CN107447953A - A kind of construction method of exterior wall EPS decoration elements in skyscraper - Google Patents

A kind of construction method of exterior wall EPS decoration elements in skyscraper Download PDF

Info

Publication number
CN107447953A
CN107447953A CN201710594245.5A CN201710594245A CN107447953A CN 107447953 A CN107447953 A CN 107447953A CN 201710594245 A CN201710594245 A CN 201710594245A CN 107447953 A CN107447953 A CN 107447953A
Authority
CN
China
Prior art keywords
eps
line
decoration elements
eps decoration
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710594245.5A
Other languages
Chinese (zh)
Inventor
尹青青
刘鑫
王晓磊
李超刚
祝斌
邱正清
章健
骆秋雁
刘家奇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Urban Construction Yuandong Construction Investment Group Co Ltd
Original Assignee
Beijing Urban Construction Yuandong Construction Investment Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Urban Construction Yuandong Construction Investment Group Co Ltd filed Critical Beijing Urban Construction Yuandong Construction Investment Group Co Ltd
Priority to CN201710594245.5A priority Critical patent/CN107447953A/en
Publication of CN107447953A publication Critical patent/CN107447953A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F19/00Other details of constructional parts for finishing work on buildings

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Load-Bearing And Curtain Walls (AREA)

Abstract

A kind of construction method of the exterior wall EPS decoration elements disclosed in this invention in skyscraper, by bullet early stage while the permanent control line and inspection line of exterior wall surface effectively prevent the error caused by line pendant is swung with the wind, without being perplexed by the secondary hanging wire of vertical line strain, reduce the number done over again, ensure that construction quality;Simultaneously, increasing by one of Bracket for steel bar realizes secondary fixation to EPS decoration elements, effectively increases the off-loading point of EPS decoration elements, EPS decorating structures and the link property of agent structure has been significantly greatly increased, make more to level off to an entirety both it, firmness improves a lot with service life.

Description

A kind of construction method of exterior wall EPS decoration elements in skyscraper
Technical field
The invention belongs to the realm of building construction, more particularly to a kind of construction of exterior wall EPS decoration elements in skyscraper Method.
Background technology
The research and use of external EPS (Expanded Polystyrene, that is, mold styrofoam) decoration pilaster and stitch Starting is more early, EPS decoration pilaster and stitch be mainly used in the door pockets of building such as villa, European style cell, hotel and commercial street, Exterior window trim, eaves linea angulata, stringcourse and front yard Zhu Deng positions.Take the lead in the eighties in last century starting in the extensive use of the state such as America and Europe, be traditional GRC The epoch-making upgrading products of component.At present, the application of Chinese EPS decoration pilaster and stitch is also like a raging fire, by for many years Development, EPS finishings stringcourse, EPS window casing board lines, EPS cornices line, EPS decorations pilaster, EPS wall surface lines, EPS angles are gradually formed A variety of components such as line, EPS gables line, EPS plinth lines.
The main construction course of EPS decoration elements:Carry out playing the vertical direct-through line of position line extension first, then carry out EPS successively Decoration element is pasted, expansion bolt is fixed, and secondly hangs alkali resistant glass fibre open weave cloth and DBI (dry-mixed plastering Interior mortar, i.e. dry mixing interior wall plastering mortar) mortar cover, finally carry out architectural surface construction.
EPS decoration element construction technologies are the emerging technologies of current building trade, and structure is decorated to EPS by word above The related introduction of part understands that its construction technology is cumbersome strict, plus the non-mature of technology of its each side, so, specific Work progress in always run into a part and need the construction Difficulties paid close attention to, these difficult points are primarily present in superelevation decoration structure The vertical smooth control of part, the installation of EPS components be fixed, assembled seaming position handles three aspects, be concentrated mainly on it is following some:
1st, because component whole height is higher, wall scroll control line is longer, easily because the factor such as blow is rocked, can not ensure to construct Quality, and it is long in time limit, during which cotton rope spoilage is higher, needs continuous hanging wire to ensure construction quality.
2nd, the installation of EPS components is found, hanging basket is in work progress using driven hanging basket as construction platform through field observation Stability extreme difference, waves more serious, and strong influence is caused for the installation quality of component.
3rd, compared to warming plate, EPS component thickness is larger, is difficult true using the fixed installation mode almost identical with warming plate Stability and the service life of component installation, the either safety problem for construction quality or later stage during use are protected, Great hidden danger can be caused.
Therefore, the deficiency for more than, the present invention are badly in need of providing a kind of construction of exterior wall EPS decoration elements in skyscraper Method.
The content of the invention
It is an object of the invention to provide a kind of construction method of exterior wall EPS decoration elements in skyscraper, to solve Existing construction method Zhong Yin buildings body is higher and causes control line is oversize easily to be influenceed by natural cause so as to influence construction quality Technical problem, while the bonding strength of EPS decoration elements and exterior wall is also enhanced, solve safety while increasing service life The technical problem of hidden danger.
To achieve these goals, the invention provides following proposal:
A kind of construction method of exterior wall EPS decoration elements in skyscraper, comprises the following steps:S1:If using dried layer as One is segmented in the permanent control line of exterior wall surface bullet and checks line, for controlling overall perpendicularity and inspection to test in work progress Receive;S2:Line starts to install EPS decoration elements, and multiple spot on EPS decoration elements described in random inspection on the basis of the control line To the distance of the inspection line, to adjust deviation;S3:Bar for line construction is carried out on the EPS decoration elements completed to construction, Bracket for steel bar construction is carried out to the EPS decoration elements simultaneously;S4:Alkali resistant glass fibre open weave cloth is hung on the EPS decoration elements With mortar cover; S5:Architectural surface is constructed.
Construction method as described above, more preferably, in S2, the EPS decoration elements are installed by hanging basket; Rope is tied on the hanging basket, the other end of the rope is tied in the agent structure for being currently installed on floor, for hindering Stop the hanging basket to swing, enhance the stability of the hanging basket.
Construction method as described above, more preferably, the inspection line are parallel with the control line, and the inspection The distance between line and the control line are 50cm.
Construction method as described above, more preferably, in S3, the guarantor that is installed on every piece of EPS decoration element Temperature nail number is any in being 4,5,6 or 8.
Construction method as described above, more preferably, in S3, Choice of Bits, in every piece of EPS decorations structure If being evenly arranged dry hole perpendicular to metope direction on part, and agent structure is anchored into reinforcing bar.
Construction method as described above, more preferably, in S3, the diameter of the reinforcing bar is straight more than the drill bit Footpath.
Construction method as described above, more preferably, in S3, from the drill bits of φ 10, hole depth enters agent structure 140mm, from the reinforcing bars of φ 12, it is 10D to anchor into agent structure depth.
Construction method as described above, more preferably, in S4, the EPS decoration elements are using the full bonding of thin layer Pasted, the percentage of bonding area and the gross area is controlled more than 90%.
Construction method as described above, more preferably, in S4, in the institute that bar for line and Bracket for steel bar construction are completed State and alkaline-resisting grid cloth is pasted on EPS decoration elements, the piece between two pieces of EPS decoration elements is being glued after being filled from filler Alkaline-resisting grid cloth is pasted to strengthen.
Construction method as described above, more preferably, during the EPS component assembling constructions, bonding used Mortar influences to use with the mortar for mixing, avoiding being stirred caused by standing time is long.
The present invention has the following advantages that compared with prior art:
A kind of construction method of the exterior wall EPS decoration elements disclosed in this invention in skyscraper, including: S1:If with Dried layer be one be segmented in the permanent control line of exterior wall surface bullet and inspection line, for controlled in work progress overall perpendicularity with And inspect for acceptance;S2:Line starts to install EPS decoration elements on the basis of the control line, and EPS described in random inspection is decorated Multiple spot is to the distance for checking line on component, to adjust deviation;S3:Carried out on the EPS decoration elements completed to construction Bar for line is constructed, while carries out Bracket for steel bar construction to the EPS decoration elements;S4:Hung on the EPS decoration elements alkaline-resisting Glass fiber reticular cloth and mortar cover;S5:Architectural surface is constructed.The present invention by early stage bullet in exterior wall surface permanent control line and Check that line effectively prevent line pendant and swing caused error with the wind simultaneously, without being perplexed by the secondary hanging wire of vertical line strain, Reduce the number done over again, ensure that construction quality;Meanwhile increase by one of Bracket for steel bar realize to EPS decoration elements two Secondary fixation, the off-loading point of EPS decoration elements is effectively increased, linking for decorative ornament component and agent structure has been significantly greatly increased Property, makes more to level off to an entirety both it, and firmness improves a lot with service life.
Embodiment
Technical scheme will be clearly and completely described below, it is clear that described embodiment is this hair Bright part of the embodiment, rather than whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art are not having There is the every other embodiment made and obtained under the premise of creative work, belong to the scope of protection of the invention.
In the description of the invention, it is necessary to explanation, term " " center ", " on ", " under ", "left", "right", " vertical ", The orientation or position relationship of the instruction such as " level ", " interior ", " outer " be based on the orientation or position relationship shown in general knowledge, merely to Be easy to the description present invention and simplify description, rather than instruction or imply signified device or element must have specific orientation, With specific azimuth configuration and operation, therefore it is not considered as limiting the invention.In addition, term " first ", " second ", " the 3rd " is only used for describing purpose, and it is not intended that instruction or hint relative importance.
In the description of the invention, it is necessary to illustrate, unless otherwise clearly defined and limited, term " installation ", " phase Even ", " connection " should be interpreted broadly, for example, it may be being fixedly connected or being detachably connected, or be integrally connected;Can To be mechanical connection or electrical connection;Can be joined directly together, can also be indirectly connected by intermediary, Ke Yishi The connection of two element internals.For the ordinary skill in the art, with concrete condition above-mentioned term can be understood at this Concrete meaning in invention.
Present embodiment discloses a kind of construction method of exterior wall EPS decoration elements in skyscraper, including: S1:If with Dried layer is segmented in the permanent control line of exterior wall surface bullet for one and checks line, for controlling overall perpendicularity and inspection in work progress Examination is received;S2:Line starts to install EPS decoration elements on the basis of control line, and multiple spot is extremely examined on random inspection EPS decoration elements Line inspection distance, to adjust deviation;S3:Bar for line construction is carried out on the EPS decoration elements completed to construction, while EPS is decorated Component carries out Bracket for steel bar construction; S4:Alkali resistant glass fibre open weave cloth and mortar cover are hung on EPS decoration elements;S5:Decorative cover Layer construction.
For S1, it is the preparation before construction, and final steps, solves external wall of high-rise building work progress In vertical flatness control problem.In the prior art, overall perpendicularity and flatness are installed for skyscraper EPS decoration elements It is difficult to the difficulties of control, in specific work progress, it is necessary first to control line is hung, to decorative cover in component mounting process Overall perpendicularity and flatness be controlled, installed in strict accordance with shown in control line, to ensure component entirety perpendicularity, In installation process, while also measure control using 2m guiding rulers are smooth to adjacent two pieces of EPS component surfaces;But due to structure Part whole height is higher, and wall scroll control line is longer, easily because the factor such as blow is rocked, can not ensure construction quality, and due to the duration Longer, during which cotton rope spoilage is higher, needs continuous hanging wire to ensure construction quality;To solve this problem of the prior art, The present embodiment is segmented in the permanent control line of exterior wall surface bullet and inspection before the construction of EPS decoration elements using some floors as one Line;Compared to hanging wire, bullet effectively prevent caused by line pendant is swung with the wind in the permanent control line and inspection line of exterior wall surface Error, while vertical line strain and the puzzlement of secondary hanging wire are not had;Certainly, control line is determined by the way of snap the line and checks line Also there is certain limitation, it is necessary first to snap the line could be completed apart from shorter and relatively-stationary both ends, but in skyscraper, Multistage division can also accordingly increase error, on the no longer same straight line of snap the line for causing two connections, therefore consider, and select If completing to build the permanent control line on surface and checking line so that dried layer building is one section, optional 3-8 layers are one section, preferably 5 layers For one section.
Then S2 steps are carried out, line starts to install EPS decoration elements on the basis of control line, and random inspection EPS is decorated Multiple spot is to linear distance is checked on component, to adjust deviation.In EPS decoration element installation processes, in strict accordance with the bullet control of metope institute Line processed is pasted using the full bonding of thin layer, and wherein the percentage of bonding area and the gross area will be controlled more than 90%, pasted Afterwards, firmly extruding EPS decoration elements make the mortar that stickup uses be overflowed from periphery, and floating in time, adjacent two pieces of EPS decorations Bonding slit width between component is not more than 3mm;And when often pasting two pieces of EPS decoration elements of completion, two meters of guiding rulers are used to EPS Decoration element surface is checked, and adjusts installation deviation in time;Quality inspection simultaneously and supervisor enter at any time in work progress Row random test, i.e. random inspection multiple spot are with checking whether the distance between line is consistent, and whether deviation is in error permission model In enclosing, and supervise adjustment and underproof EPS decoration elements are installed.Check that line be arranged in parallel with control line, and check line and control The distance between line is 50mm.
In the external wall construction of skyscraper, driven hanging basket is a kind of conventional use of construction platform, by can on move down Dynamic hanging basket realizes the installation of EPS decoration elements, still, is found through field observation, hanging basket stability extreme difference in work progress, Wave more serious, the not only installation quality of influence EPS decoration elements, while also reduce the installation effectiveness of EPS decoration elements;For Solving this problem, the present invention is equipped with the rope that an one end is lain on hanging basket, in the EPS decoration element installation processes, people The other end of rope is lain in the agent structure of work at present floor for operation, to ensure that hanging basket is stable in work progress Property, treat that this layer is untied rope after the completion of constructing and lain on next layer main building to be onstructed (i.e. in agent structure), sets up Rope effectively enhance the construction platform i.e. stability of electronics hanging basket, constructed so as to ensure that in construction quality and work progress The safety of personnel.
Secondly S3 steps are carried out, bar for line construction are carried out on the EPS decoration elements completed to construction, while EPS is decorated Component carries out Bracket for steel bar construction.Bar for line is mainly used in the fixation of warming plate in exterior wall heat-preserving system, then borrows bar for line herein Superperformance, for by EPS decoration elements and lower floor setting warming plate be fixed on together in external wall structure, bar for line has Anti-aging, resisting temperature cataclysm, it is mould proof, cold-resistant heat-resisting the advantages that, and its high capacity, tensile property are good, and mutability is not allowed after loading Shape, protection against the tide can be played a part of, delayed and shaken, absorb noise.In actual use, according to EPS decoration element sizes, freely adjust The bar for line number installed on every piece of EPS decoration element, it is preferred that for the EPS decoration elements of several Commonly Used Sizes, this hair The bright number for also providing preferred bar for line, such as the EPS decoration elements that size is 1200*700 use 4 bar for lines, size For 12,00*,800 5 bar for lines of use, size is 12,00*,900 6 bar for lines of use, and size is making for 1200*1200 With 8 bar for lines.But compared to warming plate, EPS decoration element thickness is larger, using the fixation almost identical with warming plate Mounting means it is difficult to ensure that EPS decoration elements installation stability and service life, either for construction quality or later stage Safety problem during use, great hidden danger can be caused, for this, the present invention increases by one of Bracket for steel bar working procedure, By the perforate on EPS decoration elements and reinforcing bar is anchored into, the off-loading point of EPS decoration elements is effectively increased, substantially increases EPS decoration elements and the link property of agent structure, make more to level off to an entirety both it, and firmness has very with service life Big raising.Its specific construction method is:After the completion of bar for line fixes construction, Choice of Bits, in every piece of EPS decoration element If dry hole is evenly arranged perpendicular to metope direction on, and agent structure is anchored into reinforcing bar;More fastened in order that anchoring into reinforcing bar, then The diameter that selection anchors into reinforcing bar is more than bit diameter, anchors into agent structure by force;Preferably, become owner of from the drill bits of φ 10, hole depth Body structure 140mm, from the reinforcing bars of φ 12, it is 10D to anchor into agent structure depth, i.e., reinforcing bar is implanted into lower-layer concrete, wall etc. Length is greater than or 10 times equal to bar diameter.
Again, S4 steps are carried out, alkali resistant glass fibre open weave cloth and DBI mortar covers are hung on EPS decoration elements.Using high-quality Finish coat mortar pastes the alkaline-resisting grid cloth of 200mm wide (seam both ends ensure that 100mm width overlaps respectively), and thickness is less than 2mm;It is viscous When seam is wider than 3mm, clogged in seam with thin polyphenyl piece, reuse high-quality finish coat mortar and paste the wide alkaline-resisting grid cloths of 200mm Strengthen.After drying, if stitch edge joint position leaves unnecessary mortar and polished with sand paper.Bar for line disk and Bracket for steel bar hole position face Layer carries out surface layer repairing using the alkaline-resisting grid cloth of 200*200 sizes, is polished after drying with sand paper, ensures surfacing, Negative and positive angle is straight;The inner corner trim that EPS decoration elements contact with heat insulation base layer pastes wide alkaline-resisting of 200mm using high-quality finish coat mortar Glass fiber reticular cloth, thickness are no more than 3mm.
In above-mentioned steps, bonding mortar used is with mixing, and the mortar for avoiding being stirred is caused by standing time is long And influence to use.
Last then progress S5 steps, architectural surface construction.Architectural surface construction is then the beautification for building, makes construction The building of completion is more attractive in appearance, there is Mutiple Choice in the prior art, and here is omitted.
Compared to prior art, using construction party of the exterior wall EPS decoration elements disclosed in this invention in skyscraper Method has the following advantages and beneficial effect:
1st, natural cause and human factor institute be effectively prevent with checking line in the permanent control line of basic unit's bullet before construction starts Caused error and do over again, facilitate construction and check, so-called sharpening the axe won't interfere with the cutting of firewood, and early-stage preparations process is fully accelerated on the contrary Progress, and more effectively ensure that construction quality.
2nd, hanging basket is in work progress, by special messenger in building by institute's band rope ends lie in respectively agent structure and hanging basket it On, effectively prevent hanging basket to swing, enhance the stability of hanging basket, add the operating efficiency of hanging basket, also cause installation quality There is more reliable guarantee.
3rd, one of Bracket for steel bar working procedure is increased, it is vertical every one piece of EPS decoration element electric hammer from the drill bits of φ 10 Metope uniformly opens 3 140mm deep holes, and the reinforcing bars of φ 12 are anchored into wall by force, enter wall depth 120mm, to ensure anchor bar Stabilization, effectively share load so that EPS decoration elements and agent structure more level off to an entirety.
Finally it should be noted that:Various embodiments above is merely illustrative of the technical solution of the present invention, rather than its limitations;To the greatest extent The present invention is described in detail with reference to foregoing embodiments for pipe, it will be understood by those within the art that:Its according to The technical scheme described in foregoing embodiments can so be modified, either which part or all technical characteristic are entered Row equivalent substitution;And these modifications or replacement, the essence of appropriate technical solution is departed from various embodiments of the present invention technology The scope of scheme.

Claims (10)

1. construction method of a kind of exterior wall EPS decoration elements in skyscraper, it is characterised in that comprise the following steps:
S1:If it is segmented using dried layer as one in the permanent control line of exterior wall surface bullet and checks line, for being controlled in work progress Overall perpendicularity and inspect for acceptance;
S2:Line starts to install EPS decoration elements on the basis of the control line, and more on EPS decoration elements described in random inspection Point is to the distance for checking line, to adjust deviation;
S3:Bar for line construction is carried out on the EPS decoration elements completed to construction, while the EPS decoration elements are carried out Bracket for steel bar is constructed;
S4:Alkali resistant glass fibre open weave cloth and mortar cover are hung on the EPS decoration elements;
S5:Architectural surface is constructed.
2. according to the construction method described in claim 1, it is characterised in that in S2, install the EPS by hanging basket and decorate Component;Rope is tied on the hanging basket, the other end of the rope is tied in the agent structure for being currently installed on floor, is used In preventing the hanging basket to swing, the stability of the hanging basket is enhanced.
3. according to the method described in claim 1 or 2, it is characterised in that the inspection line is parallel with the control line, and institute State and check that the distance between line and the control line are 50mm.
4. according to the construction method described in claim 1 or 2, it is characterised in that in S3, pacify on the EPS decoration elements The bar for line number of dress is any in being 4,5,6 or 8.
5. according to the construction method described in claim 1 or 2, it is characterised in that in S3, Choice of Bits, described in every piece If being evenly arranged dry hole perpendicular to metope direction on EPS decoration elements, and agent structure is anchored into reinforcing bar.
6. according to the construction method described in claim 5, it is characterised in that in S3, the diameter of the reinforcing bar is more than described Bit diameter.
7. according to the construction method described in claim 6, it is characterised in that in S3, from the drill bits of φ 10, hole depth enters main body Structure 140mm, from the reinforcing bars of φ 12, it is 10D to anchor into agent structure depth.
8. according to the construction method described in claim 1, it is characterised in that in S4, the EPS decoration elements use thin layer Full bonding is pasted, and the percentage of bonding area and the gross area is controlled more than 90%.
9. according to the construction method described in claim 1, it is characterised in that in S4, constructed in bar for line and Bracket for steel bar Alkaline-resisting grid cloth is pasted on the EPS decoration elements completed, and the piece between two pieces of EPS decoration elements is filled out from filler Alkaline-resisting grid cloth reinforcement is being pasted after filling.
10. according to the construction method described in claim 8 or 9, it is characterised in that in the EPS component assembling constructions process In, bonding mortar used influences to use with the mortar for mixing, avoiding being stirred caused by standing time is long.
CN201710594245.5A 2017-07-20 2017-07-20 A kind of construction method of exterior wall EPS decoration elements in skyscraper Pending CN107447953A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710594245.5A CN107447953A (en) 2017-07-20 2017-07-20 A kind of construction method of exterior wall EPS decoration elements in skyscraper

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710594245.5A CN107447953A (en) 2017-07-20 2017-07-20 A kind of construction method of exterior wall EPS decoration elements in skyscraper

Publications (1)

Publication Number Publication Date
CN107447953A true CN107447953A (en) 2017-12-08

Family

ID=60487443

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710594245.5A Pending CN107447953A (en) 2017-07-20 2017-07-20 A kind of construction method of exterior wall EPS decoration elements in skyscraper

Country Status (1)

Country Link
CN (1) CN107447953A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110761531A (en) * 2019-11-08 2020-02-07 中国十七冶集团有限公司 High-rise building outer wall decorative line painting construction method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2007109965A1 (en) * 2006-03-24 2007-10-04 Shuhuan Wu A binding compound insulating exterior wall with a support
KR20090033563A (en) * 2007-10-01 2009-04-06 주식회사 단디건설 Structure of fixed external wall decoration molding for building
CN201474265U (en) * 2009-07-30 2010-05-19 中建三局建设工程股份有限公司 EPS decorative strip structure
WO2011038654A1 (en) * 2009-09-29 2011-04-07 上海一金节能科技有限公司 External insulated wall provided with reinforced polystyrene laminate anchored by mechanical fixing device
CN204728682U (en) * 2015-05-27 2015-10-28 中国建筑第六工程局有限公司 A kind of fastening devices preventing hanging basket from swinging
CN205116658U (en) * 2015-10-21 2016-03-30 山东秦恒科技有限公司 EPS moulding bearing pedal
CN105672624A (en) * 2015-02-05 2016-06-15 中国建筑第四工程局有限公司 Fixing method and structure of EPS decoration line

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2007109965A1 (en) * 2006-03-24 2007-10-04 Shuhuan Wu A binding compound insulating exterior wall with a support
KR20090033563A (en) * 2007-10-01 2009-04-06 주식회사 단디건설 Structure of fixed external wall decoration molding for building
CN201474265U (en) * 2009-07-30 2010-05-19 中建三局建设工程股份有限公司 EPS decorative strip structure
WO2011038654A1 (en) * 2009-09-29 2011-04-07 上海一金节能科技有限公司 External insulated wall provided with reinforced polystyrene laminate anchored by mechanical fixing device
CN105672624A (en) * 2015-02-05 2016-06-15 中国建筑第四工程局有限公司 Fixing method and structure of EPS decoration line
CN204728682U (en) * 2015-05-27 2015-10-28 中国建筑第六工程局有限公司 A kind of fastening devices preventing hanging basket from swinging
CN205116658U (en) * 2015-10-21 2016-03-30 山东秦恒科技有限公司 EPS moulding bearing pedal

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110761531A (en) * 2019-11-08 2020-02-07 中国十七冶集团有限公司 High-rise building outer wall decorative line painting construction method

Similar Documents

Publication Publication Date Title
US4226061A (en) Reinforced masonry construction
CN101307629B (en) Fastener type self-decoration composite heat insulation high layer dwelling building module and its construction method
CN204804107U (en) Decorate heat preservation template integral structure and structural wall
CN206503251U (en) Fixed form and insulated fire composite exterior wall body integrated with structure construction
CN106088463A (en) A kind of precast concrete external wall panel and preparation method thereof
CN106836526A (en) Prefabricated reinforced concrete composite thermal-insulation external wall panel and its making and installation method
CN204212346U (en) Heat insulation decoration formwork integral structure and comprise its structural wall
CN206495369U (en) A kind of assembly type light steel wall
CN205502373U (en) Evaporate and press whole wallboard that keeps warm of aerated concrete
CN107447953A (en) A kind of construction method of exterior wall EPS decoration elements in skyscraper
CN109267695A (en) A kind of prefabricated wallboard of lightweight with connection structure and its installation method
CN219671844U (en) Prefabricated wall component of assembled reverse-beating integrated high-efficiency flame-retardant heat-insulating material
CN107700747A (en) A kind of prefabricated building
CN103758256B (en) A kind of decorative heat preservation composite wall and preparation method thereof
CN208122037U (en) A kind of assembled combined wall board
CN110397234A (en) A kind of production method of the concrete assembled prefabricated panel of super low energy consumption and the wallboard
CN206829345U (en) A kind of house floor wall-panel assembled structure based on light gauge cold-formed steel shape
CN206903107U (en) A kind of structure, insulation, the assembled wall of decorative lamination integration
CN106638978B (en) The node structure of the prefabricated load-bearing wall panel combination light weight steel frames of assembled PC
CN109505367A (en) A kind of heat preservation plaque external thermal insulation system and installation method
CN106801474A (en) A kind of high-strength anti-crack wall and its construction method
CN107724596A (en) Partial precast sandwich type wall panel and its wall body structure and building
TWI321184B (en)
CN106968363A (en) A kind of two-chamber heat-preserving wall component
CN206245497U (en) Bridge cut-off part, decorative heat preservation template integral structure and concrete structure wall

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20171208