CN107447953A - A kind of construction method of exterior wall EPS decoration elements in skyscraper - Google Patents
A kind of construction method of exterior wall EPS decoration elements in skyscraper Download PDFInfo
- Publication number
- CN107447953A CN107447953A CN201710594245.5A CN201710594245A CN107447953A CN 107447953 A CN107447953 A CN 107447953A CN 201710594245 A CN201710594245 A CN 201710594245A CN 107447953 A CN107447953 A CN 107447953A
- Authority
- CN
- China
- Prior art keywords
- eps
- line
- decoration elements
- eps decoration
- construction method
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000005034 decoration Methods 0.000 title claims abstract description 82
- 238000010276 construction Methods 0.000 title claims abstract description 74
- 238000007689 inspection Methods 0.000 claims abstract description 18
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 12
- 239000010959 steel Substances 0.000 claims abstract description 12
- 239000004570 mortar (masonry) Substances 0.000 claims description 19
- 239000003795 chemical substances by application Substances 0.000 claims description 16
- 239000004744 fabric Substances 0.000 claims description 13
- 230000003014 reinforcing effect Effects 0.000 claims description 13
- 238000000034 method Methods 0.000 claims description 9
- 239000003365 glass fiber Substances 0.000 claims description 7
- 239000003513 alkali Substances 0.000 claims description 5
- 238000002156 mixing Methods 0.000 claims description 3
- 239000000945 filler Substances 0.000 claims description 2
- 230000002787 reinforcement Effects 0.000 claims 1
- 238000011068 loading method Methods 0.000 abstract description 4
- 239000004794 expanded polystyrene Substances 0.000 description 84
- 239000010410 layer Substances 0.000 description 14
- 238000009434 installation Methods 0.000 description 12
- 238000005516 engineering process Methods 0.000 description 6
- 238000010792 warming Methods 0.000 description 6
- 238000011900 installation process Methods 0.000 description 3
- 229920000742 Cotton Polymers 0.000 description 2
- 244000137852 Petrea volubilis Species 0.000 description 2
- 238000001035 drying Methods 0.000 description 2
- 238000002360 preparation method Methods 0.000 description 2
- 238000012360 testing method Methods 0.000 description 2
- 229920006328 Styrofoam Polymers 0.000 description 1
- 238000004873 anchoring Methods 0.000 description 1
- 230000003712 anti-aging effect Effects 0.000 description 1
- 239000002585 base Substances 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000003111 delayed effect Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000007580 dry-mixing Methods 0.000 description 1
- 239000002421 finishing Substances 0.000 description 1
- 238000007667 floating Methods 0.000 description 1
- 238000009413 insulation Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 229920006389 polyphenyl polymer Polymers 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 238000004826 seaming Methods 0.000 description 1
- 230000006641 stabilisation Effects 0.000 description 1
- 238000011105 stabilization Methods 0.000 description 1
- 239000008261 styrofoam Substances 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 239000002344 surface layer Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F19/00—Other details of constructional parts for finishing work on buildings
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Load-Bearing And Curtain Walls (AREA)
Abstract
A kind of construction method of the exterior wall EPS decoration elements disclosed in this invention in skyscraper, by bullet early stage while the permanent control line and inspection line of exterior wall surface effectively prevent the error caused by line pendant is swung with the wind, without being perplexed by the secondary hanging wire of vertical line strain, reduce the number done over again, ensure that construction quality;Simultaneously, increasing by one of Bracket for steel bar realizes secondary fixation to EPS decoration elements, effectively increases the off-loading point of EPS decoration elements, EPS decorating structures and the link property of agent structure has been significantly greatly increased, make more to level off to an entirety both it, firmness improves a lot with service life.
Description
Technical field
The invention belongs to the realm of building construction, more particularly to a kind of construction of exterior wall EPS decoration elements in skyscraper
Method.
Background technology
The research and use of external EPS (Expanded Polystyrene, that is, mold styrofoam) decoration pilaster and stitch
Starting is more early, EPS decoration pilaster and stitch be mainly used in the door pockets of building such as villa, European style cell, hotel and commercial street,
Exterior window trim, eaves linea angulata, stringcourse and front yard Zhu Deng positions.Take the lead in the eighties in last century starting in the extensive use of the state such as America and Europe, be traditional GRC
The epoch-making upgrading products of component.At present, the application of Chinese EPS decoration pilaster and stitch is also like a raging fire, by for many years
Development, EPS finishings stringcourse, EPS window casing board lines, EPS cornices line, EPS decorations pilaster, EPS wall surface lines, EPS angles are gradually formed
A variety of components such as line, EPS gables line, EPS plinth lines.
The main construction course of EPS decoration elements:Carry out playing the vertical direct-through line of position line extension first, then carry out EPS successively
Decoration element is pasted, expansion bolt is fixed, and secondly hangs alkali resistant glass fibre open weave cloth and DBI (dry-mixed plastering
Interior mortar, i.e. dry mixing interior wall plastering mortar) mortar cover, finally carry out architectural surface construction.
EPS decoration element construction technologies are the emerging technologies of current building trade, and structure is decorated to EPS by word above
The related introduction of part understands that its construction technology is cumbersome strict, plus the non-mature of technology of its each side, so, specific
Work progress in always run into a part and need the construction Difficulties paid close attention to, these difficult points are primarily present in superelevation decoration structure
The vertical smooth control of part, the installation of EPS components be fixed, assembled seaming position handles three aspects, be concentrated mainly on it is following some:
1st, because component whole height is higher, wall scroll control line is longer, easily because the factor such as blow is rocked, can not ensure to construct
Quality, and it is long in time limit, during which cotton rope spoilage is higher, needs continuous hanging wire to ensure construction quality.
2nd, the installation of EPS components is found, hanging basket is in work progress using driven hanging basket as construction platform through field observation
Stability extreme difference, waves more serious, and strong influence is caused for the installation quality of component.
3rd, compared to warming plate, EPS component thickness is larger, is difficult true using the fixed installation mode almost identical with warming plate
Stability and the service life of component installation, the either safety problem for construction quality or later stage during use are protected,
Great hidden danger can be caused.
Therefore, the deficiency for more than, the present invention are badly in need of providing a kind of construction of exterior wall EPS decoration elements in skyscraper
Method.
The content of the invention
It is an object of the invention to provide a kind of construction method of exterior wall EPS decoration elements in skyscraper, to solve
Existing construction method Zhong Yin buildings body is higher and causes control line is oversize easily to be influenceed by natural cause so as to influence construction quality
Technical problem, while the bonding strength of EPS decoration elements and exterior wall is also enhanced, solve safety while increasing service life
The technical problem of hidden danger.
To achieve these goals, the invention provides following proposal:
A kind of construction method of exterior wall EPS decoration elements in skyscraper, comprises the following steps:S1:If using dried layer as
One is segmented in the permanent control line of exterior wall surface bullet and checks line, for controlling overall perpendicularity and inspection to test in work progress
Receive;S2:Line starts to install EPS decoration elements, and multiple spot on EPS decoration elements described in random inspection on the basis of the control line
To the distance of the inspection line, to adjust deviation;S3:Bar for line construction is carried out on the EPS decoration elements completed to construction,
Bracket for steel bar construction is carried out to the EPS decoration elements simultaneously;S4:Alkali resistant glass fibre open weave cloth is hung on the EPS decoration elements
With mortar cover; S5:Architectural surface is constructed.
Construction method as described above, more preferably, in S2, the EPS decoration elements are installed by hanging basket;
Rope is tied on the hanging basket, the other end of the rope is tied in the agent structure for being currently installed on floor, for hindering
Stop the hanging basket to swing, enhance the stability of the hanging basket.
Construction method as described above, more preferably, the inspection line are parallel with the control line, and the inspection
The distance between line and the control line are 50cm.
Construction method as described above, more preferably, in S3, the guarantor that is installed on every piece of EPS decoration element
Temperature nail number is any in being 4,5,6 or 8.
Construction method as described above, more preferably, in S3, Choice of Bits, in every piece of EPS decorations structure
If being evenly arranged dry hole perpendicular to metope direction on part, and agent structure is anchored into reinforcing bar.
Construction method as described above, more preferably, in S3, the diameter of the reinforcing bar is straight more than the drill bit
Footpath.
Construction method as described above, more preferably, in S3, from the drill bits of φ 10, hole depth enters agent structure
140mm, from the reinforcing bars of φ 12, it is 10D to anchor into agent structure depth.
Construction method as described above, more preferably, in S4, the EPS decoration elements are using the full bonding of thin layer
Pasted, the percentage of bonding area and the gross area is controlled more than 90%.
Construction method as described above, more preferably, in S4, in the institute that bar for line and Bracket for steel bar construction are completed
State and alkaline-resisting grid cloth is pasted on EPS decoration elements, the piece between two pieces of EPS decoration elements is being glued after being filled from filler
Alkaline-resisting grid cloth is pasted to strengthen.
Construction method as described above, more preferably, during the EPS component assembling constructions, bonding used
Mortar influences to use with the mortar for mixing, avoiding being stirred caused by standing time is long.
The present invention has the following advantages that compared with prior art:
A kind of construction method of the exterior wall EPS decoration elements disclosed in this invention in skyscraper, including: S1:If with
Dried layer be one be segmented in the permanent control line of exterior wall surface bullet and inspection line, for controlled in work progress overall perpendicularity with
And inspect for acceptance;S2:Line starts to install EPS decoration elements on the basis of the control line, and EPS described in random inspection is decorated
Multiple spot is to the distance for checking line on component, to adjust deviation;S3:Carried out on the EPS decoration elements completed to construction
Bar for line is constructed, while carries out Bracket for steel bar construction to the EPS decoration elements;S4:Hung on the EPS decoration elements alkaline-resisting
Glass fiber reticular cloth and mortar cover;S5:Architectural surface is constructed.The present invention by early stage bullet in exterior wall surface permanent control line and
Check that line effectively prevent line pendant and swing caused error with the wind simultaneously, without being perplexed by the secondary hanging wire of vertical line strain,
Reduce the number done over again, ensure that construction quality;Meanwhile increase by one of Bracket for steel bar realize to EPS decoration elements two
Secondary fixation, the off-loading point of EPS decoration elements is effectively increased, linking for decorative ornament component and agent structure has been significantly greatly increased
Property, makes more to level off to an entirety both it, and firmness improves a lot with service life.
Embodiment
Technical scheme will be clearly and completely described below, it is clear that described embodiment is this hair
Bright part of the embodiment, rather than whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art are not having
There is the every other embodiment made and obtained under the premise of creative work, belong to the scope of protection of the invention.
In the description of the invention, it is necessary to explanation, term " " center ", " on ", " under ", "left", "right", " vertical ",
The orientation or position relationship of the instruction such as " level ", " interior ", " outer " be based on the orientation or position relationship shown in general knowledge, merely to
Be easy to the description present invention and simplify description, rather than instruction or imply signified device or element must have specific orientation,
With specific azimuth configuration and operation, therefore it is not considered as limiting the invention.In addition, term " first ", " second ",
" the 3rd " is only used for describing purpose, and it is not intended that instruction or hint relative importance.
In the description of the invention, it is necessary to illustrate, unless otherwise clearly defined and limited, term " installation ", " phase
Even ", " connection " should be interpreted broadly, for example, it may be being fixedly connected or being detachably connected, or be integrally connected;Can
To be mechanical connection or electrical connection;Can be joined directly together, can also be indirectly connected by intermediary, Ke Yishi
The connection of two element internals.For the ordinary skill in the art, with concrete condition above-mentioned term can be understood at this
Concrete meaning in invention.
Present embodiment discloses a kind of construction method of exterior wall EPS decoration elements in skyscraper, including: S1:If with
Dried layer is segmented in the permanent control line of exterior wall surface bullet for one and checks line, for controlling overall perpendicularity and inspection in work progress
Examination is received;S2:Line starts to install EPS decoration elements on the basis of control line, and multiple spot is extremely examined on random inspection EPS decoration elements
Line inspection distance, to adjust deviation;S3:Bar for line construction is carried out on the EPS decoration elements completed to construction, while EPS is decorated
Component carries out Bracket for steel bar construction; S4:Alkali resistant glass fibre open weave cloth and mortar cover are hung on EPS decoration elements;S5:Decorative cover
Layer construction.
For S1, it is the preparation before construction, and final steps, solves external wall of high-rise building work progress
In vertical flatness control problem.In the prior art, overall perpendicularity and flatness are installed for skyscraper EPS decoration elements
It is difficult to the difficulties of control, in specific work progress, it is necessary first to control line is hung, to decorative cover in component mounting process
Overall perpendicularity and flatness be controlled, installed in strict accordance with shown in control line, to ensure component entirety perpendicularity,
In installation process, while also measure control using 2m guiding rulers are smooth to adjacent two pieces of EPS component surfaces;But due to structure
Part whole height is higher, and wall scroll control line is longer, easily because the factor such as blow is rocked, can not ensure construction quality, and due to the duration
Longer, during which cotton rope spoilage is higher, needs continuous hanging wire to ensure construction quality;To solve this problem of the prior art,
The present embodiment is segmented in the permanent control line of exterior wall surface bullet and inspection before the construction of EPS decoration elements using some floors as one
Line;Compared to hanging wire, bullet effectively prevent caused by line pendant is swung with the wind in the permanent control line and inspection line of exterior wall surface
Error, while vertical line strain and the puzzlement of secondary hanging wire are not had;Certainly, control line is determined by the way of snap the line and checks line
Also there is certain limitation, it is necessary first to snap the line could be completed apart from shorter and relatively-stationary both ends, but in skyscraper,
Multistage division can also accordingly increase error, on the no longer same straight line of snap the line for causing two connections, therefore consider, and select
If completing to build the permanent control line on surface and checking line so that dried layer building is one section, optional 3-8 layers are one section, preferably 5 layers
For one section.
Then S2 steps are carried out, line starts to install EPS decoration elements on the basis of control line, and random inspection EPS is decorated
Multiple spot is to linear distance is checked on component, to adjust deviation.In EPS decoration element installation processes, in strict accordance with the bullet control of metope institute
Line processed is pasted using the full bonding of thin layer, and wherein the percentage of bonding area and the gross area will be controlled more than 90%, pasted
Afterwards, firmly extruding EPS decoration elements make the mortar that stickup uses be overflowed from periphery, and floating in time, adjacent two pieces of EPS decorations
Bonding slit width between component is not more than 3mm;And when often pasting two pieces of EPS decoration elements of completion, two meters of guiding rulers are used to EPS
Decoration element surface is checked, and adjusts installation deviation in time;Quality inspection simultaneously and supervisor enter at any time in work progress
Row random test, i.e. random inspection multiple spot are with checking whether the distance between line is consistent, and whether deviation is in error permission model
In enclosing, and supervise adjustment and underproof EPS decoration elements are installed.Check that line be arranged in parallel with control line, and check line and control
The distance between line is 50mm.
In the external wall construction of skyscraper, driven hanging basket is a kind of conventional use of construction platform, by can on move down
Dynamic hanging basket realizes the installation of EPS decoration elements, still, is found through field observation, hanging basket stability extreme difference in work progress,
Wave more serious, the not only installation quality of influence EPS decoration elements, while also reduce the installation effectiveness of EPS decoration elements;For
Solving this problem, the present invention is equipped with the rope that an one end is lain on hanging basket, in the EPS decoration element installation processes, people
The other end of rope is lain in the agent structure of work at present floor for operation, to ensure that hanging basket is stable in work progress
Property, treat that this layer is untied rope after the completion of constructing and lain on next layer main building to be onstructed (i.e. in agent structure), sets up
Rope effectively enhance the construction platform i.e. stability of electronics hanging basket, constructed so as to ensure that in construction quality and work progress
The safety of personnel.
Secondly S3 steps are carried out, bar for line construction are carried out on the EPS decoration elements completed to construction, while EPS is decorated
Component carries out Bracket for steel bar construction.Bar for line is mainly used in the fixation of warming plate in exterior wall heat-preserving system, then borrows bar for line herein
Superperformance, for by EPS decoration elements and lower floor setting warming plate be fixed on together in external wall structure, bar for line has
Anti-aging, resisting temperature cataclysm, it is mould proof, cold-resistant heat-resisting the advantages that, and its high capacity, tensile property are good, and mutability is not allowed after loading
Shape, protection against the tide can be played a part of, delayed and shaken, absorb noise.In actual use, according to EPS decoration element sizes, freely adjust
The bar for line number installed on every piece of EPS decoration element, it is preferred that for the EPS decoration elements of several Commonly Used Sizes, this hair
The bright number for also providing preferred bar for line, such as the EPS decoration elements that size is 1200*700 use 4 bar for lines, size
For 12,00*,800 5 bar for lines of use, size is 12,00*,900 6 bar for lines of use, and size is making for 1200*1200
With 8 bar for lines.But compared to warming plate, EPS decoration element thickness is larger, using the fixation almost identical with warming plate
Mounting means it is difficult to ensure that EPS decoration elements installation stability and service life, either for construction quality or later stage
Safety problem during use, great hidden danger can be caused, for this, the present invention increases by one of Bracket for steel bar working procedure,
By the perforate on EPS decoration elements and reinforcing bar is anchored into, the off-loading point of EPS decoration elements is effectively increased, substantially increases
EPS decoration elements and the link property of agent structure, make more to level off to an entirety both it, and firmness has very with service life
Big raising.Its specific construction method is:After the completion of bar for line fixes construction, Choice of Bits, in every piece of EPS decoration element
If dry hole is evenly arranged perpendicular to metope direction on, and agent structure is anchored into reinforcing bar;More fastened in order that anchoring into reinforcing bar, then
The diameter that selection anchors into reinforcing bar is more than bit diameter, anchors into agent structure by force;Preferably, become owner of from the drill bits of φ 10, hole depth
Body structure 140mm, from the reinforcing bars of φ 12, it is 10D to anchor into agent structure depth, i.e., reinforcing bar is implanted into lower-layer concrete, wall etc.
Length is greater than or 10 times equal to bar diameter.
Again, S4 steps are carried out, alkali resistant glass fibre open weave cloth and DBI mortar covers are hung on EPS decoration elements.Using high-quality
Finish coat mortar pastes the alkaline-resisting grid cloth of 200mm wide (seam both ends ensure that 100mm width overlaps respectively), and thickness is less than 2mm;It is viscous
When seam is wider than 3mm, clogged in seam with thin polyphenyl piece, reuse high-quality finish coat mortar and paste the wide alkaline-resisting grid cloths of 200mm
Strengthen.After drying, if stitch edge joint position leaves unnecessary mortar and polished with sand paper.Bar for line disk and Bracket for steel bar hole position face
Layer carries out surface layer repairing using the alkaline-resisting grid cloth of 200*200 sizes, is polished after drying with sand paper, ensures surfacing,
Negative and positive angle is straight;The inner corner trim that EPS decoration elements contact with heat insulation base layer pastes wide alkaline-resisting of 200mm using high-quality finish coat mortar
Glass fiber reticular cloth, thickness are no more than 3mm.
In above-mentioned steps, bonding mortar used is with mixing, and the mortar for avoiding being stirred is caused by standing time is long
And influence to use.
Last then progress S5 steps, architectural surface construction.Architectural surface construction is then the beautification for building, makes construction
The building of completion is more attractive in appearance, there is Mutiple Choice in the prior art, and here is omitted.
Compared to prior art, using construction party of the exterior wall EPS decoration elements disclosed in this invention in skyscraper
Method has the following advantages and beneficial effect:
1st, natural cause and human factor institute be effectively prevent with checking line in the permanent control line of basic unit's bullet before construction starts
Caused error and do over again, facilitate construction and check, so-called sharpening the axe won't interfere with the cutting of firewood, and early-stage preparations process is fully accelerated on the contrary
Progress, and more effectively ensure that construction quality.
2nd, hanging basket is in work progress, by special messenger in building by institute's band rope ends lie in respectively agent structure and hanging basket it
On, effectively prevent hanging basket to swing, enhance the stability of hanging basket, add the operating efficiency of hanging basket, also cause installation quality
There is more reliable guarantee.
3rd, one of Bracket for steel bar working procedure is increased, it is vertical every one piece of EPS decoration element electric hammer from the drill bits of φ 10
Metope uniformly opens 3 140mm deep holes, and the reinforcing bars of φ 12 are anchored into wall by force, enter wall depth 120mm, to ensure anchor bar
Stabilization, effectively share load so that EPS decoration elements and agent structure more level off to an entirety.
Finally it should be noted that:Various embodiments above is merely illustrative of the technical solution of the present invention, rather than its limitations;To the greatest extent
The present invention is described in detail with reference to foregoing embodiments for pipe, it will be understood by those within the art that:Its according to
The technical scheme described in foregoing embodiments can so be modified, either which part or all technical characteristic are entered
Row equivalent substitution;And these modifications or replacement, the essence of appropriate technical solution is departed from various embodiments of the present invention technology
The scope of scheme.
Claims (10)
1. construction method of a kind of exterior wall EPS decoration elements in skyscraper, it is characterised in that comprise the following steps:
S1:If it is segmented using dried layer as one in the permanent control line of exterior wall surface bullet and checks line, for being controlled in work progress
Overall perpendicularity and inspect for acceptance;
S2:Line starts to install EPS decoration elements on the basis of the control line, and more on EPS decoration elements described in random inspection
Point is to the distance for checking line, to adjust deviation;
S3:Bar for line construction is carried out on the EPS decoration elements completed to construction, while the EPS decoration elements are carried out
Bracket for steel bar is constructed;
S4:Alkali resistant glass fibre open weave cloth and mortar cover are hung on the EPS decoration elements;
S5:Architectural surface is constructed.
2. according to the construction method described in claim 1, it is characterised in that in S2, install the EPS by hanging basket and decorate
Component;Rope is tied on the hanging basket, the other end of the rope is tied in the agent structure for being currently installed on floor, is used
In preventing the hanging basket to swing, the stability of the hanging basket is enhanced.
3. according to the method described in claim 1 or 2, it is characterised in that the inspection line is parallel with the control line, and institute
State and check that the distance between line and the control line are 50mm.
4. according to the construction method described in claim 1 or 2, it is characterised in that in S3, pacify on the EPS decoration elements
The bar for line number of dress is any in being 4,5,6 or 8.
5. according to the construction method described in claim 1 or 2, it is characterised in that in S3, Choice of Bits, described in every piece
If being evenly arranged dry hole perpendicular to metope direction on EPS decoration elements, and agent structure is anchored into reinforcing bar.
6. according to the construction method described in claim 5, it is characterised in that in S3, the diameter of the reinforcing bar is more than described
Bit diameter.
7. according to the construction method described in claim 6, it is characterised in that in S3, from the drill bits of φ 10, hole depth enters main body
Structure 140mm, from the reinforcing bars of φ 12, it is 10D to anchor into agent structure depth.
8. according to the construction method described in claim 1, it is characterised in that in S4, the EPS decoration elements use thin layer
Full bonding is pasted, and the percentage of bonding area and the gross area is controlled more than 90%.
9. according to the construction method described in claim 1, it is characterised in that in S4, constructed in bar for line and Bracket for steel bar
Alkaline-resisting grid cloth is pasted on the EPS decoration elements completed, and the piece between two pieces of EPS decoration elements is filled out from filler
Alkaline-resisting grid cloth reinforcement is being pasted after filling.
10. according to the construction method described in claim 8 or 9, it is characterised in that in the EPS component assembling constructions process
In, bonding mortar used influences to use with the mortar for mixing, avoiding being stirred caused by standing time is long.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710594245.5A CN107447953A (en) | 2017-07-20 | 2017-07-20 | A kind of construction method of exterior wall EPS decoration elements in skyscraper |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710594245.5A CN107447953A (en) | 2017-07-20 | 2017-07-20 | A kind of construction method of exterior wall EPS decoration elements in skyscraper |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107447953A true CN107447953A (en) | 2017-12-08 |
Family
ID=60487443
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710594245.5A Pending CN107447953A (en) | 2017-07-20 | 2017-07-20 | A kind of construction method of exterior wall EPS decoration elements in skyscraper |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107447953A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110761531A (en) * | 2019-11-08 | 2020-02-07 | 中国十七冶集团有限公司 | High-rise building outer wall decorative line painting construction method |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2007109965A1 (en) * | 2006-03-24 | 2007-10-04 | Shuhuan Wu | A binding compound insulating exterior wall with a support |
