CN107423525B - Method for calculating length of bored pile by circularly drilling bored pile and replacing rock judgment - Google Patents

Method for calculating length of bored pile by circularly drilling bored pile and replacing rock judgment Download PDF

Info

Publication number
CN107423525B
CN107423525B CN201710711321.6A CN201710711321A CN107423525B CN 107423525 B CN107423525 B CN 107423525B CN 201710711321 A CN201710711321 A CN 201710711321A CN 107423525 B CN107423525 B CN 107423525B
Authority
CN
China
Prior art keywords
pile
calculating
hole forming
exploration
depth
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710711321.6A
Other languages
Chinese (zh)
Other versions
CN107423525A (en
Inventor
纪贵强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xindi Energy Engineering Technology Co Ltd
Original Assignee
Xindi Energy Engineering Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xindi Energy Engineering Technology Co Ltd filed Critical Xindi Energy Engineering Technology Co Ltd
Priority to CN201710711321.6A priority Critical patent/CN107423525B/en
Publication of CN107423525A publication Critical patent/CN107423525A/en
Application granted granted Critical
Publication of CN107423525B publication Critical patent/CN107423525B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/17Mechanical parametric or variational design

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Geometry (AREA)
  • General Physics & Mathematics (AREA)
  • Evolutionary Computation (AREA)
  • General Engineering & Computer Science (AREA)
  • Computer Hardware Design (AREA)
  • Computational Mathematics (AREA)
  • Mathematical Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Pure & Applied Mathematics (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The invention relates to a method for calculating the length of a bored pile by circularly drilling a bored pile to replace rock judgment, which comprises the following steps of: (A) converting the geological survey point and the designed pile position into a coordinate system, and inserting the geological survey point into the pile position according to the coordinates; (B) drawing a holding layer curve corresponding to the geological survey point in a pile diagram, and further drawing a three-dimensional histogram if necessary; (C) and analyzing the geological survey curve, and calculating the pile length of the corresponding pile.

