CN107394622A - A kind of new prefabricated cabin formula transformer - Google Patents

A kind of new prefabricated cabin formula transformer Download PDF

Info

Publication number
CN107394622A
CN107394622A CN201710635597.0A CN201710635597A CN107394622A CN 107394622 A CN107394622 A CN 107394622A CN 201710635597 A CN201710635597 A CN 201710635597A CN 107394622 A CN107394622 A CN 107394622A
Authority
CN
China
Prior art keywords
interval
transformer
disconnecting switch
bus
switch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710635597.0A
Other languages
Chinese (zh)
Inventor
徐海洋
王媛
孙文川
孙卫东
胡兴旺
刘仕栋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Linyi Beyond Power Construction Co Ltd
State Grid Corp of China SGCC
Linyi Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
Linyi Beyond Power Construction Co Ltd
State Grid Corp of China SGCC
Linyi Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Linyi Beyond Power Construction Co Ltd, State Grid Corp of China SGCC, Linyi Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical Linyi Beyond Power Construction Co Ltd
Priority to CN201710635597.0A priority Critical patent/CN107394622A/en
Publication of CN107394622A publication Critical patent/CN107394622A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02BBOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
    • H02B1/00Frameworks, boards, panels, desks, casings; Details of substations or switching arrangements
    • H02B1/26Casings; Parts thereof or accessories therefor
    • H02B1/46Boxes; Parts thereof or accessories therefor
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02BBOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
    • H02B1/00Frameworks, boards, panels, desks, casings; Details of substations or switching arrangements
    • H02B1/20Bus-bar or other wiring layouts, e.g. in cubicles, in switchyards
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02BBOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
    • H02B1/00Frameworks, boards, panels, desks, casings; Details of substations or switching arrangements
    • H02B1/26Casings; Parts thereof or accessories therefor
    • H02B1/46Boxes; Parts thereof or accessories therefor
    • H02B1/48Mounting of devices therein
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02BBOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
    • H02B13/00Arrangement of switchgear in which switches are enclosed in, or structurally associated with, a casing, e.g. cubicle
    • H02B13/02Arrangement of switchgear in which switches are enclosed in, or structurally associated with, a casing, e.g. cubicle with metal casing
    • H02B13/035Gas-insulated switchgear

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Gas-Insulated Switchgears (AREA)

Abstract

The present invention discloses a kind of new prefabricated cabin formula transformer, including prefabricated box, line interval and survey guarantor interval, and two days parallel bus, the interval includes cable termination, inlet wire interval and main transformer interval, first bus isolating switch, the first disconnecting switch, the second disconnecting switch, transformer one, breaker one, arrester, the prefabricated cabin formula transformer station realize insulation using external thermal insulation.Its is safe to use, operating efficiency is high, and application prospect is preferable.

Description

A kind of new prefabricated cabin formula transformer
Technical field
The present invention relates to high-voltage electrical equipment field, more particularly to a kind of new prefabricated cabin formula transformer.
Background technology
Prefabricated cabin formula combination secondary device is by groups such as nacelle, nacelle auxiliary equipment, secondary device screen cabinet, secondary devices Into.Prefabricated cabin completes the work such as related layouts, debugging in factory, is transported as an entirety to job site, nearby It is arranged near primary equipment, completes connection and debugging with primary equipment.Prefabricated cabin formula combine secondary device appearance, be for Meet the management philosophy of intelligent substation and the requirements at the higher level of construction mode.Therefore, it is secondary actively to promote the combination of prefabricated cabin formula Equipment, life cycle management cost of investment can be effectively reduced, shorten the construction period, improve engineering construction quality.
Transformer station generally includes transformer, switch cubicle, linear quadratic control equipment and gas-insulating and fully-enclosed combined electrical apparatus(Gas Insulated Substation, hereinafter referred to as:GIS combination electric appliance)Deng electric equipment;Wherein, GIS combination electric appliance generally includes The charging members such as breaker, disconnecting switch, earthed switch, transformer, arrester, bus and cable termination, above-mentioned charging member Optimized design is closed by metallic conduit, and the SF6 insulating gas filled with certain pressure in the metallic conduit of closing.Generally In the case of, GIS combination electric appliance can be provided with multigroup inlet wire interval and main transformer interval, be commonly connected to one or two buses On, bus section is connected using at least one set of mother section gap, also, each section of bus is correspondingly arranged on segmentation and surveyed between guarantor Every;Wherein, inlet wire interval generally includes corresponding cable termination, disconnecting switch, earthed switch, transformer, breaker and taken shelter from the thunder Device, main transformer interval generally include cable termination, disconnecting switch and earthed switch, and segmentation, which surveys to protect to be spaced, includes disconnecting switch and mutual inductance Device, section gap include breaker, disconnecting switch, transformer;The cable termination at inlet wire interval introduces high-tension electricity, and between main transformer Every high-tension electricity is delivered into transformer.GIS combination electric appliance of the prior art generally sets a longer bus, multipair inlet wire Interval and main transformer interval and segmentation are surveyed guarantor interval and are connected to by respective disconnecting switch on bus so that GIS combination electric appliance Fish bayonet fittings are integrally formed, this make it that the width dimensions of GIS combination electric appliance are larger, can not realize that prefabricated cabin formula is arranged, and It is not readily transportable.
Prefabricated cabin formula combination secondary device scheme is applied among multiple pilot projects of Guo Wang companies, and its technology obtains Rapid Popularization and development.But produced problem in many practices is at the same time also exposed, is mainly reflected in following several Individual aspect 1) at present most of prefabricated cabin still use old-fashioned screen cabinet, cause nacelle and screen cabinet repetition;2)Protective treatment, enter cabin behaviour Make, screen cabinet specification is not easy unification between producer.3) space is limited in cabin, if secondary device shields space in cabinet by interval group screen Utilization rate is low, and screen cabinet quantity is more, influences space in cabin.4) space at present in secondary device cabin is generally narrow and small, it has not been convenient to safeguards With operation.5) reorganization and expansion complex operation at a specified future date, difficulty of construction are big eventually for prefabricated cabin formula combination secondary device.6) temperature control system needs excellent Change, industrial air-conditioning noise is larger, and temperature control effect is poor, is also easy to produce dew condensation phenomenon.Therefore, intelligent substation is built to existing moduleization Prefabricated cabin formula combination secondary device scheme redesigns and optimization, the application to promoting prefabricated cabin formula combination secondary device, improves The constructing benefits of intelligent substation have great significance.
The content of the invention
It is an object of the invention to overcome the shortcomings of the prior art, due to being limited by traffic condition, prefabricated cabin is usual Using inside holding mode, inner thermal insulating layer is generally combined into one with interior finish material, however, the casing of inside holding form easily occurs Heat bridge phenomenon prevents condensation and mouldy influence normal operation, it is necessary to handle.The application is realized using external thermal insulation.
Provide following technical scheme:
Interval, and two days parallel bus, institute are protected in a kind of new prefabricated cabin formula transformer, including prefabricated box, line interval and survey Stating interval includes cable termination, inlet wire interval and main transformer interval, the first bus isolating switch, the first disconnecting switch, the second isolation Switch, transformer one, breaker one, arrester, the cable termination and the transformer one are kept apart with described first respectively Connection is connect, and the breaker one is connected between the transformer one and second disconnecting switch;The guarantor interval of surveying includes Second bus isolating switch and the second transformer, bus connects the first bus isolating switch again and second bus is kept apart Close.The main transformer interval includes outlet cable terminal and disconnecting switch three, and the outlet cable terminal passes through the disconnecting switch Three are connected with disconnecting switch two;The segmentation survey guarantor interval includes a mother section gap and two surveys are protected and are spaced, the mother Connection section gap includes breaker two, transformer two and two disconnecting switch four, the breaker two and the transformer two-phase Connect, the breaker two and the transformer two are connected between two disconnecting switch four, and described survey protects interval bag The transformer three to link together and disconnecting switch five are included, the disconnecting switch five connects with the corresponding disconnecting switch four; Be provided between inlet-outlet line interval described in two adjacent groups it is described segmentation survey protect interval, the disconnecting switch two by bus with it is corresponding The disconnecting switch four connect, the inlet-outlet line interval, it is described segmentation survey protect interval and the bus formed linear structure, institute State inlet-outlet line interval, guarantor interval is surveyed in the segmentation and the bus is located in the prefabricated box.
The insulation construction of the transformer realized using external thermal insulation, the external heat insulating wall by golden nation's plate, breathing paper, Rock wool, Europe deals composition.
The advantages of the present invention are:
Advantages of the present invention and positive performance are:Transformer station provided by the invention, by by the inlet wire interval in same group and master Changing distance is uniformly connected on bus again after linking together so that bus interruption is set, and bus is by every group of inlet-outlet line interval with dividing Section, which is surveyed, protects interval connection so that overall structure is in linear structure, without being arranged side by side in the both sides of same root bus between inlet wire Surveyed every, main transformer interval and segmentation and protect interval so that prefabricated cabin formula GIS combination electric appliance whole width size reduces, and meets prefabricated cabin Formula arrangement requirement so that prefabricated cabin formula GIS combination electric appliance is easy to whole Transporting.Simultaneously as bus is set for interruption, effectively Reduce the usage amount of bus, reduce the manufacturing cost of prefabricated cabin formula GIS combination electric appliance.
In order that those skilled in the art more fully understand the technical scheme in the application, have below in conjunction with the application Body embodiment, the technical scheme of the application is clearly and completely described, it is clear that described embodiment is only this Shen Please part of the embodiment, rather than whole embodiment.Based on the embodiment in the application, those of ordinary skill in the art are not having There is the every other embodiment made and obtained under the premise of creative work, should all belong to the scope of protection of the invention.
Embodiment
Embodiment 1
Interval, and two days parallel bus, institute are protected in a kind of new prefabricated cabin formula transformer, including prefabricated box, line interval and survey Stating interval includes cable termination, inlet wire interval and main transformer interval, the first bus isolating switch, the first disconnecting switch, the second isolation Switch, transformer one, breaker one, arrester, the cable termination and the transformer one are kept apart with described first respectively Connection is connect, and the breaker one is connected between the transformer one and second disconnecting switch;The guarantor interval of surveying includes Second bus isolating switch and the second transformer, bus connects the first bus isolating switch again and second bus is kept apart Close.The main transformer interval includes outlet cable terminal and disconnecting switch three, and the outlet cable terminal passes through the disconnecting switch Three are connected with disconnecting switch two;The segmentation survey guarantor interval includes a mother section gap and two surveys are protected and are spaced, the mother Connection section gap includes breaker two, transformer two and two disconnecting switch four, the breaker two and the transformer two-phase Connect, the breaker two and the transformer two are connected between two disconnecting switch four, and described survey protects interval bag The transformer three to link together and disconnecting switch five are included, the disconnecting switch five connects with the corresponding disconnecting switch four; Be provided between inlet-outlet line interval described in two adjacent groups it is described segmentation survey protect interval, the disconnecting switch two by bus with it is corresponding The disconnecting switch four connect, the inlet-outlet line interval, it is described segmentation survey protect interval and the bus formed linear structure, institute State inlet-outlet line interval, guarantor interval is surveyed in the segmentation and the bus is located in the prefabricated box;
The insulation construction of the transformer realizes that the external heat insulating wall is by golden nation's plate, breathing paper, rock using external thermal insulation Cotton, Europe deals composition.
Finally it should be noted that:Obviously, above-described embodiment is only intended to clearly illustrate example of the present invention, and simultaneously The non-restriction to embodiment.For those of ordinary skill in the field, can also do on the basis of the above description Go out other various forms of changes or variation.There is no necessity and possibility to exhaust all the enbodiments.And thus drawn Among the obvious changes or variations that Shen goes out is still in protection scope of the present invention.

Claims (1)

1. interval, and two days parallel bus are protected in a kind of new prefabricated cabin formula transformer, including prefabricated box, line interval and survey, The interval includes cable termination, inlet wire interval and main transformer interval, the first bus isolating switch, the first disconnecting switch, second every Pass, transformer one, breaker one, arrester are left, the cable termination and the transformer one are isolated with described first respectively Switch connection, the breaker one are connected between the transformer one and second disconnecting switch;Described survey protects interval bag Include the second bus isolating switch and the second transformer, bus connects the first bus isolating switch again and second bus is kept apart Close;The main transformer interval includes outlet cable terminal and disconnecting switch three, and the outlet cable terminal passes through the disconnecting switch Three are connected with disconnecting switch two;The segmentation survey guarantor interval includes a mother section gap and two surveys are protected and are spaced, the mother Connection section gap includes breaker two, transformer two and two disconnecting switch four, the breaker two and the transformer two-phase Connect, the breaker two and the transformer two are connected between two disconnecting switch four, and described survey protects interval bag The transformer three to link together and disconnecting switch five are included, the disconnecting switch five connects with the corresponding disconnecting switch four; Be provided between inlet-outlet line interval described in two adjacent groups it is described segmentation survey protect interval, the disconnecting switch two by bus with it is corresponding The disconnecting switch four connect, the inlet-outlet line interval, it is described segmentation survey protect interval and the bus formed linear structure, institute State inlet-outlet line interval, guarantor interval is surveyed in the segmentation and the bus is located in the prefabricated box;
The insulation construction of the transformer realizes that the external heat insulating wall is by golden nation's plate, breathing paper, rock using external thermal insulation Cotton, Europe deals composition.
CN201710635597.0A 2017-07-31 2017-07-31 A kind of new prefabricated cabin formula transformer Pending CN107394622A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710635597.0A CN107394622A (en) 2017-07-31 2017-07-31 A kind of new prefabricated cabin formula transformer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710635597.0A CN107394622A (en) 2017-07-31 2017-07-31 A kind of new prefabricated cabin formula transformer

Publications (1)

Publication Number Publication Date
CN107394622A true CN107394622A (en) 2017-11-24

Family

ID=60342944

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710635597.0A Pending CN107394622A (en) 2017-07-31 2017-07-31 A kind of new prefabricated cabin formula transformer

Country Status (1)

Country Link
CN (1) CN107394622A (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204118570U (en) * 2014-09-30 2015-01-21 青岛特锐德电气股份有限公司 Double-bus formula prefabricated cabin formula GIS combination electric appliance and prefabricated cabin formula transformer station
CN103944099B (en) * 2014-05-09 2016-03-09 青岛特锐德电气股份有限公司 Prefabricated cabin formula GIS combination electric appliance and prefabricated cabin formula transformer station

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103944099B (en) * 2014-05-09 2016-03-09 青岛特锐德电气股份有限公司 Prefabricated cabin formula GIS combination electric appliance and prefabricated cabin formula transformer station
CN204118570U (en) * 2014-09-30 2015-01-21 青岛特锐德电气股份有限公司 Double-bus formula prefabricated cabin formula GIS combination electric appliance and prefabricated cabin formula transformer station

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张元等: "二次设备预制舱保温结构设计", 《湖南电力》 *

Similar Documents

Publication Publication Date Title
CN101662132B (en) 110kV/220kV voltage level composite apparatus and application thereof
CN104124632B (en) Combined intelligent transformer station
CN206727507U (en) One kind is based on new energy booster stations modular transformer substation
CN101207267B (en) Miniaturization premounting type transformer substation with safeguard construction
CN104821490B (en) A kind of 500kV HGIS power distribution equipment arrangement
CN201430367Y (en) 110kV/ 220kV voltage class gas insulated switchgear
CN107317226A (en) A kind of transformer station's general electric arrangement structure
CN204144762U (en) Combined intelligent transformer station
CN204732755U (en) A kind of frame-type transformer station
CN107394622A (en) A kind of new prefabricated cabin formula transformer
CN106451168A (en) Prefabricated intelligent traction substation
CN205680993U (en) 66KV indoor intelligent substation modular construction is arranged
CN107196226A (en) 110kV prefabricated cabin formula GIS combination electric appliances
CN209603568U (en) Compound substation
Wang et al. The electric energy loss in overhead ground wires of 110kV six-circuit transmission line on the same tower
CN205303956U (en) Automatic switching compensation cabinet mounting structure divides into groups
CN201122806Y (en) Optimized arrangement structure of city 220KV center transforming plant
CN209544834U (en) 220kV double space modular HGIS electric wiring device
CN207518166U (en) Power plant 1000kV outlet grade transmitting system mounting structures
Chen et al. Research on Key Technology and Technical and Economic Indicators of 220kV Prefabricated Cabin Substation
CN102176612A (en) Console type alternative current intelligent switch cubicle
CN202997406U (en) Armored metal-enclosed switch cabinet with transformer chamber
CN202586129U (en) 110kV combination electric appliance GIS applied to integrated, prefabricated and box type substation
CN105356306A (en) Mounting structure for grouping automatic switching compensation cabinet
CN206992496U (en) A kind of transformer station's general electric arrangement structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20171124