CN107420118A - A kind of roadway workface supporting construction - Google Patents

A kind of roadway workface supporting construction Download PDF

Info

Publication number
CN107420118A
CN107420118A CN201710729438.7A CN201710729438A CN107420118A CN 107420118 A CN107420118 A CN 107420118A CN 201710729438 A CN201710729438 A CN 201710729438A CN 107420118 A CN107420118 A CN 107420118A
Authority
CN
China
Prior art keywords
roadway
stalk
steel canopy
arch steel
roadway workface
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710729438.7A
Other languages
Chinese (zh)
Inventor
李风珍
王东
鲁伟
刘广金
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Science & Technology Research Co Ltd Of Shanxi Coal Transportation & Sales Group
JINNENG GROUP Co Ltd
Original Assignee
Science & Technology Research Co Ltd Of Shanxi Coal Transportation & Sales Group
JINNENG GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Science & Technology Research Co Ltd Of Shanxi Coal Transportation & Sales Group, JINNENG GROUP Co Ltd filed Critical Science & Technology Research Co Ltd Of Shanxi Coal Transportation & Sales Group
Priority to CN201710729438.7A priority Critical patent/CN107420118A/en
Publication of CN107420118A publication Critical patent/CN107420118A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/15Plate linings; Laggings, i.e. linings designed for holding back formation material or for transmitting the load to main supporting members
    • E21D11/152Laggings made of grids or nettings
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/18Arch members ; Network made of arch members ; Ring elements; Polygon elements; Polygon elements inside arches
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D21/00Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection

Abstract

The invention discloses a kind of roadway workface supporting construction, it is characterised in that:Including stalk arch steel canopy, wire netting and plank lagging, the uniform plank lagging on stalk arch steel canopy, steel wire is set on stalk arch steel canopy arch top.The present invention carries out supporting when roof wraps up in rubble in yellow mud to its roadway workface, and technology is reasonable, safe and efficient, and it can solve the problem that in alley way anchor host's Bracing Process, the problem of top plate drilling crevice water water yield is larger, and Anchor Agent Loss is serious, supporting effect is good;It can be widely used for coal road breaking roof, mining roadway and gib etc..

Description

A kind of roadway workface supporting construction
Technical field
The invention belongs to the technology category of well work mine laneway surrounding rock stability, and in particular to one kind is wrapped up in for coal seam yellow mud The roadway workface supporting construction of rubble top plate.
Background technology
It is mainly K2 limestone that, which there are some coalfields such as Qinshui coalfield 15# roofs in Shanxi, and thickness is 6 ~ 11m, is locally had False roof, directly top and base object model are K2 limestone, belong to Taiyuan group.When lid mountain thickness is less than 100m, Taiyuan Forma-tion Stratum is degraded, especially Lower and middle mountain areas, and Tu Liang and coombe development, cutting are deeper;K2 limestone is weak watery water-bearing layer, Top loose overburden pores'growth is caused, superficial part bedrock weathering zone rock fracture is developed, rock crushing, can in lower floor's limestone See small dissolution pore or corrosion fissure.By the affiliated Mount Huang of Shanxi coal transportation and sales group, the palm Shi Gou with and contain three mines exemplified by, K2 lime Rock top plate Karst Fissures are developed very much, and top plate is granular limestone, and the charges of Karst Fissures are yellow mud, overall to wrap up in rubble in yellow mud Shape, in mining roadway anchor host moves Bracing Process, top plate drilling crevice water water yield is larger, and Anchor Agent Loss is serious, The serious selection for restricting roadway workface support pattern, and then influence supporting effect of roadway;On the other hand, roadway workface has it Own characteristic, predominantly service time are shorter, mostly 5 ~ 11 months, and drift support type need not be excessively complicated.For coal seam Yellow mud wraps up in the own characteristic of this geological conditions of rubble top plate and roadway workface, invent a kind of technology it is reasonable, it is safe and efficient, The good roadway workface supporting construction of supporting effect seems very necessary.
The content of the invention
The object of the invention aims to solve the problem that coal seam yellow mud wraps up in the roadway workface support issues of rubble top plate, there is provided a kind of technology Rationally, the roadway workface supporting construction safe and efficient, supporting effect is good.
To reach above-mentioned purpose, the present invention uses following solution:A kind of roadway workface supporting construction, its feature exist In:Including stalk arch steel canopy, wire netting and plank lagging, the uniform plank lagging on stalk arch steel canopy, in stalk arch steel canopy Arch top sets steel wire.
The present invention is to propose a kind of roadway workface supporting construction, pin on the basis of the research of existing improving stability of surrounding rocks in roadway To the self-characteristic of coal seam K2 limestone roofs, effectively solve working face of coal seam roadway support issues.In roadway workface with adopting The crosspoint in area tunnel and connection roadway section, using stalk arched roof formula support pattern, by stalk arch steel canopy, wire netting and wood Backboard forms;In roadway workface section, when K2 limestone roofs are complete, using bolting with wire mesh mode, by anchor pole and bar-mat reinforcement Composition;When K2 limestone roofs wrap up in rubble in yellow mud, using stalk arched roof formula support pattern, by stalk arch steel canopy, iron wire Net and plank lagging composition.
Compared with prior art, the present invention has substantive distinguishing features following prominent and significant effect:
1st, the present invention includes stalk arch steel canopy, wire netting and plank lagging, when roof wraps up in rubble in yellow mud to its work Face tunnel carries out supporting, and technology is reasonable, safe and efficient, and can solve the problem that in alley way anchor host's Bracing Process, and top plate drilling splits The problem of gap swelling water is larger, and Anchor Agent Loss is serious, supporting effect is good.
2nd, coal road breaking roof, mining roadway and gib etc. be the composite can be widely applied to.
Brief description of the drawings
Fig. 1, the present invention structural representation.
Fig. 2, bolting with wire mesh structural representation.
In figure:1st, stalk arch steel canopy 2, wire netting 3, plank lagging 4, anchor pole 5, bar-mat reinforcement.
Embodiment
Below in conjunction with accompanying drawing, the present invention is further illustrated.
Embodiment 1:
The working face air intake crossheading of certain ore deposit 15# coal seams 15101, clear span 4.6m, clear height 5.0m, average lid mountain thickness 88m, air intake crossheading Being communicated with an exploiting field adhesive tape lane, air return way communicates with an exploiting field return airway, using sectional, based on bolting with wire mesh, stalk arch Supplemented by shape shed ding support, crossheading and mining roadway crosspoint section, using stalk arched roof formula supporting construction, support material is by straight Wall arch steel canopy 1, wire netting 2 and plank lagging 3 form;In air intake crossheading section, when K2 limestone roofs are complete, using anchor net branch Shield mode, support material are made up of anchor pole 4 and bar-mat reinforcement 5;When K2 limestone roofs wrap up in rubble in yellow mud, using stalk arched roof Formula support pattern, support material are made up of stalk arch steel canopy 1, wire netting 2 and plank lagging 3.
It is good to test supporting effect, solves the roadway workface branch that 15101 working face air intake crossheading mud wrap up in rubble top plate Shield problem.
Embodiment 2:
The working face haulage gate of certain ore deposit 15# coal seams 15101, clear span 5.0m, clear height 5.0m, average lid mountain thickness 20m are suitable transporting When groove K2 limestone roofs are complete, using bolting with wire mesh mode, support material is made up of anchor pole 4 and bar-mat reinforcement 5;K2 limestone top When plate wraps up in rubble in yellow mud, using stalk arched roof formula support pattern, support material is by stalk arch steel canopy 1, wire netting 2 and wood Backboard 3 forms, and efficiently solves the roadway workface support issues that 15101 working face haulage gate mud wrap up in rubble top plate.

Claims (1)

  1. A kind of 1. roadway workface supporting construction, it is characterised in that:Including stalk arch steel canopy, wire netting and plank lagging, straight Uniform plank lagging on wall arch steel canopy, steel wire is set on stalk arch steel canopy arch top.
CN201710729438.7A 2017-08-23 2017-08-23 A kind of roadway workface supporting construction Pending CN107420118A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710729438.7A CN107420118A (en) 2017-08-23 2017-08-23 A kind of roadway workface supporting construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710729438.7A CN107420118A (en) 2017-08-23 2017-08-23 A kind of roadway workface supporting construction

Publications (1)

Publication Number Publication Date
CN107420118A true CN107420118A (en) 2017-12-01

Family

ID=60435121

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710729438.7A Pending CN107420118A (en) 2017-08-23 2017-08-23 A kind of roadway workface supporting construction

Country Status (1)

Country Link
CN (1) CN107420118A (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201254995Y (en) * 2008-07-24 2009-06-10 义马煤业(集团)有限责任公司 U-shaped composite supporting construction for tunnel
CN102182498A (en) * 2011-03-23 2011-09-14 彬县水帘洞煤炭有限责任公司 Comprehensive laneway-supporting method for cracked area in coal mine
CN105134269A (en) * 2015-08-17 2015-12-09 河南理工大学 Control technology for roadway surrounding rock achieving cooperative load bearing by enabling anchor cables to penetrate through sheds

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201254995Y (en) * 2008-07-24 2009-06-10 义马煤业(集团)有限责任公司 U-shaped composite supporting construction for tunnel
CN102182498A (en) * 2011-03-23 2011-09-14 彬县水帘洞煤炭有限责任公司 Comprehensive laneway-supporting method for cracked area in coal mine
CN105134269A (en) * 2015-08-17 2015-12-09 河南理工大学 Control technology for roadway surrounding rock achieving cooperative load bearing by enabling anchor cables to penetrate through sheds

Similar Documents

Publication Publication Date Title
WO2020192055A1 (en) Two-step grouting modified water-protective coal mining method for roof aquifers
CN101122235B (en) Method for controlling wall rock of fully mechanized coal face goaf side coalbed laneway
CN103147761B (en) Filling mining method of gently inclined thin mineral deposit with soft roof
CN105971606B (en) A kind of thick sandstone coal wall recovery method
CN104763434B (en) A kind of without coal column double lanes driving method
CN102720498B (en) Gob-side entry retaining mining process for coal face
CN104763425A (en) Pressure relief presplitting blasting gob-side entry retaining pillar-free mining method
AU2013354613A1 (en) Method of local filling to control surface subsidence in worked-out area
CN102587914A (en) Strip-type Wongawilli mining method of coal buried under building
WO2017101634A1 (en) Fully mechanized mining-filling mixed mining working face filling section length determination method
CN103397905A (en) System and method for achieving natural striding, falling and filling of coal beds, flexible roadway protection and complete gob-side entry retaining
CN109595029B (en) Goaf partial stowage supporting structure and its construction method under the conditions of tight roof
CN104481568A (en) Fully mechanized caving face gob-side entry retaining process and ventilating method
CN104806285A (en) Coal mine goaf gas control method based on ground horizontal well
CN101302931A (en) Method for extracting rim angle coal and re-extracting after warehouse coal extracting
CN108266189A (en) A kind of lane top Tunnelling Along Goaf goaf isolation method
CN105673014A (en) Method for controlling rock burst of hard roof jump mining working face
CN110410076A (en) A kind of filling mining method for leaving Pillar Recovery for old pillars of a house goaf
CN103982186B (en) The vertical Inclined strips sublevel caving of oper cylinler retrusive
CN102900449A (en) Support method for underground goaf roof of coal mine
CN106988760A (en) Facility-sliding strata tunnel portal reinforcing construction and construction method
CN103557001B (en) A kind of low section high oper cylinler shrink afterwards filling mining method
CN104863588A (en) Advanced pier column pre-arranging gob-side entry retaining method
CN102418528B (en) End ore-drawing caving mining technology with steel concrete composite man-made false roofs
CN101139930A (en) High-route to lower route method for lowering top board beforehand

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20171201