Description

Method for calculating length of bored pile by circularly drilling bored pile and replacing rock judgment
Technical Field
The invention relates to a method for calculating the length of a bored pile by circularly drilling a bored pile to replace rock judgment.
Background
In the complex address condition, the soil layer depth has fluctuation area: such as near-sea backfill areas. Rock judgment is often needed when a final hole is constructed in the concrete cast-in-place pile so as to confirm the depth of entering a bearing stratum. Due to the mechanical construction characteristics, if a circulating drilling machine is adopted for pore-forming, rock judgment cannot be carried out due to the fact that soil samples cannot be collected; if the rotary drilling machine is used for hole forming, rock judgment can be carried out, but the construction cost is greatly increased.
Disclosure of Invention
In order to solve the technical problems, the inventor carries out intensive research, and provides a method for calculating the length of a bored pile formed by circularly drilling a bored pile instead of judging rocks, aiming at calculating the depth of a bored hole by a series of analysis methods and simplifying the rock judging process during hole forming by circularly drilling.
The invention discloses a method for calculating the length of a bored pile by circularly drilling a bored pile to replace rock judgment, which comprises the following steps of:
(A) converting the geological survey point and the designed pile position into a coordinate system, and inserting the geological survey point into the pile position according to the coordinates;
(B) drawing a holding layer curve corresponding to the geological survey point in a pile diagram, and further drawing a three-dimensional histogram if necessary;
(C) and analyzing the geological survey curve, and calculating the pile length of the corresponding pile.
In the step (C), the pile hole forming depth is calculated by adopting an averaging method, and the method comprises the following steps:
(1) finding continuous (uninterrupted) soil layer stable exploration points and determining the range of piles which can be represented by the exploration points;
(2) calculating an average distance L ave from the absolute elevation 0 meter to the bearing stratum, wherein the average distance L ave from the absolute elevation 0 meter to the bearing stratum = (L exploration point 1+ L exploration point 2+ … … L exploration point n)/n;
(3) and (4) calculating the pile hole forming depth, namely the hole forming depth l (pile 1, pile 2 and pile 3.·) = l pile ground elevation (pile 1, pile 2 and pile 3.·) + L ave + l in the range is designed into the depth of the bearing stratum.
The depth of the designed bearing stratum can be determined by one of ordinary skill in the art according to engineering requirements, specific regional rock strata and other conditions.
The scheme is economical and applicable, and has no great influence on the construction cost.
Alternatively, the maximum method is adopted to calculate the pile hole forming depth, and the method comprises the following steps:
(1) finding continuous (uninterrupted) soil layer stable exploration points and determining the range of piles which can be represented by the exploration points;
(2) calculating a maximum distance L max from the absolute elevation 0 meters to the bearing stratum, wherein the maximum distance L max = max from the absolute elevation 0 meters to the bearing stratum (L exploration point 1, L exploration point 2, … … L exploration point n);
(3) and (4) calculating the pile hole forming depth, namely the hole forming depth l (pile 1, pile 2 and pile 3.·) = l pile ground elevation (pile 1, pile 2 and pile 3.·) + L max + l in the range and designing the depth of the bearing stratum.
Alternatively, the pile hole forming depth is calculated by using a proportional method:
(1) extending the pile axis to the curve of the top surface of the bearing layer;
(2) setting adjacent ground exploration points, an absolute elevation 0 meter line and a layer top surface curve as a trapezoid, and calculating the length l of the axis of the pile in the trapezoid according to a proportion, namely a shaft (1, 2,3.. once.);
(3) within the trapezoidal range, the pile hole forming depth of each axis is l hole forming depth (pile 1, pile 2 and pile 3.·) = l pile ground elevation (pile 1, pile 2 and pile 3.·) + l axis (1, 2,3.·..) + l and the depth of the bearing stratum are designed.
In the above method, before step (a), the method further comprises verifying accuracy of the survey report, wherein the early stage comprises performing a small amount of pile hole forming by using the rotary excavator, or performing a small amount of reconnaissance.
Drawings
Fig. 1 is a map of the coordinate system of the survey points, wherein circles 38, 39, 40, 41, 42 represent the survey points, and the small circles in the map represent the pile positions.
Fig. 2 is a plot of the bearing stratum corresponding to a survey point, wherein,
line 1 represents the distance from 0 m absolute elevation to the top surface of the bearing stratum (because the ground is uneven and the elevations are different, 0 m absolute elevation is uniformly adopted as a reference point).
Line 2 is the distance mark from the elevation 0 meter to the top surface of the bearing layer.
Line 4 is an absolute 0 meter line; line 3 is the top surface curve of the support layer.
Fig. 3 is a three-dimensional histogram of survey points.
FIG. 4 is a geological survey curve analysis diagram during the gentle geological and elevation changes of soil layers.
FIG. 5 is a map of the analysis of the earth's survey curve when there is a large transition in soil stabilization.
Detailed Description
The following describes the practice of the present invention in detail with reference to the accompanying drawings.
The invention discloses a method for calculating the length of a bored pile by circularly drilling a bored pile to replace rock judgment, which comprises the following steps of:
(A) converting the surveying points and the designed pile positions into a coordinate system, inserting the surveying points into the pile positions according to coordinates, and marking the surveying points and the pile positions in the coordinate system as shown in figure 1;
(B) drawing a supporting layer curve corresponding to the geological survey point in a pile diagram, and further drawing a three-dimensional histogram if necessary, as shown in fig. 2 and fig. 3, wherein a line 1 represents the distance from an absolute elevation of 0 m to the top surface of the supporting layer (the absolute elevation of 0 m is uniformly adopted as a reference point due to uneven ground and different elevations), and a line 2 represents the distance from the elevation of 0 m to the top surface of the supporting layer; line 4 is an absolute 0 meter line; line 3 is the top surface curve of the holding layer;
(C) and analyzing the geological survey curve, and calculating the pile length of the corresponding pile (fig. 4 and 5).
In the step (C), the pile hole forming depth is calculated by adopting an averaging method, and the method comprises the following steps:
(1) finding continuous (uninterrupted) soil layer stable exploration points and determining the range of piles which can be represented by the exploration points;
(2) calculating an average distance L ave from the absolute elevation 0 meter to the bearing stratum, wherein the average distance L ave from the absolute elevation 0 meter to the bearing stratum = (L exploration point 1+ L exploration point 2+ … … L exploration point n)/n;
(3) and (4) calculating the pile hole forming depth, namely the hole forming depth l (pile 1, pile 2 and pile 3.·) = l pile ground elevation (pile 1, pile 2 and pile 3.·) + L ave + l in the range is designed into the depth of the bearing stratum.
The scheme is economical and applicable, and has no great influence on the construction cost.
Alternatively, the maximum method is adopted to calculate the pile hole forming depth, and the method comprises the following steps:
(1) finding continuous (uninterrupted) soil layer stable exploration points and determining the range of piles which can be represented by the exploration points;
(2) calculating a maximum distance L max from the absolute elevation 0 meters to the bearing stratum, wherein the maximum distance L max = max from the absolute elevation 0 meters to the bearing stratum (L exploration point 1, L exploration point 2, … … L exploration point n);
(3) and (4) calculating the pile hole forming depth, namely the hole forming depth l (pile 1, pile 2 and pile 3.·) = l pile ground elevation (pile 1, pile 2 and pile 3.·) + L max + l in the range and designing the depth of the bearing stratum.
Alternatively, the pile hole forming depth is calculated by using a proportional method:
(1) extending the pile axis to the curve of the top surface of the bearing layer;
(2) setting adjacent ground exploration points, an absolute elevation 0 meter line and a layer top surface curve as a trapezoid, and calculating the length l of the axis of the pile in the trapezoid according to a proportion, namely a shaft (1, 2,3.. once.);
(3) within the trapezoidal range, the pile hole forming depth of each axis is l hole forming depth (pile 1, pile 2 and pile 3.·) = l pile ground elevation (pile 1, pile 2 and pile 3.·) + l axis (1, 2,3.·..) + l and the depth of the bearing stratum are designed.
In the above method, before step (a), the method further comprises verifying accuracy of the survey report, wherein the early stage comprises performing a small amount of pile hole forming by using the rotary excavator, or performing a small amount of reconnaissance.
According to the method disclosed by the invention, the rock judging process during hole drilling in a circulating manner is simplified.

Claims (2)

1. A method for calculating the length of a bored pile by circularly drilling a bored pile instead of judging rocks comprises the following steps:
(A) converting the geological survey point and the designed pile position into a coordinate system, and inserting the geological survey point into the pile position according to the coordinates;
(B) drawing a holding layer curve corresponding to the geological survey point in a pile diagram, and further drawing a three-dimensional histogram if necessary;
(C) analyzing the geological survey curve, and calculating the pile length of the corresponding pile;
in the step (C), the pile hole forming depth is calculated by adopting an averaging method, and the method comprises the following steps:
(1) finding out exploration points with stable continuous soil layers, and determining the range of piles which can be represented by the exploration points;
(2) calculating an average distance L ave from the absolute elevation 0 meter to the bearing stratum, wherein the average distance L ave from the absolute elevation 0 meter to the bearing stratum = (L exploration point 1+ L exploration point 2+ … … L exploration point n)/n;
(3) calculating the pile hole forming depth, wherein the hole forming depth of each pile in the range = the ground elevation of the pile + L ave + the designed depth of the bearing stratum;
or, calculating the pile hole forming depth by adopting a maximum value method, and comprising the following steps:
(1) finding out exploration points with stable continuous soil layers, and determining the range of piles which can be represented by the exploration points;
(2) calculating a maximum distance L max from the absolute elevation 0 meters to the bearing stratum, wherein the maximum distance L max = max from the absolute elevation 0 meters to the bearing stratum (L exploration point 1, L exploration point 2, … … L exploration point n);
(3) calculating the pile hole forming depth, wherein the hole forming depth of each pile in the range = the ground elevation of the pile + L max + the designed depth of the bearing stratum;
or, calculating the pile hole forming depth by using a proportional method:
(1) extending the pile axis to the curve of the top surface of the bearing layer;
(2) setting adjacent geological survey points, an absolute elevation 0 meter line and a layer top surface curve as a trapezoid, and calculating the length of the axis of the pile in the trapezoid in proportion;
(3) and (3) the pile hole forming depth per axis in the trapezoidal range = the pile ground elevation + the length of the pile axis in the trapezoid + the depth of the designed bearing stratum.
2. The method of claim 1, wherein prior to step (a), further comprising verifying the accuracy of the survey report, including a prior drilling of a small number of pile holes with the rotary cutter, or a small number of reconnaissance.
CN201710711321.6A 2017-08-18 2017-08-18 Method for calculating length of bored pile by circularly drilling bored pile and replacing rock judgment Active CN107423525B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710711321.6A CN107423525B (en) 2017-08-18 2017-08-18 Method for calculating length of bored pile by circularly drilling bored pile and replacing rock judgment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710711321.6A CN107423525B (en) 2017-08-18 2017-08-18 Method for calculating length of bored pile by circularly drilling bored pile and replacing rock judgment

Publications (2)

Publication Number Publication Date
CN107423525A CN107423525A (en) 2017-12-01
CN107423525B true CN107423525B (en) 2020-08-04

Family

ID=60434077

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710711321.6A Active CN107423525B (en) 2017-08-18 2017-08-18 Method for calculating length of bored pile by circularly drilling bored pile and replacing rock judgment

Country Status (1)

Country Link
CN (1) CN107423525B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108729478A (en) * 2018-07-18 2018-11-02 中铁十六局集团第三工程有限公司 A kind of simulation three-dimensional surface determines the long construction method of CFG stakes

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104895078A (en) * 2015-05-18 2015-09-09 王正军 Precast pile construction method focusing on end bearing force
CN105714769A (en) * 2016-03-17 2016-06-29 中国水利水电第十一工程局有限公司 Construction method for anti-sliding cast-in-place pile
CN106682364A (en) * 2017-01-22 2017-05-17 深圳泛华工程集团有限公司 Method and system for determining the depth of each pile driven into rock layer
CN106677232A (en) * 2016-12-30 2017-05-17 华中科技大学 Torsion shear wave shock excitation collection analysis method for foundation pile detection

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010185259A (en) * 2009-02-13 2010-08-26 Ohbayashi Corp Construction method for in-situ cast pile, and excavation system
CN202247864U (en) * 2011-09-08 2012-05-30 上海建工集团股份有限公司 Bored pile

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104895078A (en) * 2015-05-18 2015-09-09 王正军 Precast pile construction method focusing on end bearing force
CN105714769A (en) * 2016-03-17 2016-06-29 中国水利水电第十一工程局有限公司 Construction method for anti-sliding cast-in-place pile
CN106677232A (en) * 2016-12-30 2017-05-17 华中科技大学 Torsion shear wave shock excitation collection analysis method for foundation pile detection
CN106682364A (en) * 2017-01-22 2017-05-17 深圳泛华工程集团有限公司 Method and system for determining the depth of each pile driven into rock layer

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
drbkj32042.钻孔灌注桩监理细则.《豆丁建筑》.2013,1-22页. *
钻孔灌注桩监理细则;drbkj32042;《豆丁建筑》;20130808;1-22页 *

Also Published As

Publication number Publication date
CN107423525A (en) 2017-12-01

Similar Documents

Publication Publication Date Title
US7921573B1 (en) Monitoring verticality of a sinking caisson
Arzi Microgravimetry for engineering applications
CN104947560B (en) Pile-net composite roadbed pile top differential settlement control method
RU2015117646A (en) ANGULAR ORIENTATION AT THE REFERENCE INTERVAL FOR DATA PROCESSING OPERATIONS WITH COORDINATE BINDING AND / OR WITH OVERLAP
CN106682364A (en) Method and system for determining the depth of each pile driven into rock layer
CN104141311A (en) Mechanical holing method for protecting wall and structure formed with method
CN112765708B (en) BIM-based earth and stone volume calculation method, system, equipment and storage medium
CN107388950A (en) A kind of stereoscopic monitoring method of the land destruction feature of coal resources pit mining
CN103790577A (en) Depth domain constraint inversion method based on horizontal well horizontal section vertical shaft virtualization
Banham et al. Geophysical and intrusive site investigations to detect an abandoned coal‐mine access shaft, Apedale, Staffordshire, UK
JP2007284903A (en) Method of suppressing amount of settlement of ground in shield construction
CN106769170A (en) A kind of acquisition method of karst underground hole, crack and soil information
CN114018225B (en) Ultra-large square construction measurement control method
CN107423525B (en) Method for calculating length of bored pile by circularly drilling bored pile and replacing rock judgment
CN212405086U (en) Disposal and detection structure for karst cave under rock-socketed pile base
CN111578989B (en) Exploration method of fault confined water bridge abutment and bridge abutment erection method
CN109184705B (en) Method for controlling stratum deformation in shield tunnel complex tunneling environment
CN103572769B (en) Well sinking medium dip degree method for supervising
Ayuso et al. A new radiolocation method for precise depth estimation and its application to the analysis of changes in groundwater levels in Colonia Clunia Sulpicia
CN114993248A (en) Ground settlement monitoring method
Ngan-Tillard et al. Total engineering geology approach applied to motorway construction and widening in the Netherlands: Part I: A pragmatic approach
Sutter et al. Underground void detection by applying the electrical resistivity tomography (ERT) method for a limestone quarry in Northland, NZ
JP5289243B2 (en) Depression location extraction device and depression location extraction program
Novak et al. Heterogeneously composed Lozice fossil landslide in Rebrnice area, Vipava Valley
JP2021046663A (en) Tunnel face state display system, tunnel face state display method, and moving measuring object

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant