底盘30的位置,然后将其密封固定。During the experiment, the rock core 50 to be tested is inserted into the leather sheath 21, the downstream end of the leather sheath 21 is closed with a sealing plug 23, and then the open end of the confining pressure chamber 10 is put into the confining pressure chamber 10, and the confining pressure The opening end of the chamber 10 is sealed, and the fixed plug 22 is inserted into the upstream end of the holster 21, and then the position where the exhaust pipe 40 passes through the chassis 30 is adjusted according to the height of the rock core 50 to be tested, and then it is sealed and fixed.

通过底盘30上的进水口31向围压腔10内注水,围压腔10中的空气由围压腔10上的排气孔11排出,当气体排尽后,可以利用阀门将排气孔11封闭,通过水压增压对渗透腔20施加围压,使围压腔10内的压力较排气管40内压力大于3MPa以上。Water is injected into the confining pressure chamber 10 through the water inlet 31 on the chassis 30, and the air in the confining pressure chamber 10 is discharged from the exhaust hole 11 on the confining pressure chamber 10. Closed, apply confining pressure to the permeation chamber 20 through hydraulic pressurization, so that the pressure in the confining pressure chamber 10 is greater than the pressure in the exhaust pipe 40 by more than 3 MPa.

由底盘30上的进气道221进行充气,高压气体进入待测岩心50,高压气体通过对待测岩心50的渗透,由待测岩心50的下部向上部渗透,最后由待测岩心50的上端进入出气道231和排气管40,然后由排气管40排出围压腔10外,进入相应容纳设备。Inflate from the air inlet 221 on the chassis 30, the high-pressure gas enters the rock core 50 to be tested, the high-pressure gas penetrates through the rock core 50 to be tested, penetrates upward from the lower part of the rock core 50 to be tested, and finally enters from the upper end of the rock core 50 to be tested The air outlet channel 231 and the exhaust pipe 40 are then discharged out of the confining pressure chamber 10 through the exhaust pipe 40 and enter the corresponding containing equipment.

通过在初始时刻给定待测岩心50两端一定的气体压力差,再测量充气过程中压力差随时间的衰减曲线,进而可计算得到渗透率。测试过程中,上下游压力差随时间的衰减曲线是直接测量值,渗透率值为依据压力随时间衰减曲线,根据一定的流动模型计算的结果。By setting a certain gas pressure difference between the two ends of the rock core 50 to be tested at the initial moment, and then measuring the decay curve of the pressure difference with time during the inflation process, the permeability can be calculated. During the test, the decay curve of the upstream and downstream pressure difference with time is a direct measurement value, and the permeability value is calculated based on the pressure decay curve with time and a certain flow model.

一般来说,在同等的待测岩心50大小(长度和截面面积)、腔体体积、温度、测试气体和初始压差条件下,压力随时间变化的速率越快,渗透率越高。因此,对于超低渗样品而言,其压力差随时间变化的速率相对较低。样品的渗透率直接决定了单位时间内气体由待测岩心50上游到达待测岩心50下游的气体量。除此以外,上下游腔体的大小也对压力差的变化速率有影响。低渗透样品单位时间通过的气体量小,为了保证压力差随时间变化的信号足够明显,需要将上下游腔体的体积设计得足够小,以保证小气体量变化在压力数值变化上有足够明显的反映。本实施方式的围压腔仅一端开口,减少一个拆卸点,而排气管的安装结构可以减少现有测量设备存在的潜在漏点多而导致内部压力显著变化的问题。Generally speaking, under the same size (length and cross-sectional area) of the rock core 50 to be tested, cavity volume, temperature, test gas and initial pressure difference, the faster the rate of pressure change with time, the higher the permeability. Therefore, for ultra-low osmotic samples, the rate of change of pressure difference with time is relatively low. The permeability of the sample directly determines the amount of gas flowing from the upstream of the core 50 to be tested to the downstream of the core 50 to be tested per unit time. In addition, the size of the upstream and downstream cavities also has an impact on the rate of change of the pressure difference. Low-permeability samples pass a small amount of gas per unit time. In order to ensure that the signal of the pressure difference changing with time is sufficiently obvious, the volume of the upstream and downstream chambers needs to be designed to be small enough to ensure that the small gas volume change is sufficiently obvious on the pressure value change. reflection. In this embodiment, only one end of the confining pressure chamber is open, which reduces a disassembly point, and the installation structure of the exhaust pipe can reduce the problem of many potential leaks in the existing measuring equipment, resulting in significant changes in internal pressure.

在本发明的一个实施方式中,可以在围压腔10内安装恒温循环管12,该恒温循环管12由围压腔10相对底盘30一端伸入围压腔10内,围绕渗透腔20的外围在围压腔10内形成均匀分布后再由伸入端引出。恒温循环管12采用管径统一的管路,在围压腔10内呈螺旋形环绕分布,以对围压腔10内的水进行均匀加温,使其保持在实验所要求的恒温状态,通过恒温水浴保证待测岩心50处温度恒定,可以消除温度变化对气体和围压压力的影响,从而保证计算结果的稳定性。采用螺旋状管路分布,还便于空间布置,增大热交换面积,利于围压水体的温度稳定。In one embodiment of the present invention, a constant temperature circulation pipe 12 can be installed in the confining pressure chamber 10. The constant temperature circulation pipe 12 extends into the confining pressure chamber 10 from the end of the confining pressure chamber 10 opposite to the chassis 30, and surrounds the periphery of the permeation chamber 20. After the uniform distribution is formed in the confining pressure chamber 10, it is led out from the protruding end. The constant temperature circulation pipe 12 adopts a pipeline with a uniform diameter, and is distributed in a spiral shape in the confining pressure chamber 10 to uniformly heat the water in the confining pressure chamber 10 to keep it in the constant temperature state required by the experiment. The constant temperature water bath ensures constant temperature at 50 places of the core to be tested, which can eliminate the influence of temperature changes on gas and confining pressure, thus ensuring the stability of calculation results. The use of spiral pipeline distribution is also convenient for spatial arrangement, increases the heat exchange area, and is beneficial to the temperature stability of the confining water body.

在本发明的一个实施方式中,可以在底盘30上安装检测围压腔10内水温的温度传感器35,和检测围压腔10内部压力的围压传感器36。In one embodiment of the present invention, a temperature sensor 35 for detecting the water temperature in the confining pressure chamber 10 and a confining pressure sensor 36 for detecting the internal pressure of the confining pressure chamber 10 may be installed on the chassis 30 .

在本发明的一个实施方式中,为方便测试不同直径的待测岩心,在固定堵头22和密封堵头23相对的一面分别设置有带内螺纹的凹槽24,该凹槽24用于安装不同直径的活动堵头25,活动堵头25的直径小于固定堵头22和密封堵头23的直径,活动堵头25的形状与密封堵头23和固定堵头22的形状对应,只是在上表面设置有一个带有外螺纹的圆柱。在当前待测岩心50的直径小于密封堵头23和固定堵头22的直径时,则可以选择相应直径的活动堵头25,利用圆柱拧在密封堵头23和固定堵头22上的凹槽24内,每个活动堵头25上都设置有与固定堵头22和密封堵头23上的进气道221和出气道231连通的气孔251。在使用时,仅将活动堵头25部分插入皮套21的两端实现密封,安装后气孔251分别与进气道221和出气道231连通。In one embodiment of the present invention, in order to facilitate the testing of rock cores of different diameters, grooves 24 with internal threads are respectively provided on the opposite sides of the fixed plug 22 and the sealing plug 23, and the grooves 24 are used for installing Different diameters of the movable plug 25, the diameter of the movable plug 25 is smaller than the diameter of the fixed plug 22 and the sealing plug 23, the shape of the movable plug 25 corresponds to the shape of the sealing plug 23 and the fixed plug 22, only on the The surface is provided with a cylinder with an external thread. When the diameter of the rock core 50 to be tested is less than the diameter of the sealing plug 23 and the fixed plug 22, the movable plug 25 of the corresponding diameter can be selected, and the grooves on the sealing plug 23 and the fixed plug 22 can be screwed on the cylinder Inside 24, each movable plug 25 is provided with an air hole 251 communicating with the air inlet 221 and the air outlet 231 on the fixed plug 22 and the sealing plug 23. When in use, only part of the movable plug 25 is inserted into the two ends of the leather sheath 21 to achieve sealing, and the air holes 251 communicate with the air inlet 221 and the air outlet 231 respectively after installation.

本实施方式中,固定堵头22和密封堵头23的直径相同且大于活动堵头25,并与可测试的最大直径的待测岩心50的直径对应。以1.5英寸和1.0英寸两种直径的岩心为例,固定堵头22和密封堵头23的直径分别为1.5英寸,活动堵头25的直径则为1.0英寸,当测试1.5英寸的岩心时,可直接用固定堵头22和密封堵头23对皮套21的两端进行密封。当测试1.0英寸的岩心时,可将活动堵头25拧在固定堵头22和密封堵头23的凹槽24内,利用活动堵头25直接密封皮套21,此状态下固定堵头22和密封堵头23位于皮套21的端口外。In this embodiment, the diameters of the fixed plug 22 and the sealing plug 23 are the same and larger than the movable plug 25, and correspond to the diameter of the rock core 50 with the largest diameter that can be tested. Take the rock core of two kinds of diameters of 1.5 inches and 1.0 inch as example, the diameter of fixed plug 22 and sealing plug 23 is respectively 1.5 inches, and the diameter of movable plug 25 is then 1.0 inches, when testing the rock core of 1.5 inches, can Directly seal the two ends of the leather sheath 21 with the fixed plug 22 and the sealing plug 23 . When testing a 1.0-inch rock core, the movable plug 25 can be screwed in the groove 24 of the fixed plug 22 and the sealing plug 23, and the movable plug 25 is used to directly seal the leather sheath 21, and the fixed plug 22 and the sealing plug 23 can be directly sealed in this state. The sealing plug 23 is located outside the port of the leather sheath 21 .

在采用不同直径的堵头时,相应的位置会发生变化,此时,仅需调整排气管40使其随密封堵头23的位置升降,调整到位后,再将排气管40与底盘30的连接处进行密封固定。When plugs with different diameters are used, the corresponding positions will change. At this time, it is only necessary to adjust the exhaust pipe 40 to make it rise and fall with the position of the sealing plug 23. After the adjustment is in place, connect the exhaust pipe 40 to the chassis 30. The joints are sealed and fixed.

现有技术中,测量的岩心不但在直径上有不同,在长度上也有不同,因此,设计有不同长度的密封堵头23和排气管,考虑耐高围压的要求,现有排气管设计的较粗,并不具备良好的柔性,而且需要事先对不同长度的密封堵头23和排气管进行体积标定。此外,体积是计算渗透率的输入参数之一,因此还需要在计算渗透率过程中注意防止气路体积使用上的混淆。In the prior art, the measured rock cores are not only different in diameter, but also different in length. Therefore, sealing plugs 23 and exhaust pipes of different lengths are designed. Considering the requirement of high confining pressure resistance, the existing exhaust pipe The design is relatively thick and does not have good flexibility, and the volume of the sealing plug 23 and the exhaust pipe of different lengths needs to be calibrated in advance. In addition, volume is one of the input parameters for calculating permeability, so it is necessary to prevent confusion in the use of gas path volume in the process of calculating permeability.

本实施方式将排气管40与密封堵头23焊接固定,可以在不改动或拆卸原有结构的情况下,通过在垂直方向上的同时移动,来适应不同长度的待测岩心50。采用一体化的排气管,在减少泄漏点的同时可保持排气管40的体积不变,减少标定次数,通过与活动堵头25的配合可适应不同直径和长度的测试岩心50,避免现有技术中在对不同直径和长度的岩心测试时,需要更换密封堵头23的结构设计,简化了结构设计和拆卸过程,减少了泄露的可能。In this embodiment, the exhaust pipe 40 and the sealing plug 23 are welded and fixed, and the rock cores 50 to be tested can be adapted to different lengths by moving simultaneously in the vertical direction without changing or dismantling the original structure. The use of an integrated exhaust pipe can keep the volume of the exhaust pipe 40 constant while reducing leakage points, reducing the number of calibrations. By cooperating with the movable plug 25, it can be adapted to test rock cores 50 of different diameters and lengths, avoiding accidents. In the prior art, when testing rock cores of different diameters and lengths, the structural design of the sealing plug 23 needs to be replaced, which simplifies the structural design and disassembly process, and reduces the possibility of leakage.

此外,在固定堵头22和密封堵头23与活动堵头25接触的接触面上,可以设置环形密封槽,并安装O形圈,通过两个堵头端面的夹紧,实现密封。In addition, on the contact surfaces of the fixed plug 22, the sealing plug 23 and the movable plug 25, an annular sealing groove can be provided, and an O-ring can be installed, and the sealing can be realized by clamping the end faces of the two plugs.

采用本发明的设计,可以保证测量大直径样品时尽可能减少漏点,同时,测量小直径样品时,通过O型圈和螺纹密封,装配方便的同时也能保证很好的密封效果。由此,实现两级或多级直径的配套使用,无需增加额外的堵头和体积,减少了堵头和排气管连接的重新拆装和安装,减少了测试和计算的变量,节省了时间,降低了气体泄漏的风险,而且气路体积始终保持不变,实验数据处理不容易出错。The design of the present invention can ensure that leak points are reduced as much as possible when measuring large-diameter samples. At the same time, when measuring small-diameter samples, the O-ring and thread seal are used to facilitate assembly and ensure a good sealing effect. As a result, two-stage or multi-stage diameters can be used together without adding additional plugs and volumes, reducing the need for re-disassembly and installation of plugs and exhaust pipe connections, reducing the variables of testing and calculation, and saving time , which reduces the risk of gas leakage, and the volume of the gas path remains unchanged, and the experimental data processing is not easy to make mistakes.

此外,测量不同长度的待测岩心50时,只需要在安装的时候松开底盘30上的密封结构,排气管40便可上下调节位置,待垂向位置确定后再紧固密封结构即可。在试验时,底盘30下方必须预留足够空间,以保证排气管40的下行空间。In addition, when measuring rock cores 50 of different lengths, it is only necessary to loosen the sealing structure on the chassis 30 during installation, and the position of the exhaust pipe 40 can be adjusted up and down, and the sealing structure can be tightened after the vertical position is determined. . During the test, sufficient space must be reserved below the chassis 30 to ensure the downward space of the exhaust pipe 40 .

当单独使用固定堵头22和密封堵头23时,为避免凹槽24增加气路体积,可以设置一个用于填充凹槽24的堵块,堵块外表面设置外螺纹,其形状与凹槽24的大小对应,当堵块拧入凹槽24内后,其底面与固定堵头22和密封堵头23的表面平齐。堵块可以包括设置气孔的结构的连通堵块,和不设置气孔结构的封堵堵块,两种结构的堵块可以用于不同的实验中。When the fixed plug 22 and the sealing plug 23 are used alone, in order to avoid the groove 24 from increasing the volume of the gas path, a blocking block for filling the groove 24 can be set, and the outer surface of the blocking block is provided with external threads, and its shape is similar to that of the groove. The size of 24 corresponds, and after the blocking block is screwed in the groove 24, its bottom surface is flush with the surfaces of the fixed plug 22 and the sealing plug 23. The blocking block may include a connecting block with a structure of pores, and a blocking block without a structure of pores, and the blocking blocks of the two structures may be used in different experiments.

为提高密封效果,可以在皮套21的两端部安装相应的卡箍,当固定堵头22和密封堵头12或活动堵头25插入皮套21内后,可利用卡箍将皮套21的端部箍紧,以减少泄露。In order to improve the sealing effect, corresponding hoops can be installed at both ends of the leather sheath 21. After the fixed plug 22 and the sealing plug 12 or the movable plug 25 are inserted into the holster 21, the hoops can be used to seal the holster 21. Tighten the ends to reduce leakage.

至此,本领域技术人员应认识到,虽然本文已详尽示出和描述了本发明的多个示例性实施例,但是,在不脱离本发明精神和范围的情况下,仍可根据本发明公开的内容直接确定或推导出符合本发明原理的许多其他变型或修改。因此,本发明的范围应被理解和认定为覆盖了所有这些其他变型或修改。So far, those skilled in the art should appreciate that, although a number of exemplary embodiments of the present invention have been shown and described in detail herein, without departing from the spirit and scope of the present invention, the disclosed embodiments of the present invention can still be used. Many other variations or modifications consistent with the principles of the invention are directly identified or derived from the content. Accordingly, the scope of the present invention should be understood and deemed to cover all such other variations or modifications.

Claims (8)

1.一种适用于多规格超低渗岩心的气测渗透率岩心夹持系统,其特征在于,包括:1. A gas permeability core clamping system suitable for multi-standard ultra-low permeability cores, characterized in that it includes: 围压腔,为一端开口的圆形腔体,在未开口端上设置有排气孔;The confining pressure chamber is a circular cavity with one end open, and an exhaust hole is arranged on the unopened end; 渗透腔,安装在所述围压腔的内部,包括两端开口的筒形皮套,和分别封闭皮套下游端的密封堵头,在所述密封堵头上设置有沿轴向贯穿的出气道;The permeation chamber is installed inside the confining pressure chamber, including a cylindrical leather sheath with two ends open, and sealing plugs respectively closing the downstream ends of the leather sheath, and an air outlet channel penetrating in the axial direction is arranged on the sealing plugs ; 底盘,活动封闭所述围压腔的开口一端,设置有向所述围压腔内注水的进水口、和向一侧突出以封闭所述皮套上游端的固定堵头,在固定堵头处设置有沿轴向贯穿的进气道;Chassis, which movably closes the opening end of the confining pressure chamber, is provided with a water inlet for injecting water into the confining pressure chamber, and a fixed plug protruding to one side to close the upstream end of the leather sheath, and is provided at the fixed plug There is an air inlet through the axial direction; 在所述固定堵头和所述密封堵头相对的一面分别设置有带内螺纹的凹槽,所述凹槽用于安装封堵不同直径待测岩心的活动堵头,所述活动堵头通过螺纹安装在所述凹槽内,且在所述活动堵头上设置有与所述进气道和所述出气道连通的气孔;On the opposite sides of the fixed plug and the sealing plug, grooves with internal threads are respectively provided, and the grooves are used to install movable plugs for plugging different diameters of rock cores to be tested, and the movable plugs pass through The thread is installed in the groove, and an air hole communicating with the air inlet and the air outlet is provided on the movable plug; 排气管,一端与所述密封堵头上的出气道焊接连接,另一端由所述底盘穿出,在所述底盘上设置有供所述排气管伸出的通孔,在所述通孔朝向所述围压腔内部的一侧依次安装有不锈钢垫圈、O形圈和压板,所述压板通过螺栓与所述底盘固定。An exhaust pipe, one end is welded to the air outlet on the sealing plug, and the other end passes through the chassis, and a through hole for the exhaust pipe to protrude is arranged on the chassis. A stainless steel washer, an O-ring and a pressure plate are sequentially installed on the side of the hole facing the inside of the confining pressure chamber, and the pressure plate is fixed to the chassis by bolts. 2.根据权利要求1所述的气测渗透率岩心夹持系统,其特征在于,2. The gas permeability rock core clamping system according to claim 1, characterized in that, 在所述围压腔内安装有恒温循环管,所述恒温循环管由所述围压腔相对所述底盘一端插入所述围压腔内,以螺旋形均匀分布后再由所述围压腔的插入端伸出。A constant temperature circulation pipe is installed in the confining pressure chamber, and the constant temperature circulation pipe is inserted into the confining pressure chamber from the end of the confining pressure chamber opposite to the chassis, evenly distributed in a spiral shape, and then passed through the confining pressure chamber The insertion end sticks out. 3.根据权利要求1所述的气测渗透率岩心夹持系统,其特征在于,3. the gas-permeability-permeability core clamping system according to claim 1, is characterized in that, 所述活动堵头的直径小于所述密封堵头和所述固定堵头的直径,且所述密封堵头和所述固定堵头的直径与最大直径的待测岩心直径对应。The diameter of the movable plug is smaller than the diameters of the sealing plug and the fixed plug, and the diameters of the sealing plug and the fixed plug correspond to the largest diameter of the rock core to be tested. 4.根据权利要求1所述的气测渗透率岩心夹持系统,其特征在于,4. The gas-permeability-permeability core clamping system according to claim 1, characterized in that, 还包括用于填充所述凹槽的堵块,所述堵块通过螺纹拧在所述凹槽内,所述堵块包括设置有与所述进气道或出气道连通气孔的连通堵块,和实心的封堵堵块。It also includes a blocking block for filling the groove, the blocking block is threaded into the groove, and the blocking block includes a communication blocking block provided with air holes communicating with the air inlet channel or the air outlet channel, And solid blockage blocks. 5.根据权利要求1所述的气测渗透率岩心夹持系统,其特征在于,5. gas permeability measurement core clamping system according to claim 1, is characterized in that, 在所述固定堵头和所述密封堵头与所述活动堵头的接触面上,以及所述底盘与所述围压腔接触的接触面上,分别设置有密封槽,在所述密封槽内安装有密封条。Sealing grooves are respectively arranged on the contact surfaces of the fixed plug, the sealing plug and the movable plug, and the contact surfaces of the chassis and the confining pressure chamber. A sealing strip is installed inside. 6.根据权利要求1所述的气测渗透率岩心夹持系统,其特征在于,6. gas permeability measurement core clamping system according to claim 1, is characterized in that, 所述待测岩心的直径为1.0~1.5英寸。The diameter of the rock core to be tested is 1.0-1.5 inches. 7.根据权利要求1所述的气测渗透率岩心夹持系统,其特征在于,7. gas-permeability-permeability core clamping system according to claim 1, is characterized in that, 在所述皮套与所述固定堵头和所述密封堵头接触的外部,设置有提高紧固效果的卡箍。On the outside of the leather sheath in contact with the fixed plug and the sealing plug, a hoop is provided to improve the fastening effect. 8.根据权利要求1所述的气测渗透率岩心夹持系统,其特征在于,8. gas permeability measurement core clamping system according to claim 1, is characterized in that, 在所述底盘上安装有检测所述围压腔内水温的温度传感器,和检测所述围压腔内部压力的围压传感器。A temperature sensor for detecting the water temperature in the confining pressure chamber and a confining pressure sensor for detecting the internal pressure of the confining pressure chamber are installed on the chassis.
CN201710709606.6A 2017-08-18 2017-08-18 A gas permeability core clamping system suitable for multi-standard ultra-low permeability cores Active CN107462509B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710709606.6A CN107462509B (en) 2017-08-18 2017-08-18 A gas permeability core clamping system suitable for multi-standard ultra-low permeability cores

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710709606.6A CN107462509B (en) 2017-08-18 2017-08-18 A gas permeability core clamping system suitable for multi-standard ultra-low permeability cores

Publications (2)

Publication Number Publication Date
CN107462509A CN107462509A (en) 2017-12-12
CN107462509B true CN107462509B (en) 2019-11-22

Family

ID=60549686

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710709606.6A Active CN107462509B (en) 2017-08-18 2017-08-18 A gas permeability core clamping system suitable for multi-standard ultra-low permeability cores

Country Status (1)

Country Link
CN (1) CN107462509B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109856033B (en) * 2019-02-25 2020-05-19 中国地质大学(北京) An adjustable core holder
CN118010594B (en) * 2024-04-09 2024-06-04 山东省地质矿产勘查开发局第二水文地质工程地质大队(山东省鲁北地质工程勘察院) Device and method for testing mechanical properties of geothermal exploration sampling rock core

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101915725A (en) * 2010-09-03 2010-12-15 中国科学院武汉岩土力学研究所 A core clamping pressure vessel
CN104792971A (en) * 2015-04-23 2015-07-22 中国石油天然气股份有限公司勘探开发研究院廊坊分院 Clamping system applied to rock cores in multiple specifications
CN106323841A (en) * 2016-10-26 2017-01-11 中国科学院武汉岩土力学研究所 Device for measuring permeability of ultra-low permeability rocks under action of triaxial stress
CN106769165A (en) * 2016-09-29 2017-05-31 中国石油天然气股份有限公司 Core Holder System
CN106769767A (en) * 2016-12-26 2017-05-31 中国石油大学(华东) Device and method for measuring anisotropic rock permeability and elastic modulus

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6971260B2 (en) * 2004-01-13 2005-12-06 Coretest Systems, Inc. Overburden rock core sample containment system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101915725A (en) * 2010-09-03 2010-12-15 中国科学院武汉岩土力学研究所 A core clamping pressure vessel
CN104792971A (en) * 2015-04-23 2015-07-22 中国石油天然气股份有限公司勘探开发研究院廊坊分院 Clamping system applied to rock cores in multiple specifications
CN106769165A (en) * 2016-09-29 2017-05-31 中国石油天然气股份有限公司 Core Holder System
CN106323841A (en) * 2016-10-26 2017-01-11 中国科学院武汉岩土力学研究所 Device for measuring permeability of ultra-low permeability rocks under action of triaxial stress
CN106769767A (en) * 2016-12-26 2017-05-31 中国石油大学(华东) Device and method for measuring anisotropic rock permeability and elastic modulus

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
双重介质岩心渗透率测定装置研究及应用;赵希春 等;《液压气动与密封》;20170415(第4期);全文 *

Also Published As

Publication number Publication date
CN107462509A (en) 2017-12-12

Similar Documents

Publication Publication Date Title
CN107631973B (en) An ultra-low permeability rock sample gas permeability multi-method test device on the same machine
CN206876359U (en) A valve air tightness automatic detection device
CN101349608A (en) Method and apparatus for detecting pressure vessel air tightness
CN110646152B (en) Pressure test system and method for plastic pipe acceptance inspection
CN105004493A (en) Leakage-detecting device for bolted flange connection system
CN107462509B (en) A gas permeability core clamping system suitable for multi-standard ultra-low permeability cores
CN110260166A (en) A kind of underground piping air tightness checking device and its application method
CN111174991A (en) Sealing device and pipeline detection device
CN106644279A (en) High-pressure inflation connecting pipe defect detection device
CN112730160B (en) Transient test system for seepage evolution rule of low-permeability coal rock
CN205333483U (en) Gas permeability test system
CN205157393U (en) But vary voltage formula permeability testing arrangement
CN103195295B (en) Method for testing sealing performance of screwed nipple of oil well pipe
CN107063879A (en) Pressure-resistant blasting tester for pipes
CN101957252A (en) Experiment device for detecting sealing performance of swelling capsule and sealing liquid
CN207280702U (en) A kind of experimental provision of follow-on test special thread sealing surface released gas rate
CN104458163A (en) Valve leakage detection device and detection method thereof
RU2270986C2 (en) Method for measuring amount of gas (flow-over), flowing through closed ball valve, and device for realization of said method
CN212206495U (en) A device for testing the sealing performance of pipe fittings
RU2758876C1 (en) Method for determining level of leakage through leaky gate of ball valve of shut-off and control valve in operating mode and device for its implementation
CN210774572U (en) Pressure test system for acceptance inspection of plastic pipes
CN209764342U (en) Thermal recovery packing element locking test device
KR101477577B1 (en) The water pressure cap for pressure testing a pipe
CN107490458A (en) A kind of air valve leak detection assembly and air valve leak hunting method
CN209992134U (en) Device for detecting air tightness of torch valve body

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant