CN107449708A - A kind of method simulated polymorphic combination coalmass crevasse and barriering effect is moved to water transport - Google Patents

A kind of method simulated polymorphic combination coalmass crevasse and barriering effect is moved to water transport Download PDF

Info

Publication number
CN107449708A
CN107449708A CN201710619059.2A CN201710619059A CN107449708A CN 107449708 A CN107449708 A CN 107449708A CN 201710619059 A CN201710619059 A CN 201710619059A CN 107449708 A CN107449708 A CN 107449708A
Authority
CN
China
Prior art keywords
water
crack
bottom plate
test specimen
barriering effect
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710619059.2A
Other languages
Chinese (zh)
Other versions
CN107449708B (en
Inventor
冯国瑞
宋诚
姜海纳
崔家庆
胡胜勇
李振
高强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taiyuan University of Technology
Original Assignee
Taiyuan University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taiyuan University of Technology filed Critical Taiyuan University of Technology
Priority to CN201710619059.2A priority Critical patent/CN107449708B/en
Publication of CN107449708A publication Critical patent/CN107449708A/en
Application granted granted Critical
Publication of CN107449708B publication Critical patent/CN107449708B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N15/00Investigating characteristics of particles; Investigating permeability, pore-volume or surface-area of porous materials
    • G01N15/08Investigating permeability, pore-volume, or surface area of porous materials

Landscapes

  • Chemical & Material Sciences (AREA)
  • Dispersion Chemistry (AREA)
  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Biochemistry (AREA)
  • General Health & Medical Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Immunology (AREA)
  • Pathology (AREA)
  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

The invention discloses a kind of method simulated polymorphic combination coalmass crevasse and barriering effect is moved to water transport, comprise the following steps:(1)Mold Making:Cube structure mould is made, mould upper and lower opening opens wide, and makes two pieces of the bottom plate matched with die size,(2)Prefabricated crack makes:Prefabricated crack is fixed on mould inside on disk groove Interal fixation, the coal dust being stirred is put into mould;Using bottom plate a, different angle, different in width, insertion or non-penetrating single crack can be obtained;Using bottom plate b, different crack combinations can be obtained;(3)Test specimen seals;(4)Water filling:In test piece upper part placement and test specimen floor space identical sponge, red ink is injected into sponge;(5)High-speed camera records:By gather way common observation, the record of water in high-speed camera and 500ml measuring cups, compare different shape, the barriering effect that various combination crack is moved to water transport.Preparation method of the present invention is easy, easy to operation.

Description

A kind of method simulated polymorphic combination coalmass crevasse and barriering effect is moved to water transport
Technical field
The present invention relates to a kind of method simulated polymorphic combination coalmass crevasse and barriering effect is moved to water transport, main research exists The method of the barriering effect moved under conditions of prefabricated different shape crack, various combination crack to water transport.
Background technology
During coal production, preventing and treating water problems is a big technical barrier of production and scientific research.In recent years, water leak accident Caused by death toll sharply increase, so research coal seam water bearing features and migration rule be particularly important.In coal seam In, the main thoroughfare that water transport moves is crack and tomography.Coal develops into as a kind of inhomogeneous concrete dynamic modulus body, its internal crack It is ripe, and fractured zones are sufficiently complex, due to the presence in crack so that the flow direction of coal seam reclaimed water, flow are very big Depending on the distribution arrangement in crack, geometric shape, syntagmatic in degree.In process of production, the influence that crack is stressed, no Disconnected extension and densification, at this moment the transport conditions of water can also change, when crack propagation to a certain extent, the flowing of water can be from layer Rheology is turbulent flow, when neighbouring preservation has water-bearing layer, will shove, cause the generation of water inrush accident.So research water is in coal Transport conditions in slabbing gap are very necessary.
Paper that Luo Rongwu is delivered " mechanics parameter and its Experimental Study on Seepage Characteristics research of preset crack test specimen " (2009, in Southern university pages 89) in, longitudinal prefabricated crack seepage tests method is employed, crack is in non-filler, breakthrough status, pressure For power water by test specimen upper surface prefabricated crack seepage flow, the method that lower surface communicates with air studies seepage flow of the water in crack, But its migration pathway using crack as water, and the iris action that research crack in prefabrication transverse crack is moved to water transport in coal sample Study less.
The Chinese invention patent of Application No. 201610574945.3 describes one kind and intersected for fluid in fine and close rock mass The simulation densification rock mass of seepage flow mechanism research in crack intersects crack permeation flow tester, but it uses rock sample, and It is rarely reported in coal test specimen in the research of prefabricated crack.
In coal test specimen transverse direction prefabricated crack, longitudinal seepage flow, different shape, migration of the crack of various combination to water have one Fixed iris action, so prefabricated different shape, the crack of various combination are to the barrier situation that water transport moves in the horizontal for research Very necessary, this can prevent and treat for colliery water leak accident and provide important scientific basis.
The content of the invention
The present invention is intended to provide a kind of method simulated polymorphic combination coalmass crevasse and barriering effect is moved to water transport, making Prefabricated crack test specimen observes the barriering effect that different crack forms, crack combination are moved to water transport well.
Method of the polymorphic combination coalmass crevasse to water transport shifting barriering effect is simulated the invention provides a kind of, including it is following Step:
(1) Mold Making:Die size is fabricated to 100mm × 100mm × 100mm as needed, and mould upper and lower opening opens wide, Make the 100mm × 100mm matched with die size two pieces of bottom plate, bottom plate thickness 10mm;Bottom plate a has using bottom plate center m as circle The circular opening of the heart, a diameter of 50mm;Bottom plate b has respectively with point n1,n2For the center of circle, a diameter of 50mm two circular openings, its Middle n1、n2For the center of circle of two tangent circles on the center line of bottom plate;The circle matched with its size is provided with above-mentioned circular opening Disk, disk can be embedded on circular opening, have scale on disk and can rotate freely, original state disk is located at 0 ° of angle;Disk edge Diametric(al) is provided with groove;Can be respectively in 0.5mm, 1mm, 1.5mm steel plate insertion groove by thickness.
(2) prefabricated crack makes:Prefabricated crack is fixed on mould inside on disk groove Interal fixation, then will Original coal sample crushes, and sieve takes the coal dust that granularity is 0.2-0.25mm;Distilled water is added into coal dust, and (moulded coal test specimen made of making contains Water rate stirs up to 2%);The coal dust being stirred is put into mould;Using the mould equipped with bottom plate a, rotating circular disk, Disc angle is set to distinguish 0 °, 30 °, 60 °, 90 °;The development degree of different configuration position cracks in coal seam is also different within coal mines, pleat Position fracture density of wrinkling is big, and length and height are relatively large, especially anticline axle portion, and Fracture Width maximum reaches 0.28- 1.4mm, so it is 100mm to choose length, thickness is respectively 0.5mm, 1mm, 1.5mm steel plate to change the thickness of prefabricated crack Degree;By choose length be 50mm steel plate, to form intermittent fracture, to simulate different angle, different in width, insertion or Non-penetrating single crack;Using the mould equipped with bottom plate b, two disks are rotated, two prefabricated cracks is in parallel, junction Geometry site, to simulate different crack combinations.It is made on 200t stiff experiment machines with 100MPa pressure 100mm × 100mm × 100mm standard moulded coal test specimen.Using orthogonal design, reduce and repeat experimental group number, 16 groups of test specimen is made.
(3) test specimen seals:Test specimen is overturn, is horizontally oriented prefabricated crack, then by vertical with horizontal direction four Individual plane covers layer of transparent heat-shrink tube, is heated using heat gun, shrinks heat-shrink tube, sealed test piece, avoids water from side seepage flow. It is placed in after coal sample is weighed in the big 6mm of inside dimension side ratio test specimen container, test specimen can be made to wrap heat-shrink tube and be just put into Container.Container bottom is porous disc, and is connected to 500ml measuring cups.
(4) water filling:Placed in test piece upper part with test specimen floor space identical sponge, the injection 500ml red ink into sponge Water, it is nature seepage flow when serving as water source using sponge, in many practical problems, big rimala staggeredly occurs, and more by fine grained Medium is filled, and making the flowing of underground water, on the whole very slowly substantially conforming to Darcy's law, this method can regard water as and exist Diffusion motion in micropore and dead end hole, when water is from moistening stronger region to moistening the poor and less region of curvature When making diffusion motion, diffusion motion is one-dimensional, is represented by the following formula:
In formula, △ MkFor the increment of moisture in coal after diffusion;
D is diffusion coefficient;
X is liquid along capillariomotor distance;
T is the time.
If the time is that i.e. t=0 is counted since diffusion process, and on the region discussed and the border of liquid diffusion source The moisture increment of (such as on prefabricated crack border) is possible maximum i.e. X=0, initial and boundary condition is substituted into above formula, then It is available to make the moisture incrementss in coal sample be by molecule diffusion motion:
In formula, a within preset time because what molecule diffusion motion made that the increase of moisture in micropore fills hole is Number, is obtained, it is relevant with the property of capillary, liquid by experiment;R is capillary radius.
It is 25 DEG C to control temperature, places 2d.
(5) high-speed camera records:Visual window is installed additional in container side, is observed using high-speed camera by visual window red Diffusion motion of the ink in test specimen, water in suspension time of the globule of prefabricated crack upper surface, 500ml measuring cups is recorded in real time Gather way, to the barriering effect for comparing different shape, various combination prefabricated crack moves to water transport.
Above-mentioned analogy method, die bottom plate can be embedded in disk in the step (1), have scale on disk and can freely revolve Turn, disk is diametrically provided with groove, and the steel plate of different-thickness can be inserted in groove.
In the step (2), using the mould equipped with bottom plate a, rotating circular disk, make disc angle be respectively 0 °, 30 °, 60°、90°;Selection length is 100mm, and thickness is respectively 0.5mm, 1mm, 1.5mm steel plate to change the thickness of prefabricated crack; The steel plate that length is 50mm is chosen, to form intermittent fracture, to simulate different angle, different in width, insertion or non-penetrating Single crack;
Using the mould equipped with bottom plate b, two disks are rotated, two prefabricated cracks is in parallel, junction geometry position Relation is put, to simulate different crack combinations.
It is to the method for test specimen sealing in the step (3):Using transparent heat-shrink tube, it is placed in container, test specimen and container It is brought into close contact.
In the step (3), the lower vessel portion has porous disc, is connected to 500ml measuring cups below porous disc, records water Collection situation.
In step (4) the injecting process, by sponge water filling, water is set uniformly to be spread since test specimen upper surface.
In the step (4), by injecting red ink, diffusion motion of the water in test specimen can be observed at any time.
In the step (5), by gather way common observation, the record of water in high-speed camera and 500ml measuring cups, Compare different shape, the barriering effect that various combination crack is moved to water transport.
Beneficial effects of the present invention:
A kind of physical analogy side for simulating the barriering effect that polymorphic combination coalmass crevasse moves to water transport provided by the invention Method, the preparation method of prefabricated crack is easy, easy to operate, uses the simple and effective crack that observes of high-speed camera and measuring cup Iris action of the boundary effect to water.
Brief description of the drawings
Fig. 1 is the structural representation of the mould equipped with bottom plate a.
Fig. 2 is the structural representation of the mould equipped with bottom plate b.
Fig. 3 is the schematic diagram of 0 °, 30 °, 60 °, 90 ° prefabricated crack of different angle.
Fig. 4 is the schematic diagram of various combination prefabricated crack (parallel, junction).
Fig. 5 is that the inventive method tests schematic diagram.
Wherein 1- steel plates, 2- disks, 3- moulds, 4- grooves, 5- porous discs, 6- containers, 7-500ml measuring cups, 8- sponges, 9- Visual window, 10- prefabricated cracks.
Embodiment
The present invention is further illustrated below by embodiment, but is not limited to following examples.
Embodiment 1:
Fig. 1, mould described in 2 structural representation in, wherein 1 is steel plate, 2 be disk, and 3 be mould, and 4 be groove, steel It is respectively that 0.5mm, 1mm, 1.5mm, 3 groups of length × a width of 100mm × 50mm and thickness are respectively that the specifications parameter of plate, which has thickness, 3 groups of 0.5mm, 1mm, 1.5mm, length × a width of 50mm × 50mm, totally 6 groups;Mould is mainly opened wide by upper and lower opening, and size is The length that 100mm × 100mm × 100mm framework matches with same frame size × a width of 100mm × 100mm, thickness are 10mm's Two pieces of bottom plate a, b assembles respectively;Offered in Fig. 1 on bottom plate using bottom plate center m as the center of circle, a diameter of 50mm circle Hole, and be respectively 0.5mm, 1mm, 1.5mm, a diameter of 50mm 1 group of disk equipped with recess width;Bottom plate b is opened up in fig. 2 Have with n1,n2For the center of circle, a diameter of 50mm two circular openings, wherein n1、n2It is tangent for two on the center line of bottom plate The round center of circle;And it is furnished with 2 groups of the disk that recess width is respectively 0.5mm, 1mm, 1.5mm, a diameter of 50mm.
In the schematic diagram of 0 °, 30 °, 60 °, 90 ° prefabricated crack of different angle described in Fig. 3, the making side of 0 ° of prefabricated crack Method is to make Interal fixation on disk groove prefabricated crack 1 to be fixed on mould inside, and rotating circular disk, it is 0 ° to make disc angle, Then original coal sample is crushed, sieve takes the coal dust that granularity is 0.2-0.25mm.27ml distilled water is added into coal dust, and is stirred equal It is even.The coal dust being stirred is put into mould, 100mm × 100mm is made with 100MPa pressure on 200t stiff experiment machines × 100mm 0 ° of prefabricated crack moulded coal test specimen.30 °, 60 °, 90 ° of prefabricated crack moulded coal test specimens pass through rotating circular disk angle, repeat Above-mentioned steps, you can be made.
In the schematic diagram of various combination prefabricated crack described in Fig. 4, the geometry site of two groups of prefabricated cracks is respectively Parallel and junction, it can be realized by using the mould equipped with bottom plate b, rotating circular disk, be respectively at two groups of steel plates parallel With the position of junction, original coal sample is crushed, sieve takes the coal dust that granularity is 0.2-0.25mm.27ml distillations are added into coal dust Water, and stir.The coal dust being stirred is put into mould, is made on 200t stiff experiment machines with 100MPa pressure 100mm × 100mm × 100mm various combination prefabricated crack moulded coal test specimen.
In the inventive method experiment schematic diagram described in Fig. 5, wherein 5 be porous disc, 6 be container, and 7 be 500ml measuring cups, 8 It is sponge, 9 be visual window, and 10 be prefabricated crack.Container is put into after prefabricated crack moulded coal test specimen is sealed by transparent heat-shrink tube, Sponge is placed in test piece upper part, 500ml red ink is injected into sponge, red ink diffuses to container bottom in test specimen, leads to Cross container bottom porous disc and flow into 500ml measuring cups.Recorded in real time from visual window using high-speed camera during experiment prefabricated The increased speed of water in suspension time of the globule of crack upper surface, 500ml measuring cups, observation red ink is in prefabricated crack moulded coal Diffusion motion in test specimen.It is 25 DEG C to control room temperature, test period 2d.
The method that barriering effect is moved to water transport using the polymorphic combination coalmass crevasse of present invention simulation, specifically includes following step Suddenly:
(1) Mold Making:As illustrated in fig. 1 and 2, die size is fabricated to 100mm × 100mm × 100mm, mould as needed Have 3 upper and lower openings to open wide, make the 100mm × 100mm matched with die size two pieces of bottom plate, bottom plate thickness 10mm;Bottom plate a have with Bottom plate center m is the center of circle, a diameter of 50mm circular opening, and bottom plate b has with n1,n2For the center of circle, a diameter of 50mm two circles Hole, wherein n1、n2For the center of circle of two tangent circles on the center line of bottom plate;Separately there is the circle matched with circular opening size Disk 2, disk 2 can be embedded on circular opening, have scale on disk 2 and can rotate freely, initial disk is located at 0 ° of angle.Disk is along directly Footpath direction fluted 4.Can be respectively that 0.5mm, 1mm, 1.5mm steel plate 1 is inserted in groove 4 by thickness.
(2) prefabricated crack makes:Steel plate 1, which is fixed on disk groove 4, makes prefabricated crack 10 be fixed on inside mould 3, Then original coal sample is crushed, sieve takes the coal dust that granularity is 0.2-0.25mm.Appropriate distilled water is added into coal dust, and is stirred equal It is even.The coal dust being stirred is put into mould.Using the mould equipped with bottom plate a, rotating circular disk, make disc angle distinguish 0 °, 30°、60°、90°;The development degree of different configuration position cracks in coal seam is also different within coal mines, and fold position fracture density is big, Length and height are relatively large, especially anticline axle portion, and Fracture Width is maximum up to 0.28-1.4mm, so selection length is 100mm, thickness are respectively 0.5mm, 1mm, 1.5mm steel plate to change the thickness of prefabricated crack;It is 50mm by choosing length Steel plate, penetrated with forming crack half, to simulate different angle, different in width, insertion or non-penetrating single crack;Use Mould equipped with bottom plate b, two disks are rotated, two prefabricated cracks is in parallel, junction geometry site, to mould Intend different crack combinations.100mm × 100mm × 100mm mark is made with 100MPa pressure on 200t stiff experiment machines Pseudotype coal test specimen.Using orthogonal design, reduce and repeat experimental group number, 16 groups of sample is made.
(3) sample seals:Sample is overturn, is horizontally oriented prefabricated crack, then by vertical with horizontal direction four Individual plane covers layer of transparent heat-shrink tube, is heated using heat gun, shrinks heat-shrink tube, seals sample, avoids water from side seepage flow. It is placed in after coal sample is weighed in the big 6mm of inside dimension side ratio sample container 6, sample can be made to wrap heat-shrink tube and be just put into Container.Container bottom is porous disc 5, and is connected to 500ml measuring cups 7.
(4) water filling:Placed on sample top with sample floor space identical sponge 8, the injection 55.81ml into sponge 8 Red ink, it is nature seepage flow, in being inscribed between many reality, big rimala staggeredly occurs, and more thin when serving as water source using sponge Granule medium is filled, and making the flowing of underground water, on the whole very slowly substantially conforming to Darcy's law, this method can be seen as Diffusion motion of the water in micropore and dead end hole, when water is poor and curvature is less to moistening from moistening stronger region When diffusion motion is made in region, diffusion motion is one-dimensional, is represented by the following formula:
In formula
△MkFor the increment of moisture in coal after diffusion;
D is diffusion coefficient;
X is liquid along capillariomotor distance;
T is the time.
If the time is that i.e. t=0 is counted since diffusion process, and on the region discussed and the border of liquid diffusion source The moisture increment of (such as on prefabricated crack border) is possible maximum i.e. X=0, initial and boundary condition is substituted into above formula, then It is available to make the moisture incrementss in coal sample be by molecule diffusion motion:
A within preset time because molecule diffusion motion makes the increase of moisture in micropore fill the coefficient of hole, by Experiment obtains, and it is relevant with the property of capillary, liquid;R is capillary radius.
It is 25 DEG C to control room temperature, places 2d.
(5) high-speed camera records:Visual window 9 is installed additional in container side, is observed using high-speed camera by visual window The diffusion motion of red ink in the sample, suspension time, the 500ml measuring cup reclaimed waters of the globule of prefabricated crack upper surface are recorded in real time Increased situation is measured, to the barriering effect for comparing different shape, various combination prefabricated crack moves to water transport.
Summarize above-mentioned specific implementation method, prefabricated crack moulded coal test specimen preparation method provided by the invention and existing method phase Than, take rotating circular disk angle, using the mould equipped with bottom plate b, change different-thickness steel plate, using length × a width of 50mm × The measures such as 50mm steel plate, it can obtain containing different angle, different in width, insertion or non-penetrating single crack and different cracks The test specimen of combination.The test method of the present invention realizes test specimen compared with existing experiment, by using red ink and high-speed camera The visualization of reclaimed water diffusion motion, available for the migration rule for analyzing different prefabricated crack test specimen reclaimed waters;Examination of the present invention Proved recipe method can realize the effective simulation for the barriering effect that polymorphic combination coalmass crevasse moves to water transport, be recorded by high-speed camera Suspension time of the globule of prefabricated crack upper surface, the data that water gathers way in 500ml measuring cups, can be to than less The barriering effect that same form, various combination prefabricated crack move to water transport, important scientific basis is provided for the preventing and treating of colliery water leak accident.

Claims (9)

  1. A kind of 1. method simulated polymorphic combination coalmass crevasse and barriering effect is moved to water transport, it is characterised in that including following step Suddenly:
    (1) Mold Making:
    The mould of cube structure is made, mould upper and lower opening opens wide, two pieces of the bottom plate that making matches with die size, on bottom plate a Have using bottom plate center m as the center of circle, a diameter of 50mm circular opening, bottom plate b has respectively with point n1,n2For the center of circle, a diameter of 50mm Two circular openings, wherein n1、n2For the center of circle of two tangent circles on the center line of bottom plate;It is provided with circular opening The disk of size matching, has scale on disk and can rotate freely, original state disk is located at 0 ° of angle;
    (2) prefabricated crack makes:Prefabricated crack is set to be fixed on mould inside on disk groove Interal fixation, then will be original Coal sample crushes, and sieve takes the coal dust that granularity is 0.2-0.25mm;Distilled water is added into coal dust, makes manufactured moulded coal test specimen moisture content Up to 2%, and stir;The coal dust being stirred is put into mould;Using bottom plate a, can obtain different angle, different in width, Insertion or non-penetrating single crack;Using bottom plate b, different crack combinations can be obtained;
    100mm × 100mm × 100mm standard moulded coal test specimen is made with 100MPa pressure on 200t stiff experiment machines;Adopt With orthogonal design, reduce and repeat experimental group number, 16 groups of test specimen is made;
    (3) test specimen seals:Test specimen is overturn, is horizontally oriented prefabricated crack, it is then flat by four vertical with horizontal direction Surface cover layer of transparent heat-shrink tube, is heated using heat gun, shrinks heat-shrink tube, sealed test piece, avoids water from side seepage flow;By coal Sample is placed in container after weighing, and container bottom is porous disc;
    (4) water filling:In test piece upper part placement and test specimen floor space identical sponge, red ink is injected into sponge, uses sponge It is nature seepage flow when serving as water source;The diffusion motion of water is one-dimensional, is represented by the following formula:
    <mrow> <mo>&amp;part;</mo> <msub> <mi>&amp;Delta;M</mi> <mi>k</mi> </msub> <mo>/</mo> <mo>&amp;part;</mo> <mi>t</mi> <mo>=</mo> <mo>&amp;part;</mo> <mrow> <mo>(</mo> <mi>D</mi> <mo>&amp;part;</mo> <msub> <mi>M</mi> <mi>k</mi> </msub> <mo>/</mo> <mo>&amp;part;</mo> <mi>X</mi> <mo>)</mo> </mrow> <mo>/</mo> <mo>&amp;part;</mo> <mi>t</mi> </mrow>
    In formula, △ MkFor the increment of moisture in coal after diffusion;
    D is diffusion coefficient;
    X is liquid along capillariomotor distance;
    T is the time;
    If the time is that i.e. t=0 is counted since diffusion process, and in the region discussed and the water on the border of liquid diffusion source It is possible maximum i.e. X=0 to divide increment, and initial and boundary condition is substituted into above formula, obtains making coal sample by molecule diffusion motion Middle moisture incrementss are:
    <mrow> <msub> <mi>M</mi> <mi>k</mi> </msub> <mo>=</mo> <msup> <mi>a&amp;pi;r</mi> <mn>2</mn> </msup> <mi>X</mi> <mo>=</mo> <msup> <mi>a&amp;pi;r</mi> <mn>2</mn> </msup> <msub> <mi>&amp;alpha;</mi> <mi>k</mi> </msub> <msqrt> <mi>t</mi> </msqrt> </mrow>
    In formula, a within preset time because molecule diffusion motion makes the increase of moisture in micropore fill the coefficient of hole, by Experiment obtains, and it is relevant with the property of capillary, liquid;R is capillary radius;
    It is 25 DEG C to control temperature, places 2d;
    (5) high-speed camera records:Visual window is installed additional in one vertical plane of container, is observed using high-speed camera by visual window Diffusion motion of the red ink in test specimen, suspension time, the 500ml measuring cup reclaimed waters of the globule of prefabricated crack upper surface are recorded in real time Amount gathers way, to the barriering effect for comparing different shape, various combination prefabricated crack moves to water transport.
  2. 2. the method that the polymorphic combination coalmass crevasse of simulation according to claim 1 moves barriering effect to water transport, its feature It is:The circular opening of die bottom plate can be embedded in disk in the step (1), and disk is diametrically provided with groove, different thick The steel plate of degree can be inserted in groove.
  3. 3. the method that the polymorphic combination coalmass crevasse of simulation according to claim 2 moves barriering effect to water transport, its feature It is:The steel plate of the different-thickness refers to that thickness is respectively 0.5mm, 1mm, 1.5mm steel plate.
  4. 4. the method that the polymorphic combination coalmass crevasse of simulation according to claim 1 moves barriering effect to water transport, its feature It is:The die size is fabricated to 100mm × 100mm × 100mm, 100mm × 100mm's that making matches with die size Two pieces of bottom plate, bottom plate thickness 10mm.
  5. 5. the method that the polymorphic combination coalmass crevasse of simulation according to claim 1 moves barriering effect to water transport, its feature It is:In the step (2), using the mould equipped with bottom plate a, rotating circular disk, disc angle is set to distinguish 0 °, 30 °, 60 °, 90 °; Selection length is 100mm, and thickness is respectively 0.5mm, 1mm, 1.5mm steel plate to change the thickness of prefabricated crack;Choose length For 50mm steel plate, to form intermittent fracture, to simulate different angle, different in width, insertion or non-penetrating single split Gap;
    Using the mould equipped with bottom plate b, two disks are rotated, two prefabricated cracks is in parallel, junction geometric position pass System, to simulate different crack combinations.
  6. 6. the method that the polymorphic combination coalmass crevasse of simulation according to claim 1 moves barriering effect to water transport, its feature It is:In the step (3), the inside dimension big 6mm of side ratio test specimen of container is chosen, test specimen is wrapped heat-shrink tube and is just put into Container;The lower vessel portion has porous disc, is connected to 500ml measuring cups below porous disc, records the collection situation of water.
  7. 7. the method that the polymorphic combination coalmass crevasse of simulation according to claim 1 moves barriering effect to water transport, its feature It is:In the step (3), the method to test specimen sealing is:Using transparent heat-shrink tube, it is placed in container, test specimen is tight with container Closely connected conjunction.
  8. 8. the method that the polymorphic combination coalmass crevasse of simulation according to claim 1 moves barriering effect to water transport, its feature It is:In step (4) the injecting process, by sponge water filling, water is set uniformly to be spread since test specimen upper surface;Pass through injection Red ink, diffusion motion of the water in test specimen can be observed at any time.
  9. 9. the method that the polymorphic combination coalmass crevasse of simulation according to claim 1 moves barriering effect to water transport, its feature It is:In the step (5), by gather way common observation, the record of water in high-speed camera and 500ml measuring cups, than The barriering effect moved compared with different shape, various combination crack to water transport.
CN201710619059.2A 2017-07-26 2017-07-26 A method of it simulating polymorphic combination coalmass crevasse and barriering effect is moved to water transport Active CN107449708B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710619059.2A CN107449708B (en) 2017-07-26 2017-07-26 A method of it simulating polymorphic combination coalmass crevasse and barriering effect is moved to water transport

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710619059.2A CN107449708B (en) 2017-07-26 2017-07-26 A method of it simulating polymorphic combination coalmass crevasse and barriering effect is moved to water transport

Publications (2)

Publication Number Publication Date
CN107449708A true CN107449708A (en) 2017-12-08
CN107449708B CN107449708B (en) 2019-09-10

Family

ID=60489039

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710619059.2A Active CN107449708B (en) 2017-07-26 2017-07-26 A method of it simulating polymorphic combination coalmass crevasse and barriering effect is moved to water transport

Country Status (1)

Country Link
CN (1) CN107449708B (en)

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1491068A (en) * 1974-06-14 1977-11-09 Metropolitan Sanitary District Automatic cleaning of sensing probes
US5540096A (en) * 1994-06-07 1996-07-30 Washington Suburban Sanitary Commission Method for the non-destructive evaluation of prestressed concrete structures
CN102830217A (en) * 2012-09-04 2012-12-19 中铁二院工程集团有限责任公司 Device for studying cracking-degree-variable multi-effect coupled critical collapse test
CN103033458A (en) * 2012-12-24 2013-04-10 长江水利委员会长江科学院 Indoor test system and test method for seepage characteristics of jointed rock mass
CN103048431A (en) * 2013-01-22 2013-04-17 河南理工大学 Hydrofracture propping agent settlement and permeability testing device
CN103808633A (en) * 2013-12-26 2014-05-21 山东科技大学 Mining-induced fractured rock mass water sand transportation testing system and monitoring method
CN204086078U (en) * 2014-08-11 2015-01-07 西安石油大学 A kind of parallel board slit simulation apparatus of fracturing fluid leak
CN205157281U (en) * 2015-12-07 2016-04-13 潍坊百汇特新型建材有限公司 Test and appraisal of crack infiltration self -healing ability are with concrete sample and test and appraisal device
CN205643336U (en) * 2015-12-02 2016-10-12 安徽理工大学 Survey physical model device based on water of aeration zone partite transport shift variant pionization under settlement condition
CN106124383A (en) * 2016-07-15 2016-11-16 中国矿业大学 A kind of simulation fine and close rock mass intersection crack permeation flow tester
CN106525526A (en) * 2016-10-26 2017-03-22 山东科技大学 Determination method of high-pressure water injection and radial gas permeability of gas-containing raw coal

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1491068A (en) * 1974-06-14 1977-11-09 Metropolitan Sanitary District Automatic cleaning of sensing probes
US5540096A (en) * 1994-06-07 1996-07-30 Washington Suburban Sanitary Commission Method for the non-destructive evaluation of prestressed concrete structures
CN102830217A (en) * 2012-09-04 2012-12-19 中铁二院工程集团有限责任公司 Device for studying cracking-degree-variable multi-effect coupled critical collapse test
CN103033458A (en) * 2012-12-24 2013-04-10 长江水利委员会长江科学院 Indoor test system and test method for seepage characteristics of jointed rock mass
CN103048431A (en) * 2013-01-22 2013-04-17 河南理工大学 Hydrofracture propping agent settlement and permeability testing device
CN103808633A (en) * 2013-12-26 2014-05-21 山东科技大学 Mining-induced fractured rock mass water sand transportation testing system and monitoring method
CN204086078U (en) * 2014-08-11 2015-01-07 西安石油大学 A kind of parallel board slit simulation apparatus of fracturing fluid leak
CN205643336U (en) * 2015-12-02 2016-10-12 安徽理工大学 Survey physical model device based on water of aeration zone partite transport shift variant pionization under settlement condition
CN205157281U (en) * 2015-12-07 2016-04-13 潍坊百汇特新型建材有限公司 Test and appraisal of crack infiltration self -healing ability are with concrete sample and test and appraisal device
CN106124383A (en) * 2016-07-15 2016-11-16 中国矿业大学 A kind of simulation fine and close rock mass intersection crack permeation flow tester
CN106525526A (en) * 2016-10-26 2017-03-22 山东科技大学 Determination method of high-pressure water injection and radial gas permeability of gas-containing raw coal

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
张延松: "煤层注水湿润煤体的研究", 《煤炭学报》 *
罗荣武: "预置裂隙试样的力学参数及其渗流特性试验研究", 《中国优秀硕士学位论文全文数据库 工程科技II辑》 *
邓广哲: "煤层裂隙应力场控制渗流特性的模拟实验研究", 《煤炭学报》 *

Also Published As

Publication number Publication date
CN107449708B (en) 2019-09-10

Similar Documents

Publication Publication Date Title
CN103556994B (en) The experiment detecting system of fractured-vuggy reservoir remaining oil distribution and detection method
CN103498669B (en) A kind of method for quantitatively determining of heterogeneous core model crossflow amount
Culligan-Hensley et al. Environmental geomechanics and transport processes
CN202673289U (en) Visual simulation experiment device for fracture-cavity carbonate reservoir
CN108875148A (en) The method for building up and model of fractured-cavernous carbonate reservoir fracture hole distribution map and application
CN103573264A (en) Heterogeneous reservoir water injection commingling interlayer disturbance simulation system and detection method
CN107063884A (en) A kind of lower experimental provision and test method for evaluating porous asphalt pavement high-temperature behavior of multi- scenarios method effect
CN102590888A (en) Experimental device for simulating spreading of propping agent in crack and application thereof
CN206311468U (en) Evaluate the experimental provision of grain-type water shutoff agent migration ability
CN107165624A (en) Fractured-cavernous carbonate reservoir three-dimensional large scale physical model and preparation method thereof
CN103953335B (en) The physical simulating method of a kind of petroleum reservoir configuration and device
CN105089589A (en) Visual experiment device for realizing combined injection and layered injection of polymer flooding agent and working method thereof
CN102434151A (en) Bottom-water coning dynamic simulation experiment device in bottom-water oil reservoir development and simulation system
CN110541691A (en) Visual water displacement experimental device and method for heterogeneous sandstone reservoir
CN105300845B (en) Bitumen regenerant diffusion test device and method of testing
CN207701131U (en) A kind of high temperature and pressure surveys the visualization large-sized model experimental provision of sweep efficiency
CN106769752A (en) Rotatable imbibition experimental provision
CN110231115A (en) Simulate the device and method of plastic zone of surrounding rock development and liquid liner structure mechanical response under different supporting power
CN108979630A (en) Strain the fine and close oily imbibition experimental provision of chip pressure test
CN108518217A (en) A kind of fault block oil reservoir gas injection migration dynamic monitoring experimental provision and method
CN216381351U (en) Horizontal well staged fracturing sand mulling supporting seam physical simulation device
CN107449708A (en) A kind of method simulated polymorphic combination coalmass crevasse and barriering effect is moved to water transport
CN109083630A (en) A method of for appraisal drilling liquid sealing characteristics
CN207650031U (en) Concrete sample Hydraulic fracturing test sealing device under axial force
CN103091372A (en) On-board seepage flow and outflow concentration real-time monitoring device and method of geotechnical centrifuge

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant