CN107387164A CN201710763518.4A CN201710763518A CN107387164A CN 107387164 A CN107387164 A CN 107387164A CN 201710763518 A CN201710763518 A CN 201710763518A CN 107387164 A CN107387164 A CN 107387164A
Authority
CN
China
Prior art keywords
cash
flexible cloth
post
gear cash
coal pillar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710763518.4A
Other languages
Chinese (zh)
Inventor
郭峰
黄克军
陈通
曹新奇
李亮
赵奕博
金声尧
梁少剑
黄欣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Coal and Chemical Technology Institute Co Ltd
Original Assignee
Shaanxi Coal and Chemical Technology Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaanxi Coal and Chemical Technology Institute Co Ltd filed Critical Shaanxi Coal and Chemical Technology Institute Co Ltd
Priority to CN201710763518.4A priority Critical patent/CN107387164A/en
Publication of CN107387164A publication Critical patent/CN107387164A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F17/00Methods or devices for use in mines or tunnels, not covered elsewhere
    • E21F17/103Dams, e.g. for ventilation
    • E21F17/12Dam doors

Abstract

The invention discloses one kind without coal pillar mining lane side obturator and its construction method, including spaced some gear cash posts, the upper and lower ends of the gear cash post are respectively arranged with top girder steel and lower steel belt, the side in goaf is provided with gear cash net in the gear cash post, the gear cash is provided with flexible cloth on the net, the flexible cloth upper end is fixed by keeping off cash post and top girder steel with crossheading top plate, and the bottom of the flexible cloth is fixed by keeping off cash post and lower steel belt with crossheading bottom plate.Structure entirety plasticity of the present invention is stronger, meets roof deformation requirement, directly using existing gear cash net, and keeps off cash post reusing, greatly reduces cost.

