- CN107423525B CN107423525B CN201710711321.6A CN201710711321A CN107423525B CN 107423525 B CN107423525 B CN 107423525B CN 201710711321 A CN201710711321 A CN 201710711321A CN 107423525 B CN107423525 B CN 107423525B
- Authority
- CN
- China
- Prior art keywords
- pile
- calculating
- hole forming
- exploration
- depth
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/17—Mechanical parametric or variational design
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Geometry (AREA)
- General Physics & Mathematics (AREA)
- Evolutionary Computation (AREA)
- General Engineering & Computer Science (AREA)
- Computer Hardware Design (AREA)
- Computational Mathematics (AREA)
- Mathematical Analysis (AREA)
- Mathematical Optimization (AREA)
- Pure & Applied Mathematics (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
The invention relates to a method for calculating the length of a bored pile by circularly drilling a bored pile to replace rock judgment, which comprises the following steps of: (A) converting the geological survey point and the designed pile position into a coordinate system, and inserting the geological survey point into the pile position according to the coordinates; (B) drawing a holding layer curve corresponding to the geological survey point in a pile diagram, and further drawing a three-dimensional histogram if necessary; (C) and analyzing the geological survey curve, and calculating the pile length of the corresponding pile.
Description
Technical Field
The invention relates to a method for calculating the length of a bored pile by circularly drilling a bored pile to replace rock judgment.
Background
In the complex address condition, the soil layer depth has fluctuation area: such as near-sea backfill areas. Rock judgment is often needed when a final hole is constructed in the concrete cast-in-place pile so as to confirm the depth of entering a bearing stratum. Due to the mechanical construction characteristics, if a circulating drilling machine is adopted for pore-forming, rock judgment cannot be carried out due to the fact that soil samples cannot be collected; if the rotary drilling machine is used for hole forming, rock judgment can be carried out, but the construction cost is greatly increased.
Disclosure of Invention
In order to solve the technical problems, the inventor carries out intensive research, and provides a method for calculating the length of a bored pile formed by circularly drilling a bored pile instead of judging rocks, aiming at calculating the depth of a bored hole by a series of analysis methods and simplifying the rock judging process during hole forming by circularly drilling.
The invention discloses a method for calculating the length of a bored pile by circularly drilling a bored pile to replace rock judgment, which comprises the following steps of:
(A) converting the geological survey point and the designed pile position into a coordinate system, and inserting the geological survey point into the pile position according to the coordinates;
(B) drawing a holding layer curve corresponding to the geological survey point in a pile diagram, and further drawing a three-dimensional histogram if necessary;
(C) and analyzing the geological survey curve, and calculating the pile length of the corresponding pile.
In the step (C), the pile hole forming depth is calculated by adopting an averaging method, and the method comprises the following steps:
(1) finding continuous (uninterrupted) soil layer stable exploration points and determining the range of piles which can be represented by the exploration points;
(2) calculating an average distance L ave from the absolute elevation 0 meter to the bearing stratum, wherein the average distance L ave from the absolute elevation 0 meter to the bearing stratum = (L exploration point 1+ L exploration point 2+ … … L exploration point n)/n;
(3) and (4) calculating the pile hole forming depth, namely the hole forming depth l (pile 1, pile 2 and pile 3.·) = l pile ground elevation (pile 1, pile 2 and pile 3.·) + L ave + l in the range is designed into the depth of the bearing stratum.
The depth of the designed bearing stratum can be determined by one of ordinary skill in the art according to engineering requirements, specific regional rock strata and other conditions.
The scheme is economical and applicable, and has no great influence on the construction cost.
Alternatively, the maximum method is adopted to calculate the pile hole forming depth, and the method comprises the following steps:
(1) finding continuous (uninterrupted) soil layer stable exploration points and determining the range of piles which can be represented by the exploration points;
(2) calculating a maximum distance L max from the absolute elevation 0 meters to the bearing stratum, wherein the maximum distance L max = max from the absolute elevation 0 meters to the bearing stratum (L exploration point 1, L exploration point 2, … … L exploration point n);
(3) and (4) calculating the pile hole forming depth, namely the hole forming depth l (pile 1, pile 2 and pile 3.·) = l pile ground elevation (pile 1, pile 2 and pile 3.·) + L max + l in the range and designing the depth of the bearing stratum.
Alternatively, the pile hole forming depth is calculated by using a proportional method:
(1) extending the pile axis to the curve of the top surface of the bearing layer;
(2) setting adjacent ground exploration points, an absolute elevation 0 meter line and a layer top surface curve as a trapezoid, and calculating the length l of the axis of the pile in the trapezoid according to a proportion, namely a shaft (1, 2,3.. once.);
(3) within the trapezoidal range, the pile hole forming depth of each axis is l hole forming depth (pile 1, pile 2 and pile 3.·) = l pile ground elevation (pile 1, pile 2 and pile 3.·) + l axis (1, 2,3.·..) + l and the depth of the bearing stratum are designed.
In the above method, before step (a), the method further comprises verifying accuracy of the survey report, wherein the early stage comprises performing a small amount of pile hole forming by using the rotary excavator, or performing a small amount of reconnaissance.
Drawings
Fig. 1 is a map of the coordinate system of the survey points, wherein circles 38, 39, 40, 41, 42 represent the survey points, and the small circles in the map represent the pile positions.
Fig. 2 is a plot of the bearing stratum corresponding to a survey point, wherein,
line 1 represents the distance from 0 m absolute elevation to the top surface of the bearing stratum (because the ground is uneven and the elevations are different, 0 m absolute elevation is uniformly adopted as a reference point).
Fig. 3 is a three-dimensional histogram of survey points.
FIG. 4 is a geological survey curve analysis diagram during the gentle geological and elevation changes of soil layers.
FIG. 5 is a map of the analysis of the earth's survey curve when there is a large transition in soil stabilization.
Detailed Description
The following describes the practice of the present invention in detail with reference to the accompanying drawings.
The invention discloses a method for calculating the length of a bored pile by circularly drilling a bored pile to replace rock judgment, which comprises the following steps of:
(A) converting the surveying points and the designed pile positions into a coordinate system, inserting the surveying points into the pile positions according to coordinates, and marking the surveying points and the pile positions in the coordinate system as shown in figure 1;
(B) drawing a supporting layer curve corresponding to the geological survey point in a pile diagram, and further drawing a three-dimensional histogram if necessary, as shown in fig. 2 and fig. 3, wherein a line 1 represents the distance from an absolute elevation of 0 m to the top surface of the supporting layer (the absolute elevation of 0 m is uniformly adopted as a reference point due to uneven ground and different elevations), and a line 2 represents the distance from the elevation of 0 m to the top surface of the supporting layer; line 4 is an absolute 0 meter line; line 3 is the top surface curve of the holding layer;
(C) and analyzing the geological survey curve, and calculating the pile length of the corresponding pile (fig. 4 and 5).
In the step (C), the pile hole forming depth is calculated by adopting an averaging method, and the method comprises the following steps:
(1) finding continuous (uninterrupted) soil layer stable exploration points and determining the range of piles which can be represented by the exploration points;
(2) calculating an average distance L ave from the absolute elevation 0 meter to the bearing stratum, wherein the average distance L ave from the absolute elevation 0 meter to the bearing stratum = (L exploration point 1+ L exploration point 2+ … … L exploration point n)/n;
(3) and (4) calculating the pile hole forming depth, namely the hole forming depth l (pile 1, pile 2 and pile 3.·) = l pile ground elevation (pile 1, pile 2 and pile 3.·) + L ave + l in the range is designed into the depth of the bearing stratum.
The scheme is economical and applicable, and has no great influence on the construction cost.
Alternatively, the maximum method is adopted to calculate the pile hole forming depth, and the method comprises the following steps:
(1) finding continuous (uninterrupted) soil layer stable exploration points and determining the range of piles which can be represented by the exploration points;
(2) calculating a maximum distance L max from the absolute elevation 0 meters to the bearing stratum, wherein the maximum distance L max = max from the absolute elevation 0 meters to the bearing stratum (L exploration point 1, L exploration point 2, … … L exploration point n);
(3) and (4) calculating the pile hole forming depth, namely the hole forming depth l (pile 1, pile 2 and pile 3.·) = l pile ground elevation (pile 1, pile 2 and pile 3.·) + L max + l in the range and designing the depth of the bearing stratum.
Alternatively, the pile hole forming depth is calculated by using a proportional method:
(1) extending the pile axis to the curve of the top surface of the bearing layer;
(2) setting adjacent ground exploration points, an absolute elevation 0 meter line and a layer top surface curve as a trapezoid, and calculating the length l of the axis of the pile in the trapezoid according to a proportion, namely a shaft (1, 2,3.. once.);
(3) within the trapezoidal range, the pile hole forming depth of each axis is l hole forming depth (pile 1, pile 2 and pile 3.·) = l pile ground elevation (pile 1, pile 2 and pile 3.·) + l axis (1, 2,3.·..) + l and the depth of the bearing stratum are designed.
In the above method, before step (a), the method further comprises verifying accuracy of the survey report, wherein the early stage comprises performing a small amount of pile hole forming by using the rotary excavator, or performing a small amount of reconnaissance.
According to the method disclosed by the invention, the rock judging process during hole drilling in a circulating manner is simplified.
Claims (2)
1. A method for calculating the length of a bored pile by circularly drilling a bored pile instead of judging rocks comprises the following steps:
(A) converting the geological survey point and the designed pile position into a coordinate system, and inserting the geological survey point into the pile position according to the coordinates;
(B) drawing a holding layer curve corresponding to the geological survey point in a pile diagram, and further drawing a three-dimensional histogram if necessary;
(C) analyzing the geological survey curve, and calculating the pile length of the corresponding pile;
in the step (C), the pile hole forming depth is calculated by adopting an averaging method, and the method comprises the following steps:
(1) finding out exploration points with stable continuous soil layers, and determining the range of piles which can be represented by the exploration points;
(2) calculating an average distance L ave from the absolute elevation 0 meter to the bearing stratum, wherein the average distance L ave from the absolute elevation 0 meter to the bearing stratum = (L exploration point 1+ L exploration point 2+ … … L exploration point n)/n;
(3) calculating the pile hole forming depth, wherein the hole forming depth of each pile in the range = the ground elevation of the pile + L ave + the designed depth of the bearing stratum;
or, calculating the pile hole forming depth by adopting a maximum value method, and comprising the following steps:
(1) finding out exploration points with stable continuous soil layers, and determining the range of piles which can be represented by the exploration points;
(2) calculating a maximum distance L max from the absolute elevation 0 meters to the bearing stratum, wherein the maximum distance L max = max from the absolute elevation 0 meters to the bearing stratum (L exploration point 1, L exploration point 2, … … L exploration point n);
(3) calculating the pile hole forming depth, wherein the hole forming depth of each pile in the range = the ground elevation of the pile + L max + the designed depth of the bearing stratum;
or, calculating the pile hole forming depth by using a proportional method:
(1) extending the pile axis to the curve of the top surface of the bearing layer;
(2) setting adjacent geological survey points, an absolute elevation 0 meter line and a layer top surface curve as a trapezoid, and calculating the length of the axis of the pile in the trapezoid in proportion;
(3) and (3) the pile hole forming depth per axis in the trapezoidal range = the pile ground elevation + the length of the pile axis in the trapezoid + the depth of the designed bearing stratum.
2. The method of claim 1, wherein prior to step (a), further comprising verifying the accuracy of the survey report, including a prior drilling of a small number of pile holes with the rotary cutter, or a small number of reconnaissance.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710711321.6A CN107423525B (en) | 2017-08-18 | 2017-08-18 | Method for calculating length of bored pile by circularly drilling bored pile and replacing rock judgment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710711321.6A CN107423525B (en) | 2017-08-18 | 2017-08-18 | Method for calculating length of bored pile by circularly drilling bored pile and replacing rock judgment |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107423525A CN107423525A (en) | 2017-12-01 |
CN107423525B true CN107423525B (en) | 2020-08-04 |
Family
ID=60434077
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710711321.6A Active CN107423525B (en) | 2017-08-18 | 2017-08-18 | Method for calculating length of bored pile by circularly drilling bored pile and replacing rock judgment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107423525B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108729478A (en) * | 2018-07-18 | 2018-11-02 | 中铁十六局集团第三工程有限公司 | A kind of simulation three-dimensional surface determines the long construction method of CFG stakes |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104895078A (en) * | 2015-05-18 | 2015-09-09 | 王正军 | Precast pile construction method focusing on end bearing force |
CN105714769A (en) * | 2016-03-17 | 2016-06-29 | 中国水利水电第十一工程局有限公司 | Construction method for anti-sliding cast-in-place pile |
CN106682364A (en) * | 2017-01-22 | 2017-05-17 | 深圳泛华工程集团有限公司 | Method and system for determining the depth of each pile driven into rock layer |
CN106677232A (en) * | 2016-12-30 | 2017-05-17 | 华中科技大学 | Torsion shear wave shock excitation collection analysis method for foundation pile detection |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2010185259A (en) * | 2009-02-13 | 2010-08-26 | Ohbayashi Corp | Construction method for in-situ cast pile, and excavation system |
CN202247864U (en) * | 2011-09-08 | 2012-05-30 | 上海建工集团股份有限公司 | Bored pile |
-
2017
- 2017-08-18 CN CN201710711321.6A patent/CN107423525B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104895078A (en) * | 2015-05-18 | 2015-09-09 | 王正军 | Precast pile construction method focusing on end bearing force |
CN105714769A (en) * | 2016-03-17 | 2016-06-29 | 中国水利水电第十一工程局有限公司 | Construction method for anti-sliding cast-in-place pile |
CN106677232A (en) * | 2016-12-30 | 2017-05-17 | 华中科技大学 | Torsion shear wave shock excitation collection analysis method for foundation pile detection |
CN106682364A (en) * | 2017-01-22 | 2017-05-17 | 深圳泛华工程集团有限公司 | Method and system for determining the depth of each pile driven into rock layer |
Non-Patent Citations (2)
Title |
---|
drbkj32042.钻孔灌注桩监理细则.《豆丁建筑》.2013,1-22页. * |
钻孔灌注桩监理细则;drbkj32042;《豆丁建筑》;20130808;1-22页 * |
Also Published As
Publication number | Publication date |
---|---|
CN107423525A (en) | 2017-12-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7921573B1 (en) | Monitoring verticality of a sinking caisson | |
Arzi | Microgravimetry for engineering applications | |
CN104947560B (en) | Pile-net composite roadbed pile top differential settlement control method | |
RU2015117646A (en) | ANGULAR ORIENTATION AT THE REFERENCE INTERVAL FOR DATA PROCESSING OPERATIONS WITH COORDINATE BINDING AND / OR WITH OVERLAP | |
CN106682364A (en) | Method and system for determining the depth of each pile driven into rock layer | |
CN104141311A (en) | Mechanical holing method for protecting wall and structure formed with method | |
CN112765708B (en) | BIM-based earth and stone volume calculation method, system, equipment and storage medium | |
CN107388950A (en) | A kind of stereoscopic monitoring method of the land destruction feature of coal resources pit mining | |
CN103790577A (en) | Depth domain constraint inversion method based on horizontal well horizontal section vertical shaft virtualization | |
Banham et al. | Geophysical and intrusive site investigations to detect an abandoned coal‐mine access shaft, Apedale, Staffordshire, UK | |
JP2007284903A (en) | Method of suppressing amount of settlement of ground in shield construction | |
CN106769170A (en) | A kind of acquisition method of karst underground hole, crack and soil information | |
CN114018225B (en) | Ultra-large square construction measurement control method | |
CN107423525B (en) | Method for calculating length of bored pile by circularly drilling bored pile and replacing rock judgment | |
CN212405086U (en) | Disposal and detection structure for karst cave under rock-socketed pile base | |
CN111578989B (en) | Exploration method of fault confined water bridge abutment and bridge abutment erection method | |
CN109184705B (en) | Method for controlling stratum deformation in shield tunnel complex tunneling environment | |
CN103572769B (en) | Well sinking medium dip degree method for supervising | |
Ayuso et al. | A new radiolocation method for precise depth estimation and its application to the analysis of changes in groundwater levels in Colonia Clunia Sulpicia | |
CN114993248A (en) | Ground settlement monitoring method | |
Ngan-Tillard et al. | Total engineering geology approach applied to motorway construction and widening in the Netherlands: Part I: A pragmatic approach | |
Sutter et al. | Underground void detection by applying the electrical resistivity tomography (ERT) method for a limestone quarry in Northland, NZ | |
JP5289243B2 (en) | Depression location extraction device and depression location extraction program | |
Novak et al. | Heterogeneously composed Lozice fossil landslide in Rebrnice area, Vipava Valley | |
JP2021046663A (en) | Tunnel face state display system, tunnel face state display method, and moving measuring object |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |