CN107390617A - Film dividing film roll vanning control system based on PLC outputs - Google Patents

Film dividing film roll vanning control system based on PLC outputs Download PDF

Info

Publication number
CN107390617A
CN107390617A CN201710417252.8A CN201710417252A CN107390617A CN 107390617 A CN107390617 A CN 107390617A CN 201710417252 A CN201710417252 A CN 201710417252A CN 107390617 A CN107390617 A CN 107390617A
Authority
CN
China
Prior art keywords
cylinder
film roll
magnetic valve
plc
tumble
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710417252.8A
Other languages
Chinese (zh)
Inventor
钱立文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Tongfeng Electronics Co Ltd
Original Assignee
Anhui Tongfeng Electronics Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Tongfeng Electronics Co Ltd filed Critical Anhui Tongfeng Electronics Co Ltd
Priority to CN201710417252.8A priority Critical patent/CN107390617A/en
Publication of CN107390617A publication Critical patent/CN107390617A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/04Programme control other than numerical control, i.e. in sequence controllers or logic controllers
    • G05B19/05Programmable logic controllers, e.g. simulating logic interconnections of signals according to ladder diagrams or function charts
    • G05B19/054Input/output
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/10Plc systems
    • G05B2219/11Plc I-O input output
    • G05B2219/1186Redundant inputs parallel, outputs series, load safe switch off, AND condition

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Automation & Control Theory (AREA)
  • Laminated Bodies (AREA)

Abstract

Film dividing film roll vanning control system of the present invention based on PLC outputs, it is desirable to provide a kind of operation is flexible, reduces labor intensity, improves operating efficiency, the film dividing film roll exported based on PLC the vanning control system of reduction production cost.Such a film dividing film roll vanning control system based on PLC outputs includes:A. input signal collecting part:Floor push K1(10), floor push K2(20)With cylinder location detecting system(30);B. logic control part:PLC(40);C. output signal executable portion:Cylinder drive magnetic valve, the cylinder drive magnetic valve include film roll bracket lift cylinder and rise drive magnetic valve F1A again(50), film roll bracket lift cylinder decline drive magnetic valve F1B(51), the first tumble cylinder rise drive magnetic valve F2A(60), the first tumble cylinder decline drive magnetic valve F2B(61), the second tumble cylinder rise drive magnetic valve F3A(70)Decline drive magnetic valve F3B with the second tumble cylinder(71).

Description

Film dividing film roll vanning control system based on PLC outputs
Technical field
The invention belongs to films for electrical purposes packaging field, and in particular to the film dividing film based on PLC outputs
Case control system is wrapped.
Background technology
Before films for electrical purposes dispatch from the factory, cutting film roll needs weighed, casing, mould turnover process, is finally completed the vanning of films for electrical purposes Work, it is exactly such a films for electrical purposes packaging facilities that CN203332448U is disclosed, and its control process need to manually be respectively started Film roll bracket vertical lifting mechanism, the first switching mechanism, the second switching mechanism;And start button be arranged on equipment rack need it is curved Waist could operate.
The content of the invention
In view of the deficiencies of the prior art, the present invention provides one kind operation flexibly, reduce labor intensity, carry
High workload efficiency, the film dividing film roll vanning control system based on PLC outputs for reducing production cost.It is above-mentioned to solve Technical problem, film dividing film roll vanning control system of the present invention based on PLC outputs, including following part:
A. input signal collecting part
A. floor push K1, for the operation and stopping for controlling film roll bracket to lift, floor push K1 and PLC first input end It is connected;
B. floor push K2, for controlling switching mechanism operation and stopping, floor push K2 is connected with PLC the second input;
C. cylinder location detecting system, for detecting each cylinder piston position, the output end of cylinder location detecting system and PLC's 3rd input is connected, and the 3rd input of the PLC is 6 road input ports, respectively with cylinder location detection switch magnetic switch S1, cylinder location detection switch magnetic switch S2, cylinder location detection switch magnetic switch S3, cylinder location detection switch magnetic switch S4, cylinder location detection switch magnetic switch S5, cylinder location detection switch magnetic switch S6 are connected;
The cylinder location detecting system includes:Film roll bracket lift cylinder lower limit, cylinder location detection switch magnetic switch S1 peaces Mounted in film roll bracket lift cylinder tail end;The film roll bracket lift cylinder upper limit;Cylinder location detection switch magnetic switch S2 is arranged on Film roll bracket lift cylinder front end;First tumble cylinder lower limit, cylinder location detection switch magnetic switch S3 are arranged on the first upset Cylinder tail end;The first tumble cylinder upper limit;Cylinder location detection switch magnetic switch S4 is arranged on the first tumble cylinder front end;Second Tumble cylinder lower limit, cylinder location detection switch magnetic switch S5 are arranged on the second tumble cylinder tail end;The second tumble cylinder upper limit, Cylinder location detection switch magnetic switch S6 is arranged on the second tumble cylinder front end;
B. logic control part:PLC, the PLC the first output end rise drive magnetic valve F1A with film roll bracket lift cylinder It is connected;Second output end declines drive magnetic valve F1B with film roll bracket lift cylinder and is connected;3rd output end and the first upset gas Cylinder rises drive magnetic valve F2A and is connected,;4th output end declines drive magnetic valve F2B with the first tumble cylinder and is connected;5th is defeated Go out end with the second tumble cylinder rising drive magnetic valve F3A to be connected;6th output end declines driving electromagnetism with the second tumble cylinder Valve F3B is connected;
C. output signal executable portion:Cylinder drive magnetic valve, the cylinder drive magnetic valve include:Film roll bracket lifting air Cylinder rises drive magnetic valve F1A, film roll bracket lift cylinder declines drive magnetic valve F1B, for driving film roll bracket lifting air Cylinder stretches;First tumble cylinder rises drive magnetic valve F2A, the first tumble cylinder declines drive magnetic valve F2B, for driving the One tumble cylinder is stretched;Second tumble cylinder rises drive magnetic valve F3A and the second tumble cylinder declines drive magnetic valve F3B, For driving the second tumble cylinder to stretch.
As a preference of the present invention, floor push K1, floor push K2 model are FS-1 types.
As a preference of the present invention, the detecting element of cylinder location detection switch is open type magnetic switch.
As a preference of the present invention, PLC model Mitsubishi FX1N-24MR-001.
As a preference of the present invention, cylinder drive magnetic valve is Feng Shishuan electric control solenoid valves in three, line Packet driven voltage For DC24V.
As a preference of the present invention, the model Ya De visitor SI series of cylinder.
Beneficial effects of the present invention in summary:The operation for being used to control film roll bracket to lift using floor push K1 is with stopping Only it is used for the structure design for controlling switching mechanism operation with stopping with floor push K2, operating personnel's operation that need not bend over can open Dynamic film roll bracket vertical lifting mechanism, the first switching mechanism, the second switching mechanism, operation is flexible and alleviates the labor of operating personnel Fatigue resistance;First switching mechanism and the automatic coherent completion of the second switching mechanism upset, improve operating efficiency;Ridden in the present invention Switch selects domestic FS-1 types, and cylinder location detection switch is general open type magnetic switch CSI-B series, and cylinder is from Ya De visitor SI series make it that this control system service life is long, cheap, and then reduces this film dividing film roll incasement operation system Production cost.
Brief description of the drawings
Fig. 1 is the schematic diagram of the present invention;
Wherein, 10 floor push K1,20 floor push K2,30 cylinder location detecting systems, 40 PLC, 50 film roll brackets Lift cylinder rises drive magnetic valve F1A, and 51 film roll bracket lift cylinders decline drive magnetic valve F1B, 60 first upset gas Cylinder rises drive magnetic valve F2A, and 61 first tumble cylinders decline drive magnetic valve F2B, and 70 second tumble cylinders rise driving Magnetic valve F3A, 71 second tumble cylinders decline drive magnetic valve F3B.
Embodiment
Control system, including following composition portion as shown in figure 1, film dividing film roll of the present invention based on PLC outputs is cased Point:Floor push K1, floor push K1 are connected with PLC first input end, for controlling the operation that film roll bracket lifts with stopping Only;Floor push K2 is used to control switching mechanism operation and stopped, and floor push K2 is connected with PLC the second input, rides Switch K1, floor push K2 model is FS-1 types;Cylinder location detecting system, the detecting element of cylinder location detecting system For open type magnetic switch, for detecting cylinder piston position, the output end of cylinder location detecting system and PLC the 3rd input It is connected, the position of cylinder location detecting system includes:Film roll bracket lift cylinder lower limit, cylinder location detecting system magnetic switch S1 Installed in film roll bracket lift cylinder tail end;The film roll bracket lift cylinder upper limit;Cylinder location detecting system magnetic switch S2 is installed In film roll bracket lift cylinder front end;First tumble cylinder lower limit, cylinder location detecting system magnetic switch S3 turn over installed in first Rotaring cylinder tail end;The first tumble cylinder upper limit;Cylinder location detecting system magnetic switch S4 is arranged on the first tumble cylinder front end;The Two tumble cylinder lower limits, cylinder location detecting system magnetic switch S5 are arranged on the second tumble cylinder tail end;In second tumble cylinder Limit, cylinder location detecting system magnetic switch S6 are arranged on the second tumble cylinder front end;PLC model Mitsubishi FX1N-24MR- 001, PLC the first output end rises drive magnetic valve F1A with film roll bracket lift cylinder and is connected;The second output of the PLC End declines drive magnetic valve F1B with film roll bracket lift cylinder and is connected;In the 3rd output end and the first tumble cylinder of the PLC Drive magnetic valve F2A is risen to be connected;PLC the 4th output end declines drive magnetic valve F2B with the first tumble cylinder and is connected; PLC The 5th output end and the second tumble cylinder rise drive magnetic valve F3A and be connected;PLC the 6th output end and the second upset gas Cylinder declines drive magnetic valve F3B and is connected;Cylinder drive magnetic valve is Feng Shishuan electric control solenoid valves in three, and line Packet driven voltage is DC24V, cylinder drive magnetic valve include:Film roll bracket lift cylinder rises under drive magnetic valve F1A, film roll bracket lift cylinder Drop drive magnetic valve F1B, the first tumble cylinder rise drive magnetic valve F2A, the first tumble cylinder declines drive magnetic valve F2B, Second tumble cylinder rises drive magnetic valve F3A and the second tumble cylinder declines drive magnetic valve F3B.Cylinder drive magnetic valve is Feng Shishuan electric control solenoid valves in three, line Packet driven voltage are DC24V.
The course of work using the above-mentioned film dividing film roll vanning control system based on PLC outputs is as follows:
1. after opening machine power, machine is set to be in original state by PLC program control, i.e.,:
1.1 film roll bracket lift cylinders are in jack-up state, film roll bracket lift cylinder upper limit magnetic switch S2 closures;
1.2 first tumble cylinders are in retracted mode, the first tumble cylinder lower limit magnetic switch S3 closures;
1.3 second tumble cylinders are in retracted mode, the second tumble cylinder lower limit magnetic switch S5 closures;
2. cutting film roll is placed on film roll bracket, shock absorbing foam is put at both ends well, installs protection board.Floor push is trampled with pin K1, floor push K1 are closed, and PLC first input end receives signal, and the control program inside PLC makes film roll bracket lifting air Cylinder declines drive magnetic valve F1B line Bao get electricity, and film roll bracket lift cylinder declines drive magnetic valve F1B actions, passes through magnetic valve F1B commutation effect, film roll bracket lift cylinder decline film roll bracket, and film roll bracket lift cylinder is in retracted mode, film Bracket lift cylinder lower limit magnetic switch S1 closures are rolled up, now protection board is suspended in film roll is cut on the first turnover panel.Film roll bracket Lift cylinder lower limit magnetic switch S1 is closed, and its signal is input to input port corresponding to PLC the 3rd input magnetic switch S1, is used Decline in terminating film roll bracket, and rise the condition of driving as the first tumble cylinder;
3. by Packaging Box is counter be enclosed in film roll after, trample floor push K2 with pin, floor push K2 closures, the second of PLC be defeated Entering termination and receive signal, the control program inside PLC makes the first tumble cylinder rise drive magnetic valve F2A lines Bao get electricity, and first Tumble cylinder rises drive magnetic valve F2A actions, is acted on by magnetic valve F2A commutation, the first tumble cylinder is increased, band Dynamic first turnover panel is pivoted, when the first tumble cylinder is in ejection state, the first tumble cylinder upper limit magnetic switch S4 closures, The now complete upset in 90 ° of Packaging Box is fallen on the second turnover panel.First tumble cylinder upper limit magnetic switch S4 is closed, the input of its signal To input port corresponding to PLC the 3rd input magnetic switch S4, for terminating the ejection of the first turnover panel, and as the second upset gas Cylinder rises the condition of driving;
4. after the first tumble cylinder upper limit magnetic switch S4 make delays 1 second, the control program inside PLC makes the second upset gas Cylinder rises drive magnetic valve F3A lines Bao get electricity, and the second tumble cylinder rises drive magnetic valve F3A actions, passes through magnetic valve F3A's Commutation acts on, and the second tumble cylinder is increased, and drives the second turnover panel to be pivoted, when the second tumble cylinder is in ejection state When, the second tumble cylinder upper limit magnetic switch S6 closures, now Packaging Box completion 180 degree ° upset is fallen on later process platform. Second tumble cylinder upper limit magnetic switch S6 is closed, and its signal is input to input corresponding to PLC the 3rd input magnetic switch S6 Mouthful, for terminating the ejection of the second turnover panel, and decline the condition driven as the second tumble cylinder;
5. after the second tumble cylinder upper limit magnetic switch S6 make delays 1 second, the control program inside PLC makes the second upset gas Cylinder declines drive magnetic valve F3B lines Bao get electricity, and the second tumble cylinder declines drive magnetic valve F3B actions, passes through magnetic valve F3B Commutation effect, make the second tumble cylinder decline, when the second tumble cylinder is in retracted mode, the second tumble cylinder lower limit magnetic S5 closures are switched, now the second turnover panel drops back into horizontality.Second tumble cylinder lower limit magnetic switch S5 is closed, and its signal is input to Input port corresponding to PLC the 3rd input magnetic switch S5, dropped back into for terminating the second turnover panel, and be used as the first tumble cylinder Decline the condition of driving;
6. when the second tumble cylinder lower limit magnetic switch S5 is closed, the control program inside PLC makes the first tumble cylinder decline drive Moving electromagnetic valve F2B lines Bao get electricity, the first tumble cylinder decline drive magnetic valve F2B actions, are made by magnetic valve F2B commutation With, make the first tumble cylinder decline, when the first tumble cylinder is in retracted mode, the first tumble cylinder lower limit magnetic switch S3 is closed Close, now the first turnover panel drops back into horizontality.First tumble cylinder lower limit magnetic switch S3 is closed, and its signal is input to the of PLC Input port corresponding to three input magnetic switch S3, dropped back into for terminating the first turnover panel, and as on film roll bracket lift cylinder Rise the condition of driving;
7. when the first tumble cylinder lower limit magnetic switch S3 is closed, the control program inside PLC makes on film roll bracket lift cylinder Drive magnetic valve F1A line Bao get electricity are risen, film roll bracket lift cylinder rises drive magnetic valve F1A actions, passes through magnetic valve F1A Commutation effect, make film roll bracket lift cylinder rise;When film roll bracket lift cylinder is in jack-up state, the lifting of film roll bracket Cylinder upper limit magnetic switch S2 is closed, and film roll bracket lift cylinder is in jack-up state, film roll bracket lift cylinder upper limit magnetic switch S2 is closed, and its signal is input to input port corresponding to PLC the 3rd input magnetic switch S2, for terminating the lifting of film roll bracket Cylinder jacks up, and terminates as a complete working period, and machine is in original state again, waits next work week Phase.
Turned over using the operation that floor push K1 is used to control film roll bracket to lift and stopping and floor push K2 for control Rotation mechanism run with stop structure design, operating personnel need not bend over operation can start film roll bracket vertical lifting mechanism, First switching mechanism, the second switching mechanism, operation is flexible and alleviates the labor intensity of operating personnel;First switching mechanism and The automatic coherent completion of two switching mechanisms upset, improves operating efficiency;Floor push selects domestic FS-1 types, cylinder in the present invention Position detecting switch is general open type magnetic switch CSI-B series, and cylinder causes this control system to make from Ya De visitor SI series With long lifespan, cheap, and then reduce the production cost of this film dividing film roll incasement operation system.

Claims (6)

  1. The control system 1. the film dividing film roll based on PLC outputs is cased, it is characterised in that including following part:
    A. input signal collecting part:
    A. floor push K1(10), for the operation and stopping for controlling film roll bracket to lift, the floor push K1(10)With PLC (40)First input end be connected;
    B. floor push K2(20), for controlling switching mechanism operation and stopping, the floor push K2(20)With the second of PLC Input is connected;
    C. cylinder location detecting system(30), for detecting each cylinder piston position, the output of the cylinder location detecting system End and PLC(40)The 3rd input be connected, the 3rd input of the PLC is 6 road input ports, respectively with cylinder location examine Slowdown monitoring switch magnetic switch S1, cylinder location detection switch magnetic switch S2, cylinder location detection switch magnetic switch S3, cylinder location detection Switch magnetic switch S4, cylinder location detection switch magnetic switch S5, cylinder location detection switch magnetic switch S6 are connected;The cylinder Position detecting system(30)Including:Film roll bracket lift cylinder lower limit, cylinder location detecting system magnetic switch S1 are arranged on film roll Bracket lift cylinder tail end;The film roll bracket lift cylinder upper limit;Cylinder location detecting system magnetic switch S2 is arranged on film roll bracket Lift cylinder front end;First tumble cylinder lower limit, cylinder location detecting system magnetic switch S3 are arranged on the first tumble cylinder tail end; The first tumble cylinder upper limit;Cylinder location detecting system magnetic switch S4 is arranged on the first tumble cylinder front end;Second tumble cylinder Lower limit, cylinder location detecting system magnetic switch S5 are arranged on the second tumble cylinder tail end;The second tumble cylinder upper limit, cylinder location Detecting system magnetic switch S6 is arranged on the second tumble cylinder front end;
    B. logic control part:PLC (40), the first output end of the PLC (40) rises with film roll bracket lift cylinder to be driven Magnetic valve F1A(50)It is connected;Second output end of the PLC (40) declines drive magnetic valve F1B with film roll bracket lift cylinder (51)It is connected;3rd output end of the PLC (40) rises drive magnetic valve F2A with the first tumble cylinder(60)It is connected;It is described PLC (40) the 4th output end declines drive magnetic valve F2B with the first tumble cylinder(61)It is connected;The 5th of the PLC (40) Output end rises drive magnetic valve F3A with the second tumble cylinder(70)It is connected;6th output end of the PLC (40) is turned over second Rotaring cylinder declines drive magnetic valve F3B(71)It is connected;
    C. output signal executable portion:Cylinder drive magnetic valve, the cylinder drive magnetic valve include:Film roll bracket lift cylinder Rise drive magnetic valve F1A(50), film roll bracket lift cylinder decline drive magnetic valve F1B(51), for driving film roll bracket Lift cylinder stretches;First tumble cylinder rises drive magnetic valve F2A(60), the first tumble cylinder decline drive magnetic valve F2B (61), for driving the first tumble cylinder to stretch;Second tumble cylinder rises drive magnetic valve F3A(70)With the second tumble cylinder Decline drive magnetic valve F3B(71), for driving the second tumble cylinder to stretch.
  2. The control system 2. the film dividing film roll according to claim 1 based on PLC outputs is cased, it is characterised in that institute State floor push K1, floor push K2 model is FS-1 types.
  3. The control system 3. the film dividing film roll according to claim 1 based on PLC outputs is cased, it is characterised in that institute The detecting element for stating cylinder location detecting system is open type magnetic switch.
  4. The control system 4. the film dividing film roll according to claim 1 based on PLC outputs is cased, it is characterised in that institute State PLC model Mitsubishi FX1N-24MR-001.
  5. The control system 5. the film dividing film roll according to claim 1 based on PLC outputs is cased, it is characterised in that institute It is Feng Shishuan electric control solenoid valves in three to state cylinder drive magnetic valve, and line Packet driven voltage is DC24V.
  6. The control system 6. the film dividing film roll according to claim 1 based on PLC outputs is cased, it is characterised in that institute State the model Ya De visitor SI series of cylinder.
CN201710417252.8A 2017-06-06 2017-06-06 Film dividing film roll vanning control system based on PLC outputs Pending CN107390617A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710417252.8A CN107390617A (en) 2017-06-06 2017-06-06 Film dividing film roll vanning control system based on PLC outputs

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710417252.8A CN107390617A (en) 2017-06-06 2017-06-06 Film dividing film roll vanning control system based on PLC outputs

Publications (1)

Publication Number Publication Date
CN107390617A true CN107390617A (en) 2017-11-24

Family

ID=60332007

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710417252.8A Pending CN107390617A (en) 2017-06-06 2017-06-06 Film dividing film roll vanning control system based on PLC outputs

Country Status (1)

Country Link
CN (1) CN107390617A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108132643A (en) * 2018-01-11 2018-06-08 钱立文 A kind of aluminium shell of capacitor Controlling System of Automatic Cutting Equipment
CN113023436A (en) * 2020-12-30 2021-06-25 山东正奇塑料机械有限公司 Implementation method of control system of device for automatically threading and pulling core shaft

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202848101U (en) * 2012-09-07 2013-04-03 上海固好包装机械有限公司 Fully automatic control system for sealing cuter
CN103303521A (en) * 2013-06-27 2013-09-18 安徽铜爱电子材料有限公司 Packaging equipment for slit film roll of plastic film
CN204871681U (en) * 2015-07-22 2015-12-16 诸暨市佳尔达机械有限公司 Surrounding type packing apparatus
CN205420807U (en) * 2016-03-02 2016-08-03 浙江海润丰化纤有限公司 Dye test braider
CN106005602A (en) * 2016-06-30 2016-10-12 苏州市盛百威包装设备有限公司 Hot shrinkable film machine capable of preventing labels from being wetted

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202848101U (en) * 2012-09-07 2013-04-03 上海固好包装机械有限公司 Fully automatic control system for sealing cuter
CN103303521A (en) * 2013-06-27 2013-09-18 安徽铜爱电子材料有限公司 Packaging equipment for slit film roll of plastic film
CN204871681U (en) * 2015-07-22 2015-12-16 诸暨市佳尔达机械有限公司 Surrounding type packing apparatus
CN205420807U (en) * 2016-03-02 2016-08-03 浙江海润丰化纤有限公司 Dye test braider
CN106005602A (en) * 2016-06-30 2016-10-12 苏州市盛百威包装设备有限公司 Hot shrinkable film machine capable of preventing labels from being wetted

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108132643A (en) * 2018-01-11 2018-06-08 钱立文 A kind of aluminium shell of capacitor Controlling System of Automatic Cutting Equipment
CN113023436A (en) * 2020-12-30 2021-06-25 山东正奇塑料机械有限公司 Implementation method of control system of device for automatically threading and pulling core shaft

Similar Documents

Publication Publication Date Title
CN108083043B (en) Intelligent construction elevator
CN204964206U (en) Ferroelectric passenger door testing arrangement in ground
CN205087650U (en) Full automatic reel alternation device of plastics plastic film
CN107390617A (en) Film dividing film roll vanning control system based on PLC outputs
CN206537964U (en) Graphene EPS cutting plates automatic stacking machines
CN204130068U (en) Impart knowledge to students with program control elevator Practical training equipment
CN106848856B (en) A kind of retaining device for preventing toy from entering in power station
CN108792900A (en) A kind of lift work platform that accident rate is low
CN202447400U (en) Passive high level pay-off mechanism of dry-type wire drawing machine
CN206437688U (en) A kind of substrate tension control device
CN204688960U (en) The upper and lower website master cock of hanging conveyor line
CN203362685U (en) Electric hydraulic control device for lifting supporting bridge
CN105388813B (en) A kind of control system of big volume wool packaging line
CN204958036U (en) A bolt formula safety guarantee structure for elevator
CN204212960U (en) Intelligent and high-efficiency control system of water pump
CN204330273U (en) One falls detection machine automatically
CN103343762A (en) Power-driven hydraulic control device for lifting support bridge and control method of power-driven hydraulic control device
CN207831940U (en) Electrical kiln self- lift
CN203540590U (en) Superclean bench with window door capable of moving up and down in CIT (China Interventional Therapeutics)
CN207957619U (en) Projecting circulation electric elevator
CN207682413U (en) A kind of three coordinate machine device people Z axis telescopic system
CN206502496U (en) Open three folding elevator door upper sill frames in side
CN207175268U (en) A kind of heavy module assembling/disassembling machine
CN205771345U (en) Pharmacy drug lifting device
CN105370074A (en) Direct-current low-voltage 24V safe and energy-saving anti-dropping device for parking equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20171124

RJ01 Rejection of invention patent application after publication