CN107392978A - Oil development method and apparatus - Google Patents

Oil development method and apparatus Download PDF

Info

Publication number
CN107392978A
CN107392978A CN201710441073.8A CN201710441073A CN107392978A CN 107392978 A CN107392978 A CN 107392978A CN 201710441073 A CN201710441073 A CN 201710441073A CN 107392978 A CN107392978 A CN 107392978A
Authority
CN
China
Prior art keywords
oil well
current
target parameter
production target
classification chart
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710441073.8A
Other languages
Chinese (zh)
Inventor
甘俊奇
孔凡忠
王俊文
周杨
任艳斌
修增鹏
李斌
王正来
李全
李殿波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Natural Gas Co Ltd
Original Assignee
China Petroleum and Natural Gas Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Natural Gas Co Ltd filed Critical China Petroleum and Natural Gas Co Ltd
Priority to CN201710441073.8A priority Critical patent/CN107392978A/en
Publication of CN107392978A publication Critical patent/CN107392978A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T11/002D [Two Dimensional] image generation
    • G06T11/20Drawing from basic elements, e.g. lines or circles
    • G06T11/206Drawing of charts or graphs
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation

Abstract

The invention provides a kind of oil development method and apparatus, wherein, this method includes:Obtain multiple production target parameter values of each oil well in multiple oil wells;Following operation is performed to each oil well, to obtain oil well classification chart corresponding to each oil well:Centered on the center of current oil well, using the delineation boundary of determination as border, the regional extent of current oil well is generated on graphing is treated, to generate oil well classification chart corresponding to current oil well;Intuitively comparing is carried out to multiple production target parameter values using oil well classification chart corresponding to multiple oil wells, and according to comparative result, instructs oil development.In embodiments of the present invention, it intuitively can rapidly read out multigroup production target parameter value of different oil wells, intuitively compare the quality of the oil well production index of different times, solve in the prior art the parameter value reading process caused by needing repeatedly to draw image corresponding to various production target parameter values is excessively cumbersome the defects of, improve oil development efficiency.

