CN107389897B - Foundation pit stage excavation and non-uniform displacement supporting lateral pressure test device and method - Google Patents

Foundation pit stage excavation and non-uniform displacement supporting lateral pressure test device and method Download PDF

Info

Publication number
CN107389897B
CN107389897B CN201710445063.1A CN201710445063A CN107389897B CN 107389897 B CN107389897 B CN 107389897B CN 201710445063 A CN201710445063 A CN 201710445063A CN 107389897 B CN107389897 B CN 107389897B
Authority
CN
China
Prior art keywords
wall
piece
wall piece
loading bolt
barricade
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201710445063.1A
Other languages
Chinese (zh)
Other versions
CN107389897A (en
Inventor
熊国军
王建华
韩磊
肖潇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Jiaotong University
Original Assignee
Shanghai Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Jiaotong University filed Critical Shanghai Jiaotong University
Priority to CN201710445063.1A priority Critical patent/CN107389897B/en
Publication of CN107389897A publication Critical patent/CN107389897A/en
Application granted granted Critical
Publication of CN107389897B publication Critical patent/CN107389897B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N33/00Investigating or analysing materials by specific methods not covered by groups G01N1/00 - G01N31/00
    • G01N33/24Earth materials
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Health & Medical Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Geology (AREA)
  • Remote Sensing (AREA)
  • Civil Engineering (AREA)
  • Paleontology (AREA)
  • Food Science & Technology (AREA)
  • Medicinal Chemistry (AREA)
  • Structural Engineering (AREA)
  • Analytical Chemistry (AREA)
  • Biochemistry (AREA)
  • General Health & Medical Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Immunology (AREA)
  • Pathology (AREA)
  • Force Measurement Appropriate To Specific Purposes (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The present invention provides a kind of foundation pit stage excavation and non-uniform displacement supporting lateral pressure test device and method, comprising: splicing barricade, loading bolt, load turn, miniature soil pressure sensor, rubber film and model casing;Splicing barricade and loading bolt are all set at the one side wall of model casing, and splicing barricade is located at the inside of side wall and parallel with side wall, side-wall outer side are provided with several vertical ribbed stiffeners and horizontal ribbed stiffener, splicing barricade is spliced by several contour wall pieces to be formed;Miniature soil pressure sensor is arranged in each wall on piece, and rubber film covers and is bonded in wall on piece;One end of multiple loading bolts passes through side wall outside model casing, reaches each wall piece of splicing barricade, and loading bolt can be turned.The present invention can simulate the lateral pressure of foundation pit stage excavation process supporting construction, provide foundation for engineering design and supporting;The regularity of distribution of supporting construction lateral pressure and its changing rule with displacement when can study non-uniform displacement.

Description

Foundation pit stage excavation and non-uniform displacement supporting lateral pressure test device and method
Technical field
The present invention relates to the indoor model tests of geotechnical engineering, and in particular, to a kind of foundation pit stage excavation with it is non-homogeneous It is displaced supporting lateral pressure test device and method when operating condition.
Background technique
Foundation pit gradually excavates off-load, and the regularity of distribution of soil pressure is the important content of base pit engineering research in supporting construction, It is also the foundation of Foundation Pit Support Design, earth pressure of supporting structure is also the important of geotechnical engineering with the changing rule of digging process Problem in science.
Rigid retaining walls soil pressure research it is a lot of, in Practical Project, other than Gravity Retaining Wall, other various supporting knots Structure in use, can generate deflection deformation, embody flexible retaining wall feature, and sidesway is only respectively along depth non-uniform Distribution The universal real working condition of kind supporting construction working condition, the experiment and theoretical research of the soil pressure feature of non-homogeneous sidesway are relatively It is few.
So far, the experimental rig of off-load soil pressure and few is excavated about research both at home and abroad, and hierarchy number is less, one Secondary property off-load depth is too big, it is difficult to simulate actual condition;Study non-uniform displacement when supporting construction on soil pressure experimental provision It is more rare.
Summary of the invention
For the defects in the prior art, the object of the present invention is to provide a kind of foundation pit stage excavations and non-uniform displacement branch Protect lateral pressure test device and method.
According to an aspect of the present invention, foundation pit stage excavation and non-uniform displacement supporting lateral pressure test device are provided, It include: splicing barricade, loading bolt, load is turned, miniature soil pressure sensor, rubber film, model casing and rigidity are reinforced Part;Wherein:
The model casing is fixed on the inside of the rigidity reinforcer;
The splicing barricade, the loading bolt are all set at the one side wall of the model casing, the splicing barricade by Several contour wall pieces vertically splice composition, and are set to the inside sidewalls of described model casing one end and parallel with the side wall;
The miniature soil pressure sensor is laid on the face that each wall piece column face in the model casing in a manner of shrinkage pool;
The rubber film is covered and is pasted on the splicing barricade face for having laid miniature soil pressure sensor;
Several loading bolts are through the side wall of the model casing and corresponding with splicing each wall piece of barricade respectively Connection;The end side-wall outer side of the model casing is provided with several vertical ribbed stiffeners and horizontal ribbed stiffener, is located at side wall midline position Vertical ribbed stiffener be provided with a column screw hole, be used for and the loading bolt cooperate;
The load is turned to be connect with end on the outside of the loading bolt, and the rotation load, which is turned, drives the loading bolt Rotation, so that the loading bolt be assisted to realize horizontal addload.
Preferably, the overall height H of the splicing barricade is set according to requirement of experiment, and the width B for splicing barricade takes total height Spend the 1/2~1/3 of H.
Preferably, the back center position of the wall piece is provided with circular pit, and the depth of circular pit is not more than wall piece Thickness T 1/3, be not less than 2cm, the diameter of circular pit is not less than the 1/2 of wall piece height h;
The center of the wall piece is provided with bolt hole.
It is highly preferred that the wall piece number N takes 5~20, N need to be according to the fussy degree of experiment purpose and production operation It is comprehensive to determine: to get the small value 5~10 when simulation foundation pit stage excavation;Active, quilt under simulation flexible retaining wall non-uniform displacement operating condition Take large values 10~20 when dynamic soil pressure.
It is highly preferred that the wall piece height h is equal to splicing barricade overall height H/wall piece number N, the value of wall piece thickness T For splice barricade width B 1/6 or be to splice the width B of barricade 1/10 to put more energy into rib thickness, and not less than passively Extreme displacement estimated value Sp, in which: passively extreme displacement estimated value Sp is estimated according to 5 times of active limiting displacement estimated value Sa, Overall height H estimation of the active limiting displacement estimated value Sa according to splicing barricade, Sa=H*0.2%.
Preferably, the loading bolt is made of screw rod, nut, rotation end and ring cowling, in which:
The center of the wall piece and ribbed stiffener is provided with bolt hole, described screw rod one end from the outside of model casing according to Secondary to pass through ribbed stiffener, model casing side wall and reach wall piece, the diameter of the bolt hole is identical as screw diameter;
The nut is located at the outside of model casing side wall, and the lateral surface of nut is equipped with concave inward structure;
The rotation end is made of thin cylinder egative film and cylinder, the cylinder of screw rod and nut, screw rod and rotation end it Between using circle falcon connect with pin mode it is integral;The diameter of thin cylinder egative film and the circle that thickness is less than wall piece back center are recessed Cheat size;
The center opening and bore dia of the ring cowling are greater than column diameter, and the periphery of ring cowling is provided with several bolts hole, thin Cylinder egative film is placed on the circular pit of wall piece back center, cylinder passes through the centre bore of ring cowling, and passes through ring cowling by bolt On bolt hole ring cowling is fixed on wall on piece.
It is highly preferred that the diameter d of the screw rod takes the 1/5~1/3 of wall piece height h, the screw flight segment length l is not It is 5*Sp+t less than passive extreme displacement estimated value Sp thickness t, the l value for adding model casing;The screw screw pitch Δ l of the screw rod No more than the half of active limiting displacement estimated value Sa, Δ l value Sa/8~Sa/2;
The diameter D of the nut is not more than wall piece height h, and it is 1/2~2/3 that D, which takes wall piece height h,;
Thin cylinder negative plate size in the rotation end is identical as the circular pit size of wall piece back center position, column The diameter of body is identical as screw rod.
Preferably, the load is turned is made of the tri linear rod piece and connection end being linked together, in which:
By three sections of line bars, right angle connects the tri linear rod piece in the same plane, and junction is rigid connection;
The connection end is equipped with outer male structure, and the nut side face of the loading bolt is equipped with concave inward structure, and evagination Structure is matched with concave inward structure, and the outer male structure of connection end is docked with the concave inward structure of nut, i.e., turns and load spiral shell load It tethers and is connected in entirety, and loading bolt is rotated by rotation tri linear rod piece;
The turning of the tri linear rod piece is right angle, and segment length is greater than the screw diameter of loading bolt among it;It is described The diameter of connection end is identical as the nut outer diameter of loading bolt.
Preferably, the clear span of model casing is greater than the width B of splicing barricade, and the height of model casing is total not less than splicing barricade Height H;
In the active earth pressure operating condition tested under excavation of foundation pit and non-uniform displacement, the length dimension L of the model casing It is not less thanWherein: l is the spiro rod length of loading bolt, and H is the total height for splicing barricade, and T is wall Piece thickness, π be pi,The internal friction angle of pourable medium;
In the passive earth pressure operating condition tested under non-uniform displacement, the length dimension L of the model casing is not less than
Preferably, the ribbed stiffener includes vertical ribbed stiffener and horizontal ribbed stiffener, indulges ribbed stiffener and horizontal ribbed stiffener constitutes cross and hands over Pronged shape.
Preferably, the rigidity reinforcer includes two panels trivet and rigid carriers, in which:
The rigid carriers setting is connected and fixed in model casing bottom, and with the bottom of model casing;Rigid carriers are by rectangle Frame is securely connected and composed with several cross bars;
The two panels trivet is separately positioned on the two sides of model casing, and is connected and fixed with model casing side wall;Trivet Bottom be fixed in the rectangular shaped rim of rigid carriers, the vertical bar of trivet be arranged in the outside of horizontal ribbed stiffener and with horizontal ribbed stiffener Securely connection.
It is highly preferred that the trivet is supportted using Composite Triangular, the cross bar of the rigid carriers is no less than 3.
Preferably, the rigidity reinforcer is by H-section or rectangular section fashioned iron welding production
According to the second aspect of the invention, a kind of layering Unloading Condition earth pressure test side using above-mentioned apparatus is provided Method, step are as follows:
(1) each loading bolt is turned, each wall piece for splicing barricade is pushed into same position;
(2) rubber film is covered on wall on piece, and rubber film surrounding is bonded in wall on piece;
(3) nut of the loading bolt corresponding to the 1st layer of wall piece is turned outward manually, number of rotation is not less than m=360* (Sa1/ Δ h), in which: Sa1For active limiting displacement estimated value, Sa1=h1*0.2%, h1 are the height of the 1st layer of wall piece, and Δ h is The screw flight screw pitch of loading bolt;So that the 1st layer of wall piece is displaced outward not less than active limiting displacement estimated value Sa1, The side pressure force data of each miniature soil pressure sensor record, the soil pressure force value after as 1 layer of off-load;
(4) nut of the loading bolt corresponding to the 1st, 2 layer of wall piece is turned outward manually, number of rotation is not less than m= 360*(Sa2/ Δ h), in which: Sa2For active limiting displacement estimated value, Sa2=(h1+h2) * 0.2%, h1, h2 are respectively the 1st layer The height of wall piece, the 2nd layer of wall piece, Δ h are the screw flight screw pitch of loading bolt;So that the 1st, 2 layer of wall piece is displaced outward Not less than active limiting displacement estimated value Sa2, the side pressure force data of each miniature soil pressure sensor record, after as 2 layers of off-load Soil pressure force value;
……
(n+2) .n indicates the mobile wall piece number of the n-th+2 step, turns adding corresponding to the 1st, 2,3 ... n-layer wall pieces outward Bolt is carried, number of rotation is not less than m=360* (San/ Δ h), in which: San is active limiting displacement estimated value, San=(h1+ H2+ ...+hn) * 0.2%, h1, h2, h3 ... hn are respectively the height of the 1st, 2,3 ... n-layer wall pieces, and Δ h is the screw rod of loading bolt Thread pitch;So that the 1st, 2,3 ... n-layer wall pieces are displaced outward not less than active limiting displacement estimated value San, each miniature soil The side pressure force data of pressure sensor record, as the soil pressure force value after n-layer off-load;
Until n=N, N are wall piece number, all loading bolts are rotated, number of rotation is not less than m=360* (SaN/Δ H), in which: SaN is active limiting displacement estimated value, and SaN=(h1+h2+ ...+hN) * 0.2%, h1, h2, h3 ... hN are respectively the 1, the height of 2,3 ... N layers of wall piece, Δ h are the screw flight screw pitch of loading bolt;All wall pieces are whole to generate displacement not outward Less than active limiting displacement estimated value SaN, the side pressure force data of each miniature soil pressure sensor record, after as whole off-loads Soil pressure force value.
According to the third aspect of the invention we, a kind of non-homogeneous sidesway operating condition earth pressure test side using above-mentioned apparatus is provided Method, described method includes following steps:
(1) each wall piece for splicing barricade is pushed into same position by the nut for turning each loading bolt manually, and by rubber Glue film covers and is bonded in wall on piece;
(2) the sidesway value S at corresponding each wall blade unit height is determined according to preset non-homogeneous sidesway curvei(i= 1,2 ... N), wherein N is the number of wall piece;
(3) first using the nut for turning each loading bolt outward one by one manually, the degree of each loading bolt rotation is respectively m =360* (Si/ Δ h), in which: Si(i=1,2 ... N) are the sidesway value of each wall piece in step (2), and Δ h is the spiral shell of loading bolt The thread pitch of bar;Each wall piece lateral displacement is set to reach the sidesway value S of each wall piece in step (2)i(i=1,2 ... N), it is each micro- The side pressure force data of type soil pressure sensor record, as corresponds to preset non-homogeneous sidesway curve operating condition pair in step (2) The distribution lateral pressure answered;
When turning the nut difficulty of loading bolt manually, especially when in step (2) scheduled non-uniform displacement be quilt When dynamic displacement, load is turned using load, the connection end that load is turned is connect with the nut of each loading bolt one by one, turn adds The tri linear rod piece turned is carried, m=360* (S is rotatediAfter/Δ h) angle, the lateral pressure of each miniature soil pressure sensor record is recorded Data as correspond to the corresponding distribution lateral pressure of preset non-homogeneous sidesway curve operating condition in step (2).
Compared with prior art, the present invention have it is following the utility model has the advantages that
Each wall blade unit can wait high settings in apparatus of the present invention, can also according to the practical layer height high settings such as not, and Hierarchy number is limited less, hierarchy number can be more;
Counting principle is advanced, and precision is high, it is convenient to read, and the small horizontal addload of quantitative control will be difficult to by loading bolt Displacement is converted into the rotation angle indirectly controlled level displacement by controlling loading bolt;
Simulation foundation pit stage excavation operating condition that can be relatively good, moreover it is possible to simulate flexible retaining wall along depth non-uniform displacement work Condition, while meeting the practical application of base pit engineering and the scientific research needs of geotechnical engineering.
Detailed description of the invention
Upon reading the detailed description of non-limiting embodiments with reference to the following drawings, other feature of the invention, Objects and advantages will become more apparent upon:
Fig. 1 is the device tomograph of one embodiment of the invention;
Fig. 2 is the model casing three-dimensional figure of one embodiment of the invention;
Fig. 3 is the model cassette carrier and trivet three-dimensional figure of one embodiment of the invention;
Fig. 4 be one embodiment of the invention loading bolt, splicing barricade, miniature soil pressure sensor, rubber film it is quiet State positional relationship 3-D view;
Fig. 5 is a loading bolt of one embodiment of the invention and the three-dimensional figure that load is turned;
Fig. 6 is the splicing barricade simulation layering Unloading Condition three-dimensional figure of one embodiment of the invention;
Fig. 7 is that the splicing barricade of one embodiment of the invention simulates the 3-D view of active non-uniform displacement operating condition;
Fig. 8 is that the splicing barricade of one embodiment of the invention simulates the 3-D view of passive non-uniform displacement operating condition;
In figure: 1 --- splicing barricade, 2 --- loading bolt, 3 --- miniature soil pressure sensor, 4 --- rubber film, 5 --- ribbed stiffener, 6 --- trivet, 7 --- wall piece, 8 --- model casing, 9 --- load is turned, and 10 --- screw hole, 11 --- Model cassette carrier, 12 --- it loads and turns connection end, 13 --- loading bolt nut, 14 --- loading bolt screw rod, 15 --- Ring cowling, 16 --- loading bolt rotates end.
Specific embodiment
The present invention is described in detail combined with specific embodiments below.Following embodiment will be helpful to the technology of this field Personnel further understand the present invention, but the invention is not limited in any way.It should be pointed out that the ordinary skill of this field For personnel, without departing from the inventive concept of the premise, various modifications and improvements can be made.These belong to the present invention Protection scope.
As shown in Figs 1-4, a kind of foundation pit stage excavation and non-uniform displacement supporting lateral pressure test device, comprising: splicing Barricade 1, loading bolt 2, miniature soil pressure sensor 3, rubber film 4, model casing 8, trivet 6 and model cassette carrier 11.
The splicing barricade 1 and loading bolt 2 are all set at the one side wall of model casing 8, and the splicing barricade 1 is located at mould It is on the inside of the one side wall of molding box 8 and parallel with side wall, the side-wall outer side is provided with several ribbed stiffeners 5, the ribbed stiffener 5 includes vertical Ribbed stiffener and horizontal ribbed stiffener, indulge ribbed stiffener and horizontal ribbed stiffener constitutes cross shape;
The trivet 6 is arranged on the two sidewalls for being close to model casing 8, and if being equipped with bolt stem between 8 side wall of model casing Connection, the vertical bar of trivet 6 are arranged on the outside of the horizontal ribbed stiffener both ends of ribbed stiffener 5 and are bolted, the bottom welding of trivet 6 On two longitudinal frames of model cassette carrier 11;
The model cassette carrier 11 is formed by welding by rectangular shaped rim and several cross bars, and several cross bars are adopted with 8 bottom plate of model casing If being fixed with bolt stem or rivet.
The splicing barricade 1 is made of equal 7 splicing of high-walls piece of several total high equal parts, if dry wall piece 7 is along splicing barricade 1 High uniformity arrangement;
The miniature soil pressure sensor 3 has several and is separately positioned on each wall piece 7;
The rubber film 4 is covered and is bonded on wall piece 7;
One end of multiple loading bolts 2 passes through the side wall of model casing 8 outside model casing 8, and reaches splicing barricade 1 Each wall piece 7, the position of loading bolt 2 and each wall piece 7 corresponds, and loading bolt 2 can be turned.
In some embodiments, the overall height H of the splicing barricade 1 determined by actual size scale smaller or according to Experiment purpose determines, splices the 1/2~1/3 of the preferred height of width B of barricade 1.
In some embodiments, the wall piece 7, number N are 5~20, N preferably 10.
In some embodiments, the wall piece 7, height h are equal to H/N, and thickness T is according to the rigidity requirement of wall piece 7 It determines;Preferred: 7 thickness T value of wall piece is to splice the 1/6 of 1 width B of barricade, or add to splice the 1/10 of 1 width B of barricade The thickness of upper ribbed stiffener 5;And the 7 thickness T of wall piece is not less than passive extreme displacement estimated value Sp, in which: passive limit position Estimated value Sp is moved according to 5 times of active limiting displacement estimated value Sa estimations, active limiting displacement estimated value Sa according to splicing keep off The estimation of 1 overall height H of wall, preferably active limiting displacement estimated value Sa value are Sa=H*0.2%.
In some embodiments, the loading bolt 2 is made of loading bolt screw rod 14 and loading bolt nut 13, In: loading bolt screw rod 14 passes through the side wall of model casing 8 and passes through vertical ribbed stiffener;Loading bolt nut 13 is in the model casing 8 Side wall outside.
In some embodiments, the vertical middle line of side wall of the model casing 8 with equidistantly set respectively on the ribbed stiffener 5 It is equipped with bolt hole identical with 14 diameter of loading bolt screw rod, is passed through for loading bolt screw rod 14.
In some embodiments, the spiro rod length l adds 8 thickness t of model casing not less than h/N, and preferred length l is 2* h/N+t。
In some embodiments, height h of the head diameter less than wall piece 7, preferably h/2~2h/3, material are excellent It is selected as micro- plastics.
In some embodiments, 4 surface roughness of rubber film according to the practical barricade operating condition simulated or The selection of person's experiment purpose;4 film of rubber film has certain deformability.In other embodiments, the rubber film 4 can be with Using the elastic film of other changeabilities.
In some embodiments, the size of the miniature soil pressure sensor 3 is smaller, circular, and diameter 1cm~ 2cm, thickness 4mm~8mm.
In some embodiments, the model casing 8 is cuboid, and the clear span of model casing 8 is equal to the width of splicing barricade 1 The additional 1mm affluence size of B, the overall height H of the not small splicing barricade 1 of the height of model casing 8, length dimension are true according to experiment purpose It is fixed:
When testing the active earth pressure operating condition under excavation of foundation pit and non-uniform displacement, the length dimension L of model casing 8 is not less thanWherein: l is the spiro rod length of loading bolt 2, and H is the total height for splicing barricade 1, and T is wall piece 7 Thickness, π be pi,The internal friction angle of pourable medium;
When testing the passive earth pressure operating condition under non-uniform displacement, the length dimension L of model casing 8 is not less than
As shown in figure 5, the loading bolt is by loading bolt screw rod 14, loading bolt in the preferred embodiment of part Nut 13, loading bolt rotation end 16 and ring cowling 15 are constituted, in which:
Described 14 one end of loading bolt screw rod sequentially passes through longitudinal ribbed stiffener 5,8 side of model casing from the outside of model casing 8 Wall simultaneously reaches wall piece 7;The loading bolt nut 13 is located at the outside of 8 side wall of model casing;The center of the wall piece 7 is vertical The center of ribbed stiffener is provided with bolt hole identical with 14 diameter of loading bolt screw rod and is used for across loading bolt screw rod 14, The lateral surface of loading bolt nut 13 is equipped with concave inward structure;
Loading bolt rotation end 16 is made of thin cylinder egative film and cylinder, loading bolt screw rod 14 and loading bolt It is connected between nut 13, loading bolt screw rod 14 and the cylinder of loading bolt rotation end 16 using circle falcon and pin mode whole Body;
The center opening and opening diameter of the ring cowling 15 are greater than the column diameter of loading bolt rotation end 16, ring cowling 15 Periphery be provided with several bolts hole, the cylinder that loading bolt rotates end 16 passes through the centre bore of ring cowling 15, and passes through bolt Ring cowling 15 is fixed on wall piece 7 by the bolt hole on ring cowling 15.
Further, in the loading bolt 2:
The diameter d of the loading bolt screw rod 14 takes the 1/5~1/3 of 7 height h of wall piece, the screw thread of loading bolt screw rod 14 Segment length l is 5*Sp+t plus thickness t, the l value of model casing 8 not less than passive extreme displacement estimated value Sp;Loading bolt spiral shell The screw screw pitch Δ l of bar 14 is not more than the half of active limiting displacement estimated value Sa, Δ l value Sa/8~Sa/2;
The diameter D of the loading bolt nut 13 is not more than 7 height h of wall piece, and preferably D takes the 1/2~2/ of 7 height h of wall piece 3;
The cylindric pit of the indent of thin cylinder negative plate size and 7 back side of wall piece in loading bolt rotation end 16 Size is identical, and the column diameter that loading bolt rotates in end 16 is identical as loading bolt screw rod 14.
As shown in figure 5, the device further comprises that load turns 9, the 9 tri linear bar by being linked together is turned in the load Part and load turn connection end 12 composition, in which: load turn connection end 12 be equipped with in the lateral surface of loading bolt nut 13 The interior of the outer male structure of connection end 12 and 13 lateral surface of loading bolt nut is turned in the outer male structure of recessed structure exact matching, load When recessed structure is docked, load turns 9 and is connected as entirety with loading bolt 2, can by the tri linear rod piece that rotation load turns 9 Rotate loading bolt 2;
The tri linear rod piece refers to that right angle connects in the same plane by three sections of line bars, and junction is rigid connection.
Further, the load is turned in 9:
The turning of the tri linear rod piece is right angle, and segment length is greater than 14 diameter of loading bolt screw rod among it;
The diameter that connection end 12 is turned in the load is identical as the outer diameter of loading bolt nut 13.
The setting of above-mentioned apparatus structure and its parameter in order to better understand the present invention provides a specific example:
Overall height H=1.5m of the splicing barricade 1, splices the width B=50cm of barricade 1;The wall of composition splicing barricade 1 7 number N of piece takes N=10, and 10 equal high-walls pieces 7 are equal: long 50cm, high 15cm, thickness 8cm;The diameter of bolt hole 3cm at 7 center of wall piece, The wedge slope slot clear span 2cm of side, ratio of slope 1:10.
In the loading bolt 2: the length of loading bolt screw rod 14 is 15cm, diameter 3cm, loading bolt nut 13 Diameter 6cm, plastic material.
Three quartering points of each wall piece 7 are arranged in the miniature soil pressure sensor 3, diameter 1.2cm, thickness 5mm Place.
The rubber film 4, thick 1mm, surface are smooth.
The model casing 8 is cuboid, clear span 50.1cm, wall thickness 1.5cm, organic glass material, net long 110cm.
The side wall of the model casing 8 is equipped with loading bolt 2 and splicing barricade 1, and several in the setting of 8 side-wall outer side of model casing The ribbed stiffener 5 of vertical and horizontal, the ribbed stiffener 5 is using square-section light pipe and constitutes cross shape;Model casing 8 is put down The capable two sides setting Composite Triangular with loading direction supports 6.
Further, corresponding test method may be implemented according to above-mentioned apparatus, including layering Unloading Condition soil pressure is surveyed Method for testing, non-uniform displacement operating condition earth pressure test method.As shown in figs 6-8.
In one embodiment, it is layered Unloading Condition earth pressure test method, is included the following steps:
(1) each loading bolt is turned, each wall piece for splicing barricade is pushed into same position;
(2) rubber film is covered on wall on piece, and rubber film surrounding is bonded in wall on piece;
(3) nut of the loading bolt corresponding to the 1st layer of wall piece is turned outward manually, number of rotation is not less than m=360* (Sa1/ Δ h), in which: Sa1For active limiting displacement estimated value, Sa1=h1*0.2%, h1 are the height of the 1st layer of wall piece, and Δ h is The screw flight screw pitch of loading bolt;So that the 1st layer of wall piece is displaced outward not less than active limiting displacement estimated value Sa1, The side pressure force data of each miniature soil pressure sensor record, the soil pressure force value after as 1 layer of off-load;
(4) nut of the loading bolt corresponding to the 1st, 2 layer of wall piece is turned outward manually, number of rotation is not less than m= 360*(Sa2/ Δ h), in which: Sa2For active limiting displacement estimated value, Sa2=(h1+h2) * 0.2%, h1, h2 are respectively the 1st layer The height of wall piece, the 2nd layer of wall piece, Δ h are the screw flight screw pitch of loading bolt;So that the 1st, 2 layer of wall piece is displaced outward Not less than active limiting displacement estimated value Sa2, the side pressure force data of each miniature soil pressure sensor record, after as 2 layers of off-load Soil pressure force value;
……
(n+2) .n indicates the mobile wall piece number of the n-th+2 step, turns adding corresponding to the 1st, 2,3 ... n-layer wall pieces outward Bolt is carried, number of rotation is not less than m=360* (San/ Δ h), in which: San is active limiting displacement estimated value, San=(h1+h2 + ...+hn) * 0.2%, h1, h2, h3 ... hn are respectively the height of the 1st, 2,3 ... n-layer wall pieces, and Δ h is the screw rod of loading bolt Thread pitch;So that the 1st, 2,3 ... n-layer wall pieces are displaced outward not less than active limiting displacement estimated value San, each miniature soil pressure The side pressure force data of force snesor record, as the soil pressure force value after n-layer off-load;
Until n=N, N are wall piece number, all loading bolts are rotated, number of rotation is not less than m=360* (SaN/Δ H), in which: SaN is active limiting displacement estimated value, and SaN=(h1+h2+ ...+hN) * 0.2%, h1, h2, h3 ... hN are respectively the 1, the height of 2,3 ... N layers of wall piece, Δ h are the screw flight screw pitch of loading bolt;All wall pieces are whole to generate displacement not outward Less than active limiting displacement estimated value SaN, the side pressure force data of each miniature soil pressure sensor record, after as whole off-loads Soil pressure force value.
In one embodiment, non-homogeneous sidesway operating condition (includes: active non-uniform displacement operating condition and such as Fig. 8 as shown in Figure 7 Shown in passive non-uniform displacement operating condition) earth pressure test method, include the following steps:
(1) each wall piece for splicing barricade is pushed into same position by the nut for turning each loading bolt manually, and by rubber Glue film covers and is bonded in wall on piece;
(2) the sidesway value S at corresponding each wall piece height is determined according to preset non-homogeneous sidesway curvei(i=1, 2 ... N), wherein N is the number of wall piece;
(3) first using the nut for turning each loading bolt outward one by one manually, the degree of each loading bolt rotation is respectively m =360* (Si/ Δ h), in which: Si(i=1,2 ... N) are the sidesway value of each wall piece in step (2), and Δ h is the spiral shell of loading bolt The thread pitch of bar;Each wall piece lateral displacement is set to reach the sidesway value S of each wall piece in step (2)i(i=1,2 ... N), it is each micro- The side pressure force data of type soil pressure sensor record, as corresponds to preset non-homogeneous sidesway curve operating condition pair in step (2) The distribution lateral pressure answered;
When turning the nut difficulty of loading bolt manually, especially when in step (2) scheduled non-uniform displacement be quilt When dynamic displacement, load is turned using load, the connection end that load is turned is connect with the nut of each loading bolt one by one, turn adds The tri linear rod piece turned is carried, m=360* (S is rotatediAfter/Δ h) angle, the lateral pressure of each miniature soil pressure sensor record is recorded Data as correspond to the corresponding distribution lateral pressure of preset non-homogeneous sidesway curve operating condition in step (2).
The present invention can simulate the lateral pressure of foundation pit stage excavation process supporting construction, for engineering design and supporting provide according to According to;The regularity of distribution of supporting construction lateral pressure and its changing rule with displacement when can study non-uniform displacement.
Specific embodiments of the present invention are described above.It is to be appreciated that the invention is not limited to above-mentioned Particular implementation, those skilled in the art can make various deformations or amendments within the scope of the claims, this not shadow Ring substantive content of the invention.

Claims (10)

1. a kind of foundation pit stage excavation and non-uniform displacement supporting lateral pressure test device characterized by comprising splicing gear Wall, loading bolt, load turn, miniature soil pressure sensor, rubber film, model casing and rigidity reinforcer;Wherein:
The model casing is fixed on the inside of the rigidity reinforcer;
The splicing barricade, the loading bolt are all set at the one side wall of the model casing, and the splicing barricade is by several Contour wall piece vertically splices composition, and is set to the inside sidewalls of described model casing one end and parallel with the side wall;
The miniature soil pressure sensor is laid on the face that each wall piece column face in the model casing in a manner of shrinkage pool;
The rubber film is covered and is pasted on the splicing barricade face for having laid miniature soil pressure sensor;
Several loading bolts run through the side wall of the model casing and each wall piece with the splicing barricade is correspondingly connected with respectively; The end side-wall outer side of the model casing is provided with several vertical ribbed stiffeners and horizontal ribbed stiffener, vertical positioned at side wall midline position adds Strength rib is provided with a column screw hole, for cooperating with the loading bolt;
The load is turned to be connect with end on the outside of the loading bolt, and the rotation load, which is turned, drives the loading bolt to turn It is dynamic, so that the loading bolt be assisted to realize horizontal addload.
2. foundation pit stage excavation according to claim 1 and non-uniform displacement supporting lateral pressure test device, feature exist In described device further comprises following one or more of features:
--- the overall height H of the splicing barricade is set according to requirement of experiment, and the width B for splicing barricade takes the 1/2 of overall height H ~1/3;
--- wall piece number N takes 5~20, and N need to be according to the comprehensive determination of fussy degree of experiment purpose and production operation: simulation base 5~10 are got the small value when cheating stage excavation;It takes large values when simulating the active and passive soil pressure under flexible retaining wall non-uniform displacement operating condition 10~20;
--- wall piece height h is equal to splicing barricade overall height H/wall piece number N, and the value of wall piece thickness T is the width for splicing barricade Degree B 1/6 or put more energy into rib thickness to splice the 1/10 of the width B of barricade, and not less than passive extreme displacement estimated value Sp, in which: passive extreme displacement estimated value Sp estimates that active limiting displacement is estimated according to 5 times of active limiting displacement estimated value Sa Overall height H estimation of the calculation value Sa according to splicing barricade, Sa=H*0.2%.
3. foundation pit stage excavation according to claim 2 and non-uniform displacement supporting lateral pressure test device, feature exist , the back center position of the wall piece is provided with circular pit, the depth of circular pit no more than wall piece thickness T 1/3, no Less than 2cm, the diameter of circular pit is not less than the 1/2 of wall piece height h;
The center of the wall piece is provided with bolt hole.
4. foundation pit stage excavation according to claim 3 and non-uniform displacement supporting lateral pressure test device, feature exist In the loading bolt is made of screw rod, nut, rotation end and ring cowling, in which:
Described screw rod one end sequentially passes through ribbed stiffener, model casing side wall from the outside of model casing and reaches wall piece, the bolt hole Diameter it is identical as screw diameter;
The nut is located at the outside of model casing side wall, and the lateral surface of nut is equipped with concave inward structure;
The rotation end is made of thin cylinder egative film and cylinder, is adopted between screw rod and nut, screw rod and the cylinder for rotating end It is connect with circle falcon with pin mode integral;
The center opening and bore dia of the ring cowling are greater than column diameter, and the periphery of ring cowling is provided with several bolts hole, Bao Yuanzhu Egative film is placed on the circular pit of wall piece back center, cylinder passes through the centre bore of ring cowling, and is passed through on ring cowling by bolt Ring cowling is fixed on wall on piece by bolt hole.
5. foundation pit stage excavation according to claim 4 and non-uniform displacement supporting lateral pressure test device, feature exist In the diameter d of the screw rod takes the 1/5~1/3 of wall piece height h, and the screw flight segment length l is not less than passive limit position It is 5*Sp+t that estimated value Sp, which is moved, plus thickness t, the l value of model casing;The screw screw pitch Δ l of the screw rod is not more than the active limit The half of offset estimation value Sa, Δ l value Sa/8~Sa/2;
The diameter D of the nut is not more than wall piece height h, and it is 1/2~2/3 that D, which takes wall piece height h,;
Thin cylinder negative plate size in the rotation end is identical as the circular pit size of wall piece back center position, cylinder Diameter is identical as screw rod.
6. foundation pit stage excavation according to claim 4 and non-uniform displacement supporting lateral pressure test device, feature exist In the load is turned to be made of the tri linear rod piece and connection end being linked together, in which:
By three sections of line bars, right angle connects the tri linear rod piece in the same plane, and junction is rigid connection;
The connection end is equipped with outer male structure, and the nut side face of the loading bolt is equipped with concave inward structure, and outer male structure It is matched with concave inward structure, the outer male structure of connection end is docked with the concave inward structure of nut, i.e., turns load and connect with loading bolt It is connected in entirety, and loading bolt is rotated by rotation tri linear rod piece;
The turning of the tri linear rod piece is right angle, and segment length is greater than the screw diameter of loading bolt among it;The connection The diameter of end is identical as the nut outer diameter of loading bolt.
7. foundation pit stage excavation according to claim 4 and non-uniform displacement supporting lateral pressure test device, feature exist In the model casing is cuboid, and the clear span of model casing is greater than the width B of splicing barricade, and the height of model casing is not less than spelling Connect the overall height H of barricade;
In the active earth pressure operating condition tested under excavation of foundation pit and non-uniform displacement, the length dimension L of the model casing is not small InWherein: l is the spiro rod length of loading bolt, and H is the total height for splicing barricade, and T is that wall piece is thick Degree, π be pi,The internal friction angle of pourable medium;
In the passive earth pressure operating condition tested under non-uniform displacement, the length dimension L of the model casing is not less than
8. foundation pit stage excavation according to claim 1 and non-uniform displacement supporting lateral pressure test device, feature exist In described device further comprises following one or more of features:
--- the vertical ribbed stiffener and horizontal ribbed stiffener constitute cross shape;
--- the rigidity reinforcer includes two panels trivet and rigid carriers, in which:
The rigid carriers setting is connected and fixed in model casing bottom, and with the bottom of model casing;Rigid carriers are by rectangular shaped rim It is securely connected and composed with several cross bars;
The two panels trivet is separately positioned on the two sides of model casing, and is connected and fixed with model casing side wall;The bottom of trivet Portion is fixed in the rectangular shaped rim of rigid carriers, and the outside of horizontal ribbed stiffener and secured with horizontal ribbed stiffener is arranged in the vertical bar of trivet Connection.
9. a kind of layering Unloading Condition earth pressure test method using any one of claim 1-8 described device, feature exist In described method includes following steps:
(1) each loading bolt is turned, each wall piece for splicing barricade is pushed into same position;
(2) rubber film is covered on wall on piece, and rubber film surrounding is bonded in wall on piece;
(3) nut of the loading bolt corresponding to the 1st layer of wall piece is turned outward manually, number of rotation is not less than m=360* (Sa1/ Δ h), in which: Sa1For active limiting displacement estimated value, Sa1=h1*0.2%, h1 are the height of the 1st layer of wall piece, and Δ h is load The screw flight screw pitch of bolt;So that the 1st layer of wall piece is displaced outward not less than active limiting displacement estimated value Sa1, each micro- The side pressure force data of type soil pressure sensor record, the soil pressure force value after as 1 layer of off-load;
(4) nut of the loading bolt corresponding to the 1st, 2 layer of wall piece is turned outward manually, number of rotation is not less than m=360* (Sa2/ Δ h), in which: Sa2For active limiting displacement estimated value, Sa2=(h1+h2) * 0.2%, h1, h2 are respectively the 1st layer of wall The height of piece, the 2nd layer of wall piece, Δ h are the screw flight screw pitch of loading bolt;So that the 1st, 2 layer of wall piece is displaced not outward Less than active limiting displacement estimated value Sa2, the side pressure force data of each miniature soil pressure sensor record, after as 2 layers of off-load Soil pressure force value;
……
(n+2) .n indicates the mobile wall piece number of the n-th+2 step, turns the load spiral shell corresponding to the 1st, 2,3 ... n-layer wall pieces outward Bolt, number of rotation are not less than m=360* (San/ Δ h), in which: San be active limiting displacement estimated value, San=(h1+h2+ ...+ Hn) * 0.2%, h1, h2, h3 ... hn are respectively the height of the 1st, 2,3 ... n-layer wall pieces, and Δ h is the screw flight of loading bolt Screw pitch;So that the 1st, 2,3 ... n-layer wall pieces are displaced outward not less than active limiting displacement estimated value San, each miniature soil pressure is passed The side pressure force data of sensor record, as the soil pressure force value after n-layer off-load;
Until n=N, N are wall piece number, all loading bolts are rotated, number of rotation is not less than m=360* (SaN/ Δ h), In: SaN is active limiting displacement estimated value, SaN=(h1+h2+ ...+hN) * 0.2%, h1, h2, h3 ... hN be respectively the 1st, 2, The height of 3 ... N layers of wall piece, Δ h are the screw flight screw pitch of loading bolt;The whole displacement of generation outward of all wall pieces is not less than Active limiting displacement estimated value SaN, the side pressure force data of each miniature soil pressure sensor record, the soil pressure after as whole off-loads Force value.
10. a kind of non-homogeneous sidesway operating condition earth pressure test method using any one of claim 1-8 described device, feature It is, described method includes following steps:
(1) each wall piece for splicing barricade is pushed into same position by the nut for turning each loading bolt manually, and rubber is thin Film covers and is bonded in wall on piece;
(2) the sidesway value S at corresponding each wall piece height is determined according to preset non-homogeneous sidesway curvei, i=1,2 ... N, Middle N is the number of wall piece;
(3) first using the nut for turning each loading bolt outward one by one manually, the degree of each loading bolt rotation is respectively m= 360*(Si/ Δ h), in which: SiFor the sidesway value of each wall piece in step (2), Δ h is the screw flight screw pitch of loading bolt; Each wall piece lateral displacement is set to reach the sidesway value S of each wall piece in step (2)i, the side pressure of each miniature soil pressure sensor record Force data as corresponds to the corresponding distribution lateral pressure of preset non-homogeneous sidesway curve operating condition in step (2);
When turning the nut difficulty of loading bolt manually, load is turned using load, one by one and respectively by the connection end that turns of load The nut of a loading bolt connects, and turn loads the tri linear rod piece turned, rotates m=360* (SiAfter/Δ h) angle, record is each The side pressure force data of miniature soil pressure sensor record, as corresponds to preset non-homogeneous sidesway curve operating condition in step (2) Corresponding distribution lateral pressure.
CN201710445063.1A 2017-06-13 2017-06-13 Foundation pit stage excavation and non-uniform displacement supporting lateral pressure test device and method Expired - Fee Related CN107389897B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710445063.1A CN107389897B (en) 2017-06-13 2017-06-13 Foundation pit stage excavation and non-uniform displacement supporting lateral pressure test device and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710445063.1A CN107389897B (en) 2017-06-13 2017-06-13 Foundation pit stage excavation and non-uniform displacement supporting lateral pressure test device and method

Publications (2)

Publication Number Publication Date
CN107389897A CN107389897A (en) 2017-11-24
CN107389897B true CN107389897B (en) 2019-06-28

Family

ID=60331825

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710445063.1A Expired - Fee Related CN107389897B (en) 2017-06-13 2017-06-13 Foundation pit stage excavation and non-uniform displacement supporting lateral pressure test device and method

Country Status (1)

Country Link
CN (1) CN107389897B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110439041A (en) * 2019-07-12 2019-11-12 同济大学 A kind of simulator of excavation of foundation pit
CN110501233B (en) * 2019-07-12 2021-03-26 同济大学 Test device for simulating wall deflection to induce wall rear soil deformation through water pressure drive
CN112014226B (en) * 2020-08-17 2021-07-30 东北大学 Rock multi-unit non-uniform uniaxial loading creep experiment device and working method
CN113293808A (en) * 2021-05-24 2021-08-24 中国电建市政建设集团有限公司 Test device and method capable of simulating foundation pit retaining wall displacement to induce wall rear soil body deformation
CN116084473A (en) * 2023-03-02 2023-05-09 叙镇铁路有限责任公司 Deep foundation pit excavation side soil pressure coefficient measuring device and using method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1081537A1 (en) * 1983-01-17 1984-03-23 Научно-Исследовательский Сектор Всесоюзного Ордена Ленина Проектно-Изыскательского И Научно-Исследовательского Института "Гидропроект" Им.С.Я.Жука Device for investigating pressure of ground on buttress wall
JP4038938B2 (en) * 1999-07-12 2008-01-30 株式会社大林組 Underground wall water flow device
CN101127169A (en) * 2007-09-24 2008-02-20 浙江大学 Soil mass positive and passive destruction demonstrator
CN102928296A (en) * 2012-11-23 2013-02-13 河海大学 Active and passive soil pressure damage simulation analyzer for soil body behind retaining structure
CN106370452A (en) * 2016-11-21 2017-02-01 郑州大学 Multifunctional movable retaining wall test device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1081537A1 (en) * 1983-01-17 1984-03-23 Научно-Исследовательский Сектор Всесоюзного Ордена Ленина Проектно-Изыскательского И Научно-Исследовательского Института "Гидропроект" Им.С.Я.Жука Device for investigating pressure of ground on buttress wall
JP4038938B2 (en) * 1999-07-12 2008-01-30 株式会社大林組 Underground wall water flow device
CN101127169A (en) * 2007-09-24 2008-02-20 浙江大学 Soil mass positive and passive destruction demonstrator
CN102928296A (en) * 2012-11-23 2013-02-13 河海大学 Active and passive soil pressure damage simulation analyzer for soil body behind retaining structure
CN106370452A (en) * 2016-11-21 2017-02-01 郑州大学 Multifunctional movable retaining wall test device

Also Published As

Publication number Publication date
CN107389897A (en) 2017-11-24

Similar Documents

Publication Publication Date Title
CN107389897B (en) Foundation pit stage excavation and non-uniform displacement supporting lateral pressure test device and method
CN107389446B (en) It is layered off-load and non-homogeneous sidesway supporting lateral pressure test model apparatus and method
CN108362864B (en) Multifunctional combined tunnel excavation similar model test device
CN108872530B (en) Large-scale model test device for simulating asymmetric small-clear-distance tunnel excavation process
CN102175533B (en) Ultra-large type geotechnical engineering three-dimensional model test system
CN104515734B (en) Visualization simulator and simulation method for tubular pile vertical static test
CN107179396A (en) Multifunctional built-up formula Geotechnical Engineering physics similar test system
CN201843152U (en) Simulation tester for construction and monitoring of deep foundation pit engineering
CN110288881B (en) Modular structure mechanics experiment platform system
US11193865B1 (en) P-y curve-based element test device and test method
CN102645310A (en) Complete set of test method of soft soil iron structure vibration table
WO2021184608A1 (en) Platform for simulating dangerous rock collapse of surrounding rock in underground engineering, and simulation system and method
CN106596268A (en) Multi-soaking condition simulation test model box and test method thereof
Li et al. Application of numerical analysis principles and key technology for high fidelity simulation to 3-D physical model tests for underground caverns
CN109709307B (en) Simulation test device and method for similar materials under irregular boundary conditions
CN107036909A (en) A kind of ring shear test instrument suitable for vertical shearing face
CN206205011U (en) A kind of calcareous sand sound load Multifunctional pile base model test apparatus
CN109537644A (en) A kind of karst Anti-seismic Pile Foundation test and experiment device based on small vibrating platform model
CN208685680U (en) A kind of geosynthetic reinforced pile supported embankments on soft soil model test apparatus
CN206420870U (en) A kind of Geotechnical Engineering multifunction test slot device
CN107614814B (en) Assemble block
CN112681403B (en) Model test device and test method capable of changing angle of anchor rod
CN109520810A (en) It is a kind of to be produced once the production method of the sliceable identical rock structural face mold of multiple groups based on 3D printing
CN115902151B (en) Test device and method for simulating shield stratum loss and monitoring soil body displacement
CN110296881B (en) Soil body model test system and method suitable for rock-soil side slope and roadbed embankment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190628

CF01 Termination of patent right due to non-payment of annual fee