KR20090033563A (en) * | 2007-10-01 | 2009-04-06 | 주식회사 단디건설 | Structure of fixed external wall decoration molding for building |
CN201474265U (en) * | 2009-07-30 | 2010-05-19 | 中建三局建设工程股份有限公司 | EPS decorative strip structure |
WO2011038654A1 (en) * | 2009-09-29 | 2011-04-07 | 上海一金节能科技有限公司 | External insulated wall provided with reinforced polystyrene laminate anchored by mechanical fixing device |
CN204728682U (en) * | 2015-05-27 | 2015-10-28 | 中国建筑第六工程局有限公司 | A kind of fastening devices preventing hanging basket from swinging |
CN205116658U (en) * | 2015-10-21 | 2016-03-30 | 山东秦恒科技有限公司 | EPS moulding bearing pedal |
CN105672624A (en) * | 2015-02-05 | 2016-06-15 | 中国建筑第四工程局有限公司 | Fixing method and structure of EPS decoration line |
-
2017
- 2017-07-20 CN CN201710594245.5A patent/CN107447953A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2007109965A1 (en) * | 2006-03-24 | 2007-10-04 | Shuhuan Wu | A binding compound insulating exterior wall with a support |
KR20090033563A (en) * | 2007-10-01 | 2009-04-06 | 주식회사 단디건설 | Structure of fixed external wall decoration molding for building |
CN201474265U (en) * | 2009-07-30 | 2010-05-19 | 中建三局建设工程股份有限公司 | EPS decorative strip structure |
WO2011038654A1 (en) * | 2009-09-29 | 2011-04-07 | 上海一金节能科技有限公司 | External insulated wall provided with reinforced polystyrene laminate anchored by mechanical fixing device |
CN105672624A (en) * | 2015-02-05 | 2016-06-15 | 中国建筑第四工程局有限公司 | Fixing method and structure of EPS decoration line |
CN204728682U (en) * | 2015-05-27 | 2015-10-28 | 中国建筑第六工程局有限公司 | A kind of fastening devices preventing hanging basket from swinging |
CN205116658U (en) * | 2015-10-21 | 2016-03-30 | 山东秦恒科技有限公司 | EPS moulding bearing pedal |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110761531A (en) * | 2019-11-08 | 2020-02-07 | 中国十七冶集团有限公司 | High-rise building outer wall decorative line painting construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US4226061A (en) | Reinforced masonry construction | |
CN101307629B (en) | Fastener type self-decoration composite heat insulation high layer dwelling building module and its construction method | |
CN204804107U (en) | Decorate heat preservation template integral structure and structural wall | |
CN206503251U (en) | Fixed form and insulated fire composite exterior wall body integrated with structure construction | |
CN106088463A (en) | A kind of precast concrete external wall panel and preparation method thereof | |
CN106836526A (en) | Prefabricated reinforced concrete composite thermal-insulation external wall panel and its making and installation method | |
CN204212346U (en) | Heat insulation decoration formwork integral structure and comprise its structural wall | |
CN206495369U (en) | A kind of assembly type light steel wall | |
CN205502373U (en) | Evaporate and press whole wallboard that keeps warm of aerated concrete | |
CN107447953A (en) | A kind of construction method of exterior wall EPS decoration elements in skyscraper | |
CN109267695A (en) | A kind of prefabricated wallboard of lightweight with connection structure and its installation method | |
CN219671844U (en) | Prefabricated wall component of assembled reverse-beating integrated high-efficiency flame-retardant heat-insulating material | |
CN107700747A (en) | A kind of prefabricated building | |
CN103758256B (en) | A kind of decorative heat preservation composite wall and preparation method thereof | |
CN208122037U (en) | A kind of assembled combined wall board | |
CN110397234A (en) | A kind of production method of the concrete assembled prefabricated panel of super low energy consumption and the wallboard | |
CN206829345U (en) | A kind of house floor wall-panel assembled structure based on light gauge cold-formed steel shape | |
CN206903107U (en) | A kind of structure, insulation, the assembled wall of decorative lamination integration | |
CN106638978B (en) | The node structure of the prefabricated load-bearing wall panel combination light weight steel frames of assembled PC | |
CN109505367A (en) | A kind of heat preservation plaque external thermal insulation system and installation method | |
CN106801474A (en) | A kind of high-strength anti-crack wall and its construction method | |
CN107724596A (en) | Partial precast sandwich type wall panel and its wall body structure and building | |
TWI321184B (en) | ||
CN106968363A (en) | A kind of two-chamber heat-preserving wall component | |
CN206245497U (en) | Bridge cut-off part, decorative heat preservation template integral structure and concrete structure wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20171208 |