CN107422293A CN201710287797.1A CN201710287797A CN107422293A CN 107422293 A CN107422293 A CN 107422293A CN 201710287797 A CN201710287797 A CN 201710287797A CN 107422293 A CN107422293 A CN 107422293A
Authority
CN
China
Prior art keywords
task
module
data
subsystem
verification
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710287797.1A
Other languages
Chinese (zh)
Inventor
张大维
刘鸿飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI SHINE ENERGY INFO-TECH Co Ltd
State Grid Shanghai Electric Power Co Ltd
Original Assignee
SHANGHAI SHINE ENERGY INFO-TECH Co Ltd
State Grid Shanghai Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI SHINE ENERGY INFO-TECH Co Ltd, State Grid Shanghai Electric Power Co Ltd filed Critical SHANGHAI SHINE ENERGY INFO-TECH Co Ltd
Priority to CN201710287797.1A priority Critical patent/CN107422293A/en
Publication of CN107422293A publication Critical patent/CN107422293A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R35/00Testing or calibrating of apparatus covered by the other groups of this subclass
    • G01R35/04Testing or calibrating of apparatus covered by the other groups of this subclass of instruments for measuring time integral of power or current

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention relates to a kind of electric energy meter field intellectuality verification system and method, the system includes inspection administration server and hand-held intelligent terminal, described inspection administration server communication connection hand-held intelligent terminal, described inspection administration server is provided with mission dispatching and management subsystem, described hand-held intelligent terminal is provided with task and received and data feedback subsystem, described mission dispatching and management subsystem is used to issue verification task to hand-held intelligent terminal, described task reception and data feedback subsystem according to acquisition on-site proving data and feeds back to mission dispatching and management subsystem, described mission dispatching and management subsystem is handled and managed to on-site proving data.Compared with prior art, the present invention, which has, can realize fully digitalization informationization, reduce manual operation, there is provided efficiency.

Description

A kind of electric energy meter field intellectuality verification system and method
Technical field
The present invention relates to a kind of electric energy meter detecting system and method, is examined and determine more particularly, to a kind of electric energy meter field is intelligent System and method.
Background technology
Before this, Shanghai Electric Power Co electric energy measurement center possesses more electric energy metering verification equipment and numerous calibrating people Member, electric energy metering device calibrating calibration equipment used exist manufacturer is different, model is different, operation complexity is different, Operate the problems such as software differences are big, calibrating scheme and project randomness are big.It is how each being closely related with Measurement Verification Work Kind information is integrated, and makes these information organic " association ", forms the electric energy metrical inspection by each elements integration of measurement verification Determine computer network system, realize electric energy metering verification condition, metrological standard unit, metrological personnel (complete as defined in operate), Workflow etc. is automatically controlled as the key issue for needing to solve at present.
The content of the invention
It is an object of the present invention to overcome the above-mentioned drawbacks of the prior art and provide a kind of electric energy meter field intelligence Verification system and method can be changed.
The purpose of the present invention can be achieved through the following technical solutions:
A kind of electric energy meter field intellectuality verification system, the system include inspection administration server and hand-held intelligent terminal, Described inspection administration server communication connection hand-held intelligent terminal, described inspection administration server are provided with mission dispatching and pipe Subsystem is managed, described hand-held intelligent terminal is provided with task and received and data feedback subsystem, described mission dispatching and management Subsystem is used to issue verification task to hand-held intelligent terminal, and described task receives and data feedback subsystem is existing according to obtaining Calibrating data simultaneously feed back to mission dispatching and management subsystem, described mission dispatching and management subsystem to on-site proving number According to being handled and managed.
Described mission dispatching and management subsystem includes:
Task accepts submodule:The module connects external system, described for receiving the verification task of external system transmission Verification task include ammeter verification task data file;
Mission dispatching module:Received for ammeter verification task data file to be sent to the task into hand-held intelligent terminal With data feedback subsystem;
On-site proving data reception module:The module is used to receive the scene that task receives and data feedback subsystem feeds back Calibrating data simultaneously preserve;
Examine and determine report generation module:The module is used to be given birth to according to each verification task and corresponding on-site proving data Into calibrating form;
Auditing module:The module is used to audit calibrating form and generates auditing result;
Final-period management module:The module is used to carry out verification task final-period management according to auditing result.
Described task receives and data feedback subsystem includes:
Task receiving module:The module correspondingly connects mission dispatching module, and task receiving module receives ammeter verification task Data file is simultaneously shown;
Data inputting sending module:The module correspondingly connects on-site proving data reception module, data inputting sending module On-site proving data reception module is delivered to for on-site proving personnel's typing on-site proving Data Concurrent.
Described mission dispatching and management subsystem also includes reservation management prompting module, and the module is used to store and user Examine and determine the reservation information of reservation, while reservation management prompting module reminds letter always according to reservation information growth mission dispatching Breath, administrative staff are reminded to issue verification task.
A kind of method that electric energy meter field intellectuality verification system carries out the intelligent calibrating of electric energy meter field, this method include Following steps:
(1) mission dispatching and management subsystem obtain the verification task that external system is sent;
(2) mission dispatching and management subsystem judge whether verification task is outfield task, if then performing step (3);
(3) user's reservation, mission dispatching and management subsystem typing reservation information are carried out;
(4) mission dispatching and management subsystem receive according to reservation information to task and data feedback subsystem sends calibrating Task;
(5) on-site proving personnel carry out electric energy meter field calibrating and by on-site proving data by task receive and data it is anti- Feedback subsystem feeds back to mission dispatching and management subsystem;
(6) mission dispatching and management subsystem generate calibrating form according to on-site proving data;
(7) calibrating form is audited, confirms to reply if auditing progress user and external system if, otherwise return Step (5) re-starts electric energy meter field calibrating.
Compared with prior art, the invention has the advantages that:
(1) outfield electric energy meter calibration is carried out using hand-held intelligent terminal, its on-site proving data can be with inspection administration service Mission dispatching and management subsystem in device interact, and realize fully digitalization informationization, reduce manual operation, there is provided effect Rate.
(2) system uses Web server mode, realizes real-time Communication for Power and the operational control of calibration equipment, and and local Net resource has reached shared resources, has drastically increased the efficiency of inspection administration work, makes verification task, plan, calibrating scheme Formulation and the work change such as calibrating data examination & approval, operation flow it is very light;
(3) calibrating report generation module and auditing module are set, on-site proving data are analyzed in time and examine report Table simultaneously does timely examination & verification, obstructed out-of-date can send relevant information when auditing to hand-held intelligent terminal in time and re-start live inspection It is fixed, improve operating efficiency.
Brief description of the drawings
Fig. 1 is the FB(flow block) of the method for the intelligent calibrating of electric energy meter field of the present invention;
Fig. 2 is the Software Architecture Design figure in embodiment electric energy meter field intellectuality verification system.
Embodiment
The present invention is described in detail with specific embodiment below in conjunction with the accompanying drawings.
Embodiment
A kind of electric energy meter field intellectuality verification system, the system include inspection administration server and hand-held intelligent terminal, Described inspection administration server communication connection hand-held intelligent terminal, described inspection administration server are provided with mission dispatching and pipe Subsystem is managed, described hand-held intelligent terminal is provided with task and received and data feedback subsystem, described mission dispatching and management Subsystem is used to issue verification task to hand-held intelligent terminal, and described task receives and data feedback subsystem is existing according to obtaining Calibrating data simultaneously feed back to mission dispatching and management subsystem, described mission dispatching and management subsystem to on-site proving number According to being handled and managed.
Described mission dispatching and management subsystem includes:
Task accepts submodule:The module connects external system, described for receiving the verification task of external system transmission Verification task include ammeter verification task data file;
Mission dispatching module:Received for ammeter verification task data file to be sent to the task into hand-held intelligent terminal With data feedback subsystem;
On-site proving data reception module:The module is used to receive the scene that task receives and data feedback subsystem feeds back Calibrating data simultaneously preserve;
Examine and determine report generation module:The module is used to be given birth to according to each verification task and corresponding on-site proving data Into calibrating form;
Auditing module:The module is used to audit calibrating form and generates auditing result;
Final-period management module:The module is used to carry out verification task final-period management according to auditing result.
Described task receives and data feedback subsystem includes:
Task receiving module:The module correspondingly connects mission dispatching module, and task receiving module receives ammeter verification task Data file is simultaneously shown;
Data inputting sending module:The module correspondingly connects on-site proving data reception module, data inputting sending module On-site proving data reception module is delivered to for on-site proving personnel's typing on-site proving Data Concurrent.
Described mission dispatching and management subsystem also includes reservation management prompting module, and the module is used to store and user Examine and determine the reservation information of reservation, while reservation management prompting module reminds letter always according to reservation information growth mission dispatching Breath, administrative staff are reminded to issue verification task.
As shown in figure 1, a kind of method that electric energy meter field intellectuality verification system carries out the intelligent calibrating of electric energy meter field, This method comprises the following steps:
(1) mission dispatching and management subsystem obtain the verification task that external system is sent;
(2) mission dispatching and management subsystem judge whether verification task is outfield task, if then performing step (3);
(3) user's reservation, mission dispatching and management subsystem typing reservation information are carried out;
(4) mission dispatching and management subsystem receive according to reservation information to task and data feedback subsystem sends calibrating Task;
(5) on-site proving personnel carry out electric energy meter field calibrating and by on-site proving data by task receive and data it is anti- Feedback subsystem feeds back to mission dispatching and management subsystem;
(6) mission dispatching and management subsystem generate calibrating form according to on-site proving data;
(7) calibrating form is audited, confirms to reply if auditing progress user and external system if, otherwise return Step (5) re-starts electric energy meter field calibrating.
In Fig. 1, CMS is external system, and the system can realize the calibrating of outfield task and the calibrating of indoor task. Indoor task calibrating is examined and determine indoor inspection stage body, and the calibrating of outfield task carries out scene by hand-held intelligent terminal Examine.
Shanghai Power Company's electric energy measurement center builds universal design and meter according to provincial measurement centre of State Grid Corporation of China Buret manages relevant regulations, intelligent with electric energy meter field for trade settlement with reference to Shanghai Power Company's electric energy measurement center itself The demand of calibrating business, meet the requirement of " SG186 engineerings " correlation function, according to the principle of " coming from standard, higher than standard ", tissue The specialization information management platform building-up work of measurement centre of Shanghai Power Company is carried out.New phase bid result is netted with state simultaneously Coordinate with corresponding manufacturer, calibration equipment is moved in the outfield provided using corresponding manufacturer, carries out on-site proving task and verification result Typing, realize the interworking of on-site proving equipment and measurement centre's specialization information management platform.
Shanghai Power Company's electric energy measurement center specialization information management platform system uses Web server mode, realizes The real-time Communication for Power of calibration equipment and operational control, and reached shared resources with local network resource, drastically increased calibrating The efficiency of management work, make verification task, plan, the formulation for examining and determine scheme and examine and determine the work such as data examination & approval, operation flow change It is very light.
Customer service management carries the main window to the outside world services of measurement centre, main responsible metering counseling services, Shen school vocational work.Task definition relates to, but are not limited to trade and examined and determine with electric energy meter field, and client pays a return visit and investigation, and client tells Miscellaneous services such as the initiation and filing of synergetic office work caused by asking.
Client's electric energy meter Shen school mainly for electricity consumption user to query be present in dress table, the business that need to be examined and determine and carried out Work.Client examine and determine center to big customer center, electric company entrust verification outfield electric energy meter accepted, on-site proving, Probation redport is formed, electric company and user is informed and carries out filing and pay a return visit work.It is main to include accepting, examining and determine, forming inspection Fixed report, result such as inform, filed, paying a return visit at the service link.:
A.CMS systems obtain outfield electric energy meter Shen school task data by web Service interface and middle database, and are counting Flow of task operating is carried out by Work-flow control in amount center specialization information management platform;
B. the class of accepting personnel, which accept, confirms Shen school task, and judges whether this task is outfield (scene) task by system;
C. if live task, then task flow goes to client class, and reservation operation is carried out to user by client class;
D. client class exports mission data file by measurement centre's specialization information management platform, and associated documents are led Enter in pda system by forming PDA tasks after parsing, carry PDA and go to scene to carry out electric energy meter calibration;
E. use and made a report on line, the multimode progress task data typing such as PDA Two-way Files data importing is held under line;
F. measurement centre's specialization information management platform automatically generates electric energy meter Shen school newspaper according to logging data and accused;Client class Mission dispatching to result is audited link by personnel;
G. examination & verification group carries out report examination & verification, if by the way that task to be further issued to examination & approval group;If not by, Then task is retracted, performs step e;
H. examination & approval group carries out report examination & approval, if by the way that task to be further issued to the class of accepting personnel and carries out user Confirm to reply;Measurement centre's specialization information management platform then judges it is to carry out external-change-internal verifying process flow according to verification result, also It is to carry out report mailing archive operation;Simultaneously plateform system automatically by electric energy meter Shen school newspaper accuse be uploaded to file server for When consult download;
I. measurement centre's specialization information management platform is replied Shen school result by web Service interface and middle database To CMS system.
Fig. 2 is the Software Architecture Design figure of the present invention.The system uses J2EE platform technologys completely, realizes cross-platform letter Breath management and information sharing, realize the Three-tider architecture based on B/S frameworks.System not only has platform-neutral, and client Any software need not be installed, it is only necessary to IE browser.System will represent that logic, service logic and mathematical logic are separated, make be The parallel work-flow of system, network calculations ability greatly improve.
System makees back-end data storage using oracle database, using Oracle Application Server conducts Middleware and WORKFLOW functions.Front end development technique is showed using JSP, and embedding professional list chart FINEREPORT is inserted Part.
In the region for building power information Intranet of the system, it is contemplated that network security problem, do not support Internet's Directly access.Servers-all is to being respectively placed in measurement centre's computer room and garden road.
Measurement centre's computer room is main equipment room, wherein the capital equipment such as application server, database server, interface server This is placed in, additionally comprises test, exploitation, Training Environment.Data are stored in a manner of special San networks, and by standby The mode of part server and tape library is backed up.
The development of center service is examined and determine for fit, it is necessary to be accessed on garden road DianKeYuan measurement centre garden roadbed The access of IP phone is realized on the basis of Utilities Electric Co.'s Intranet.
Determined in measurement centre's specialization information management platform design specification for platform and other systems or stage body software Interface mode can use the mode such as file, middle database, WebService.For data volume is big, requirement of real-time is not high Data, the mode such as file or middle database, such as electric energy meter detection data can be used, for data volume is small, requirement of real-time is high Data, such as abnormal information, topology update the data, and can use the modes such as WebService.
The information management platform of measurement centre's specialization at present (MCP) and line inspection palm machine and the interface of other engineering platforms Mode is file, and the interface mode with CMS and related check stage body is WebService+ middle databases.

Claims (5)

1. a kind of electric energy meter field intellectuality verification system, it is characterised in that the system includes inspection administration server and held Intelligent terminal, described inspection administration server communication connection hand-held intelligent terminal, described inspection administration server, which is provided with, appoints Business issues and managed subsystem, and described hand-held intelligent terminal is provided with task and received and data feedback subsystem, described task Issue and manage subsystem to be used to issue verification task to hand-held intelligent terminal, described task receives and data feedback subsystem According to acquisition on-site proving data and mission dispatching and management subsystem are fed back to, described mission dispatching and management subsystem pair On-site proving data are handled and managed.
2. a kind of electric energy meter field intellectuality verification system according to claim 1, it is characterised in that under described task Hair and management subsystem include:
Task accepts submodule:The module connects external system, for receiving the verification task of external system transmission, described inspection Determining task includes ammeter verification task data file;
Mission dispatching module:Sum is received for ammeter verification task data file to be sent to the task into hand-held intelligent terminal According to feedback subsystem;
On-site proving data reception module:The module is used to receive the on-site proving that task receives and data feedback subsystem feeds back Data simultaneously preserve;
Examine and determine report generation module:The module is used for according to each verification task and the generation inspection of corresponding on-site proving data Determine form;
Auditing module:The module is used to audit calibrating form and generates auditing result;
Final-period management module:The module is used to carry out verification task final-period management according to auditing result.
3. a kind of electric energy meter field intellectuality verification system according to claim 2, it is characterised in that described task connects Receive and data feedback subsystem includes:
Task receiving module:The module correspondingly connects mission dispatching module, and task receiving module receives ammeter verification task data File is simultaneously shown;
Data inputting sending module:The module correspondingly connects on-site proving data reception module, and data inputting sending module is used for On-site proving personnel's typing on-site proving Data Concurrent delivers to on-site proving data reception module.
4. a kind of electric energy meter field intellectuality verification system according to claim 2, it is characterised in that under described task Hair and management subsystem also include reservation management prompting module, and the reservation that the module with user examine and determine reservation for storage is believed Breath, while reservation management prompting module grows mission dispatching prompting message always according to reservation information, reminds administrative staff to issue inspection Determine task.
5. one kind carries out the intelligent inspection of electric energy meter field using electric energy meter field intellectuality verification system as claimed in claim 1 Fixed method, it is characterised in that this method comprises the following steps:
(1) mission dispatching and management subsystem obtain the verification task that external system is sent;
(2) mission dispatching and management subsystem judge whether verification task is outfield task, if then performing step (3);
(3) user's reservation, mission dispatching and management subsystem typing reservation information are carried out;
(4) mission dispatching and management subsystem receive according to reservation information to task and data feedback subsystem sends calibrating and appointed Business;
(5) on-site proving personnel carry out electric energy meter field calibrating and receive on-site proving data and data feedback by task System feedback is to mission dispatching and manages subsystem;
(6) mission dispatching and management subsystem generate calibrating form according to on-site proving data;
(7) calibrating form is audited, confirms to reply if auditing progress user and external system if, otherwise return to step (5) electric energy meter field calibrating is re-started.
CN201710287797.1A 2017-04-27 2017-04-27 A kind of electric energy meter field intellectuality verification system and method Pending CN107422293A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710287797.1A CN107422293A (en) 2017-04-27 2017-04-27 A kind of electric energy meter field intellectuality verification system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710287797.1A CN107422293A (en) 2017-04-27 2017-04-27 A kind of electric energy meter field intellectuality verification system and method

Publications (1)

Publication Number Publication Date
CN107422293A true CN107422293A (en) 2017-12-01

Family

ID=60424370

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710287797.1A Pending CN107422293A (en) 2017-04-27 2017-04-27 A kind of electric energy meter field intellectuality verification system and method

Country Status (1)

Country Link
CN (1) CN107422293A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109886426A (en) * 2018-07-24 2019-06-14 广东电网有限责任公司 A kind of intelligence inspection bench sheet of instruments system
CN109886425A (en) * 2018-07-24 2019-06-14 广东电网有限责任公司 A kind of with no paper electrical measurement inspection bench sheet of instruments system
CN110598901A (en) * 2019-07-31 2019-12-20 国网上海市电力公司 Electric energy meter application and calibration management system

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103679348A (en) * 2013-11-28 2014-03-26 国家电网公司 Operation-maintenance-integrated on-site data collection and feedback tour-inspection management system

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103679348A (en) * 2013-11-28 2014-03-26 国家电网公司 Operation-maintenance-integrated on-site data collection and feedback tour-inspection management system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张大维: "《电能表强检站专业化信息管理平台设计与实现》", 《中国优秀硕士学位论文全文数据库.信息科技辑》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109886426A (en) * 2018-07-24 2019-06-14 广东电网有限责任公司 A kind of intelligence inspection bench sheet of instruments system
CN109886425A (en) * 2018-07-24 2019-06-14 广东电网有限责任公司 A kind of with no paper electrical measurement inspection bench sheet of instruments system
CN110598901A (en) * 2019-07-31 2019-12-20 国网上海市电力公司 Electric energy meter application and calibration management system
CN110598901B (en) * 2019-07-31 2024-02-23 国网上海市电力公司 Electric energy meter correction management system

Similar Documents

Publication Publication Date Title
CN101144854B (en) Electrical energy metering automatic verification integrative management platform system
CN109325724A (en) Power engineering project quality in site receipt control method and system
CN110070343A (en) A kind of prospecting project management system and method
CN107422293A (en) A kind of electric energy meter field intellectuality verification system and method
CN108694649A (en) A kind of intellectual property trusteeship service platform
CN107517246A (en) Large-scale scientific research apparatus based on Internet of Things shares and on-line intelligence test system
CN109377180A (en) A kind of electric system industry expansion procedure information managing and control system
CN107067260A (en) Information management system and method
CN106960289B (en) A kind of special equipment inspection and detection system
CN109189844A (en) A kind of inspection examining report business management system
CN110188132A (en) A kind of method for interchanging data and system
CN110795422B (en) Data service management method and system
CN110490559A (en) A kind of mobile law enforcement inspection method, device, system and server
CN102043986A (en) Online processing system for abnormal electricity information transferring and application method of system
CN110149241A (en) A kind of automated testing method and storage medium based on IMS equipment
CN109164407A (en) A kind of electric energy metering device field test management system based on mobile job-oriented terminal
CN109064142A (en) Power engineering Project Management System based on J2EE platform
CN107563721A (en) Electric power meter field test integrated information management system and management method
CN107563671A (en) A kind of enterprise's test and appraisal planning service system based on internet
CN207473653U (en) The evaluation system of substation's O&M performance
CN115358706A (en) Cross-domain communication method based on government affair service cooperation technology and support system
CN107967600A (en) Comprehensive business management system based on cloud platform application
WO2009148894A1 (en) Systems and methods for valuation services information management
CN101140644A (en) INTEDNET professional technology qualification reporting system
CN113660553A (en) Positioning navigation centralized reading, operation and maintenance system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20171201