Description

Oil development method and apparatus
Technical field
The present invention relates to technical field of geological exploration, more particularly to a kind of oil development method and apparatus.
Background technology
During oil development, the production target parameter value of acquired multiple oil wells is painted during by exploitation System, can quickly read out substantial amounts of oil well information and subsurface reservoir information.Such as:Comparative analysis difference oil well can be passed through Different times oil well production index so that it is determined that going out the physical property of reservoir, elastic lapse rate, natural energy size and moisture content Situations such as, so as to reflect the production status of different oil wells and geologic development potentiality.
At present, when classification shows the production target of oil well, a graphing can normally only read out single production Index parameter value.Thus, when needing to contrast a variety of oil well production indexs of multiple oil wells, then need to draw the life of each oil well The image corresponding to index is produced, by contrasting image of each oil well under each oil well production index, so as to select The oil well needed, above-mentioned means are comparatively laborious, it is impossible to directly perceived quickly to read out required result.
In view of the above-mentioned problems, not yet propose effective solution at present.
The content of the invention
The invention provides a kind of oil development method and apparatus, to reach, directly perceived rapidly to read out different oil wells multigroup The purpose of production target parameter value.
The embodiments of the invention provide a kind of oil development method, can include:Obtain each oil well in multiple oil wells Multiple production target parameter values, wherein, the production target parameter includes:First production target parameter, the second production target ginseng Number and third production index parameter;Following operation is performed to each oil well in the multiple oil well, to obtain each oil Oil well classification chart corresponding to well:Using the first production target parameter as the abscissa for treating graphing, with the described second life Production index parameter treats the ordinate of graphing as described in, is given birth to according to the first production target parameter value of current oil well and second Production index parameter value is treated to determine position corresponding to the current oil well in graphing described, and the position of determination is made For the center of the current oil well;Delineation boundary is determined according to the third production index parameter value of the current oil well;With Centered on the center of the current oil well, using the delineation boundary of determination as border, treat to generate institute on graphing described The regional extent of current oil well is stated, to generate oil well classification chart corresponding to the current oil well;It is corresponding using the multiple oil well Oil well classification chart intuitively comparing is carried out to the multiple production target parameter value, and according to comparative result, carry out oil development.
In one embodiment, centered on the center of the current oil well, using the delineation boundary of determination as border, In the regional extent for treating to generate the current oil well on graphing, classified with oil well corresponding to generating the current oil well Figure, can include:Centered on the center of the current oil well, using the delineation boundary of the determination as radius, described Treat to generate the border circular areas scope of the current oil well on graphing, classified with oil well corresponding to generating the current oil well Figure.
In one embodiment, centered on the center of the current oil well, using the delineation boundary of determination as border, In the regional extent for treating to generate the current oil well on graphing, classified with oil well corresponding to generating the current oil well Figure, can include:Centered on the center of the current oil well, using the delineation boundary of the determination as the length of side, described Treat to generate the regular polygon regional extent of the current oil well on graphing, to generate oil well point corresponding to the current oil well Class figure.
In one embodiment, centered on the center of the current oil well, using the delineation boundary of determination as border, In the regional extent for treating to generate the current oil well on graphing, classified with oil well corresponding to generating the current oil well Figure, can include:Centered on the center of the current oil well, using the delineation boundary of the determination as diagonal, in institute The regular polygon regional extent for treating that the current oil well is generated on graphing is stated, to generate oil well corresponding to the current oil well Classification chart.
In one embodiment, the production target parameter can also include:4th production target parameter, wherein, it is described 4th production target parameter is recorded in the centre bit of the regional extent of the current oil well by way of word and/or numeral Put.
In one embodiment, the production target parameter type can include but is not limited at least one of:Daily output Oil, tired oil-producing, moisture content, the time that brings in, well-name, daily output liquid, tired production liquid and tired production water.
The embodiment of the present invention additionally provides a kind of oil development device, can include:Parameter value acquisition module, can be used for Multiple production target parameter values of each oil well in multiple oil wells are obtained, wherein, the production target parameter includes:First production Index parameter, the second production target parameter and third production index parameter;Classification chart drafting module, for the multiple oil well In each oil well perform following operation, to obtain oil well classification chart corresponding to each oil well:Referred to the described first production It is to treat the abscissa of graphing to mark parameter, treats the ordinate of graphing, root as described in using the second production target parameter Treat to determine institute in graphing described according to the first production target parameter value and the second production target parameter value of current oil well State position corresponding to current oil well, and the center using the position of determination as the current oil well;According to described current The third production index parameter value of oil well determines delineation boundary;Centered on the center of the current oil well, with determination Delineation boundary is border, in the regional extent for treating to generate the current oil well on graphing, to generate the current oil Oil well classification chart corresponding to well;Oil development module, it can be used for using oil well classification chart corresponding to the multiple oil well to institute State multiple production target parameter values and carry out intuitively comparing, and guiding improves oil development effect.
