CN107459001A - 一种人工挖孔桩出土提升装置 - Google Patents
一种人工挖孔桩出土提升装置 Download PDFInfo
- Publication number
- CN107459001A CN107459001A CN201710746752.6A CN201710746752A CN107459001A CN 107459001 A CN107459001 A CN 107459001A CN 201710746752 A CN201710746752 A CN 201710746752A CN 107459001 A CN107459001 A CN 107459001A
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- connecting rod
- pole
- chutes
- conveyer belt
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66F—HOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
- B66F11/00—Lifting devices specially adapted for particular uses not otherwise provided for
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mechanical Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Earth Drilling (AREA)
Abstract
本发明公开了一种人工挖孔桩出土提升装置,包括底座和挖孔桩,所述底座上固定连接支架的两侧端,所述挖孔桩位于支架的下方,本发明通过加入支架、第一连接杆、传动齿轮、第二连接杆和第二支杆等结构,通过接通外部电源,启动传动电机,带动传送带旋转,工作人员在挖孔桩内将土渣或土石料放入收容箱中,由传送带旋转传送至底座上,再使用运土车运出工作区域,随着挖孔工作的进行,孔洞变深,此时,利用正反开关,启动调节电机,使螺杆旋转,从而使第三连接杆向左移动,调节了第三连接杆和第二连接杆的距离,使位于挖孔桩内的传送带的高度下降,更有利于人工挖孔桩的出土。
Description
技术领域
本发明涉及桥梁挖孔桩施工领域,具体为一种人工挖孔桩出土提升装置。
背景技术
在公路桥梁桩基施工建设中,一座桥梁墩台由多根桩基设计施工,为满足快速施工,多桩基同时开挖,给桥梁承台施工创造条件,一般采用机械钻孔桩和人工挖孔桩成孔作业。在地质条件允许的情况下为加快施工,多采用人工挖孔桩。在施工作业中由于桩基比较深,人工开挖土石料方及材料、机具提升受到限制,如用吊车提升作业配合人工施工,成本高,吊车司机无法看到孔底作业,需要一人专门指挥才能完成提升作业,从目前国内公路桥梁桩基挖孔桩施工情况看,施工期间仍用人工配合汽车吊车来完成,机械投入浪费,劳动强度大,安全风险高,人机配合困难,工效低,施工速度慢。
发明内容
本发明的目的在于提供一种人工挖孔桩出土提升装置,以解决上述背景技术中提出的问题。
一种人工挖孔桩出土提升装置,包括底座和挖孔桩,所述底座上固定连接支架的两侧端,所述挖孔桩位于支架的下方,所述支架水平一段的下端面固定连接第一连接杆的上端,所述第一连接杆的下端垂直固定连接第一支杆的一端,所述第一支杆的另一端固定连接传动电机的底端,所述传动电机的输出端固定连接传动齿轮的中心,所述传动齿轮啮合连接传送带反面的齿条,所述传送带的正面设有两个第一滑槽,所述传送带的反面设有两个第二滑槽和一个齿条,且齿条位于两个第二滑槽之间,所述传送带的正面固定连接有若干收容箱,且收容箱位于两个第一滑槽之间,所述底座上从左至右依次固定连接有两个第四连接杆、第二连接杆和支座,且两个第四连接杆位于挖孔桩的右侧,所述第四连接杆的上端均垂直固定连接第四支杆的一端,两个所述第四支杆的另一端均转动连接有第一滑轮,且两个第一滑轮分别与两个第一滑槽滑动连接,所述第二连接杆的上端垂直固定连接有第二支杆,所述第二支杆贯穿两个第二滑轮的中心,且两个第二滑轮分别与两个第二滑槽滑动连接,所述第二连接杆的中部侧壁固定连接第三支杆,所述第三支杆贯穿两个第三滑轮的中心,且两个第三滑轮分别与两个第二滑槽滑动连接,所述支座的上端开设有条形滑槽,所述条形滑槽内滑动连接第三连接杆的下端,所述第三连接杆的上端垂直固定连接有第五支杆,所述第五支杆贯穿两个第四滑轮,且两个第四滑轮与两个第二滑槽滑动连接,所述第三连接杆螺纹连接有螺杆,所述螺杆的一端固定连接调节电机的输出端,所述螺杆的另一端转动连接在第二支撑杆的侧壁上,所述第二支撑杆的下端与支座的上端面固定连接,所述调节电机的底端固定连接在第一支撑杆的侧壁,所述第一支撑杆的下端与支座的上端面固定连接,所述底座的上端面设有运土车。
优选的,所述运土车位于第二连接杆和支座之间。
优选的,所述齿条位于传送带的中线上。
优选的,所述收容箱的开口处设有盖子。
与现有技术相比,本发明的有益效果是:本发明通过加入支架、第一连接杆、传动齿轮、第二连接杆和第二支杆等结构,通过接通外部电源,启动传动电机,带动传送带旋转,工作人员在挖孔桩内将土渣或土石料放入收容箱中,由传送带旋转传送至底座上,再使用运土车运出工作区域,随着挖孔工作的进行,孔洞变深,此时,利用正反开关,启动调节电机,使螺杆旋转,从而使第三连接杆向左移动,调节了第三连接杆和第二连接杆的距离,使位于挖孔桩内的传送带的高度下降,更有利于人工挖孔桩的出土。