Description

One kind is without coal pillar mining lane side obturator and its construction method
Technical field
The invention belongs to mineral engineering field, and in particular to one kind is without coal pillar mining lane side obturator and its construction Method.
Background technology
, it is necessary to tunnel at least two tunnels, form pressure on the rib of both sides after exploitation increases the traditional arrangement of working face High region, easily trigger the dynamic disasters such as bump, coal and gas prominent, therefore set enough between traditional working face with staying Protection coal pillar solve problems.Without coal pillar mining technology, no coal pillar mining is not only realized, it is also pre- using advanced explosion The technology directly pushed up is split, improves the stress distribution around stope.This method is to be caving self-contained lane side using what is directly pushed up, because Pernicious gas passage between this isolation goaf and tunnel is the key for solving safety in production.Traditional slip casting wastes largely Goods and materials, and can not meet the plasticity requirements to crush, existing flexible encapsulated, flexible material is in the complicated operation ring in underground Phenomena such as easily being scratched in border, the joining place between material can not ensure absolutely not to leak out, and can not meet fluctuations compared with Big top plate.
The content of the invention
Opened in view of the above-mentioned deficiencies in the prior art, the technical problem to be solved by the present invention is that providing one kind without coal column Lane side obturator and its construction method are adopted, solves to waste time and energy in prior art construction, sealing effectiveness is poor, material property difference Defect.
The present invention uses following technical scheme:
One kind is described to keep off the upper and lower of cash post without coal pillar mining lane side obturator, including spaced some gear cash posts Both ends are respectively arranged with top girder steel and lower steel belt, and the side in goaf is provided with gear cash net, institute in the gear cash post State gear cash and be provided with flexible cloth on the net, the flexible cloth upper end is fixed by keeping off cash post and top girder steel with crossheading top plate, institute The bottom for stating flexible cloth is fixed by keeping off cash post and lower steel belt with crossheading bottom plate.
Further, gear cash net side surface spraying has hermetic flexible material.
Further, the hermetic flexible material is the inorganic material being made up of base-material addition fire retardant.
Further, it is bonded and is fixed by band between the gear cash net and flexible cloth.
Further, the flexible cloth is to be combined by macromolecule waterproof ventilative material plus cloth.
A kind of construction method of no coal pillar mining lane side obturator, comprises the following steps:
S1, flexible cloth and gear cash net fitting fixed;
S2, by flexible cloth side towards goaf, flexible cloth upper end is fixed on crossheading by keeping off cash post and top girder steel Top plate;Flexible cloth bottom is fixed on crossheading bottom plate by keeping off cash post and lower steel belt;
S3, hermetic flexible material is injected in the side surface of gear cash net one, completes construction.
Further, after the completion of step S3, treat that goaf spoil is stable, after deformation of crushing, to step S3 surface Carry out the second gunite.
Compared with prior art, the present invention at least has the advantages that:
The present invention is without coal pillar mining lane side obturator, including spaced some gear cash posts, and is arranged on gear cash The top girder steel and lower steel belt of post upper and lower ends, the side in goaf is provided with gear cash net in gear cash post, gear cash is online It is provided with flexible cloth and is used for closed, is aided with gear cash net support, the air channel completely cut off between goaf and tunnel, securely and reliably, work Skill is simple, and mechanized construction substantially increases efficiency.
Further, keeping off cash net side surface spraying has hermetic flexible material, closed using two layers of flexible cloth and whitewashing body, Closed intensity is improved, extends service life.
The invention also discloses a kind of construction method of no coal pillar mining lane side obturator, by flexible cloth and gear cash net patch Close and fix, by flexible cloth side towards goaf, flexible cloth upper end is fixed on crossheading top plate by keeping off cash post and top girder steel; Flexible cloth bottom is fixed on crossheading bottom plate by keeping off cash post and lower steel belt, hermetic flexible material is finally injected in gear cash The side surface of net one, completes construction, and pulp shooting machine is adopted hermetic flexible material spraying in gear cash net, whole construction by slurry pipeline steel pipe With mechanized operation, speed of application is fast, low cost, hermetic flexible material adsorptivity are strong, and flex capability is good, meets mine safety height Imitate the demand of production.
In summary, structure entirety plasticity of the present invention is stronger, meets roof deformation requirement, directly keeps off cash net using existing, And gear cash post reusing, greatly reduce cost.
Below by drawings and examples, technical scheme is described in further detail.
Brief description of the drawings
Fig. 1 is construction effect sectional view of the present invention;
Fig. 2 is I-I visual angles schematic diagram in Fig. 1.
Wherein:1. keep off cash net;2. flexible cloth;3. keep off cash post;4. top girder steel;5. band;6. pulp shooting machine;7. slurry pipeline steel Pipe;8. hermetic flexible material;9. lower steel belt;10. goaf.
Embodiment
Fig. 1 and Fig. 2 are referred to, the invention discloses one kind without coal pillar mining lane side obturator, including spaced Some gear cash posts 3, the upper and lower ends of the gear cash post 3 are respectively arranged with top girder steel 4 and lower steel belt 9, in the gear cash post 3 The side in goaf 10 is provided with gear cash net 1, is bonded on the gear cash net 1 by band 5 and is fixed with flexible cloth 2, it is described The upper end of flexible cloth 2 is fixed by keeping off cash post 3 and top girder steel 4 with crossheading top plate, and the bottom of the flexible cloth 2 is by keeping off cash Post 3 and lower steel belt 9 are fixed with crossheading bottom plate.
Sprayed towards goaf 10, the side surface of gear cash net 1 one by pulp shooting machine 6 and slurry pipeline steel pipe 7 side of flexible cloth 2 Scribble hermetic flexible material 8.
Hermetic flexible material 8 is the inorganic material being made up of base-material addition fire retardant.
Flexible cloth 2 is to be combined by macromolecule waterproof ventilative material (PTFE film) plus cloth.
A kind of construction method for the lane side obturator for cutting top release gob side entry retaining, comprises the following steps:
S1, flexible cloth and gear cash net fitting fixed;
S2, by flexible cloth side towards goaf, flexible cloth upper end is fixed on crossheading by keeping off cash post and top girder steel Top plate;Flexible cloth bottom is fixed on crossheading bottom plate by keeping off cash post and lower steel belt;
S3, hermetic flexible material is injected in the side surface of gear cash net one;
S4, treat that goaf spoil is stable, after deformation of crushing, the second gunite is carried out to step S3 surface.
The inventive method uses the second gunite technology, in goaf stabilization process, along with crushing, meeting of crushing Certain destruction is caused to original whitewashing, preferably ensure that the sealing function of this device.
The technological thought of above content only to illustrate the invention, it is impossible to protection scope of the present invention is limited with this, it is every to press According to technological thought proposed by the present invention, any change done on the basis of technical scheme, claims of the present invention is each fallen within Protection domain within.

Claims (7)

1. one kind is without coal pillar mining lane side obturator, it is characterised in that described including spaced some gear cash posts (3) The upper and lower ends of gear cash post (3) are respectively arranged with top girder steel (4) and lower steel belt (9), in the gear cash post (3) close to mined out The side in area (10) is provided with gear cash net (1), and flexible cloth (2), flexible cloth (2) upper end are provided with the gear cash net (1) Portion is fixed by keeping off cash post (3) and top girder steel (4) with crossheading top plate, and the bottom of the flexible cloth (2) is by keeping off cash post (3) Fixed with lower steel belt (9) with crossheading bottom plate.
2. one kind according to claim 1 is without coal pillar mining lane side obturator, it is characterised in that the gear cash net (1) Side surface spraying has hermetic flexible material (8).
3. one kind according to claim 2 is without coal pillar mining lane side obturator, it is characterised in that the hermetic flexible material Material (8) is the inorganic material being made up of base-material addition fire retardant.
4. one kind according to claim 1 is without coal pillar mining lane side obturator, it is characterised in that the gear cash net (1) It is bonded and is fixed by band (5) between flexible cloth (2).
5. one kind according to claim 1 or 4 is without coal pillar mining lane side obturator, it is characterised in that the flexible cloth (2) it is to be combined by macromolecule waterproof ventilative material plus cloth.
6. a kind of construction method as claimed in claim 1 without coal pillar mining lane side obturator, it is characterised in that including following Step:
S1, flexible cloth and gear cash net fitting fixed;
S2, by flexible cloth side towards goaf, flexible cloth upper end is fixed on crossheading top plate by keeping off cash post and top girder steel; Flexible cloth bottom is fixed on crossheading bottom plate by keeping off cash post and lower steel belt;
S3, hermetic flexible material is injected in the side surface of gear cash net one, completes construction.
A kind of 7. construction method of no coal pillar mining lane side obturator according to claim 1, it is characterised in that step After the completion of S3, treat that goaf spoil is stable, after deformation of crushing, the second gunite is carried out to step S3 surface.
CN201710763518.4A 2017-08-30 2017-08-30 One kind is without coal pillar mining lane side obturator and its construction method Pending CN107387164A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710763518.4A CN107387164A (en) 2017-08-30 2017-08-30 One kind is without coal pillar mining lane side obturator and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710763518.4A CN107387164A (en) 2017-08-30 2017-08-30 One kind is without coal pillar mining lane side obturator and its construction method

Publications (1)

Publication Number Publication Date
CN107387164A true CN107387164A (en) 2017-11-24

Family

ID=60348674

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710763518.4A Pending CN107387164A (en) 2017-08-30 2017-08-30 One kind is without coal pillar mining lane side obturator and its construction method

Country Status (1)

Country Link
CN (1) CN107387164A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109162759A (en) * 2018-11-02 2019-01-08 榆林学院 One kind being suitable for quick closing device and method by gob side entry retaining lane
CN109915138A (en) * 2019-03-26 2019-06-21 中国矿业大学(北京) Spontaneous fire seam cuts top self-contained lane without pillar mining method
CN112112668A (en) * 2020-09-25 2020-12-22 陕西煤业化工技术研究院有限责任公司 Gob-side entry retaining gob gangue blocking closed structure and manufacturing method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BE877665A (en) * 1979-07-12 1979-11-05 Drahtwerke Rosler Soest G M B WIRE MESH LINING FOR SUPPORT OF GALLERIES IN THE CONSTRUCTION OF TUNNELS AND IN MINING EXPLOITATION
CN101864987A (en) * 2010-06-13 2010-10-20 中国矿业大学 Building method of filled wall body for gob-side entry retaining of large-inclination coal seam
CN101881180A (en) * 2010-06-04 2010-11-10 新汶矿业集团有限责任公司孙村煤矿 Coal face paste-like filling method and slurry-baffling device
CN202431302U (en) * 2011-12-22 2012-09-12 铜陵有色金属集团控股有限公司 Filling retaining wall device for high large-scale mining stope in roadway
CN205349416U (en) * 2016-02-03 2016-06-29 山西古县老母坡煤业有限公司 Simple and easy gob entry device of no wall body
CN205422813U (en) * 2016-03-07 2016-08-03 马钢(集团)控股有限公司 Detachable filling and retaining wall

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BE877665A (en) * 1979-07-12 1979-11-05 Drahtwerke Rosler Soest G M B WIRE MESH LINING FOR SUPPORT OF GALLERIES IN THE CONSTRUCTION OF TUNNELS AND IN MINING EXPLOITATION
CN101881180A (en) * 2010-06-04 2010-11-10 新汶矿业集团有限责任公司孙村煤矿 Coal face paste-like filling method and slurry-baffling device
CN101864987A (en) * 2010-06-13 2010-10-20 中国矿业大学 Building method of filled wall body for gob-side entry retaining of large-inclination coal seam
CN202431302U (en) * 2011-12-22 2012-09-12 铜陵有色金属集团控股有限公司 Filling retaining wall device for high large-scale mining stope in roadway
CN205349416U (en) * 2016-02-03 2016-06-29 山西古县老母坡煤业有限公司 Simple and easy gob entry device of no wall body
CN205422813U (en) * 2016-03-07 2016-08-03 马钢(集团)控股有限公司 Detachable filling and retaining wall

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109162759A (en) * 2018-11-02 2019-01-08 榆林学院 One kind being suitable for quick closing device and method by gob side entry retaining lane
CN109915138A (en) * 2019-03-26 2019-06-21 中国矿业大学(北京) Spontaneous fire seam cuts top self-contained lane without pillar mining method
CN112112668A (en) * 2020-09-25 2020-12-22 陕西煤业化工技术研究院有限责任公司 Gob-side entry retaining gob gangue blocking closed structure and manufacturing method thereof

Similar Documents

Publication Publication Date Title
US20210348471A1 (en) Fracturing relief method for stress concentration of remaining ore pillars in overlying goaf
AU2015377024B2 (en) Complete non-coal-pillar continuous depressurized mining method for short-distance coal seam group
CN110424966B (en) Ultrahigh water material filling working face gangue pumping entry retaining non-coal pillar mining method
CN103742148B (en) The soft coal-mining method covering the descending waste filling of supporting of a kind of half-edge coal seam
CN104533452B (en) A kind of underground coal mine crushes coal body stagewise grouting strengthening method
CN109339786A (en) A kind of prefabricated Fracture orientation hydraulic fracturing cracking method
CN109209472A (en) The coal seam pressure relief anti-burst method that a kind of punching, explosion, water filling intercouple
CN107387164A (en) One kind is without coal pillar mining lane side obturator and its construction method
CN103899350B (en) Fully mechanized coal face frame carries top coal gas drainage system
CN105735995A (en) Gob-side roadway retaining method based on roof cutting of soft roof plate
CN103821558A (en) Coal mine gob filling mining system and gob-side entry retaining filling process
CN103953345B (en) A kind of small section entry retaining along gob side exploitation method
CN109763821B (en) Dynamic pressure mining area large roadway composite roadway protection method
CN101749020A (en) Forward coal mining by filling method
CN110410076A (en) A kind of filling mining method for leaving Pillar Recovery for old pillars of a house goaf
CN104453994A (en) Gob-side entry retaining method for putting top waste rock down to achieve roadway side packing
CN105804750A (en) Prevention method for pressure bump of approximately-vertical super-thick coal seams
CN106285770B (en) A kind of method that working seam bottom plate mud stone increases closely projecting coal bed group's gas permeability as protective layer
CN105756702A (en) Roadway-side mesh cage filling supporting gob-side entry retaining method
CN104763427A (en) Method for precracking of thick hard difficult-to-break coal mine top board by supercritical CO2
CN110173295B (en) Method for extracting gas and preventing and extinguishing fire by using bedding directional drilling
CN106285692B (en) A kind of construction method of gob side entry retaining
CN102425431B (en) Ultra-close coal layer mining roadway distributing method
CN105971607A (en) Method for gob-side entry retaining of medium-thickness coal seam
CN117108283A (en) Fluidized coal mining method utilizing self energy storage of coal seam

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20171124