In one embodiment, the classification chart drafting module can be used for the center using the current oil well in The heart, using the delineation boundary of the determination as radius, in the border circular areas model for treating to generate the current oil well on graphing Enclose, to generate oil well classification chart corresponding to the current oil well.
In one embodiment, the classification chart drafting module can be used for the center using the current oil well in The heart, using the delineation boundary of the determination as the length of side, in the regular polygon area for treating to generate the current oil well on graphing Domain scope, to generate oil well classification chart corresponding to the current oil well.
In one embodiment, the classification chart drafting module can be used for the center using the current oil well in The heart, using the delineation boundary of the determination as diagonal, in the regular polygon for treating to generate the current oil well on graphing Regional extent, to generate oil well classification chart corresponding to the current oil well.
In embodiments of the present invention, it is proposed that a kind of new oil well classification drawing drawing method, can from the oil well classification chart To read out multigroup production target parameter value, i.e. depict multigroup production target parameter value in the oil well classification chart:First production Index parameter value, the second production target parameter value, third production index parameter value.Pass through the first production target parameter value, second Production target parameter value determines position corresponding to current oil well in graphing is treated;It is true according to third production index parameter value Determine delineation boundary;Then, above rheme is set to center, using above-mentioned delineation boundary as border, generates the regional extent of current oil well, To generate oil well classification chart corresponding to current oil well, and developed.Further, above-mentioned oil well classification chart can also draw Four production target parameter values, the 4th production target parameter value can be recorded in current oil by way of word and/or numeral The center of the regional extent of well.From the oil well classification chart, multigroup life of different oil wells intuitively can be rapidly read out Index parameter value is produced, intuitively compares the quality of the oil well production index of different times, solves in the prior art due to needs The defects of parameter value reading process corresponding to various production target parameter values caused by image is excessively cumbersome is repeatedly drawn, is improved Oil development efficiency.
Brief description of the drawings
, below will be to embodiment or existing in order to illustrate more clearly of the embodiment of the present application or technical scheme of the prior art There is the required accompanying drawing used in technology description to be briefly described, it should be apparent that, drawings in the following description are only this Some embodiments described in application, for those of ordinary skill in the art, do not paying the premise of creative labor Under, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is a kind of flow chart for oil development method that the application provides;
Fig. 2 is oil well classification chart corresponding to moisture content at initial stage that the application provides;
Fig. 3 is oil well classification chart corresponding to the tired oil-producing of the application offer;
Fig. 4 is a kind of structured flowchart for oil development device that the application provides.
Embodiment
In order that those skilled in the art more fully understand the technical scheme in the application, it is real below in conjunction with the application The accompanying drawing in example is applied, the technical scheme in the embodiment of the present application is clearly and completely described, it is clear that described implementation Example only some embodiments of the present application, rather than whole embodiments.It is common based on the embodiment in the application, this area The every other embodiment that technical staff is obtained under the premise of creative work is not made, it should all belong to the application protection Scope.
When carrying out oil development in view of the oil well classification chart drawn in the prior art using oil well production index parameter value, Because a graphing is only capable of reading out single production target parameter value, thus ought need to analyze multiple parameter values When, it is necessary to draw multiple graphings, the defects of analysis means are comparatively laborious, inventors herein proposing can draw in a figure A kind of method of multiple parameters, specifically, oil well sorting technique is proposed, as shown in figure 1, may comprise steps of:
S101:Obtain multiple production target parameter values of each oil well in multiple oil wells.
In the present embodiment, the production target parameter type can include but is not limited at least one of:Day oil-producing, Tired oil-producing, moisture content, the time that brings in, well-name, daily output liquid, tired production liquid and tired production water, and these above-mentioned parameter types Statistical value, such as:Average annual statistical value, monthly statistical value or average daily statistical value etc..Wherein, what daily output liquid referred to can be a day oil-producing With daily output water quality and.Tired production liquid also refer to produce daily the cumulative of liquid and.Tired production water also refers to produce the cumulative of water daily With.
In one embodiment of the application, multiple production target parameters of each oil well in multiple oil wells can be obtained Value, wherein, above-mentioned production target parameter can include:First production target parameter, the second production target parameter and third production Index parameter.When the production target parameter of acquisition is three, then the oil well classification chart drawn out according to the application can To read out above three production target parameter.
For example, can obtain each oil well day at initial stage oil-producing, bring in time and average annual day oil-producing at initial stage.Its In, day at initial stage oil-producing also refer to bring in the average day oil-producing of first month, can also refer to bringing in first three Individual month day the respective average peak of oil-producing.Specifically can be depending on research object from which above-mentioned concept.According to these three Parameter draws obtained oil well classification chart, intuitively can rapidly read out these three parameter values and be compared.
In another embodiment of the application, above-mentioned production target parameter can include:First production target parameter, Two production target parameters and third production index parameter, can also include:4th production target parameter.
For example, when discussing oil well classification chart corresponding to moisture content at initial stage of multiple oil wells, each oil well can be obtained Initial stage moisture content, the time that brings in, average annual moisture content at initial stage and well-name.Wherein, initial stage, moisture content also referred to oil well The average moisture content of operation first month, can also refer to bringing in first trimester moisture content each average peak. Specifically can be depending on research object from which above-mentioned concept.The oil well classification chart for drawing to obtain according to this four parameters, can Intuitively rapidly to read out this four parameter values and be compared.
Further, above-mentioned first production target parameter, the second production target parameter, third production index parameter and Four production target parameters can be the parameter determined according to the actual requirements, can be identical parameter or different ginsengs Number, the application are not construed as limiting to this.
In this application, by obtaining multiple production target parameter values of each oil well in multiple oil wells, so as to for The drafting for being carried out oil well classification chart using these production target parameter values afterwards is laid the first stone.
S102:Following operation is performed to each oil well in multiple oil wells, is classified with obtaining oil well corresponding to each oil well Figure:Centered on the center of current oil well, using the delineation boundary of determination as border, current oil is generated on graphing is treated The regional extent of well, to generate oil well classification chart corresponding to current oil well.
In the present embodiment, following operation can be performed to each oil well in multiple oil wells, to obtain each oil well pair The oil well classification chart answered:
S2-1:Using the first production target parameter as the abscissa for treating graphing, using the second production target parameter as The ordinate of graphing is treated, is waiting to paint according to the first production target parameter value of current oil well and the second production target parameter value Position corresponding to current oil well, and the center using the position of determination as current oil well are determined in drawing shape.
S2-2:Delineation boundary is determined according to the third production index parameter value of current oil well.
S2-3:Centered on the center of current oil well, using the delineation boundary of determination as border, on graphing is treated The regional extent of current oil well is generated, to generate oil well classification chart corresponding to current oil well.
In this application, determined to treat the horizontal stroke of graphing respectively according to the first production target and the second production target After coordinate and ordinate, the two can be determined according to first production target parameter the second production target parameter of acquisition Position of the parameter in graphing is treated, and the center using the position as current oil well.Third production index is joined again Several divided by default scale parameter is so that it is determined that delineation boundary.Wherein, above-mentioned default ratio is according to the multiple of each oil well 4th production target parameter value, treat the length of abscissa and ordinate determination in graphing.Determining above-mentioned center After position and delineation boundary, can centered on the center of current oil well, using the delineation boundary of determination as border, Treat to generate the regional extent of current oil well on graphing, to generate oil well classification chart corresponding to current oil well.At this point it is possible to root The size of above-mentioned third production index parameter value is determined according to the regional extent of the current oil well generated.
In one embodiment of the application, oil well classification chart corresponding to current oil well is obtained drawing through the above way Afterwards, the 4th can also be recorded in the center of the regional extent of the current oil well by way of word and/or numeral Production target parameter, such as well-name, bring in time production target parameter.
In one embodiment of the application, after above-mentioned center and delineation boundary is determined, can with work as Centered on the center of preceding oil well, using the delineation boundary of determination as radius, the circle of current oil well is generated on graphing is treated Shape regional extent, to generate oil well classification chart corresponding to current oil well.
For example, when drawing in S101 oil well classification chart corresponding to moisture content at initial stage, moisture content at initial stage herein can refer to Bring in the average moisture content of first month.From S101:Initial stage, the oil well classification chart of moisture content can include:Oil well is thrown Produce time, well-name, moisture content at initial stage and average annual moisture content at initial stage this four production target parameters.Initial stage as shown in Figure 2 contains Oil well classification chart corresponding to water rate is understood:Abscissa can represent the time in Fig. 2, i.e. bring in the time;Ordinate can be with table Show moisture content at initial stage, scale interval can choose any value needed according to actual conditions, can be 10%, 20% etc..Root The well point position of oil well is determined according to the combination of the abscissa and ordinate, and pound sign is marked in the side of well point position.Again will The average annual moisture content divided by a certain fixed numbers M at initial stage of all multiple oil wells, obtain a numerical value and be used as radius, using well point to justify The heart, drawn and justified with the radius, the size of the circle characterizes the average annual moisture content at initial stage of the well, and the figure for drawing to obtain is each oil The initial stage of well oil well classification chart corresponding to moisture content.
According to oil well classification chart corresponding to moisture content at the initial stage of above-mentioned each oil well, it can intuitively compare different year throwing Oil-producing well initial stage moisture content size;Can intuitively in the range of geo-statistic difference moisture content at initial stage oil well number;Can be straight Watch out the size of the average annual moisture content of each well;The velocity information of aqueous rising at initial stage can be reflected.As shown in Figure 2:2004 it The oil well moisture content at initial stage gone into operation afterwards is of a relatively high.Day at initial stage, oil well number of the oil-producing between 60% to 80% only had 2 mouthfuls. Q2-2 and Q2-42 wells initial stage moisture content 0% or so, show that the moisture content of the first month of this two mouthfuls of wells is of substantially equal; But the circle of Q2-2 wells is small, and the circle of Q2-42 wells is big, shows that Q2-42 wells are larger in the moisture content rate of climb of First Year, causes The aqueous rate score in month is larger afterwards in First Year for it, causes First Year moisture content average value larger.
For example, when drawing oil well classification chart corresponding to tired oil-producing, now, the three production target parameter bags drawn Include:Bring in time, well-name and tired oil-producing.Oil well classification chart is understood corresponding to tired oil-producing as shown in Figure 3:It is horizontal in Fig. 3 Coordinate can represent the time, i.e. bring in the time;Ordinate can represent tired oil-producing, and scale interval can be according to actual feelings Condition chooses any value needed, can be 50,000 tons, 100,000 tons etc..Oil well is determined according to the combination of the abscissa and ordinate Well point position, and pound sign is marked in the side of well point position.By the tired oil-producing of all oil wells divided by a certain fixed numbers N, A numerical value is obtained as radius, using well point as the center of circle, is drawn and justified with the radius, round size characterizes the tired oil-producing of the well, painted The figure being made is oil well classification chart corresponding to the tired oil-producing of each oil well.
According to oil well classification chart corresponding to the tired oil-producing of above-mentioned each oil well, it can intuitively compare different year operation oil The size of the tired oil-producing of well;Oil well number that can intuitively in the range of the different tired oil-producing of geo-statistic.As shown in Figure 3:After 2004 It is relatively low that the oil well of operation tires out oil-producing.Tired oil well number of the oil-producing between 200,000 tons to 250,000 tons only has 2 mouthfuls, and can be straight Watch out the well-name of the higher oil well of tired oil-producing:Q2-61 and Q2-58.
, can be centered on the center of current oil well, with the delineation of determination in another embodiment of the application Border is the length of side, and the regular polygon regional extent of current oil well is generated on graphing is treated, to generate corresponding to current oil well Oil well classification chart.Above-mentioned regular polygon can be equilateral triangle, square, regular pentagon etc., and the application is not construed as limiting to this.
, can be centered on the center of current oil well, with the delineation of determination in another embodiment of the application Border is diagonal, and the regular polygon regional extent of current oil well is generated on graphing is treated, corresponding to generate current oil well Oil well classification chart.Above-mentioned regular polygon can be equilateral triangle, square, regular pentagon etc., and the application is not construed as limiting to this.
From above-mentioned oil well classification chart, multigroup production target parameter value of different oil wells intuitively can be rapidly read out, Intuitively compare the quality of the oil well production index of different times, solve in the prior art due to needing repeatedly to draw various lifes The defects of parameter value reading process corresponding to production index parameter value caused by image is excessively cumbersome, improve oil development effect Rate.
S103:Intuitively comparing is carried out to multiple production target parameter values using oil well classification chart corresponding to multiple oil wells, and According to comparative result, oil development is instructed.
After oil well classification chart corresponding to each oil well is generated, multiple production target parameter values can intuitively be compared Compared with according to quickly comparative observation result directly perceived, to instruct oil development.The method proposed using the application can also be quick Ground obtains the relatively low oil well information of production target parameter value, and analyzes reason, so as to rapidly propose to make what each oil well improved Measure.
Based on same inventive concept, a kind of oil development device is additionally provided in the embodiment of the present invention, such as following implementation Described in example.It is similar to oil development method to solve the principle of problem due to oil development device, therefore the reality of oil development device The implementation that may refer to oil development method is applied, part is repeated and repeats no more.It is used below, term " unit " or " mould Block " can realize the combination of the software and/or hardware of predetermined function.Although the device described by following examples is preferably with soft Part is realized, but hardware, or software and hardware combination realization and may and be contemplated.Fig. 4 is of the invention real A kind of structured flowchart of the oil development device of example is applied, as shown in figure 4, can include:Parameter value acquisition module 401, classification chart Drafting module 402, oil development module 403, are illustrated to the structure below.
Parameter value acquisition module 401, it can be used for obtaining multiple production target parameter values of each oil well in multiple oil wells, Wherein, the production target parameter includes:First production target parameter, the second production target parameter and third production index ginseng Number;
Classification chart drafting module 402, it can be used for performing each oil well in the multiple oil well following operation, with To oil well classification chart corresponding to each oil well:Abscissa using the first production target parameter to treat graphing, with The second production target parameter is the ordinate for treating graphing, according to the first production target parameter value of current oil well Treat to determine position corresponding to the current oil well in graphing described with the second production target parameter value, and by determination Center of the position as the current oil well;Delineation is determined according to the third production index parameter value of the current oil well Border;Centered on the center of the current oil well, using the delineation boundary of determination as border, treated described on graphing The regional extent of the current oil well is generated, to generate oil well classification chart corresponding to the current oil well;
Oil development module 403, it can be used for using oil well classification chart corresponding to the multiple oil well to the multiple life Produce index parameter value and carry out intuitively comparing, and guiding improves oil development effect.
In one embodiment, the classification chart drafting module can be used for the center using the current oil well in The heart, using the delineation boundary of the determination as radius, in the border circular areas model for treating to generate the current oil well on graphing Enclose, to generate oil well classification chart corresponding to the current oil well.
In one embodiment, the classification chart drafting module can be used for the center using the current oil well in The heart, using the delineation boundary of the determination as the length of side, in the regular polygon area for treating to generate the current oil well on graphing Domain scope, to generate oil well classification chart corresponding to the current oil well.
In one embodiment, the classification chart drafting module can be used for the center using the current oil well in The heart, using the delineation boundary of the determination as diagonal, in the regular polygon for treating to generate the current oil well on graphing Regional extent, to generate oil well classification chart corresponding to the current oil well.