附图说明
图1为本发明结构示意图;
图2为A-A剖视图;
图3为B-B剖视图;
图4为传送带正面图;
图5为传送带反面图。
图中:底座1、挖孔桩2、传送带3、收容箱4、支架5、第一连接杆6、传动齿轮7、第二连接杆8、第二支杆9、运土车10、第三连接杆11、第一支撑杆12、调节电机13、螺杆14、第四连接杆15、第一滑槽16、第二滑槽17、齿条18。
具体实施方式
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。
请参阅图1-5,本发明提供一种技术方案:
一种人工挖孔桩出土提升装置,包括底座1和挖孔桩2,底座1上固定连接支架5的两侧端,挖孔桩2位于支架5的下方,支架5水平一段的下端面固定连接第一连接杆6的上端,第一连接杆6的下端垂直固定连接第一支杆的一端,第一支杆的另一端固定连接传动电机的底端,传动电机的输出端固定连接传动齿轮7的中心,传动齿轮7啮合连接传送带3反面的齿条18,传送带3的正面设有两个第一滑槽16,传送带3的反面设有两个第二滑槽17和一个齿条18,且齿条18位于两个第二滑槽17之间,齿条18位于传送带3的中线上,传送带3的正面固定连接有若干收容箱4,且收容箱4位于两个第一滑槽16之间,收容箱4的开口处设有盖子,底座1上从左至右依次固定连接有两个第四连接杆15、第二连接杆8和支座,且两个第四连接杆15位于挖孔桩2的右侧,第四连接杆15的上端均垂直固定连接第四支杆的一端,两个第四支杆的另一端均转动连接有第一滑轮,且两个第一滑轮分别与两个第一滑槽16滑动连接,第二连接杆8的上端垂直固定连接有第二支杆9,第二支杆9贯穿两个第二滑轮的中心,且两个第二滑轮分别与两个第二滑槽17滑动连接,第二连接杆8的中部侧壁固定连接第三支杆,第三支杆贯穿两个第三滑轮的中心,且两个第三滑轮分别与两个第二滑槽17滑动连接,支座的上端开设有条形滑槽,条形滑槽内滑动连接第三连接杆11的下端,第三连接杆11的上端垂直固定连接有第五支杆,第五支杆贯穿两个第四滑轮,且两个第四滑轮与两个第二滑槽17滑动连接,第三连接杆11螺纹连接有螺杆14,螺杆14的一端固定连接调节电机13的输出端,螺杆14的另一端转动连接在第二支撑杆的侧壁上,第二支撑杆的下端与支座的上端面固定连接,调节电机13的底端固定连接在第一支撑杆12的侧壁,第一支撑杆12的下端与支座的上端面固定连接,底座1的上端面设有运土车10,运土车10位于第二连接杆8和支座之间。
工作原理:通过接通外部电源,启动传动电机,带动传送带3旋转,工作人员在挖孔桩2内将土渣或土石料放入收容箱4中,由传送带3旋转传送至底座1上,再使用运土车10运出工作区域,随着挖孔工作的进行,孔洞变深,此时,利用正反开关,启动调节电机13,使螺杆14旋转,从而使第三连接杆11向左移动,调节了第三连接杆11和第二连接杆8的距离,使位于挖孔桩2内的传送带3的高度下降,更有利于人工挖孔桩的出土。
尽管已经示出和描述了本发明的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本发明的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本发明的范围由所附权利要求及其等同物限定。
Claims (4)
1.一种人工挖孔桩出土提升装置,包括底座(1)和挖孔桩(2),其特征在于:所述底座(1)上固定连接支架(5)的两侧端,所述挖孔桩(2)位于支架(5)的下方,所述支架(5)水平一段的下端面固定连接第一连接杆(6)的上端,所述第一连接杆(6)的下端垂直固定连接第一支杆的一端,所述第一支杆的另一端固定连接传动电机的底端,所述传动电机的输出端固定连接传动齿轮(7)的中心,所述传动齿轮(7)啮合连接传送带(3)反面的齿条(18),所述传送带(3)的正面设有两个第一滑槽(16),所述传送带(3)的反面设有两个第二滑槽(17)和一个齿条(18),且齿条(18)位于两个第二滑槽(17)之间,所述传送带(3)的正面固定连接有若干收容箱(4),且收容箱(4)位于两个第一滑槽(16)之间,所述底座(1)上从左至右依次固定连接有两个第四连接杆(15)、第二连接杆(8)和支座,且两个第四连接杆(15)位于挖孔桩(2)的右侧,所述第四连接杆(15)的上端均垂直固定连接第四支杆的一端,两个所述第四支杆的另一端均转动连接有第一滑轮,且两个第一滑轮分别与两个第一滑槽(16)滑动连接,所述第二连接杆(8)的上端垂直固定连接有第二支杆(9),所述第二支杆(9)贯穿两个第二滑轮的中心,且两个第二滑轮分别与两个第二滑槽(17)滑动连接,所述第二连接杆(8)的中部侧壁固定连接第三支杆,所述第三支杆贯穿两个第三滑轮的中心,且两个第三滑轮分别与两个第二滑槽(17)滑动连接,所述支座的上端开设有条形滑槽,所述条形滑槽内滑动连接第三连接杆(11)的下端,所述第三连接杆(11)的上端垂直固定连接有第五支杆,所述第五支杆贯穿两个第四滑轮,且两个第四滑轮与两个第二滑槽(17)滑动连接,所述第三连接杆(11)螺纹连接有螺杆(14),所述螺杆(14)的一端固定连接调节电机(13)的输出端,所述螺杆(14)的另一端转动连接在第二支撑杆的侧壁上,所述第二支撑杆的下端与支座的上端面固定连接,所述调节电机(13)的底端固定连接在第一支撑杆(12)的侧壁,所述第一支撑杆(12)的下端与支座的上端面固定连接,所述底座(1)的上端面设有运土车(10)。
2.根据权利要求1所述的一种人工挖孔桩出土提升装置,其特征在于:所述运土车(10)位于第二连接杆(8)和支座之间。
3.根据权利要求1所述的一种人工挖孔桩出土提升装置,其特征在于:所述齿条(18)位于传送带(3)的中线上。
4.根据权利要求1所述的一种人工挖孔桩出土提升装置,其特征在于:所述收容箱(4)的开口处设有盖子。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710746752.6A CN107459001B (zh) | 2017-08-27 | 2017-08-27 | 一种人工挖孔桩出土提升装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710746752.6A CN107459001B (zh) | 2017-08-27 | 2017-08-27 | 一种人工挖孔桩出土提升装置 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107459001A true CN107459001A (zh) | 2017-12-12 |
CN107459001B CN107459001B (zh) | 2023-05-26 |
Family
ID=60549456
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710746752.6A Active CN107459001B (zh) | 2017-08-27 | 2017-08-27 | 一种人工挖孔桩出土提升装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107459001B (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108059104A (zh) * | 2017-12-13 | 2018-05-22 | 中国建筑第八工程局有限公司 | 一种挖孔桩孔口提升防护结构及施工方法 |
CN109853657A (zh) * | 2019-03-15 | 2019-06-07 | 湖北工业大学 | 一种基于bim技术的人工挖孔桩自动出渣装置及使用方法 |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08218779A (ja) * | 1995-02-17 | 1996-08-27 | Shimizu Corp | 搬送装置 |
JPH08225124A (ja) * | 1995-02-22 | 1996-09-03 | Taisei Corp | ベルトコンベヤ装置 |
JP2000159498A (ja) * | 1998-11-30 | 2000-06-13 | Chugoku Electric Power Co Inc:The | 土砂搬送装置及びそれを用いた掘削孔形成方法 |
CN101775821A (zh) * | 2009-12-10 | 2010-07-14 | 中国建筑一局(集团)有限公司 | 逆作法施工土方垂直运输装置及方法 |
CN202417345U (zh) * | 2012-01-23 | 2012-09-05 | 佳木斯大学 | 钻孔机出土传送装置 |
CN203513129U (zh) * | 2013-09-11 | 2014-04-02 | 中铁十二局集团第二工程有限公司 | 一种挖孔桩施工材料运送升降装置 |
CN105965685A (zh) * | 2016-05-11 | 2016-09-28 | 汤始建华建材(南通)有限公司 | 一种混凝土管桩自动揭盖模系统 |
CN207142776U (zh) * | 2017-08-27 | 2018-03-27 | 贵州新联爆破工程集团有限公司 | 一种人工挖孔桩出土提升装置 |
-
2017
- 2017-08-27 CN CN201710746752.6A patent/CN107459001B/zh active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08218779A (ja) * | 1995-02-17 | 1996-08-27 | Shimizu Corp | 搬送装置 |
JPH08225124A (ja) * | 1995-02-22 | 1996-09-03 | Taisei Corp | ベルトコンベヤ装置 |
JP2000159498A (ja) * | 1998-11-30 | 2000-06-13 | Chugoku Electric Power Co Inc:The | 土砂搬送装置及びそれを用いた掘削孔形成方法 |
CN101775821A (zh) * | 2009-12-10 | 2010-07-14 | 中国建筑一局(集团)有限公司 | 逆作法施工土方垂直运输装置及方法 |
CN202417345U (zh) * | 2012-01-23 | 2012-09-05 | 佳木斯大学 | 钻孔机出土传送装置 |
CN203513129U (zh) * | 2013-09-11 | 2014-04-02 | 中铁十二局集团第二工程有限公司 | 一种挖孔桩施工材料运送升降装置 |
CN105965685A (zh) * | 2016-05-11 | 2016-09-28 | 汤始建华建材(南通)有限公司 | 一种混凝土管桩自动揭盖模系统 |
CN207142776U (zh) * | 2017-08-27 | 2018-03-27 | 贵州新联爆破工程集团有限公司 | 一种人工挖孔桩出土提升装置 |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108059104A (zh) * | 2017-12-13 | 2018-05-22 | 中国建筑第八工程局有限公司 | 一种挖孔桩孔口提升防护结构及施工方法 |
CN108059104B (zh) * | 2017-12-13 | 2019-05-10 | 中国建筑第八工程局有限公司 | 一种挖孔桩孔口提升防护结构及施工方法 |
CN109853657A (zh) * | 2019-03-15 | 2019-06-07 | 湖北工业大学 | 一种基于bim技术的人工挖孔桩自动出渣装置及使用方法 |
Also Published As
Publication number | Publication date |
---|---|
CN107459001B (zh) | 2023-05-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110374500B (zh) | 一种成组钻孔植桩施工方法 | |
CN105952406B (zh) | 一种岩石底部切割取芯钻头 | |
CN113006042B (zh) | 一种建筑垃圾土地层大型水工构筑物地基加固施工工艺 | |
US11891892B2 (en) | Square pile construction method and equipment of a rotary drilling rig | |
CN104912376B (zh) | 一种自动立电杆装置 | |
CN107288171B (zh) | 钻撑一体式竖井成孔装置 | |
CN207142776U (zh) | 一种人工挖孔桩出土提升装置 | |
CN207934087U (zh) | 一种水磨钻配合人工挖孔的施工结构 | |
CN110318763A (zh) | 多平台台车式斜井扩挖方法 | |
CN107459001A (zh) | 一种人工挖孔桩出土提升装置 | |
CN104196072A (zh) | 高原山地基坑开挖施工设备 | |
CN105922279A (zh) | 一种用于岩土浆砌石的自动抓取机械手 | |
CN206844193U (zh) | 钻撑一体式桩孔成形装置 | |
CN113250027B (zh) | 一种市政道路软基智能施工工艺 | |
CN112854239B (zh) | 一种超深淤泥质土层三轴搅拌桩加固施工方法 | |
CN110331936B (zh) | 一种组合式钻孔扩底植桩施工方法 | |
CN205876331U (zh) | 一种用于隧道暗挖机的刨土装置 | |
CN103147437A (zh) | 一种带纵移机构的型钢水泥土搅拌桩机 | |
CN106800363A (zh) | 一种淤泥/污泥堆场原位固化装置 | |
CN110295596A (zh) | 一种用于预制锚拉式挡土墙的施工装置 | |
CN113006088B (zh) | 一种深层地基的加固装置及其处理方法 | |
CN109736294A (zh) | Smw工法桩施工方法 | |
CN211874383U (zh) | 一种双动力全程泵吸反循环冲孔设备 | |
CN210529685U (zh) | 一种空心钻杆开挖机 | |
CN209483357U (zh) | 一种用于顶管施工的敞口式盾构机 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information | ||
CB02 | Change of applicant information |
Address after: 550002, 14 floor, Fu Zhong commercial building, No. 102 Xinhua Road, Nanming District, Guiyang, Guizhou. Applicant after: POLY XINLIAN BLASTING ENGINEERING GROUP Co.,Ltd. Address before: 550002, 14 floor, Fu Zhong commercial building, No. 102 Xinhua Road, Nanming District, Guiyang, Guizhou. Applicant before: GUIZHOU XINLIAN BLASTING ENGINEERING GROUP Co.,Ltd. |
|
GR01 | Patent grant | ||
GR01 | Patent grant |