In one embodiment, the production target parameter can also include:4th production target parameter, wherein, it is described 4th production target parameter is recorded in the centre bit of the regional extent of the current oil well by way of word and/or numeral Put.
In one embodiment, the production target parameter type can include but is not limited at least one of:Daily output Oil, tired oil-producing, moisture content, the time that brings in, well-name, daily output liquid, tired production liquid and tired production water.
The embodiment of the oil development device provided using the various embodiments described above, can implement oil development side automatically Method, instruct oil development, it may not be necessary to implement the specific participation of personnel, can directly export reservoir prediction result, operation letter It is single quick, effectively increase Consumer's Experience.In oil development device, the 4th production target parameter, oil well classification chart determination mode, The extension of production target parameter type is referred to the associated description of preceding method.
Although the 4th production target parameter, oil well classification chart determination mode, production target parameter are mentioned in teachings herein Type etc. describes, and still, the application is not limited to meet the situation described by the embodiment of the present application.Some industry marks Embodiment amended slightly can also be realized in standard or the practice processes described using self-defined mode or embodiment State embodiment it is identical, it is equivalent or it is close or deformation after it is anticipated that implementation result.Using the oil well point after these modifications or deformation The embodiment of the acquisitions such as class figure, parameter type, the 4th production target parameter determination mode, still may belong to the optional of the application Within the scope of embodiment.
Although this application provides the method operating procedure as described in embodiment or flow chart, based on conventional or noninvasive The means for the property made can include more or less operating procedures.The step of being enumerated in embodiment order is only numerous steps A kind of mode in execution sequence, does not represent unique execution sequence., can be with when device in practice or end product perform According to embodiment, either method shown in the drawings order performs or parallel performs (such as parallel processor or multiple threads Environment, even distributed data processing environment).Term " comprising ", "comprising" or its any other variant are intended to Nonexcludability includes, so that process, method, product or equipment including a series of elements not only will including those Element, but also the other element including being not expressly set out, or it is this process, method, product or equipment also to include Intrinsic key element.In the absence of more restrictions, be not precluded from the process including the key element, method, product or Other identical or equivalent elements in person's equipment also be present.
Unit, device or module that above-described embodiment illustrates etc., it can specifically be realized by computer chip or entity, or Realized by the product with certain function.For convenience of description, various modules point are divided into function when describing apparatus above Do not describe.Certainly, when implementing the application can the function of each module in same or multiple softwares and/or hardware it is real It is existing, the module for realizing same function can also be realized by the combination of multiple submodule or subelement etc..Dress described above Put that embodiment is only schematical, for example, the division of the unit, only a kind of division of logic function, when actually realizing There can be other dividing mode, such as multiple units or component can combine or be desirably integrated into another system, or one A little features can be ignored, or not perform.It is another, shown or discussed mutual coupling or direct-coupling or communication link It can be by some interfaces, the INDIRECT COUPLING or communication connection of device or unit to connect, and can be electrical, mechanical or other shapes Formula.
It is also known in the art that in addition to realizing controller in a manner of pure computer readable program code, it is complete Entirely can by by method and step carry out programming in logic come controller with gate, switch, application specific integrated circuit, may be programmed The form of logic controller and embedded microcontroller etc. realizes identical function.Therefore this controller is considered one kind Hardware component, and what its inside was included is used to realize that the device of various functions can also to be considered as the structure in hardware component.Or Person even, not only can be able to will be the software module of implementation method but also can be hardware for realizing that the device of various functions is considered as Structure in part.
The application can be described in the general context of computer executable instructions, such as program Module.Usually, program module includes performing particular task or realizes routine, program, object, the group of particular abstract data type Part, data structure, class etc..The application can also be put into practice in a distributed computing environment, in these DCEs, By performing task by communication network and connected remote processing devices.In a distributed computing environment, program module can With in the local and remote computer-readable storage medium including storage device.
As seen through the above description of the embodiments, those skilled in the art can be understood that the application can Realized by the mode of software plus required general hardware platform.Based on such understanding, the technical scheme essence of the application On the part that is contributed in other words to prior art can be embodied in the form of software product, the computer software product It can be stored in storage medium, such as ROM/RAM, magnetic disc, CD, including some instructions are causing a computer equipment (can be personal computer, mobile terminal, server, either network equipment etc.) perform each embodiment of the application or implementation Method described in some parts of example.
Each embodiment in this specification is described by the way of progressive, same or analogous portion between each embodiment Divide mutually referring to what each embodiment stressed is the difference with other embodiment.The application can be used for crowd In more general or special purpose computing system environments or configuration.Such as:Personal computer, server computer, handheld device or Portable set, laptop device, multicomputer system, the system based on microprocessor, set top box, programmable electronics are set Standby, network PC, minicom, the DCE etc. of mainframe computer including any of the above system or equipment.
Although depicting the application by embodiment, it will be appreciated by the skilled addressee that the application have it is many deformation and Change is without departing from spirit herein, it is desirable to which appended claim includes these deformations and changed without departing from the application's Spirit.

Claims (10)

  1. A kind of 1. oil development method, it is characterised in that including:
    Multiple production target parameter values of each oil well in multiple oil wells are obtained, wherein, the production target parameter includes:First Production target parameter, the second production target parameter and third production index parameter;
    Following operation is performed to each oil well in the multiple oil well, is classified with obtaining oil well corresponding to each oil well Figure:
    Using the first production target parameter as the abscissa for treating graphing, institute is used as using the second production target parameter The ordinate for treating graphing is stated, according to the first production target parameter value of current oil well and the second production target parameter value in institute State and treat to determine position corresponding to the current oil well in graphing, and using the position of determination as the current oil well Center;
    Delineation boundary is determined according to the third production index parameter value of the current oil well;
    Centered on the center of the current oil well, using the delineation boundary of determination as border, treated described on graphing The regional extent of the current oil well is generated, to generate oil well classification chart corresponding to the current oil well;
    Intuitively comparing, and root are carried out to the multiple production target parameter value using oil well classification chart corresponding to the multiple oil well According to comparative result, oil development is carried out.
  2. 2. the method as described in claim 1, it is characterised in that centered on the center of the current oil well, to determine Delineation boundary be border, it is described current to generate in the regional extent for treating to generate the current oil well on graphing Oil well classification chart corresponding to oil well, including:
    Centered on the center of the current oil well, using the delineation boundary of the determination as radius, drafting figure is treated described The border circular areas scope of the current oil well is generated in shape, to generate oil well classification chart corresponding to the current oil well.
  3. 3. the method as described in claim 1, it is characterised in that centered on the center of the current oil well, to determine Delineation boundary be border, it is described current to generate in the regional extent for treating to generate the current oil well on graphing Oil well classification chart corresponding to oil well, including:
    Centered on the center of the current oil well, using the delineation boundary of the determination as the length of side, drafting figure is treated described The regular polygon regional extent of the current oil well is generated in shape, to generate oil well classification chart corresponding to the current oil well.
  4. 4. the method as described in claim 1, it is characterised in that centered on the center of the current oil well, to determine Delineation boundary be border, it is described current to generate in the regional extent for treating to generate the current oil well on graphing Oil well classification chart corresponding to oil well, including:
    Centered on the center of the current oil well, using the delineation boundary of the determination as diagonal, wait to draw described The regular polygon regional extent of the current oil well is generated on figure, to generate oil well classification chart corresponding to the current oil well.
  5. 5. the method as any one of Claims 1-4, it is characterised in that the production target parameter also includes:4th Production target parameter, wherein, the 4th production target parameter is recorded in the current oil by way of word and/or numeral The center of the regional extent of well.
  6. 6. method as claimed in claim 5, it is characterised in that the production target parameter type includes at least one of: Day oil-producing, tired oil-producing, moisture content, the time that brings in, well-name, daily output liquid, tired production liquid and tired production water.
  7. A kind of 7. oil development device, it is characterised in that including:
    Parameter value acquisition module, for obtaining multiple production target parameter values of each oil well in multiple oil wells, wherein, the life Production index parameter includes:First production target parameter, the second production target parameter and third production index parameter;
    Classification chart drafting module, it is described each to obtain for performing following operation to each oil well in the multiple oil well Oil well classification chart corresponding to oil well:Abscissa using the first production target parameter to treat graphing, with the described second life Production index parameter is the ordinate for treating graphing, is produced according to the first production target parameter value of current oil well and second Index parameter value treats to determine position corresponding to the current oil well in graphing described, and using the position of determination as The center of the current oil well;Delineation boundary is determined according to the third production index parameter value of the current oil well;With institute Centered on the center for stating current oil well, using the delineation boundary of determination as border, treated described on graphing described in generation The regional extent of current oil well, to generate oil well classification chart corresponding to the current oil well;
    Oil development module, for utilizing oil well classification chart corresponding to the multiple oil well to the multiple production target parameter value Intuitively comparing is carried out, and guiding improves oil development effect.
  8. 8. device as claimed in claim 7, it is characterised in that the classification chart drafting module is used for the current oil well Centered on center, using the delineation boundary of the determination as radius, treat to generate the current oil well on graphing described Border circular areas scope, to generate oil well classification chart corresponding to the current oil well.
  9. 9. device as claimed in claim 7, it is characterised in that the classification chart drafting module is used for the current oil well Centered on center, using the delineation boundary of the determination as the length of side, treat to generate the current oil well on graphing described Regular polygon regional extent, to generate oil well classification chart corresponding to the current oil well.
  10. 10. device as claimed in claim 7, it is characterised in that the classification chart drafting module is used for the current oil well Center centered on, using the delineation boundary of the determination as diagonal, it is described treat to generate on graphing it is described current The regular polygon regional extent of oil well, to generate oil well classification chart corresponding to the current oil well.
CN201710441073.8A 2017-06-13 2017-06-13 Oil development method and apparatus Pending CN107392978A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710441073.8A CN107392978A (en) 2017-06-13 2017-06-13 Oil development method and apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710441073.8A CN107392978A (en) 2017-06-13 2017-06-13 Oil development method and apparatus

Publications (1)

Publication Number Publication Date
CN107392978A true CN107392978A (en) 2017-11-24

Family

ID=60332909

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710441073.8A Pending CN107392978A (en) 2017-06-13 2017-06-13 Oil development method and apparatus

Country Status (1)

Country Link
CN (1) CN107392978A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108825217A (en) * 2018-04-19 2018-11-16 中国石油化工股份有限公司 Synthesis well index calculation method suitable for reservoir numerical simulation
CN111760897A (en) * 2020-07-07 2020-10-13 北京建工环境修复股份有限公司 Operating well arrangement method and system for conduction type in-situ thermal desorption repair area

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102222088A (en) * 2011-05-30 2011-10-19 大连银行股份有限公司 System and method for checking, summarizing and displaying data quality according to multidimensional attribute
CN103392188A (en) * 2011-02-23 2013-11-13 贝克曼考尔特公司 Method and apparatus for displaying multidimensional data
CN103541718A (en) * 2012-07-11 2014-01-29 中国石油化工股份有限公司 Method for chart interpretation of water content of oil well
CN103700027A (en) * 2013-12-11 2014-04-02 国家电网公司 Method for achieving multi-dimensional bidirectional free-matching visual display of electric power data and graphics
CN103853922A (en) * 2014-02-27 2014-06-11 中国海洋石油总公司 Visualized quantitative evaluation method of oil and gas field similarity
CN105089642A (en) * 2015-05-28 2015-11-25 中国石油天然气股份有限公司 Method and device for identifying oil-gas reservoir abnormal production well
CN106250984A (en) * 2016-07-29 2016-12-21 中国石油天然气股份有限公司 The determination methods of the oil water relation pattern of oil well and device
CN106401579A (en) * 2016-11-04 2017-02-15 上海神开石油科技有限公司 While-drilling multi-parameter analysis-based oil-gas-water identification method and system

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103392188A (en) * 2011-02-23 2013-11-13 贝克曼考尔特公司 Method and apparatus for displaying multidimensional data
CN102222088A (en) * 2011-05-30 2011-10-19 大连银行股份有限公司 System and method for checking, summarizing and displaying data quality according to multidimensional attribute
CN103541718A (en) * 2012-07-11 2014-01-29 中国石油化工股份有限公司 Method for chart interpretation of water content of oil well
CN103700027A (en) * 2013-12-11 2014-04-02 国家电网公司 Method for achieving multi-dimensional bidirectional free-matching visual display of electric power data and graphics
CN103853922A (en) * 2014-02-27 2014-06-11 中国海洋石油总公司 Visualized quantitative evaluation method of oil and gas field similarity
CN105089642A (en) * 2015-05-28 2015-11-25 中国石油天然气股份有限公司 Method and device for identifying oil-gas reservoir abnormal production well
CN106250984A (en) * 2016-07-29 2016-12-21 中国石油天然气股份有限公司 The determination methods of the oil water relation pattern of oil well and device
CN106401579A (en) * 2016-11-04 2017-02-15 上海神开石油科技有限公司 While-drilling multi-parameter analysis-based oil-gas-water identification method and system

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
杨晓妍: "唐114井区长6油层注水效果评价", 《中国优秀硕士学位论文全文数据库工程科技Ⅰ辑》 *
王礼常等: "样本分解交汇图法与决策树方法识别苏丹某油田流体性质", 《科技导报》 *
罗刚君: "《Excel函数、图表与透视表从入门到精通(全新版)》", 31 May 2016 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108825217A (en) * 2018-04-19 2018-11-16 中国石油化工股份有限公司 Synthesis well index calculation method suitable for reservoir numerical simulation
CN108825217B (en) * 2018-04-19 2021-08-20 中国石油化工股份有限公司 Comprehensive well index calculation method suitable for numerical reservoir simulation
CN111760897A (en) * 2020-07-07 2020-10-13 北京建工环境修复股份有限公司 Operating well arrangement method and system for conduction type in-situ thermal desorption repair area

Similar Documents

Publication Publication Date Title
Burrows et al. An investigation into the character of pre-explosion core-collapse supernova shock motion
CN103217960B (en) Automatic selection method of dynamic scheduling strategy of semiconductor production line
CN105138413B (en) A kind of power distribution network online data method for detecting abnormality
CN107877262A (en) A kind of numerical control machine tool wear monitoring method based on deep learning
CN103218534B (en) Right tail-truncated type lifetime data distribution selection method
CN104865827B (en) A kind of pumping production optimization method based on multi-state model
CN106777732B (en) Fatigue reliability analysis method considering random load and strength degradation
CN107882541B (en) Water drive flow field generation method and device
TWI674823B (en) System and method for automatic layout
CN106529062A (en) Bridge structure health diagnosis method based on deep learning
CN106202380A (en) The construction method of a kind of corpus of classifying, system and there is the server of this system
CN108318010A (en) A kind of pit retaining monitoring measuring point fast selecting method based on BIM
CN109214642B (en) Automatic extraction and classification method and system for building construction process constraints
CN110225453A (en) Mobile terminal locating method, device, electronic equipment and storage medium
CN105488628A (en) Electric power big data visualization oriented data mining method
CN107392978A (en) Oil development method and apparatus
CN109299163A (en) A kind of interpolation method and device of the precipitation data based on convolutional neural networks
CN110442523A (en) A kind of spanned item mesh Software Defects Predict Methods
CN111144433B (en) Oil well working condition intelligent diagnosis and analysis method and device based on SVM model
CN107305640A (en) A kind of method of unbalanced data classification
CN107369170A (en) Image registration treating method and apparatus
CN106126799A (en) A kind of passive emulation link constructing system and method
CN103136709A (en) Typical fault tree evaluation method based on grid equipment
CN105868783A (en) Reduction type support vector data description method based on information entropy
CN107701177A (en) A kind of geologic prospecting method and device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20171124